SlideShare a Scribd company logo
1 of 53
Download to read offline
S P O R T S + R E C P R A C T I C E
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
P
a
g
e
3
Introduction - who we are
We are value creators, plain and simple.
Our clients rely on us to properly plan and
thoughtfully design each project to achieve their
goals, maximize their investment, and create
spaces for their end-users that will be enjoyed for
many years.
In a nutshell. Studio Architects is a full-
service architecture firm with offices in Atlanta,
Georgia and Charleston, South Carolina.
Our expertise includes eSports, education,
housing, mixed-use, religious, senior living, and
sports+rec. We believe that listening to our
clients and exceeding their expectations daily is
our number one priority. Whether it’s through
our team’s hands on approach, attention to
detail, or leaving no stone unturned style, we
like to call ourselves designers and relationship
builders that partner with a client from day one
to help them achieve all of their goals.
HUMBLE BEGINNINGS. In July of 2008, Greg
Clever and Alan James opened the Atlanta
Branch Office of Davis Architects in the
basement of Greg’s home to serve multifamily
and mixed-use developers with the intent of
providing hands-on, client driven services. Over
the next ten years, they worked tirelessly to fulfill
these goals and create award-winning, nationally
recognized projects. In 2018, Greg and Alan
purchased the Atlanta Office of Davis Architects
and Studio Architects was formed with the help
of dedicated and talented Principals James
Anderson, Chris Kacena, and Chris Van Kley, who
were elevated to Partners.
NEW BLOOD. In May of 2019, Geoff Clever joined
the firm as Principal and was tasked by the
partners of the firm with diversifying its portfolio
to include education, civic, and sports projects.
Geoff’s resume and portfolio of work included
numerous K-12 school systems, as well as County,
City, and Municipal entities in the Southeast,
Collegiate, and Athletic clients including the
University of Alabama, Clemson University,
University of Florida, University of Georgia, and
Auburn University. With these new areas of
expertise in the firm’s arsenal, Studio Architects
was able to offer an increased level of service to its
current and prospective clients.
TRIED & TRUE APPROACH. Collaboration is
the glue that binds all of our work. At Studio
Architects, we approach each project uniquely.
We work closely with each of our clients to
establish goals at the outset of a project and
diligently monitor these objectives as a job moves
through design, document preparation, and
construction phases. Principal involvement from
start to finish is paramount to our team’s hands-
on approach to ensure that quality is maintained
throughout the building design process. Each
project is staffed with a team
tailored to that specific project
type and led by a Principal with
the knowledge and experience
to ensure success.
WORDS TO WORK BY. We
love what we do. Whether it’s
working late to meet a deadline,
participating in a design
charrette, attending a lunch
& learn, playing ping pong at
lunch, or taking in a ball game,
we like to have fun.
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
P
a
g
e
5
team - meet the starting lineup
The Sports+Rec Practice at Studio Architects
is a Southeast-based architectural workshop
specializing in athletic facility projects. Just sports
- men and women, varsity or club. We design
facilities for traditional sports such as football,
basketball, and baseball, but also design facilities
for non-traditional sports such as eSports, Ice
Hockey, and Rugby. Our practice is virtual with an
emphasis on recruiting, trends, and technology.
Firm services include Design, Master Planning,
Programming, Feasibility Studies, and Recruiting
/ Fundraising Packages. Our five-year goal is to
become the go-to sports+rec architectural firm
in the Southeast specializing in collegiate, prep
school, and parks+recreation projects, and in
particular, helping clients conceptualize proposed
facility improvements and developing recruiting
and/or fundraising material to generate interest,
capital, and buzz to move projects forward.
Our team
Geoff Clever
Practice Leader
University of Virginia
Riwa Hojeij
Project Interior Designer
Georgia Tech
Sean Jeong
BIM Manager
Auburn University
Chris Chaphe
Project Coordinator
Kennesaw State University
TJ Helms
Project Manager
Auburn University
Denisha Garland
Project Coordinator
Auburn University
Daniel Garcia
Job Captain
Kennesaw State University
Lauren Carberry
Project Architect
University of Illinois
Hal Greer
Brand Designer
University at Buffalo
Ben Hanna
Project Coordinator
Clemson University
Dennys Pozo
Project Coordinator
Georgia Tech
Emily McClure
Project Coordinator
Kennesaw State University
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
P
a
g
e
7
services - what we do
5-Point
Program
Checkup
Complimentary analysis of
existing branding, facilities,
game day experience,
premium seating, and
fundraising programs.
Sports
Consulting
Hourly, daily, and retainer-
based consulting services
for a variety of sports facility
needs including material/
color selection, deferred
maintenance, and any in-
house design construction
projects.
Athletic
Master
Planning
5, 10, and 20-year
comprehensive planning
effort involving visioning,
benchmarking, programming,
design, and cost & schedule
preparation.
Feasibility
Studies
Written and graphic
analysis that takes all of a
project’s relevant factors
into account—including
viability, operations, and cost
& scheduling considerations
to determine likelihood
of completing the project
successfully.
Recruiting
Packages
Design and preparation of 2D
and 3D images of proposed
athletic facility improvements
used by administrators,
development staff, and
coaches to generate interest
and excitement from recruits
or donors.
Architecture,
Design,
Panning
Full A/E Services including
programming, design, design
development, construction
documents, bidding &
negotiation, and construction
administration.
Auburn University
Kennesaw State University
University of Alabama Birmingham
University of Alabama
Georgia Institute of Technology
University of Georgia
University of Florida
College of Charleston
Georgia State University
Clemson University
North Carolina State University
University of Central Florida
Florida A&M University
Birmingham Southern College
The Miami Dolphins Football Team
Greenville Triumph Soccer Club
some of the great
institutions We’ve
had the pleasure to
partner with...
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
At Studio Architects, we are skilled
athletic facility planners. We understand
how athletic departments work when it
comes to planning facility improvements.
We realize the importance of proper
planning and conceptualizing proposed
improvements at the outset of an idea. We
appreciate the financial circumstances
of proposed facility improvements as
they relate to fundraising and recruiting
efforts. Whether the pre-design effort is an
athletic facilities master plan or a feasibility
study, Studio Architects possesses the
right expertise to plan, design, and deliver
drawings and marketing material to help
generate interest, funding, and buzz to
move proposed projects forward.
Pre-design - recruiting & fundraising expertise
Master Plans
• University of Alabama - The Crimson Standard
• University of Alabama at Birmingham
• College of Charleston
• University of Maine
• Sacred Heart University
• 	
Johns Island Park
• 	
Atlanta Men’s Baseball Association
Feasibility Studies
• 	
Marquis Grissom Baseball Association: Baseball Training Facility
• 	
Baptist Hill High School: Homecoming Tailgate Event
• Hampstead Park: Soccer Mini-Pitch
• Lawson State Community College: Baseball Player Development Center
• 	
Clemson University: Football Operations Complex
• 	
North Carolina State University: Carter-Finley Stadium - Revenue Generating Opportunities.
Reynolds Coliseum: Women’s Volleyball, Gymnastics, Softball
• 	
Kennesaw State University: Fifth Third Bank Stadium - Sports Performance Complex
• 	
Georgia State University: Sports Arena Annex - Multi-Sport Training Facility
• 	
Georgia Tech: Bobby Dodd Stadium - Football Locker Room Upgrades
• 	
University of Georgia: Stegeman Coliseum - Seating Bowl & Branding
• 	
Florida A&M University: Bragg Memorial Stadium - Athletic Performance Facility
• 	
Florida A&M University: Bragg Memorial Stadium - Athletic Performance Facility
• 	
College of Charleston: Patriots Point Athletic Complex - Sports Medicine/Orthopedics &
	 Cougar Athletics Center
• 	
The Gold Dome: New eSports Venue
• 	
Player One eSports: Competition Arena
• 	
US Naval Academy: D1 Hockey Arena
• 	
Robert Morris University: New eSports Center
• 	
Greenville Triumph: Practice & Competition Venue
• 	
Oregon Institute of Technology: eSports Practice Facility
• 	
University of Alabama at Birmingham: Blazer Football Stadium
• 	
Oklahoma City University: eSports Practice Facility
• 	
University of Alabama: Coleman Coliseum - Gymnastics Training Facility, Sewell-Thomas Stadium
- Baseball Operations Facility, Coleman Coliseum - Courtside Club, Aquatics Complex, Rowing
Operations Facility, Indoor Tennis Center, Captain’s Plaza
Projects represent individual experience for Geoff Clever while employed at Davis Architects, MPS Architecture, or JLG Architects.
P
a
g
e
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
design - our work defines us
Each project is unique and a special opportunity for our team
to make a positive impact on the built environment and add
value to each and every client’s vision. Whatever the project,
Studio Architects approaches each job with optimism and a fresh
perspective that allows our designers to craft the best possible
solution which are both efficient and economical, as well as
distinctly creative. Studio Architects’ collaborative approach
to practicing architecture is focused on creating positive
experiences for all of our customers by maximizing service,
building strong relationships, and helping achieve their business
goals in each project we design.
PAINT @ STUCCO:
SW 7674 - Peppercorn
PAINT @ TRIM:
SW 6991 - Black Magic
Johns island park
the lodge at piney mountain
Henderson state
olmsted savannah
Soccer Mini-pitch
kannapolis
P
a
g
e
1
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
The Gold Dome
New esports venue - Feasibility study
Oklahoma City University
Oklahoma City, OK
Future Completion
$10M Project Cost (estimated)
Proposed renovation of 33,000 SF, 1950’s geodesic
dome structure built originally as a bank. The proposed
improvements included collegiate eSports team space
for OCU’s fledgling program at the basement level
encompassing 12-gaming station practice bay, coaches’
offices, scrum room, war room, locker rooms, training
room, and nutrition bar (branded “RAM FUEL”). The
main level contained space for 42 gaming stations,
retro arcade, food & beverage bar, merchandise areas,
and VIP Suite housed in original bank vault (branded
“The Vault”), together with gaming competition spaces
including house floor, stage, team practice rooms &
lounge, green room, production, and server room. The
upper level incorporated common reception area, and
coworking and/or incubator spaces for local eSports or
technology firms to lease. Deliverables included plans,
3-D renderings, and cost estimate, as well as design &
construction schedule.
Project represents collaborative programming, design, and cost
estimating effort by A/E/C team led by Studio Architects that
included Mass Architects and Flintco
P
a
g
e
1
3
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Coleman Coliseum
new courtside club - feasibility study
University of Alabama
Tuscaloosa, AL
Future Completion
$1.5M Project Cost (estimated)
Feasibility study for the renovation of existing
press dining area to serve as VIP club for basketball
patrons before, during, and after games. Capacity
for the proposed lounge was set at 100 people to
ensure exclusivity and premium-level experience for
patrons with seats on the floor. Amenities of club
incorporated food service, bar, seating, and private
restrooms, as well as direct view of team’s path
from locker room to court. Services of work effort
included programming, design, and branding, as
well as cost estimating, scheduling, and preparation
of donor fundraising package.
Project represents individual experience for
Geoff Clever while employed at Davis Architects
P
a
g
e
1
5
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Reeves Football
Operations
Complex
new football operations
- feasibility study
Clemson University
