Operations / Project Administrator available immediately
JJ New cv
1. CV for JJ OLIVIER
PERSONAL DETAILS
FIRST NAMES : Joseph James JJ
SURNAME : Olivier
RESIDENT ADDRESS : 3 Waterson Street Sasolburg
E-Mail address : joseph.olivier@snclavalin.com
CELL NUMBER : +27 78 460 2734
Office Number : +27 16 910 9301
Additionally : +27 71 992 1498
ID NUMBER : 6903265140086
GENDER : Male
MARITAL STATUS : Single
DEPENDANTS : None
NATIONALITY : South African
DRIVERS LICENSE : Code 14
LANGUAGE ABILITY : English/Afrikaans
AVAILABILITY : Notice Time
PASSPORT : Yes
2. HIGHER EDUCATIONAL BACKGROUND
1. University of Pretoria
Business Management Course
SWAT Analysis
Management and Leadership
Managing Diversity
Human Resource Management
Production/Operations Management
2. Business Management training College (BMT)
Advanced Supervisor Certificate
TEAM SUPERVISING
PROJECT PLANNING AND MANAGING
PLAN, ORGANISE AND ALLOCATE WORK
MONITOR AND MEASUREING OF WORK PROCESSES
National Fitter Trade test Certificate
National N3 Certificate
Additional Courses
Punching
FER Training
20 Keys To Improve Performance
T.M Developmentprogram
Fire and Firstaid training
H I R A
3. EMPLOYMENT HISTORY
1. COMPANY Kentz Engineering & Projects (E&P) for Sasol wax Expansion
project
Reverence Gielie Reimers Deputy Project Director FT Wax Project
Contact details: Cell:0833808321
Office: 016 960 4444
Richard Nolan Project Manager
Position held: Appointed 16.2 Site Manager for Gielie Reimers running of
daily project activities and liaison between different service providers
DUTIES AND RESPONSIBILITIES:
Oversee the construction project
Bringing about optimum utilization of resources- labour, materials and equipment, and
ensuring their procurement is optimised
Ensure that construction activities move according to predetermined schedule.
Development of effective communications and mechanisms for resolving conflicts among the
service providers
Control, drive and supervise planned work activities.
Direct reporting and feedback to Deputy Project Director of work completed and in progress
Daily plan and updating of work and assigning these to sub-contractor
Confirm materials and equipment as installed for compliance with contract plans and
specifications
Coordinate and inventory management
Establish and maintain teamwork spirit in my work pack to accomplish construction in an
efficient, effective and safe manner
Ensure excellent collaboration with my team and support groups on a daily basis to minimize
work interferences
Monitor the progress of the construction activities on a regular basis and hold regular status
meetings with all the contractors
Ensure project documents are complete.
Control and signing off completed work and punch items in work pack RFC Files
Monitor and control construction work within the schedule for the assigned area.
Ensure quality levels are maintained in the work packs of my responsibility
Measuring of safety, quality and work performance
4. EMPLOYMENT HISTORY
2. COMPANY Kentz Engineering & Projects (E & P)
Reverence Bertus Van Wyk 078 804 4853 (Project Manager)
Jaques Van Loggenberg 082 551 6487 (Project Engineer)
OFFICE NUMBER: 016 910 9301
Position held: Site Manager for Kentz Group E & P Projects
At Mozambique and ongoing Projects for E & P
DUTIES AND RESPONSIBILITIES:
Oversee the construction project from start to finish.
Bringing about optimum utilization of resources- labour, materials and equipment, and
ensuring their procurement at most cost-effective terms.
Ensure that construction activities move according to predetermined schedule.
Development of effective communications and mechanisms for resolving conflicts among the
work force
Plan, control, drive and supervise planned work activities.
Direct reporting and feedback to Project manager of work completed and in progress
Weekly and daily plan and updating of work and assigning these to sub-contractor
Confirm materials and equipment as installed for compliance with contract plans and
specifications
Suggestion and evaluation of technical improvements
Coordinate and inventory management
Establish and maintain teamwork spirit in my work pack to accomplish construction in an
efficient, effective and safe manner
Ensure excellent collaboration with my team and support groups on a daily basis to minimize
work interferences
Monitor the progress of the construction activities on a regular basis and hold regular status
meetings with all the sub-teams
Periodic inspection of construction sites.
Ensure project documents are complete
Create the teams, develop the objectives/goals of each and assign individual responsibilities.
Control and signing off of my completed work and QC packs in work pack
Develop maintenance guidelines and procedures
Maintain technical records, drawings and then monitor and control construction work within
the schedule for the assigned area.
