Concept of JIT, Super Market & KanBan
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
2
Just-in-Time
Established by Kiichiro Toyoda, the founder of the Company.
“Just-in-Time” means, simply enough, supplying the right
parts, at exactly the right time and in exactly the right amount.
Part Needed
At Time Needed
In Amounts Needed
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
3
Where a customer can get-
(1) what is needed
(2) at the time needed
(3) in the amount needed
Therefore the supermarket is a place where we can buy according to need
What is a Super-Market
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
4
Supermarkets
Supermarket
• A controlled level of inventory with a specific location for each
item to give what is required, when it is required and how much
is required.
Application
• Is used to buffer one process from the other process where
continuous flow (one piece flow) is not feasible.
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
5
1st Step The Later Process (Customer) goes to the earlier
Process (Super-market)
2nd Step Acquire the required items (Commodities) at the time
and in the required quantities needed
3rd Step The earlier process immediately produces the quantity
just taken ( restocking the shelves)
How does the Super-Market
function?
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
6
Analogy between the Super-Market
function and Manufacturing
Manufacturing
Latter process goes to acquire
required parts at the time and
quantity needed
Earlier process immediately
produces the quantity just
taken
Super market
Customer goes to supermarket
Picks up commodities as per
his need
Supermarket restocks the
shelves
Supermarket & KanBan Concept
SUPER MARKET
SUPER MARKET WAREHOUSE
FACTORY & WAREHOUSE
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
8
Translating Super market
concept to product
How to operate super-market in production environment?
Applying Concept of Kanban
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
9
Translating Super market
concept to product
What is a Kanban ?
- A simple Visual Tool which communicates the needs
- Carries information
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
10
Translating Super market
concept to product
What information ?
(1) Pick up information
(2) Transfer information
(3) Production information
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
11
Functions of kanban
1. Provides pick-up or transport information.
2. Provides production information.
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
12
Functions of kanban (Contd.)
3. Prevents overproduction and excessive
transport.
4. Serves as a work order attached to goods.
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
13
Functions of kanban (Contd.)
5. Prevents defective products by identifying the
process making the defectives.
6. Reveals existing problems and maintains
inventory control.
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
14
Translating Super market
concept to manufacturing
How does it work ?
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
15
FLOWCHART…
PARTS
STORAGE
&
DISPATCH
C
U
S
T
O
M
E
R
Sub-
Assembly
Assembly
Machining
MATERIAL
STORAGE
SHIPPING
KANBAN
POST
PRODN
KANBAN
POSTS
Customer
Warehouse
Assembly Line
Finished Goods
Storage
Assembly parts storage Purchased parts
storage
Subassembly Line
Finished parts storage
Subassembly
parts storage
Parts Storage
Parts Storage
Raw material & purchased
parts storage
Suppliers
KANBAN ROUTES IN A FACTORY
M
M
M
M
M
M
M
P
P
M
M M
M
M
P
P
P
Sub-
Assembly
Line Parts
Fabricatio
n line
P : Production Card
M : Movement Card
Parts
Fabrication
Line
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
17
Rules
1. Later process picks up the number of items
indicated by the kanban at the earlier process.
2. Earlier process produces items in the quantity
and sequence indicated by the kanban.
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
18
3. No items are made or transported without a
kanban.
4. Always attach a kanban to the goods.
Rules (Contd.)
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
19
5. Defective products are not sent on to the
subsequent process. The result is 100% defect-
free goods.
6. Reducing the number of kanban increases their
sensitivity.
Rules (Contd.)
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
20
To increase his productivity,
the first principle a Toyota
employee remembers is to
maintain a bright, efficient
work environment - a
pleasant place for him to do
his job - by clearing and
arranging his own worksite
himself.
Tools to Implement Kanban - The “Four S’s”
Seiri = clearing
Seiton = arrangement
Seiso = sweeping and
washing
Seiketsu = cleanliness
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
21
Seiri = clearing Seiton = arrangement Seiso = sweeping and
washing
Seiketsu = cleanliness
Tools to Implement Kanban - The “Four S’s”
(Contd.)
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
22
*Seiri means to decide what things you need and what you do