Clemson, SC
Spring 2017 Completion
$55M Project Cost
Feasibility study for a proposed new football
operation complex. The purpose of the
feasibility study was to develop a program &
design that reflected the needs of Clemson
University (and its football program) and
included all the necessary components
of a state-of-the-art football operations
complex. The scope of the work also included
conceptual design, renderings, fly-around
animation, cost estimating, scheduling, and
peer analysis of similar facilities at ACC schools,
as well as schools that Clemson University
recruits against year end and year out.
Project represents individual experience for
Geoff Clever while employed at Davis Architects
P
a
g
e
1
7
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Sports Arena Annex
New multi-sport training facility -
feasibility study
Georgia State University
Atlanta, GA
Future Completion
$1M Project Cost (estimated)
Feasibility study involving the proposed renovation of
existing natatorium into multi-sport training facility for
soccer, sand volleyball, baseball, basketball, golf, and
track & field. Proposed project also involved creation
of new locker rooms, student-athlete support spaces,
coaches’ office, viewing grandstand, and outdoor
civic plaza with branding sculpture and signage.
Deliverables of the work effort included building
program, site & floor plans, 3-D drawings, fundraising
animation, and phased construction cost estimate.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
1
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Bartow Arena
Upgrades to men’s basketball
Operations center -
feasibility study
University of Alabama at Birmingham
Birmingham, AL
Future Completion
$500K Project Cost (estimated)
Feasibility study for the renovation of existing
men’s basketball offices into state-of-the-
art operations center to enhance recruiting
opportunities for program. Scope of proposed
work included exterior enhancements including
marquee signage, colorful banners, and oversized
player-based graphic window film. Proposed
interior work involved major overhaul to lobby,
head coach’s office, and support spaces, as well
as staff and team areas. Highlights of suggested
lobby upgrades included contemporary
reception desk, basketball-themed waiting
area, A/V, and branding improvements, as well
as new floor, wall, and ceiling finishes with
specialty lighting. Services of work effort included
programming, design, and branding, as well as
cost estimating, scheduling, and preparation of
recruiting package.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
2
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Carter-Finley
Stadium
Revenue generating opportunities -
feasibility study
North Carolina State University
Raleigh, NC
Future Completion
$25M Project Cost (estimated)
Feasibility study focused on development of
“blue collar” revenue generating opportunities for
Carter-Finley Stadium. Opportunities examined
included grandstand club cut into the upper deck
at the east side, tailgate club adjacent to PNC
Arena, twelve suites, party terrace below the north
end zone scoreboard, four field level loge patios,
and two field level clubs at the south end zone
flanking the team’s tunnel access from the locker
onto the field. Each project was designed to take
advantage of existing stadium features without
costly modifications. Each project was themed
to reinforce “Wolfpack” branding to enhance
the fan experience at the stadium on game day.
Deliverables of the study included plans, 3-D
renderings, and cost estimate, as well as design &
construction schedule.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
2
3
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Sewell-Thomas
Stadium
Renovation & expansion
University of Alabama
Tuscaloosa, AL
Winter 2016 Completion
$37.5M Project Cost
Renovation and expansion project involving
major improvements to 8,500-seat stadium.
Work included concourse upgrades, additional
restrooms / concessions / seating, expanded
canopy, skyboxes, two club lounges, home
run berm, student section, field level seating,
continuous outfield walk, family playground,
pre-game picnic area, team store, commissary,
press box, branding graphics & wayfinding
signage, home team locker room & lounge,
team meeting room, weight room, bullpen,
Coca Cola viewing porch in right field, and four-
lane indoor batting facility.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
2
5
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Reynolds Coliseum
women’s volleyball, gymnastics, &
Softball team area upgrades -
feasibility study
North Carolina State University
Raleigh, NC
Future Completion
$3M Project Cost (estimated)
Feasibility study involving preparation
of concepts to improve the layout and
functionality of these team spaces, as well
as how best to create separate identities for
Women’s Volleyball, Softball, and Gymnastics.
The study also involved the development of
ideas to enhance recruiting opportunities
through a modern makeover of spaces, finishes,
lighting, and branding consistent with other
top-10 Division 1 programs. Deliverables
included program, floor plans, 3-D renderings
representing the design concept, construction
phasing, and cost estimate.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
2
7
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Coleman Coliseum
gymnastics training facility
renovation & expansion - Feasibility Study
University of Alabama
Tuscaloosa, AL
Future Completion
$5M Project Cost (estimated)
Feasibility study involving proposed renovation
and 10,000 SF expansion of existing practice
gymnasium into state-of-the-art gymnastics
training facility containing practice gym,
locker room, players’ lounge, training room,
equipment room, coaches’ office, team meeting
room, multi-purpose event space, and viewing
platforms. Scope of work included benchmarking,
programming, design, and preparation of 3-D
rendering for recruiting and fundraising.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
2
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Fifth Third
Bank Stadium
new sports performance complex -
feasibility study
Kennesaw State University
Kennesaw, GA
Future Completion
$20M Project Cost (estimated)
Feasibility study involving the preparation of
design concepts for a multi-level, state-of-the-
art sports facility to house football operations,
football training table, student-athlete dining
hall, premium club, academic center, sports
performance facility, strength & conditioning,
football locker room / training room / equipment
room, and related support spaces in the north
end zone of Fifth Third Bank Stadium. Services
of the study consisted of evaluation of existing
facilities, programming meetings with building
users & stakeholders, and conceptual design
with program, conceptual design drawings, 3-d
renderings, donor “naming” renderings, and cost
estimate & schedule as primary deliverables.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
3
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Bobby Dodd Stadium
football locker room upgrades -
feasibility study
Georgia Institute of Technology
Atlanta, GA
Summer 2018 Completion
$4.5M Project Cost
Feasibility study encompassing the renovation of
the home team locker room, as well as adjacent
spaces such as the coaches’ locker room, NFL locker
room, equipment room hallway, and associated
entry and circulation spaces. The proposed project
included new lockers, finishes, MEP systems, A/V,
and graphics, as well as addressed function and
flow during the week for practice and on game
days. Deliverable for the work effort included
project description, program, conceptual design
drawings, 3-d renderings for fundraising &
recruiting, and cost estimate.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
3
3
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
New eSports Center
conceptual design
Robert Morris University
Moon Township, PA
Summer 2019 Completion
$50K Project Cost
Conceptual design effort for the renovation of 700 SF of
existing space within the Student Recreation & Fitness
Center for the Colonials new Esports Program. Proposed
improvements included 10-gaming stations, soft seating
area with wall-mounted TV monitor, server closet to
house the computer data rack, Respawn gaming tables
& chairs, and branding graphics. The renovated area was
located adjacent to a gymnasium, as well as unoccupied
space that was transformed into a head coach’s office
for the team. The proposed design was economical and
efficient, but edgy to coincide with the team’s recruiting
approach and spirit of the program. Deliverables
included floor plan, 3-D renderings, and cost estimate.
P
a
g
e
3
5
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Stephen C.
O’Connell Center
new ted crom gymnastics studio
University of Florida
Gainesville, FL
Spring 2013 Completion
$2M Project Cost
Renovation and expansion project involving
creation of 18,000 SF state-of-the-art training
facility with practice gymnasium, training room,
coaches’ offices, team lobby, equipment room, and
branding graphics. Gymnasium improvements
included design of practice areas for vault, uneven
bars, balance beam, and floor exercise.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
3
7
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Roth Athletic
Center
renovation & expansion of
wayne densch sports center
University of Central Florida
Orlando, FL
Fall 2019 Completion
$10M Project Cost
Two-story expansion project involving addition
of 23,500 SF to existing Wayne Densch Sports
Center to accommodate growth of football
program, as well as new space for soccer and
athletic administration offices. First floor
components of the project include Hall of
Fame lobby, football players’ lounge, recruiting
room, hydro-therapy area, meeting & position
rooms, Golden Knights Club headquarters,
and locker facilities for the men’s and women’s
soccer program. Second floor components
include athletic department offices for senior
administration, business & facility departments,
coaches, and staff health & wellness area.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
3
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
BBVA Compass Field
new soccer stadium for blazer soccer
& birmingham legion fc
University of Alabama at Birmingham
Birmingham, AL
Summer 2017 Completion
$10M Project Cost
New home team “pitch” for UAB Soccer,
as well as Birmingham Legion FC. Soccer-
specific stadium includes 5,000 seats, entry
plaza, fan zone, beer garden, ticketing,
concessions, restrooms, press box, aluminum
bleacher seating, LED video board, and
synthetic turf field.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
4
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Auburn Arena
new multi-purpose arena
Auburn University
Auburn, AL
Summer 2010 Completion
$67M Project Cost
New 9,200-seat multi-purpose arena
for sporting events, concerts, and
commencement. Facility serves as home
for Men’s & Women’s Basketball, Women’s
Volleyball, and Women’s Gymnastics
programs. New arena design includes open
concourse, center-hung LED video board,
intimate seating, sky boxes, clubs, 14,000 SF
practice facility, weight room, locker rooms,
players’ lounges, coaches’ offices, team
store, student entry & lobby, and interactive
Lovelace Museum & Hall of Honor, as well as
branding graphics throughout facility.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
4
3
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Homewood
Community
Center
new community center
Homewood Parks & Recreation
Homewood, AL
Spring 2014 Completion
$14M Project Cost
New LEED Silver Certified
community center featuring
two full-size gyms, elevated
running track, multi-story
lobby, fitness rooms, weight &
cardio exercise area, 100-person
community meeting space, 25-yard
competition pool, and instructional
/ leisure pool with vortex & zero-
entry kids’ wading pool with play
structure, as well as birthday
party room, lifeguard facilities,
concessions, restrooms, and
covered outdoor dining area.
Project represents individual experience
for Geoff Clever while employed at Davis
Architects
P
a
g
e
4
5
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
General Charles
Krulak Stadium
new multi-purpose stadium
Birmingham Southern College
Birmingham, AL
Summer 2008 Completion
$7M Project Cost
New multi-sport stadium seating 1,600 involving
design of press box, grandstand, and field
house. Stadium work included creation of home
team practice and competition facilities for
Birmingham-Southern football, Men’s & Women’s
Lacrosse, Cross Country, and Track and Field