Ensure quality levels are maintained in the work packs of my responsibility
Measuring of safety, quality and work performance
5. 3. COMPANY Kentz Construction
Reverence Lenny Manus 071 533 5418 (Site Superintendent)
Nash Shidu 078 800 3892 (Construction Manager)
Position held Snr Site Piping Supervisor Work pack 6
Acting site Superintendent for Feb 2014 Shut down WP 6
DUTIES AND RESPONSIBILITIES:
Reading, understanding and confirming of ISOs
Plan, control, drive and supervise all Tie-ins and planned work activities.
Direct reporting and feedback to Project manager of work completed and in progress
Weekly and daily plan and updating of work and assigning these to sub-contractor
Confirm materials and equipment as installed for compliance with contract plans and
specifications
Suggestion and evaluation of technical improvements
Coordinate and inventory management, bag and tag and store stock.
Do (DSTI) Daily Tasks Instructions and maintain work rules and work force discipline
Establish and maintain teamwork spirit in my work pack to accomplish construction in an
efficient, effective and safe manner
Ensure excellent collaboration with my team and support groups on a daily basis to
minimize work interferences
Control and signing off of my completed work and QC packs in work pack
Organisation of regular toolbox meetings and instruct personnel in good housekeeping
and safety practices
Develop maintenance guidelines and procedures
Maintain technical records, drawings and then monitor and control construction work
within the schedule for the assigned area.
Ensure quality levels are maintained in the work packs of my responsibility
Measuring of safety, quality and work performance
Do Safety Reviews on MFD and ISO with sastech before commencing of work
Daily work progress reports and feedback to management
4. COMPANYFTWEP (Sasol Wax Expansion Project) FTWEP
Reverence Ricardo Chitray 016 960 6369 or 082 882 7560
Position held Site Supervisor Work pack 4 and 6
DUTIES AND RESPONSIBILITIES:
Plan, control, drive and supervise all Tie-ins and planned work activities.
Direct reporting and feedback to Project managerof work completed and in progress
Weekly and daily plan and updating of work and assigning these to sub-contractor
Updating Barr chart to show work flow
Coordinate and inventory management, bag and tag and store stock.
Do (DTI) Daily Tasks Instructions
Establish and maintain teamwork spirit in my work pack
Ensure excellent collaboration with my team and support groups
Control and signing off of my completed tie-ins and QC packs inwork pack
Organisation of regular toolbox meetings
Maintain technical records and drawings and update where necessary
Ensure quality levels are maintained in the work packs of my responsibility
Measuring of safety, quality and work performance
Do Punching on completed work and signing off of QC packs
6. Do Safety Reviews on MFD and ISO with sastech before commencing of work
Control Bag and Tag of material in work area
3 COMPANY : Stirk Engineering and now ERD MMS
DATES OF EMPLOYMENT : November 2007 – December 2011
Contact Persons : ERD Manager Damian Marshall at 076918861
: Sasol Wax Mechanical Department Manager
Rev Mr. H Suurd at 016 960 3193 or cell 0836414219
POSITION HELD : Site Manager - Petrol Chemical Industry (Sasol)
4 COMPANY : P.P.M.S
DATES OF EMPLOYMENT : January 2001 – September 2007
Contact Persons Rev Chris Botha at 0836274812 or 0169602727
POSITION : Site Sup Petrol Chemical Industry (Sasol)
QUALITIES
I AM A VERY RELIABLE, CLEAN AND SOBER PERSON ANDDON’T SMOKE.
I BELIEVE IN RESPECT FOR INDIVIDUALS ANDSUPERIORS FOR WITCH I WORKFOR.
VERY GOOD LEADER AND PERFORM VERY GOOD UNDER PRESSURE IN
ANYCIRCUMSTANCES
MY POSSITIVE ATTITUDE HAS A GOOD EFFECT ONTEAM MEMBERS TOWARDS THEIR WORK
PERFORMANCE
MY WORK IS ALWAYS DONE ON TIME WITH NO INJURIES WITH SAFETYAS MY 1ST PRIORITY
MY SAFETYRECORD IS IMMACULATE AS A SITE MANAGER AT MY SITES
I BELIEVE I WILL BE AN ASSETTO YOUR COMPANNY ANDWORK FORCE
BECAUSE I AMA PERSON WITH INTEGRETY AND SOUNDVALLUES.
I HAVE JUSTFINNISH MY STUDYS ATBMT COLLEGE TO MAKE SURE I STAYIN TOUCH WITH WORK
RELATIONS LAWS AND CHANGES WITHIN THE JOB MARKET.
ENROLLING AT UNISA TODO MY SENIOR PROJECTS MANAGEMENT COURSE