not need, and then get rid of the things you don’t need.
*Seiton means to arrange the things which you need so that
they can be easily used.
*Seiso means to sweep and wash everything cleanly.
*Seiketsu is the overall neatness that results when the
previous three S’s are followed consistently.
Tools to Implement Kanban - The “Four S’s”
(Contd.)
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
23
4S’s also play role in discovering muda
The 4S’s aid in the
elimination of muda (waste).
With “a place for everything
and everything in its place,”
unnecessary parts,
equipment and other
materials are easy to identify.
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
24
A dirty workplace is dangerous
They are also important to safety.
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
25
Safety always comes first
There is one basic rule that
always comes first - the
safety of each person’s work
environment must always be
preserved. At Toyota, safety
always comes before every
other consideration.
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
26
KANBAN
Production Ordering
Kanban
(In-Process Kanban)
Withdrawal Kanban
Types of Kanbans
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
27
Production
Ordering
Kanban
Ordinary Production
Kanban
For production other than lot
production
For lot production
Triangular Kanban
Types of Kanbans
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
28
Withdrawal
Kanban
Interprocess
withdrawal
Kanban
Types of Kanbans
Supplier Kanban
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
29
Withdrawal Kanban
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
30
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
31
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
32
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
33
Parts Supply Management
By
Ram Mohan
IN-O-Tech Engineers & Consultants
Delhi
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
34
System for Parts Procurement
•Rolling Material requirement plan is issued monthly
for next 3 months to suppliers based on market
demand
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
35
System for Parts Procurement
•No of Kanbans required for next month is informed to
the suppliers
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
36
Material requirement program
deploying Kanban
Production
Program
Bill of
Material
Calculation of
material
required
List of Material
requirement
Program
No of
Kanbans in
use
Kanban
Information
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
37
Relationship -shorter lead time and Just -in -Time Production
Production day
order parts Long Lead time
Production day
order parts Short Lead time
Time
More parts
Less
parts
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
38
Control of Parts Supply
Daily part supply is controlled by
Kanban
Lead time -Most of the cases within
one day
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
39
Control of Parts Supply through Kanban
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
40
Transportation Methodology
Forms and Methods
1. Short Distance -Inter plant Transportation
( less than 100 Kms - Basically transported
by Toyota)
2. Long distance Inter Plant Transportation
( Independent Transporters)
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
41
Transportation Methodology
Forms and Methods
3. Purchase Parts Transportation
a. by Toyota
b. Supplier Truck
c. Independent Transporters
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
42
Basic Concept in
Transportation
Transportation plays the role of a conveyor
Transfers
What is needed
at a time when needed
as much as needed
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
43
Achieving Transportation by
Succeeding shop- Fundamental Principle
Elimination of Muda
Transferring what is needed ,at a time
when needed and as much as need
Result - Just in time Supply
End objective elimination of anti productive
factors like excessive inventory
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
44
Know-How to lower Transportation Cost
and Inventory
1. Utilisation of Returning Truck
Pallet standardisation
relay- Truck system
Toyota Supplier A
sell raw material and parts
purchase parts and sub-
assembly
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
45
Know-How to lower Transportation Cost
and Inventory
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
46
Elimination of Muda, Mura and Muri
Supply 1/day
Supply 4t/day
Excess inventory
Leveled production
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
47
Side Loading- different
bins/suppliers and easy to load
Part Supply truck
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
48
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
49
Parts Supply FIFO
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
50
Parts Supply FIFO
Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants
51
Parts Supply Schematic
Flow
Buffer Area
Receiving area/line side
direct supply
No Separate Stores
Supplier
Customer