programs. The facility features an eight-lane track
with steeplechase, long/triple jump pits, high
jump, and pole vault, natural turf practice football
field, discus & shot-put throwing cages, javelin
runway, and synthetic turf soccer field. The field
house includes coaches’ offices, team meeting
rooms, locker rooms, training room, weight room,
and officials’ locker room.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
4
7
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Birmingham
CrossPlex
new multi-purpose
athletic facility
City of Birmingham
Birmingham, AL
Summer 2011 Completion
$48M Project Cost
New world-class practice & competition
venue featuring a 50-meter natatorium
and hydraulically banked 200-meter indoor
track. The LEED Certified project is located
on the site of the historic Alabama State Fair
Grounds and has served as a civic catalyst
for the revitalization of Five Points West.
Meeting facilities and services to support
regional and national sporting events are
programmed, as well as training facilities
for local amateur and college swimming
& diving programs. The venue includes
a multi-story lobby, café & concessions,
meeting hall, conference center, team areas,
and event area, as well as accommodations
for volleyball, basketball, gymnastics, and
cheerleading & dance camps.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
4
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Falcon Stadium
game day football upgrades
@ north end zone
United States Air Force Academy
Colorado Springs, CO
Summer 2018 Completion
$6M Project Cost
Renovation and expansion project to
existing game day football locker room.
Work included a 9,500 SF expansion of the
locker room underneath the concourse level
that included a coaches’ locker room, video
room, press room, multi-purpose locker
rooms, and field storage. In order to provide
tractor-trailer access to the field for concerts
and other events, the entrance to the tunnel
was enlarged at the north end, as well as
improved and upgraded along its length.
Renovation work featured dual-sport
lockers (football & lacrosse), training room,
equipment room, medical room with x-ray,
press room, green room (for dignitaries
& talent), team “swag” area, and Falcon
Fueling Station.
Project represents individual experience for Geoff
Clever while employed at Davis Architects
P
a
g
e
5
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Trussville
Civic Center
new community center
Trussville Parks & Recreation
Trussville, AL
Fall 2008 Completion
$13M Project Cost
New civic center including
community auditorium,
1000-person exhibition hall,
commissary, six meeting rooms,
fitness center, weight training
room, cardio/fitness room,
exercise room, spin room, indoor
walking track, two basketball
courts, and men’s and women’s
locker rooms.
Project represents individual experience
for Geoff Clever while employed at Davis
Architects
P
a
g
e
5
3
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Digital Media
Center
Bryant-denny stadium
University of Alabama
Tuscaloosa, AL
Spring 2014 Completion
$15M Project Cost
Renovation and expansion project
involving 40,000 SF of vacant space at
the North End Zone of Bryant-Denny
Stadium. Users of the state-of-the-art
facility teaching and video production
facility include Crimson Tide Productions,
WVUA, Alabama Public Radio, and the
Center for Public Television & Radio.
Scope of work included new plaza level
entrance, broadcast studios, control
rooms, edit suites, and offices, as well as
the set for “The Nick Saban Show.”
Project represents individual experience for Geoff
Clever while employed at Davis Architects
P
a
g
e
5
5
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Bessemer City
High School
new athletic fields complex
Bessemer City Schools
Bessemer, AL
Winter 2010 Completion
$5M Project Cost
New two-level, 1,500-student high
schools with baseball, softball, and
football athletic fields complexes.
Schools features classrooms,
laboratories, performing & visual arts
center, administrative areas, media
center, food-court style cafeteria,
and two gymnasiums. Features
of the athletic complexes include
entry structure with ticketing /
concessions, restrooms, synthetic
turf football field, 8-lane track, home
team & visitor bleachers, press box,
and field house
Project represents individual experience
for Geoff Clever while employed at Davis
Architects
P
a
g
e
5
7
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Sarah Patterson
Champions Plaza
new sports plaza
University of Alabama
Tuscaloosa, AL
Fall 2013 Completion
$2.8M Project Cost
New public plaza honoring the Crimson
Tide’s national champion coaches for all
sports except football. The curved plaza
features granite slabs highlighting all of
the Tide’s varsity sports besides football,
including a listing of each sports’ NCAA
and Southeastern Conference titles. The
plaza was designed to recognize the
successes of each sport, as well as each
sport’s founding and initial coaching staff.
A statue of Sarah Patterson, head coach
of 6 NCAA national championship titles, is
located in the center of the plaza bearing
her name. The plaza was also designed
as a backdrop for TV media broadcasts
from the adjacent Mal M. Moore Athletic
Facility, as well as Coleman Coliseum.
Project represents individual experience for
Geoff Clever while employed at Davis Architects
P
a
g
e
5
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
The Pool at
Patriot Park
new community outdoor pool
Homewood Parks & Recreation
Homewood, AL
Summer 2019 Completion
$8M Project Cost
New seasonal outdoor community
pool with leisure pool, deck, splash
pad with spray features, zero depth
entrance ramp with mushroom, water
slide, concession stand with eating
area, men’s & women’s locker rooms,
lifeguard room, and check-in station.
Project represents individual experience for
Geoff Clever while employed at Davis Architects
P
a
g
e
6
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Mortimer Jordan
High School
New athletic fields complex
JEFCOED
Kimberly, AL
Summer 2011 & 2012 Completion
$5M Project Cost
New two-level, 1,000-student high schools
with baseball, softball, and football athletic
fields complexes. Schools features
classrooms, laboratories, performing &
visual arts center, administrative areas,
media center, food-court style cafeteria,
and two gymnasiums. Features of the
athletic complexes include entry structure
with ticketing / concessions, restrooms,
natural turf football field, 8-lane track,
home team & visitor bleachers, press box,
and field house.
Project represents individual experience for
Geoff Clever while employed at Davis Architects
P
a
g
e
6
3
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Sam Bailey
Track Stadium
renovaion & expansion
University of Alabama
Tuscaloosa, AL
Summer 2013 Completion
$3M Project Cost
Renovation and expansion project to the
existing stadium included installation of new
nine-lane, state-of-the-art Beynon BSS-2000
track, as well as relocation of shot-put throw
area to the west end of the track, outside of
the oval. The infield was replaced with a new
hybrid Bermuda grass providing landing areas
for the javelin, hammer throw, and discus with
cages for the throw events relocated to allow
for better meet management. Additional work
involved the relocation and reconfiguration of
the jumps area, two pole vault runways, and
two high jump aprons. Timing locations were
added throughout the track area. In addition to
the track renovations, the grandstand, press box,
concessions, and restrooms were also upgraded
with a new entry plaza added to commemorate
the history of Alabama track athletes.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
6
5
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Turner Field
soccer grandstand &
press box renovation
University of Georgia
Athens, GA
Summer 2017 Completion
$4M Project Cost
Replacement of existing grandstands, as
well as related fan and team amenities at
soccer stadium. Work included design of
new 1,600 seat, aluminum grandstand, press
box, concessions, restroom, and VIP viewing
platform for women’s soccer program. Press
box was designed to meet SEC Network
media requirements, as well as athletic
operations, radio broadcast, and press corps.
Project represents individual experience for
Geoff Clever while employed at Davis Architects
P
a
g
e
6
7
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Homewood
Athletic
Complex
Multi-use athletic facility
Homewood Parks & Recreation
Homewood, AL
Summer 2019 Completion
$17M Project Cost
Renovation and expansion of West
Homewood Park into multi-use athletic
facility for Homewood Parks & Recreation
Board. Primary use of Homewood Athletic
Complex is youth baseball & softball, adult
softball, and tennis. The complex has eleven
fields used for baseball & softball and two
large multi-purpose fields used primarily for
flag football, lacrosse, and soccer, as well as
eight hard-surface tennis courts. Batting
cages, walking trails, and parking are also
provided for the community’s use.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
6
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Stephen C.
O’Connell Center
Renovation & expansion
University of Florida
Gainesville, FL
Winter 2016 Completion
$65M Project Cost
Renovation and expansion project to multi-
purpose arena housing basketball, gymnastics,
and swimming & diving programs, as well as
concerts and other public events. The work at
the seating bowl included installation of a new
center-hung scoreboard with new video-replay
boards, as well as new chair-back seating
throughout the arena. Other work at the
interior included reconfiguration of all levels
with a new concourse introduced at mid-level,
as well as comprehensive fan, student-athlete,
and staff upgrades. The lobby of the facility
was also enlarged and contains Gator branding
elements on the floor, walls, and ceilings.
Premium amenities added to the facility
include an exclusive 50-seat courtside club, a
530-seat center-court club, and 12 premium
loge boxes.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
7
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Birmingham-
Jefferson
Convention
Complex
new legacy arena club
Birmingham-Jefferson Civic Center Authority
Birmingham, AL
Summer 2011 Completion
$1M Project Cost
Renovation of existing space underneath lower
seating bowl of BJCC Arena into exclusive,
premium lounge limited to 500 patrons. The
club opens 2 hours before event time for
socialization and serves up-scale food, beverage,
and merchandise prior to concerts and
other events. Private restrooms, soft-seating
areas, buffet dining, food & beverage access,
dedicated entry, and convenient location
adjacent to the Arena and parking are
provided to each member.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
7
3
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Rhoads Stadium
new indoor practice facility &
Clubhouse renovation
University of Alabama
Tuscaloosa, AL
Spring 2011 Completion
$2.5M Project Cost
Renovation and expansion project to softball
stadium involving addition of outfield seating
area called “The Brickyard, as well as creation
of 8,000 SF indoor practice facility with
reconfigurable netting systems to mimic the
infield, as well as four batting lanes for practice.
The clubhouse was renovated and expanded
to meet player development needs with a
spacious lobby featuring brand graphics, trophy
cases, and soft seating added, while the locker
room, players’ lounge, team meeting room,
training room, and laundry facilities received
substantive upgrades.
Project represents individual experience for Geoff Clever
while employed at Davis Architects
P
a
g
e
7
5
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Mal M. Moore
Athletic Facility
football facility renovation &
new alabama strength &
conditioning complex
University of Alabama
Tuscaloosa, AL
Summer 2013 Completion
$17M Project Cost
Work included renovation of the existing
weight room and locker room spaces into
player development hub for Crimson Tide
Football. Hub contains theater-style team
meeting room, position meeting rooms,
players’ lounge, and expanded team locker
room with player rehab pool area, as well
as branded “waterfall” feature. The two-
story, 35,000 SF strength & conditioning
facility was constructed. Other features
incorporated into the design of the weight
room include flexible connection to the
Indoor Practice Facility, flush weight lifting
platforms, and nutrition bar with bod pod,
grab & go area, video monitors, sound
system, and branding graphics.
Project represents individual experience for
Geoff Clever while employed at Davis Architects
P
a
g
e
7
7
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Indoor Practice
Facility
new indoor football
practice facility
University of Florida
Gainesville, FL
Summer 2015 Completion
$16M Project Cost
New 100,000 SF indoor practice facility
featuring 120-yard synthetic turf field
with drill area at north end. Facility also
includes recruit room with outdoor patio,
satellite training room, video work room,
equipment storage, restrooms, and
branding graphics. Filming platforms
were designed at the south, north, and
west interior walls of the building with a
state-of-the-art sound system for voice,
music, and crowd noise replication.
Work also included the replacement of
two grass practice fields to the west of
the indoor facility, as well as the design
of a new field maintenance building.
Project represents individual experience for
Geoff Clever while employed at Davis Architects
P
a
g
e
7
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
West Homewood
Athletic Center
new community athletic facilities
Homewood Parks & Recreation
Homewood, AL
Summer 2019 Completion
$5M Project Cost
New athletic facility containing two
multi-purpose gymnasiums for youth
athletics with bleacher spectator seating,
concession area, staff offices, and eight
covered batting cages, as well as City
Park Maintenance Operations Center
which include vehicle, equipment, and
material storage. The facility also includes
a synthetic, mega-field for soccer and
other youth sports that sits adjacent to
the center and parking.
Project represents individual experience for
Geoff Clever while employed at Davis Architects
P
a
g
e
8
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Outdoor
Training Pool
new outdoor 50-meter pool
Auburn University
Auburn, AL
Fall 2007 Completion
$2M Project Cost
New outdoor swimming pool and clubhouse for
Auburn’s swimming and diving program. The
new pool is 50-meters long by 25-meters wide
and was designed to mimic similar outdoor
aquatic facilities on the international circuit, as
well as serve as a recruiting tool for the coaching
staff. The pool allows for 10 lanes for long course
and 22 lanes for short course swimming and
was strategically located adjacent to the Martin
Aquatic Center. While the 600,000-gallon pool
is primarily used as a training site for Olympic
competition by student-athletes, the pool is used
in the off-season by the general student body
through the University’s Student Life Department.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
8
3
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Memorial Stadium
game day football upgrades
@ west end zone
Clemson University
Clemson, SC
Summer 2014 Completion
$1M Project Cost
Renovation project involving upgrade of
football game day facilities at Memorial
Stadium including home team locker
room, players’ lounge, and nutrition bar.
Locker room work included renovated
lockers, showers, and restroom facilities,
as well as upgrades to finishes, lighting,
and brand graphics. Work at the Players’
Lounge included branding graphics, video
game stations, billiards, ping pong, shuffle
board, cornhole, and enclosed arcade zone
with video games and pinball machines.
Nutrition bar work included creation of
new juice bar for student athletes adjacent
to primary strength & conditioning facility
for nutritional support of student athletes
during training activities.
Project represents individual experience for Geoff
Clever while employed at Davis Architects
P
a
g
e
8
5
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Bryant-Denny
Stadium
north & south end zone expansion
& new walk of champions plaza
University of Alabama
Tuscaloosa, AL
Summer 2006 / Summer 2010 Completion
$93M Project Cost
Work at the north end zone included 7,000-seat
upper deck, VIP club with 1,700 outdoor seats,
upper concourse, 38 skyboxes with TEPCO glazing,
athletic offices, press room, ticketing, concessions,
300-seat recruiting lounge, and home team locker
room complex. Work at the south end zone
included 36 skyboxes, VIP club with 1,700 outdoor
seats, 1,000-seat “stadium” club, donor hall of
recognition, development administrative offices,
outdoor market, and 8,600-seat upper deck with
concourse. Expansion work involved the design
of public plaza at the north end zone, The plaza
features commemorative statues of national
championship coaches, as well as commemorative
plaques for national championship teams.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
8
7
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
The Crimson Standard
master plan
University of Alabama
Tuscaloosa, AL
Summer 2021 Completion (phase one)
$250M Project Cost (estimated)
Master plan encompassing fifteen varsity sports
and their respective practice and competition
facilities, as well as administrative offices and
student-athlete residential accommodations. The
purpose of the master plan was to chart a ten-
year course for future athletic facility development
and to proactively address upcoming changes to
Crimson Tide Athletics’ fan base. The scope of work
included benchmarking (collegiate & professional
sports facilities), visioning, programming, design,
and master plan package preparation, as well as
coordination with ongoing campus master planning
efforts. Deliverables provided at the conclusion of
the effort comprised a comprehensive master plan
document, master campus site plan of existing &
proposed athletic facilities, project designs, 3-D
renderings, project animations, and fundraising and/
or “hype” videos.
Project represents individual experience for Geoff Clever while
employed at Davis Architects
P
a
g
e
8
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
baseball Player
development
center
feasibility study
Lawson State Community College
Birmingham, AL
Future Completion
$5M Project Cost (estimated)
New Baseball Player Development Center
at Lawson State Community College. The
facility is adjacent to the community college’s
existing baseball stadium and includes locker
rooms, equipment rooms, offices, a team
lounge, and an indoor hitting facility. The new
facility consolidates all of the baseball team’s
operations into one building. The indoor hitting
facility allows the team to practice indoors
during inclement weather or while other
players are using the field. The facility is also a
huge draw in recruiting, allowing Lawson State
to draw elite prospects to their program.
Parking
Lot
Wilso
n
Road
SW
Roy W. Johnson Jr.
Baseball Field
Building B
Building C
Building D
Cougar Baseball Player
Development Center
Rutledge Avenue SW
3
7
t
h
S
t
r
e
e
t
S
W
PROJECT NUMBER:
PROJECT:
DRAWING TITLE:
DATE:
SCALE: 1" = 100'-0"
PR 20-115
COUGAR BASEBALL PLAYER
DEVELOPMENT CENTER
Site Plan
05/19/2020
Playground
Hitting Facility
Team
Lounge
Locker
Room
Toilets
Showers
Building Program
Players
Coaches
Hitting Facility
Umpires
Laundry/Storage
Coach's
Suite
Umpires
Equipment
Storage
PROJECT NUMBER:
PROJECT:
DRAWING TITLE:
DATE:
SCALE: 1" = 20'-0"
PR 20-115
COUGAR BASEBALL PLAYER
DEVELOPMENT CENTER
Floorplan
05/19/20
P
a
g
e
9
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
West Ashley
High School
weight room
renovation
Charleston County School District
Charleston, SC
Summer 2021 Completion
$250K Project Cost
Expansion and renovation of the existing
weight room at West Ashley High School. The
expansion demolished a wall between the
existing weight room and a storage room to
create a larger, open space that functioned
and flowed in a more efficient way for
workouts to be held by the student athletes.
The new space created an improved layout
that maximized the amount of equipment in
the weight room. A single strength coach can
now conduct workouts for student athletes
while seeing the entire space, creating a safer,
more efficient space.
P
a
g
e
9
3
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Johns island park
master plan
St. John’s High School
Johns Island, SC
Winter 2023 (anticipated)
$2.8M Project Cost
Athletics master plan for St. John’s High School at
Johns Island Park. Charleston County School District
and the City of Charleston wanted to develop a five,
ten, and twenty year master plan for the city park
that included baseball, softball, soccer, and tennis,
as well as disc golf, beach volleyball, and a children’s
fully accessible playground. Johns Island Park is the
home of St. John’s High School’s baseball, softball,
soccer, and tennis programs, and as a result, another
component of the master plan involved athletic
facility upgrades to better align its sports features
with other high schools in the District.
P
a
g
e
9
5
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
0’ 10’ 20’ 40’
NORTH
A
M
E
R
IC
A
S
T
COLUMBUS ST
BUILDING
MINI-PITCH
PERIMETER FENCE, TYP.
BLEACHERS, TYP.
SHRUBS &
GROUNDCOVERS, TYP.
10’ PASS-THROUGH
MAIN ENTRANCE
EXISTING TREE, TYP.
E
H
A
M
P
S
T
E
A
D
S
Q
U
A
R
E
Soccer Mini-pitch
at hampstead park
Feasibility study
Charleston County School District
Charleston, SC
Future Completion
$1.2M Project Cost
Master plan for a new Soccer Mini-Pitch
on an abandoned park’s lot adjacent to an
elementary school. The program includes a
120’ x 60’ artificial turf soccer field intended
to be used by both Charleston County School
District and recreation leagues in the city. In
addition to the field itself, there are landscape
improvements throughout the park that
included new vegetation, softscape, and
hardscape. Bleachers allow for spectators to
watch games or sit and relax in the park when
the field is not in use. A small fieldhouse allows
for a gated entry into the complex and offers
concessions, storage areas, and restrooms.
P
a
g
e
9
7
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Marquis Grissom
Baseball training
facility
Feasibility study
Lithonia, GA
Future Completion
$7.5M Project Cost (estimated)
Master plan for a baseball complex dedicated to
various travel teams of the Marquis Grissom Baseball
Association. The complex includes both indoor
and outdoor program. The indoor facility consists
of dedicated locker rooms, strength and condition
spaces, homework and study rooms, and offices
for coaches and members of the foundation. The
outdoor program consists of a covered batting cage,
a covered dedicated warmup area, a covered infield,
and a full size competition and practice field with
a 500 seat grandstand and press box. In addition
to being the home of Marquis Grissom Baseball
Association, the complex is developing relationships
with the Atlanta Braves as well as Major League
Baseball’s RBI program.
P
a
g
e
9
9
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Baptist Hill
High School
tailgate event
Feasibility study
Charleston County School District
Hollywood, SC
Future Completion
$10K Project Cost (estimated)
Master plan for the annual Homecoming
Tailgate Event at Baptist Hill High School.
Held on the school’s baseball field adjacent to
the football stadium, the event attracts 2,000
alums and fans every year and is well known in
the area for being one of the best high school
pregame atmospheres in South Carolina.
Charleston County School District sought a
more structured, safer event for the school.
Through site planning and code analysis, the
event is now staged in a more structured and
systemized way, allowing for better ingress,
egress, and access to amenities.
P
a
g
e
1
0
1
s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s
Southeast athletic
complex renovation
master plan
Atlanta Men’s Baseball Association
Lithonia, GA
Future Completion
$25M Project Cost (estimated)
Master plan for the redevelopment and expansion
of an existing, defunct softball complex outside
of Atlanta. The project sought to transform the
existing softball fields into full size baseball
fields and included a dedicated practice field
with an indoor hitting facility. Additional batting
cages and bullpens are placed adjacent to fields
throughout the complex. In addition to the
primary baseball fields, there are multiple youth
fields, a soccer field, a driving range, and a 2,500
seat competition stadium intended to be used by
a local Division II baseball program in addition to
tournament championship games.
marquis grissom
baseball association
Atlanta Area
Men’s Senior
Baseball League
Southeast Athletic Complex
Renovation Master Plan
05/05/21
marquis grissom
baseball association
Atlanta Area
Men’s Senior
Baseball League
Southeast Athletic Complex
Renovation Master Plan
05/05/21
P
a
g
e
1
0
3
Geoff Clever, AIA
Principal, Sports+Rec Practice Leader
843.300.8197
geoff@studioarchitects.us
Our expertise includes education,
eSports, housing, mixed-use, religious,
senior living, and sports+rec.