More Related Content

Similar to Jit kanban supermarket

OM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptxOM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptx
ArpitaMandal22
 
Distribution management concluding session revised
Distribution management   concluding session revisedDistribution management   concluding session revised
Distribution management concluding session revisedReejo Samuel
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
Akshay Jain
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
Aysel Muradlı
 
Sansera Project Report
Sansera Project ReportSansera Project Report
Sansera Project Report
sohilsha
 
Industrial Visit report: Automobile industry
Industrial Visit report: Automobile industryIndustrial Visit report: Automobile industry
Industrial Visit report: Automobile industry
Nishikant Rajeshirke
 
Low Cost Automation Case Studies By Tetrahedron
Low Cost Automation Case Studies By TetrahedronLow Cost Automation Case Studies By Tetrahedron
Low Cost Automation Case Studies By Tetrahedron
Sagar Sangam Sahu
 
Create Rugged Applications: Managing Your Software Supply Chain
Create Rugged Applications: Managing Your Software Supply ChainCreate Rugged Applications: Managing Your Software Supply Chain
Create Rugged Applications: Managing Your Software Supply Chain
SeniorStoryteller
 
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
Enamul Khan
 
Lean Flow Seminar
Lean Flow SeminarLean Flow Seminar
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Sabio Bernard
 
Toyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesToyota Production System 14 Management Principles
Toyota Production System 14 Management Principles
DK Sharma
 
Automotive Industry & Toyota Scm
Automotive Industry & Toyota ScmAutomotive Industry & Toyota Scm
Automotive Industry & Toyota Scm
praveenvarghese
 
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
Abdul Qadir Master
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
Gurpreet Singh
 

Similar to Jit kanban supermarket (20)

OM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptxOM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptx
 
Distribution management concluding session revised
Distribution management   concluding session revisedDistribution management   concluding session revised
Distribution management concluding session revised
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
 
Sansera Project Report
Sansera Project ReportSansera Project Report
Sansera Project Report
 
Industrial Visit report: Automobile industry
Industrial Visit report: Automobile industryIndustrial Visit report: Automobile industry
Industrial Visit report: Automobile industry
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
Low Cost Automation Case Studies By Tetrahedron
Low Cost Automation Case Studies By TetrahedronLow Cost Automation Case Studies By Tetrahedron
Low Cost Automation Case Studies By Tetrahedron
 
Create Rugged Applications: Managing Your Software Supply Chain
Create Rugged Applications: Managing Your Software Supply ChainCreate Rugged Applications: Managing Your Software Supply Chain
Create Rugged Applications: Managing Your Software Supply Chain
 
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
Impact of JIT Inventory on procurement function in Perspective of Toyota Moto...
 
Lean Flow Seminar
Lean Flow SeminarLean Flow Seminar
Lean Flow Seminar
 
project ppt
project pptproject ppt
project ppt
 
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.
 
Toyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesToyota Production System 14 Management Principles
Toyota Production System 14 Management Principles
 
Automotive Industry & Toyota Scm
Automotive Industry & Toyota ScmAutomotive Industry & Toyota Scm
Automotive Industry & Toyota Scm
 
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
 
Toyota
ToyotaToyota
Toyota
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
CRM Survey
CRM Survey CRM Survey
CRM Survey
 
AKS
AKSAKS
AKS
 

More from Jitesh Gaurav

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
Jitesh Gaurav
 
Weld material
Weld materialWeld material
Weld material
Jitesh Gaurav
 
Six sigma
Six sigmaSix sigma
Six sigma
Jitesh Gaurav
 
Spi link
Spi linkSpi link
Spi link
Jitesh Gaurav
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
Jitesh Gaurav
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
Jitesh Gaurav
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
Jitesh Gaurav
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
Jitesh Gaurav
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
Jitesh Gaurav
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
Jitesh Gaurav
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
Jitesh Gaurav
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
Jitesh Gaurav
 
Pattern production
Pattern productionPattern production
Pattern production
Jitesh Gaurav
 
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
Jitesh Gaurav
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
Jitesh Gaurav
 
Qip
QipQip
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
Jitesh Gaurav
 

More from Jitesh Gaurav (20)

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
Weld material
Weld materialWeld material
Weld material
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Spi link
Spi linkSpi link
Spi link
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
 
Pattern production
Pattern productionPattern production
Pattern production
 
smed
smedsmed
smed
 
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
 
Qip
QipQip
Qip
 
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
 
Tqm
TqmTqm
Tqm
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 

Recently uploaded

6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
01-GPON Fundamental fttx ftth basic .pptx
01-GPON Fundamental fttx ftth basic .pptx01-GPON Fundamental fttx ftth basic .pptx
01-GPON Fundamental fttx ftth basic .pptx
benykoy2024
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 