More Related Content

Similar to Sports+RecBook 6.7.22.James.pdf

School Event Proposal PowerPoint Presentation Slides
School Event Proposal PowerPoint Presentation SlidesSchool Event Proposal PowerPoint Presentation Slides
School Event Proposal PowerPoint Presentation SlidesSlideTeam
 
DPS All Practice Areas Brochure
DPS All Practice Areas BrochureDPS All Practice Areas Brochure
DPS All Practice Areas Brochureannmarie1964
 
Schaffner edited2 STRATEGIC PLAN AND PRESENTATION FINAL
Schaffner edited2 STRATEGIC PLAN AND PRESENTATION FINALSchaffner edited2 STRATEGIC PLAN AND PRESENTATION FINAL
Schaffner edited2 STRATEGIC PLAN AND PRESENTATION FINALStacey Schaffner-Moy
 
College Campus Event Proposal PowerPoint Presentation Slides
College Campus Event Proposal PowerPoint Presentation SlidesCollege Campus Event Proposal PowerPoint Presentation Slides
College Campus Event Proposal PowerPoint Presentation SlidesSlideTeam
 
BestPlacesToWork_20150824
BestPlacesToWork_20150824BestPlacesToWork_20150824
BestPlacesToWork_20150824Danone Simpson
 
Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8ClearedJobs.Net
 
Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8ClearedJobs.Net
 
The Rock - HR & Training
The Rock - HR & TrainingThe Rock - HR & Training
The Rock - HR & TrainingAntony Felix
 
Liz greer resume mar 2018
Liz greer resume mar 2018Liz greer resume mar 2018
Liz greer resume mar 2018Liz Greer
 
Cleared Job Fair Handbook | April 4, 2024
Cleared Job Fair Handbook | April 4, 2024Cleared Job Fair Handbook | April 4, 2024
Cleared Job Fair Handbook | April 4, 2024ClearedJobs.Net
 
6 Square Infra Engineers & Designers
6 Square Infra Engineers & Designers6 Square Infra Engineers & Designers
6 Square Infra Engineers & Designers6squareinfra
 
Design & Construct Company Profile
Design & Construct Company ProfileDesign & Construct Company Profile
Design & Construct Company Profileephrams
 
Beth Gailius Portfolio
Beth Gailius PortfolioBeth Gailius Portfolio
Beth Gailius PortfolioBeth Gailius
 
east-ridge-high-school-case-study
east-ridge-high-school-case-studyeast-ridge-high-school-case-study
east-ridge-high-school-case-studyJames H
 

Similar to Sports+RecBook 6.7.22.James.pdf (20)

Amicus Brochure Athletics
Amicus Brochure AthleticsAmicus Brochure Athletics
Amicus Brochure Athletics
 
School Event Proposal PowerPoint Presentation Slides
School Event Proposal PowerPoint Presentation SlidesSchool Event Proposal PowerPoint Presentation Slides
School Event Proposal PowerPoint Presentation Slides
 
Resume.doc[1]
Resume.doc[1]Resume.doc[1]
Resume.doc[1]
 
Career development in exigen services
Career development in exigen servicesCareer development in exigen services
Career development in exigen services
 
Gastorf Resume
Gastorf ResumeGastorf Resume
Gastorf Resume
 
GB 2010-11 Overview
GB 2010-11 OverviewGB 2010-11 Overview
GB 2010-11 Overview
 
DPS All Practice Areas Brochure
DPS All Practice Areas BrochureDPS All Practice Areas Brochure
DPS All Practice Areas Brochure
 
Schaffner edited2 STRATEGIC PLAN AND PRESENTATION FINAL
Schaffner edited2 STRATEGIC PLAN AND PRESENTATION FINALSchaffner edited2 STRATEGIC PLAN AND PRESENTATION FINAL
Schaffner edited2 STRATEGIC PLAN AND PRESENTATION FINAL
 
College Campus Event Proposal PowerPoint Presentation Slides
College Campus Event Proposal PowerPoint Presentation SlidesCollege Campus Event Proposal PowerPoint Presentation Slides
College Campus Event Proposal PowerPoint Presentation Slides
 
BestPlacesToWork_20150824
BestPlacesToWork_20150824BestPlacesToWork_20150824
BestPlacesToWork_20150824
 
Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8
 
Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8
 
The Rock - HR & Training
The Rock - HR & TrainingThe Rock - HR & Training
The Rock - HR & Training
 
Liz greer resume mar 2018
Liz greer resume mar 2018Liz greer resume mar 2018
Liz greer resume mar 2018
 
Cleared Job Fair Handbook | April 4, 2024
Cleared Job Fair Handbook | April 4, 2024Cleared Job Fair Handbook | April 4, 2024
Cleared Job Fair Handbook | April 4, 2024
 
6 Square Infra Engineers & Designers
6 Square Infra Engineers & Designers6 Square Infra Engineers & Designers
6 Square Infra Engineers & Designers
 
Design & Construct Company Profile
Design & Construct Company ProfileDesign & Construct Company Profile
Design & Construct Company Profile
 
Beth Gailius Portfolio
Beth Gailius PortfolioBeth Gailius Portfolio
Beth Gailius Portfolio
 
Amesite Investor Deck 2020
Amesite Investor Deck 2020Amesite Investor Deck 2020
Amesite Investor Deck 2020
 
east-ridge-high-school-case-study
east-ridge-high-school-case-studyeast-ridge-high-school-case-study
east-ridge-high-school-case-study
 

Recently uploaded

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDEGURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDEkajalroy875762
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacovaimostorept
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfHolger Mueller
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxseemajojo02
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...yulianti213969
 
Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.htj82vpw
 
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEJIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEkajalroy875762
 
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Klinik kandungan
 
Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Holger Mueller
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312LR1709MUSIC
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckHajeJanKamps
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 

Recently uploaded (20)

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDEGURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDE
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptx
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.
 
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEJIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
 
Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 

Sports+RecBook 6.7.22.James.pdf

  • 1. S P O R T S + R E C P R A C T I C E
  • 2. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s P a g e 3 Introduction - who we are We are value creators, plain and simple. Our clients rely on us to properly plan and thoughtfully design each project to achieve their goals, maximize their investment, and create spaces for their end-users that will be enjoyed for many years. In a nutshell. Studio Architects is a full- service architecture firm with offices in Atlanta, Georgia and Charleston, South Carolina. Our expertise includes eSports, education, housing, mixed-use, religious, senior living, and sports+rec. We believe that listening to our clients and exceeding their expectations daily is our number one priority. Whether it’s through our team’s hands on approach, attention to detail, or leaving no stone unturned style, we like to call ourselves designers and relationship builders that partner with a client from day one to help them achieve all of their goals. HUMBLE BEGINNINGS. In July of 2008, Greg Clever and Alan James opened the Atlanta Branch Office of Davis Architects in the basement of Greg’s home to serve multifamily and mixed-use developers with the intent of providing hands-on, client driven services. Over the next ten years, they worked tirelessly to fulfill these goals and create award-winning, nationally recognized projects. In 2018, Greg and Alan purchased the Atlanta Office of Davis Architects and Studio Architects was formed with the help of dedicated and talented Principals James Anderson, Chris Kacena, and Chris Van Kley, who were elevated to Partners. NEW BLOOD. In May of 2019, Geoff Clever joined the firm as Principal and was tasked by the partners of the firm with diversifying its portfolio to include education, civic, and sports projects. Geoff’s resume and portfolio of work included numerous K-12 school systems, as well as County, City, and Municipal entities in the Southeast, Collegiate, and Athletic clients including the University of Alabama, Clemson University, University of Florida, University of Georgia, and Auburn University. With these new areas of expertise in the firm’s arsenal, Studio Architects was able to offer an increased level of service to its current and prospective clients. TRIED & TRUE APPROACH. Collaboration is the glue that binds all of our work. At Studio Architects, we approach each project uniquely. We work closely with each of our clients to establish goals at the outset of a project and diligently monitor these objectives as a job moves through design, document preparation, and construction phases. Principal involvement from start to finish is paramount to our team’s hands- on approach to ensure that quality is maintained throughout the building design process. Each project is staffed with a team tailored to that specific project type and led by a Principal with the knowledge and experience to ensure success. WORDS TO WORK BY. We love what we do. Whether it’s working late to meet a deadline, participating in a design charrette, attending a lunch & learn, playing ping pong at lunch, or taking in a ball game, we like to have fun.
  • 3. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s P a g e 5 team - meet the starting lineup The Sports+Rec Practice at Studio Architects is a Southeast-based architectural workshop specializing in athletic facility projects. Just sports - men and women, varsity or club. We design facilities for traditional sports such as football, basketball, and baseball, but also design facilities for non-traditional sports such as eSports, Ice Hockey, and Rugby. Our practice is virtual with an emphasis on recruiting, trends, and technology. Firm services include Design, Master Planning, Programming, Feasibility Studies, and Recruiting / Fundraising Packages. Our five-year goal is to become the go-to sports+rec architectural firm in the Southeast specializing in collegiate, prep school, and parks+recreation projects, and in particular, helping clients conceptualize proposed facility improvements and developing recruiting and/or fundraising material to generate interest, capital, and buzz to move projects forward. Our team Geoff Clever Practice Leader University of Virginia Riwa Hojeij Project Interior Designer Georgia Tech Sean Jeong BIM Manager Auburn University Chris Chaphe Project Coordinator Kennesaw State University TJ Helms Project Manager Auburn University Denisha Garland Project Coordinator Auburn University Daniel Garcia Job Captain Kennesaw State University Lauren Carberry Project Architect University of Illinois Hal Greer Brand Designer University at Buffalo Ben Hanna Project Coordinator Clemson University Dennys Pozo Project Coordinator Georgia Tech Emily McClure Project Coordinator Kennesaw State University
  • 4. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s P a g e 7 services - what we do 5-Point Program Checkup Complimentary analysis of existing branding, facilities, game day experience, premium seating, and fundraising programs. Sports Consulting Hourly, daily, and retainer- based consulting services for a variety of sports facility needs including material/ color selection, deferred maintenance, and any in- house design construction projects. Athletic Master Planning 5, 10, and 20-year comprehensive planning effort involving visioning, benchmarking, programming, design, and cost & schedule preparation. Feasibility Studies Written and graphic analysis that takes all of a project’s relevant factors into account—including viability, operations, and cost & scheduling considerations to determine likelihood of completing the project successfully. Recruiting Packages Design and preparation of 2D and 3D images of proposed athletic facility improvements used by administrators, development staff, and coaches to generate interest and excitement from recruits or donors. Architecture, Design, Panning Full A/E Services including programming, design, design development, construction documents, bidding & negotiation, and construction administration. Auburn University Kennesaw State University University of Alabama Birmingham University of Alabama Georgia Institute of Technology University of Georgia University of Florida College of Charleston Georgia State University Clemson University North Carolina State University University of Central Florida Florida A&M University Birmingham Southern College The Miami Dolphins Football Team Greenville Triumph Soccer Club some of the great institutions We’ve had the pleasure to partner with...
  • 5. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s At Studio Architects, we are skilled athletic facility planners. We understand how athletic departments work when it comes to planning facility improvements. We realize the importance of proper planning and conceptualizing proposed improvements at the outset of an idea. We appreciate the financial circumstances of proposed facility improvements as they relate to fundraising and recruiting efforts. Whether the pre-design effort is an athletic facilities master plan or a feasibility study, Studio Architects possesses the right expertise to plan, design, and deliver drawings and marketing material to help generate interest, funding, and buzz to move proposed projects forward. Pre-design - recruiting & fundraising expertise Master Plans • University of Alabama - The Crimson Standard • University of Alabama at Birmingham • College of Charleston • University of Maine • Sacred Heart University • Johns Island Park • Atlanta Men’s Baseball Association Feasibility Studies • Marquis Grissom Baseball Association: Baseball Training Facility • Baptist Hill High School: Homecoming Tailgate Event • Hampstead Park: Soccer Mini-Pitch • Lawson State Community College: Baseball Player Development Center • Clemson University: Football Operations Complex • North Carolina State University: Carter-Finley Stadium - Revenue Generating Opportunities. Reynolds Coliseum: Women’s Volleyball, Gymnastics, Softball • Kennesaw State University: Fifth Third Bank Stadium - Sports Performance Complex • Georgia State University: Sports Arena Annex - Multi-Sport Training Facility • Georgia Tech: Bobby Dodd Stadium - Football Locker Room Upgrades • University of Georgia: Stegeman Coliseum - Seating Bowl & Branding • Florida A&M University: Bragg Memorial Stadium - Athletic Performance Facility • Florida A&M University: Bragg Memorial Stadium - Athletic Performance Facility • College of Charleston: Patriots Point Athletic Complex - Sports Medicine/Orthopedics & Cougar Athletics Center • The Gold Dome: New eSports Venue • Player One eSports: Competition Arena • US Naval Academy: D1 Hockey Arena • Robert Morris University: New eSports Center • Greenville Triumph: Practice & Competition Venue • Oregon Institute of Technology: eSports Practice Facility • University of Alabama at Birmingham: Blazer Football Stadium • Oklahoma City University: eSports Practice Facility • University of Alabama: Coleman Coliseum - Gymnastics Training Facility, Sewell-Thomas Stadium - Baseball Operations Facility, Coleman Coliseum - Courtside Club, Aquatics Complex, Rowing Operations Facility, Indoor Tennis Center, Captain’s Plaza Projects represent individual experience for Geoff Clever while employed at Davis Architects, MPS Architecture, or JLG Architects. P a g e 9
  • 6. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s design - our work defines us Each project is unique and a special opportunity for our team to make a positive impact on the built environment and add value to each and every client’s vision. Whatever the project, Studio Architects approaches each job with optimism and a fresh perspective that allows our designers to craft the best possible solution which are both efficient and economical, as well as distinctly creative. Studio Architects’ collaborative approach to practicing architecture is focused on creating positive experiences for all of our customers by maximizing service, building strong relationships, and helping achieve their business goals in each project we design. PAINT @ STUCCO: SW 7674 - Peppercorn PAINT @ TRIM: SW 6991 - Black Magic Johns island park the lodge at piney mountain Henderson state olmsted savannah Soccer Mini-pitch kannapolis P a g e 1 1
  • 7. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s The Gold Dome New esports venue - Feasibility study Oklahoma City University Oklahoma City, OK Future Completion $10M Project Cost (estimated) Proposed renovation of 33,000 SF, 1950’s geodesic dome structure built originally as a bank. The proposed improvements included collegiate eSports team space for OCU’s fledgling program at the basement level encompassing 12-gaming station practice bay, coaches’ offices, scrum room, war room, locker rooms, training room, and nutrition bar (branded “RAM FUEL”). The main level contained space for 42 gaming stations, retro arcade, food & beverage bar, merchandise areas, and VIP Suite housed in original bank vault (branded “The Vault”), together with gaming competition spaces including house floor, stage, team practice rooms & lounge, green room, production, and server room. The upper level incorporated common reception area, and coworking and/or incubator spaces for local eSports or technology firms to lease. Deliverables included plans, 3-D renderings, and cost estimate, as well as design & construction schedule. Project represents collaborative programming, design, and cost estimating effort by A/E/C team led by Studio Architects that included Mass Architects and Flintco P a g e 1 3
  • 8. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Coleman Coliseum new courtside club - feasibility study University of Alabama Tuscaloosa, AL Future Completion $1.5M Project Cost (estimated) Feasibility study for the renovation of existing press dining area to serve as VIP club for basketball patrons before, during, and after games. Capacity for the proposed lounge was set at 100 people to ensure exclusivity and premium-level experience for patrons with seats on the floor. Amenities of club incorporated food service, bar, seating, and private restrooms, as well as direct view of team’s path from locker room to court. Services of work effort included programming, design, and branding, as well as cost estimating, scheduling, and preparation of donor fundraising package. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 1 5
  • 9. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Reeves Football Operations Complex new football operations - feasibility study Clemson University Clemson, SC Spring 2017 Completion $55M Project Cost Feasibility study for a proposed new football operation complex. The purpose of the feasibility study was to develop a program & design that reflected the needs of Clemson University (and its football program) and included all the necessary components of a state-of-the-art football operations complex. The scope of the work also included conceptual design, renderings, fly-around animation, cost estimating, scheduling, and peer analysis of similar facilities at ACC schools, as well as schools that Clemson University recruits against year end and year out. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 1 7
  • 10. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Sports Arena Annex New multi-sport training facility - feasibility study Georgia State University Atlanta, GA Future Completion $1M Project Cost (estimated) Feasibility study involving the proposed renovation of existing natatorium into multi-sport training facility for soccer, sand volleyball, baseball, basketball, golf, and track & field. Proposed project also involved creation of new locker rooms, student-athlete support spaces, coaches’ office, viewing grandstand, and outdoor civic plaza with branding sculpture and signage. Deliverables of the work effort included building program, site & floor plans, 3-D drawings, fundraising animation, and phased construction cost estimate. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 1 9
  • 11. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Bartow Arena Upgrades to men’s basketball Operations center - feasibility study University of Alabama at Birmingham Birmingham, AL Future Completion $500K Project Cost (estimated) Feasibility study for the renovation of existing men’s basketball offices into state-of-the- art operations center to enhance recruiting opportunities for program. Scope of proposed work included exterior enhancements including marquee signage, colorful banners, and oversized player-based graphic window film. Proposed interior work involved major overhaul to lobby, head coach’s office, and support spaces, as well as staff and team areas. Highlights of suggested lobby upgrades included contemporary reception desk, basketball-themed waiting area, A/V, and branding improvements, as well as new floor, wall, and ceiling finishes with specialty lighting. Services of work effort included programming, design, and branding, as well as cost estimating, scheduling, and preparation of recruiting package. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 2 1
  • 12. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Carter-Finley Stadium Revenue generating opportunities - feasibility study North Carolina State University Raleigh, NC Future Completion $25M Project Cost (estimated) Feasibility study focused on development of “blue collar” revenue generating opportunities for Carter-Finley Stadium. Opportunities examined included grandstand club cut into the upper deck at the east side, tailgate club adjacent to PNC Arena, twelve suites, party terrace below the north end zone scoreboard, four field level loge patios, and two field level clubs at the south end zone flanking the team’s tunnel access from the locker onto the field. Each project was designed to take advantage of existing stadium features without costly modifications. Each project was themed to reinforce “Wolfpack” branding to enhance the fan experience at the stadium on game day. Deliverables of the study included plans, 3-D renderings, and cost estimate, as well as design & construction schedule. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 2 3
  • 13. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Sewell-Thomas Stadium Renovation & expansion University of Alabama Tuscaloosa, AL Winter 2016 Completion $37.5M Project Cost Renovation and expansion project involving major improvements to 8,500-seat stadium. Work included concourse upgrades, additional restrooms / concessions / seating, expanded canopy, skyboxes, two club lounges, home run berm, student section, field level seating, continuous outfield walk, family playground, pre-game picnic area, team store, commissary, press box, branding graphics & wayfinding signage, home team locker room & lounge, team meeting room, weight room, bullpen, Coca Cola viewing porch in right field, and four- lane indoor batting facility. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 2 5