Recently uploaded (20)

6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
01-GPON Fundamental fttx ftth basic .pptx
01-GPON Fundamental fttx ftth basic .pptx01-GPON Fundamental fttx ftth basic .pptx
01-GPON Fundamental fttx ftth basic .pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 

Jit kanban supermarket

  • 1. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 1 Concept of JIT, Super Market & KanBan
  • 2. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 2 Just-in-Time Established by Kiichiro Toyoda, the founder of the Company. “Just-in-Time” means, simply enough, supplying the right parts, at exactly the right time and in exactly the right amount. Part Needed At Time Needed In Amounts Needed
  • 3. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 3 Where a customer can get- (1) what is needed (2) at the time needed (3) in the amount needed Therefore the supermarket is a place where we can buy according to need What is a Super-Market
  • 4. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 4 Supermarkets Supermarket • A controlled level of inventory with a specific location for each item to give what is required, when it is required and how much is required. Application • Is used to buffer one process from the other process where continuous flow (one piece flow) is not feasible.
  • 5. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 5 1st Step The Later Process (Customer) goes to the earlier Process (Super-market) 2nd Step Acquire the required items (Commodities) at the time and in the required quantities needed 3rd Step The earlier process immediately produces the quantity just taken ( restocking the shelves) How does the Super-Market function?
  • 6. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 6 Analogy between the Super-Market function and Manufacturing Manufacturing Latter process goes to acquire required parts at the time and quantity needed Earlier process immediately produces the quantity just taken Super market Customer goes to supermarket Picks up commodities as per his need Supermarket restocks the shelves
  • 7. Supermarket & KanBan Concept SUPER MARKET SUPER MARKET WAREHOUSE FACTORY & WAREHOUSE
  • 8. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 8 Translating Super market concept to product How to operate super-market in production environment? Applying Concept of Kanban
  • 9. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 9 Translating Super market concept to product What is a Kanban ? - A simple Visual Tool which communicates the needs - Carries information
  • 10. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 10 Translating Super market concept to product What information ? (1) Pick up information (2) Transfer information (3) Production information
  • 11. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 11 Functions of kanban 1. Provides pick-up or transport information. 2. Provides production information.
  • 12. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 12 Functions of kanban (Contd.) 3. Prevents overproduction and excessive transport. 4. Serves as a work order attached to goods.
  • 13. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 13 Functions of kanban (Contd.) 5. Prevents defective products by identifying the process making the defectives. 6. Reveals existing problems and maintains inventory control.
  • 14. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 14 Translating Super market concept to manufacturing How does it work ?
  • 15. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 15 FLOWCHART… PARTS STORAGE & DISPATCH C U S T O M E R Sub- Assembly Assembly Machining MATERIAL STORAGE SHIPPING KANBAN POST PRODN KANBAN POSTS
  • 16. Customer Warehouse Assembly Line Finished Goods Storage Assembly parts storage Purchased parts storage Subassembly Line Finished parts storage Subassembly parts storage Parts Storage Parts Storage Raw material & purchased parts storage Suppliers KANBAN ROUTES IN A FACTORY M M M M M M M P P M M M M M P P P Sub- Assembly Line Parts Fabricatio n line P : Production Card M : Movement Card Parts Fabrication Line
  • 17. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 17 Rules 1. Later process picks up the number of items indicated by the kanban at the earlier process. 2. Earlier process produces items in the quantity and sequence indicated by the kanban.
  • 18. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 18 3. No items are made or transported without a kanban. 4. Always attach a kanban to the goods. Rules (Contd.)
  • 19. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 19 5. Defective products are not sent on to the subsequent process. The result is 100% defect- free goods. 6. Reducing the number of kanban increases their sensitivity. Rules (Contd.)
  • 20. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 20 To increase his productivity, the first principle a Toyota employee remembers is to maintain a bright, efficient work environment - a pleasant place for him to do his job - by clearing and arranging his own worksite himself. Tools to Implement Kanban - The “Four S’s” Seiri = clearing Seiton = arrangement Seiso = sweeping and washing Seiketsu = cleanliness
  • 21. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 21 Seiri = clearing Seiton = arrangement Seiso = sweeping and washing Seiketsu = cleanliness Tools to Implement Kanban - The “Four S’s” (Contd.)