  • 14. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Reynolds Coliseum women’s volleyball, gymnastics, & Softball team area upgrades - feasibility study North Carolina State University Raleigh, NC Future Completion $3M Project Cost (estimated) Feasibility study involving preparation of concepts to improve the layout and functionality of these team spaces, as well as how best to create separate identities for Women’s Volleyball, Softball, and Gymnastics. The study also involved the development of ideas to enhance recruiting opportunities through a modern makeover of spaces, finishes, lighting, and branding consistent with other top-10 Division 1 programs. Deliverables included program, floor plans, 3-D renderings representing the design concept, construction phasing, and cost estimate. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 2 7
  • 15. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Coleman Coliseum gymnastics training facility renovation & expansion - Feasibility Study University of Alabama Tuscaloosa, AL Future Completion $5M Project Cost (estimated) Feasibility study involving proposed renovation and 10,000 SF expansion of existing practice gymnasium into state-of-the-art gymnastics training facility containing practice gym, locker room, players’ lounge, training room, equipment room, coaches’ office, team meeting room, multi-purpose event space, and viewing platforms. Scope of work included benchmarking, programming, design, and preparation of 3-D rendering for recruiting and fundraising. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 2 9
  • 16. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Fifth Third Bank Stadium new sports performance complex - feasibility study Kennesaw State University Kennesaw, GA Future Completion $20M Project Cost (estimated) Feasibility study involving the preparation of design concepts for a multi-level, state-of-the- art sports facility to house football operations, football training table, student-athlete dining hall, premium club, academic center, sports performance facility, strength & conditioning, football locker room / training room / equipment room, and related support spaces in the north end zone of Fifth Third Bank Stadium. Services of the study consisted of evaluation of existing facilities, programming meetings with building users & stakeholders, and conceptual design with program, conceptual design drawings, 3-d renderings, donor “naming” renderings, and cost estimate & schedule as primary deliverables. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 3 1
  • 17. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Bobby Dodd Stadium football locker room upgrades - feasibility study Georgia Institute of Technology Atlanta, GA Summer 2018 Completion $4.5M Project Cost Feasibility study encompassing the renovation of the home team locker room, as well as adjacent spaces such as the coaches’ locker room, NFL locker room, equipment room hallway, and associated entry and circulation spaces. The proposed project included new lockers, finishes, MEP systems, A/V, and graphics, as well as addressed function and flow during the week for practice and on game days. Deliverable for the work effort included project description, program, conceptual design drawings, 3-d renderings for fundraising & recruiting, and cost estimate. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 3 3
  • 18. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s New eSports Center conceptual design Robert Morris University Moon Township, PA Summer 2019 Completion $50K Project Cost Conceptual design effort for the renovation of 700 SF of existing space within the Student Recreation & Fitness Center for the Colonials new Esports Program. Proposed improvements included 10-gaming stations, soft seating area with wall-mounted TV monitor, server closet to house the computer data rack, Respawn gaming tables & chairs, and branding graphics. The renovated area was located adjacent to a gymnasium, as well as unoccupied space that was transformed into a head coach’s office for the team. The proposed design was economical and efficient, but edgy to coincide with the team’s recruiting approach and spirit of the program. Deliverables included floor plan, 3-D renderings, and cost estimate. P a g e 3 5
  • 19. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Stephen C. O’Connell Center new ted crom gymnastics studio University of Florida Gainesville, FL Spring 2013 Completion $2M Project Cost Renovation and expansion project involving creation of 18,000 SF state-of-the-art training facility with practice gymnasium, training room, coaches’ offices, team lobby, equipment room, and branding graphics. Gymnasium improvements included design of practice areas for vault, uneven bars, balance beam, and floor exercise. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 3 7
  • 20. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Roth Athletic Center renovation & expansion of wayne densch sports center University of Central Florida Orlando, FL Fall 2019 Completion $10M Project Cost Two-story expansion project involving addition of 23,500 SF to existing Wayne Densch Sports Center to accommodate growth of football program, as well as new space for soccer and athletic administration offices. First floor components of the project include Hall of Fame lobby, football players’ lounge, recruiting room, hydro-therapy area, meeting & position rooms, Golden Knights Club headquarters, and locker facilities for the men’s and women’s soccer program. Second floor components include athletic department offices for senior administration, business & facility departments, coaches, and staff health & wellness area. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 3 9
  • 21. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s BBVA Compass Field new soccer stadium for blazer soccer & birmingham legion fc University of Alabama at Birmingham Birmingham, AL Summer 2017 Completion $10M Project Cost New home team “pitch” for UAB Soccer, as well as Birmingham Legion FC. Soccer- specific stadium includes 5,000 seats, entry plaza, fan zone, beer garden, ticketing, concessions, restrooms, press box, aluminum bleacher seating, LED video board, and synthetic turf field. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 4 1
  • 22. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Auburn Arena new multi-purpose arena Auburn University Auburn, AL Summer 2010 Completion $67M Project Cost New 9,200-seat multi-purpose arena for sporting events, concerts, and commencement. Facility serves as home for Men’s & Women’s Basketball, Women’s Volleyball, and Women’s Gymnastics programs. New arena design includes open concourse, center-hung LED video board, intimate seating, sky boxes, clubs, 14,000 SF practice facility, weight room, locker rooms, players’ lounges, coaches’ offices, team store, student entry & lobby, and interactive Lovelace Museum & Hall of Honor, as well as branding graphics throughout facility. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 4 3
  • 23. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Homewood Community Center new community center Homewood Parks & Recreation Homewood, AL Spring 2014 Completion $14M Project Cost New LEED Silver Certified community center featuring two full-size gyms, elevated running track, multi-story lobby, fitness rooms, weight & cardio exercise area, 100-person community meeting space, 25-yard competition pool, and instructional / leisure pool with vortex & zero- entry kids’ wading pool with play structure, as well as birthday party room, lifeguard facilities, concessions, restrooms, and covered outdoor dining area. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 4 5
  • 24. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s General Charles Krulak Stadium new multi-purpose stadium Birmingham Southern College Birmingham, AL Summer 2008 Completion $7M Project Cost New multi-sport stadium seating 1,600 involving design of press box, grandstand, and field house. Stadium work included creation of home team practice and competition facilities for Birmingham-Southern football, Men’s & Women’s Lacrosse, Cross Country, and Track and Field programs. The facility features an eight-lane track with steeplechase, long/triple jump pits, high jump, and pole vault, natural turf practice football field, discus & shot-put throwing cages, javelin runway, and synthetic turf soccer field. The field house includes coaches’ offices, team meeting rooms, locker rooms, training room, weight room, and officials’ locker room. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 4 7
  • 25. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Birmingham CrossPlex new multi-purpose athletic facility City of Birmingham Birmingham, AL Summer 2011 Completion $48M Project Cost New world-class practice & competition venue featuring a 50-meter natatorium and hydraulically banked 200-meter indoor track. The LEED Certified project is located on the site of the historic Alabama State Fair Grounds and has served as a civic catalyst for the revitalization of Five Points West. Meeting facilities and services to support regional and national sporting events are programmed, as well as training facilities for local amateur and college swimming & diving programs. The venue includes a multi-story lobby, café & concessions, meeting hall, conference center, team areas, and event area, as well as accommodations for volleyball, basketball, gymnastics, and cheerleading & dance camps. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 4 9
  • 26. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Falcon Stadium game day football upgrades @ north end zone United States Air Force Academy Colorado Springs, CO Summer 2018 Completion $6M Project Cost Renovation and expansion project to existing game day football locker room. Work included a 9,500 SF expansion of the locker room underneath the concourse level that included a coaches’ locker room, video room, press room, multi-purpose locker rooms, and field storage. In order to provide tractor-trailer access to the field for concerts and other events, the entrance to the tunnel was enlarged at the north end, as well as improved and upgraded along its length. Renovation work featured dual-sport lockers (football & lacrosse), training room, equipment room, medical room with x-ray, press room, green room (for dignitaries & talent), team “swag” area, and Falcon Fueling Station. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 5 1
  • 27. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Trussville Civic Center new community center Trussville Parks & Recreation Trussville, AL Fall 2008 Completion $13M Project Cost New civic center including community auditorium, 1000-person exhibition hall, commissary, six meeting rooms, fitness center, weight training room, cardio/fitness room, exercise room, spin room, indoor walking track, two basketball courts, and men’s and women’s locker rooms. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 5 3
  • 28. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Digital Media Center Bryant-denny stadium University of Alabama Tuscaloosa, AL Spring 2014 Completion $15M Project Cost Renovation and expansion project involving 40,000 SF of vacant space at the North End Zone of Bryant-Denny Stadium. Users of the state-of-the-art facility teaching and video production facility include Crimson Tide Productions, WVUA, Alabama Public Radio, and the Center for Public Television & Radio. Scope of work included new plaza level entrance, broadcast studios, control rooms, edit suites, and offices, as well as the set for “The Nick Saban Show.” Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 5 5
  • 29. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Bessemer City High School new athletic fields complex Bessemer City Schools Bessemer, AL Winter 2010 Completion $5M Project Cost New two-level, 1,500-student high schools with baseball, softball, and football athletic fields complexes. Schools features classrooms, laboratories, performing & visual arts center, administrative areas, media center, food-court style cafeteria, and two gymnasiums. Features of the athletic complexes include entry structure with ticketing / concessions, restrooms, synthetic turf football field, 8-lane track, home team & visitor bleachers, press box, and field house Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 5 7
  • 30. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Sarah Patterson Champions Plaza new sports plaza University of Alabama Tuscaloosa, AL Fall 2013 Completion $2.8M Project Cost New public plaza honoring the Crimson Tide’s national champion coaches for all sports except football. The curved plaza features granite slabs highlighting all of the Tide’s varsity sports besides football, including a listing of each sports’ NCAA and Southeastern Conference titles. The plaza was designed to recognize the successes of each sport, as well as each sport’s founding and initial coaching staff. A statue of Sarah Patterson, head coach of 6 NCAA national championship titles, is located in the center of the plaza bearing her name. The plaza was also designed as a backdrop for TV media broadcasts from the adjacent Mal M. Moore Athletic Facility, as well as Coleman Coliseum. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 5 9
  • 31. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s The Pool at Patriot Park new community outdoor pool Homewood Parks & Recreation Homewood, AL Summer 2019 Completion $8M Project Cost New seasonal outdoor community pool with leisure pool, deck, splash pad with spray features, zero depth entrance ramp with mushroom, water slide, concession stand with eating area, men’s & women’s locker rooms, lifeguard room, and check-in station. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 6 1
  • 32. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Mortimer Jordan High School New athletic fields complex JEFCOED Kimberly, AL Summer 2011 & 2012 Completion $5M Project Cost New two-level, 1,000-student high schools with baseball, softball, and football athletic fields complexes. Schools features classrooms, laboratories, performing & visual arts center, administrative areas, media center, food-court style cafeteria, and two gymnasiums. Features of the athletic complexes include entry structure with ticketing / concessions, restrooms, natural turf football field, 8-lane track, home team & visitor bleachers, press box, and field house. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 6 3
  • 33. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Sam Bailey Track Stadium renovaion & expansion University of Alabama Tuscaloosa, AL Summer 2013 Completion $3M Project Cost Renovation and expansion project to the existing stadium included installation of new nine-lane, state-of-the-art Beynon BSS-2000 track, as well as relocation of shot-put throw area to the west end of the track, outside of the oval. The infield was replaced with a new hybrid Bermuda grass providing landing areas for the javelin, hammer throw, and discus with cages for the throw events relocated to allow for better meet management. Additional work involved the relocation and reconfiguration of the jumps area, two pole vault runways, and two high jump aprons. Timing locations were added throughout the track area. In addition to the track renovations, the grandstand, press box, concessions, and restrooms were also upgraded with a new entry plaza added to commemorate the history of Alabama track athletes. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 6 5
  • 34. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Turner Field soccer grandstand & press box renovation University of Georgia Athens, GA Summer 2017 Completion $4M Project Cost Replacement of existing grandstands, as well as related fan and team amenities at soccer stadium. Work included design of new 1,600 seat, aluminum grandstand, press box, concessions, restroom, and VIP viewing platform for women’s soccer program. Press box was designed to meet SEC Network media requirements, as well as athletic operations, radio broadcast, and press corps. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 6 7
  • 35. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Homewood Athletic Complex Multi-use athletic facility Homewood Parks & Recreation Homewood, AL Summer 2019 Completion $17M Project Cost Renovation and expansion of West Homewood Park into multi-use athletic facility for Homewood Parks & Recreation Board. Primary use of Homewood Athletic Complex is youth baseball & softball, adult softball, and tennis. The complex has eleven fields used for baseball & softball and two large multi-purpose fields used primarily for flag football, lacrosse, and soccer, as well as eight hard-surface tennis courts. Batting cages, walking trails, and parking are also provided for the community’s use. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 6 9
  • 36. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Stephen C. O’Connell Center Renovation & expansion University of Florida Gainesville, FL Winter 2016 Completion $65M Project Cost Renovation and expansion project to multi- purpose arena housing basketball, gymnastics, and swimming & diving programs, as well as concerts and other public events. The work at the seating bowl included installation of a new center-hung scoreboard with new video-replay boards, as well as new chair-back seating throughout the arena. Other work at the interior included reconfiguration of all levels with a new concourse introduced at mid-level, as well as comprehensive fan, student-athlete, and staff upgrades. The lobby of the facility was also enlarged and contains Gator branding elements on the floor, walls, and ceilings. Premium amenities added to the facility include an exclusive 50-seat courtside club, a 530-seat center-court club, and 12 premium loge boxes. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 7 1
  • 37. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Birmingham- Jefferson Convention Complex new legacy arena club Birmingham-Jefferson Civic Center Authority Birmingham, AL Summer 2011 Completion $1M Project Cost Renovation of existing space underneath lower seating bowl of BJCC Arena into exclusive, premium lounge limited to 500 patrons. The club opens 2 hours before event time for socialization and serves up-scale food, beverage, and merchandise prior to concerts and other events. Private restrooms, soft-seating areas, buffet dining, food & beverage access, dedicated entry, and convenient location adjacent to the Arena and parking are provided to each member. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 7 3
  • 38. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Rhoads Stadium new indoor practice facility & Clubhouse renovation University of Alabama Tuscaloosa, AL Spring 2011 Completion $2.5M Project Cost Renovation and expansion project to softball stadium involving addition of outfield seating area called “The Brickyard, as well as creation of 8,000 SF indoor practice facility with reconfigurable netting systems to mimic the infield, as well as four batting lanes for practice. The clubhouse was renovated and expanded to meet player development needs with a spacious lobby featuring brand graphics, trophy cases, and soft seating added, while the locker room, players’ lounge, team meeting room, training room, and laundry facilities received substantive upgrades. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 7 5
  • 39. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Mal M. Moore Athletic Facility football facility renovation & new alabama strength & conditioning complex University of Alabama Tuscaloosa, AL Summer 2013 Completion $17M Project Cost Work included renovation of the existing weight room and locker room spaces into player development hub for Crimson Tide Football. Hub contains theater-style team meeting room, position meeting rooms, players’ lounge, and expanded team locker room with player rehab pool area, as well as branded “waterfall” feature. The two- story, 35,000 SF strength & conditioning facility was constructed. Other features incorporated into the design of the weight room include flexible connection to the Indoor Practice Facility, flush weight lifting platforms, and nutrition bar with bod pod, grab & go area, video monitors, sound system, and branding graphics. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 7 7
  • 40. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Indoor Practice Facility new indoor football practice facility University of Florida Gainesville, FL Summer 2015 Completion $16M Project Cost New 100,000 SF indoor practice facility featuring 120-yard synthetic turf field with drill area at north end. Facility also includes recruit room with outdoor patio, satellite training room, video work room, equipment storage, restrooms, and branding graphics. Filming platforms were designed at the south, north, and west interior walls of the building with a state-of-the-art sound system for voice, music, and crowd noise replication. Work also included the replacement of two grass practice fields to the west of the indoor facility, as well as the design of a new field maintenance building. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 7 9
  • 41. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s West Homewood Athletic Center new community athletic facilities Homewood Parks & Recreation Homewood, AL Summer 2019 Completion $5M Project Cost New athletic facility containing two multi-purpose gymnasiums for youth athletics with bleacher spectator seating, concession area, staff offices, and eight covered batting cages, as well as City Park Maintenance Operations Center which include vehicle, equipment, and material storage. The facility also includes a synthetic, mega-field for soccer and other youth sports that sits adjacent to the center and parking. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 8 1
  • 42. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Outdoor Training Pool new outdoor 50-meter pool Auburn University Auburn, AL Fall 2007 Completion $2M Project Cost New outdoor swimming pool and clubhouse for Auburn’s swimming and diving program. The new pool is 50-meters long by 25-meters wide and was designed to mimic similar outdoor aquatic facilities on the international circuit, as well as serve as a recruiting tool for the coaching staff. The pool allows for 10 lanes for long course and 22 lanes for short course swimming and was strategically located adjacent to the Martin Aquatic Center. While the 600,000-gallon pool is primarily used as a training site for Olympic competition by student-athletes, the pool is used in the off-season by the general student body through the University’s Student Life Department. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 8 3
  • 43. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Memorial Stadium game day football upgrades @ west end zone Clemson University Clemson, SC Summer 2014 Completion $1M Project Cost Renovation project involving upgrade of football game day facilities at Memorial Stadium including home team locker room, players’ lounge, and nutrition bar. Locker room work included renovated lockers, showers, and restroom facilities, as well as upgrades to finishes, lighting, and brand graphics. Work at the Players’ Lounge included branding graphics, video game stations, billiards, ping pong, shuffle board, cornhole, and enclosed arcade zone with video games and pinball machines. Nutrition bar work included creation of new juice bar for student athletes adjacent to primary strength & conditioning facility for nutritional support of student athletes during training activities. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 8 5
  • 44. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Bryant-Denny Stadium north & south end zone expansion & new walk of champions plaza University of Alabama Tuscaloosa, AL Summer 2006 / Summer 2010 Completion $93M Project Cost Work at the north end zone included 7,000-seat upper deck, VIP club with 1,700 outdoor seats, upper concourse, 38 skyboxes with TEPCO glazing, athletic offices, press room, ticketing, concessions, 300-seat recruiting lounge, and home team locker room complex. Work at the south end zone included 36 skyboxes, VIP club with 1,700 outdoor seats, 1,000-seat “stadium” club, donor hall of recognition, development administrative offices, outdoor market, and 8,600-seat upper deck with concourse. Expansion work involved the design of public plaza at the north end zone, The plaza features commemorative statues of national championship coaches, as well as commemorative plaques for national championship teams. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 8 7
  • 45. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s The Crimson Standard master plan University of Alabama Tuscaloosa, AL Summer 2021 Completion (phase one) $250M Project Cost (estimated) Master plan encompassing fifteen varsity sports and their respective practice and competition facilities, as well as administrative offices and student-athlete residential accommodations. The purpose of the master plan was to chart a ten- year course for future athletic facility development and to proactively address upcoming changes to Crimson Tide Athletics’ fan base. The scope of work included benchmarking (collegiate & professional sports facilities), visioning, programming, design, and master plan package preparation, as well as coordination with ongoing campus master planning efforts. Deliverables provided at the conclusion of the effort comprised a comprehensive master plan document, master campus site plan of existing & proposed athletic facilities, project designs, 3-D renderings, project animations, and fundraising and/ or “hype” videos. Project represents individual experience for Geoff Clever while employed at Davis Architects P a g e 8 9
  • 46. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s baseball Player development center feasibility study Lawson State Community College Birmingham, AL Future Completion $5M Project Cost (estimated) New Baseball Player Development Center at Lawson State Community College. The facility is adjacent to the community college’s existing baseball stadium and includes locker rooms, equipment rooms, offices, a team lounge, and an indoor hitting facility. The new facility consolidates all of the baseball team’s operations into one building. The indoor hitting facility allows the team to practice indoors during inclement weather or while other players are using the field. The facility is also a huge draw in recruiting, allowing Lawson State to draw elite prospects to their program. Parking Lot Wilso n Road SW Roy W. Johnson Jr. Baseball Field Building B Building C Building D Cougar Baseball Player Development Center Rutledge Avenue SW 3 7 t h S t r e e t S W PROJECT NUMBER: PROJECT: DRAWING TITLE: DATE: SCALE: 1" = 100'-0" PR 20-115 COUGAR BASEBALL PLAYER DEVELOPMENT CENTER Site Plan 05/19/2020 Playground Hitting Facility Team Lounge Locker Room Toilets Showers Building Program Players Coaches Hitting Facility Umpires Laundry/Storage Coach's Suite Umpires Equipment Storage PROJECT NUMBER: PROJECT: DRAWING TITLE: DATE: SCALE: 1" = 20'-0" PR 20-115 COUGAR BASEBALL PLAYER DEVELOPMENT CENTER Floorplan 05/19/20 P a g e 9 1
  • 47. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s West Ashley High School weight room renovation Charleston County School District Charleston, SC Summer 2021 Completion $250K Project Cost Expansion and renovation of the existing weight room at West Ashley High School. The expansion demolished a wall between the existing weight room and a storage room to create a larger, open space that functioned and flowed in a more efficient way for workouts to be held by the student athletes. The new space created an improved layout that maximized the amount of equipment in the weight room. A single strength coach can now conduct workouts for student athletes while seeing the entire space, creating a safer, more efficient space. P a g e 9 3
  • 48. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Johns island park master plan St. John’s High School Johns Island, SC Winter 2023 (anticipated) $2.8M Project Cost Athletics master plan for St. John’s High School at Johns Island Park. Charleston County School District and the City of Charleston wanted to develop a five, ten, and twenty year master plan for the city park that included baseball, softball, soccer, and tennis, as well as disc golf, beach volleyball, and a children’s fully accessible playground. Johns Island Park is the home of St. John’s High School’s baseball, softball, soccer, and tennis programs, and as a result, another component of the master plan involved athletic facility upgrades to better align its sports features with other high schools in the District. P a g e 9 5
  • 49. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s 0’ 10’ 20’ 40’ NORTH A M E R IC A S T COLUMBUS ST BUILDING MINI-PITCH PERIMETER FENCE, TYP. BLEACHERS, TYP. SHRUBS & GROUNDCOVERS, TYP. 10’ PASS-THROUGH MAIN ENTRANCE EXISTING TREE, TYP. E H A M P S T E A D S Q U A R E Soccer Mini-pitch at hampstead park Feasibility study Charleston County School District Charleston, SC Future Completion $1.2M Project Cost Master plan for a new Soccer Mini-Pitch on an abandoned park’s lot adjacent to an elementary school. The program includes a 120’ x 60’ artificial turf soccer field intended to be used by both Charleston County School District and recreation leagues in the city. In addition to the field itself, there are landscape improvements throughout the park that included new vegetation, softscape, and hardscape. Bleachers allow for spectators to watch games or sit and relax in the park when the field is not in use. A small fieldhouse allows for a gated entry into the complex and offers concessions, storage areas, and restrooms. P a g e 9 7
  • 50. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Marquis Grissom Baseball training facility Feasibility study Lithonia, GA Future Completion $7.5M Project Cost (estimated) Master plan for a baseball complex dedicated to various travel teams of the Marquis Grissom Baseball Association. The complex includes both indoor and outdoor program. The indoor facility consists of dedicated locker rooms, strength and condition spaces, homework and study rooms, and offices for coaches and members of the foundation. The outdoor program consists of a covered batting cage, a covered dedicated warmup area, a covered infield, and a full size competition and practice field with a 500 seat grandstand and press box. In addition to being the home of Marquis Grissom Baseball Association, the complex is developing relationships with the Atlanta Braves as well as Major League Baseball’s RBI program. P a g e 9 9
  • 51. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Baptist Hill High School tailgate event Feasibility study Charleston County School District Hollywood, SC Future Completion $10K Project Cost (estimated) Master plan for the annual Homecoming Tailgate Event at Baptist Hill High School. Held on the school’s baseball field adjacent to the football stadium, the event attracts 2,000 alums and fans every year and is well known in the area for being one of the best high school pregame atmospheres in South Carolina. Charleston County School District sought a more structured, safer event for the school. Through site planning and code analysis, the event is now staged in a more structured and systemized way, allowing for better ingress, egress, and access to amenities. P a g e 1 0 1
  • 52. s p o r t s + r e c p r a c t i c e - s t u d i o a r c h i t e c t s Southeast athletic complex renovation master plan Atlanta Men’s Baseball Association Lithonia, GA Future Completion $25M Project Cost (estimated) Master plan for the redevelopment and expansion of an existing, defunct softball complex outside of Atlanta. The project sought to transform the existing softball fields into full size baseball fields and included a dedicated practice field with an indoor hitting facility. Additional batting cages and bullpens are placed adjacent to fields throughout the complex. In addition to the primary baseball fields, there are multiple youth fields, a soccer field, a driving range, and a 2,500 seat competition stadium intended to be used by a local Division II baseball program in addition to tournament championship games. marquis grissom baseball association Atlanta Area Men’s Senior Baseball League Southeast Athletic Complex Renovation Master Plan 05/05/21 marquis grissom baseball association Atlanta Area Men’s Senior Baseball League Southeast Athletic Complex Renovation Master Plan 05/05/21 P a g e 1 0 3
  • 53. Geoff Clever, AIA Principal, Sports+Rec Practice Leader 843.300.8197 geoff@studioarchitects.us Our expertise includes education, eSports, housing, mixed-use, religious, senior living, and sports+rec.