  • 22. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 22 *Seiri means to decide what things you need and what you do not need, and then get rid of the things you don’t need. *Seiton means to arrange the things which you need so that they can be easily used. *Seiso means to sweep and wash everything cleanly. *Seiketsu is the overall neatness that results when the previous three S’s are followed consistently. Tools to Implement Kanban - The “Four S’s” (Contd.)
  • 23. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 23 4S’s also play role in discovering muda The 4S’s aid in the elimination of muda (waste). With “a place for everything and everything in its place,” unnecessary parts, equipment and other materials are easy to identify.
  • 24. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 24 A dirty workplace is dangerous They are also important to safety.
  • 25. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 25 Safety always comes first There is one basic rule that always comes first - the safety of each person’s work environment must always be preserved. At Toyota, safety always comes before every other consideration.
  • 26. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 26 KANBAN Production Ordering Kanban (In-Process Kanban) Withdrawal Kanban Types of Kanbans
  • 27. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 27 Production Ordering Kanban Ordinary Production Kanban For production other than lot production For lot production Triangular Kanban Types of Kanbans
  • 28. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 28 Withdrawal Kanban Interprocess withdrawal Kanban Types of Kanbans Supplier Kanban
  • 29. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 29 Withdrawal Kanban
  • 30. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 30
  • 31. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 31
  • 32. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 32
  • 33. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 33 Parts Supply Management By Ram Mohan IN-O-Tech Engineers & Consultants Delhi
  • 34. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 34 System for Parts Procurement •Rolling Material requirement plan is issued monthly for next 3 months to suppliers based on market demand
  • 35. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 35 System for Parts Procurement •No of Kanbans required for next month is informed to the suppliers
  • 36. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 36 Material requirement program deploying Kanban Production Program Bill of Material Calculation of material required List of Material requirement Program No of Kanbans in use Kanban Information
  • 37. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 37 Relationship -shorter lead time and Just -in -Time Production Production day order parts Long Lead time Production day order parts Short Lead time Time More parts Less parts
  • 38. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 38 Control of Parts Supply Daily part supply is controlled by Kanban Lead time -Most of the cases within one day
  • 39. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 39 Control of Parts Supply through Kanban
  • 40. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 40 Transportation Methodology Forms and Methods 1. Short Distance -Inter plant Transportation ( less than 100 Kms - Basically transported by Toyota) 2. Long distance Inter Plant Transportation ( Independent Transporters)
  • 41. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 41 Transportation Methodology Forms and Methods 3. Purchase Parts Transportation a. by Toyota b. Supplier Truck c. Independent Transporters
  • 42. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 42 Basic Concept in Transportation Transportation plays the role of a conveyor Transfers What is needed at a time when needed as much as needed
  • 43. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 43 Achieving Transportation by Succeeding shop- Fundamental Principle Elimination of Muda Transferring what is needed ,at a time when needed and as much as need Result - Just in time Supply End objective elimination of anti productive factors like excessive inventory
  • 44. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 44 Know-How to lower Transportation Cost and Inventory 1. Utilisation of Returning Truck Pallet standardisation relay- Truck system Toyota Supplier A sell raw material and parts purchase parts and sub- assembly
  • 45. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 45 Know-How to lower Transportation Cost and Inventory
  • 46. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 46 Elimination of Muda, Mura and Muri Supply 1/day Supply 4t/day Excess inventory Leveled production
  • 47. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 47 Side Loading- different bins/suppliers and easy to load Part Supply truck
  • 48. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 48
  • 49. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 49 Parts Supply FIFO
  • 50. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 50 Parts Supply FIFO
  • 51. Material Source: Toyota Training Handouts@ Ram Mohan Ino-Tech Engineers.&Consultants 51 Parts Supply Schematic Flow Buffer Area Receiving area/line side direct supply No Separate Stores Supplier Customer