Electro Pneumatic Valve Positioner
A simple design and concept equals a simple operation of these components:
•A pneumatic positioner
•A manifold coupled I/P converter
Supply pressure up to 145 PSI is connected to the supply port of the unit
(marked S on the gauge block side), and the actuator ports (marked C+ and
C-) are connected to either a double or single acting (spring return
actuator-rotary or linear) actuator. The C+ port is the positioners opening
port.
An Instrument signal (generally 4-20 mA) is then connected to the I/P
connection block. The pneumatic I/P port (located on the ¼” porting side)
should be plugged.
With no electronic signal on the unit, the positioner is stable, but no
actuator movement has occurred. The I/P is directly coupled with the
pneumatic positioner; either internally mounted our externally mounted (EX
and FF units) with a custom designed adapter.
Air supply for the I/P (up to 145 psi) is provided through the positioners
supply port. The I/P converter will convert the 0-10V DC signal to a 3-15
psi signal sent internally to the positioner diaphragm.
A voltage change causes the I/P to respond and sends a pneumatic signal
(internally) to the positioner diaphragm, causing the diaphragm to move
and the spool valve (air shuttle valve) to move, sending air to the actuator.
As the actuator moves, feedback to the positioner is provided through the
actuator linkage and the positioner spindle/cam assembly.
As the actuator moves the spindle/cam rotates and turns to the desired
“set point” based on the mA input signal.
Once the set point is achieved a steady state position is maintained, and
the supply air is “balanced” between ports.

More Related Content

What's hot

What's hot (20)

Different types of control valves
Different types of control valvesDifferent types of control valves
Different types of control valves
 
Pneumatic valves
Pneumatic valvesPneumatic valves
Pneumatic valves
 
Control valves
Control valves Control valves
Control valves
 
Flow control valves
Flow control valvesFlow control valves
Flow control valves
 
Transmitter By MItesh Kumar
Transmitter By MItesh KumarTransmitter By MItesh Kumar
Transmitter By MItesh Kumar
 
Control valve positioners
Control valve positionersControl valve positioners
Control valve positioners
 
Basic instrumentation
Basic instrumentationBasic instrumentation
Basic instrumentation
 
Hidraulic Symbols
Hidraulic Symbols Hidraulic Symbols
Hidraulic Symbols
 
Hydraulic and pneumatic control elements
Hydraulic and pneumatic control elementsHydraulic and pneumatic control elements
Hydraulic and pneumatic control elements
 
Pressure
PressurePressure
Pressure
 
DIRECTION CONTROL VALVE
DIRECTION CONTROL VALVEDIRECTION CONTROL VALVE
DIRECTION CONTROL VALVE
 
Pneumatics Circuits Components (Circuit details)
Pneumatics Circuits Components (Circuit details)Pneumatics Circuits Components (Circuit details)
Pneumatics Circuits Components (Circuit details)
 
Control Valves
Control ValvesControl Valves
Control Valves
 
Actuators er.sanyam s. saini (me regular)
Actuators er.sanyam s. saini  (me regular)Actuators er.sanyam s. saini  (me regular)
Actuators er.sanyam s. saini (me regular)
 
Control valves
Control valvesControl valves
Control valves
 
Control valve ppt
Control valve pptControl valve ppt
Control valve ppt
 
Hydraulic beginner
Hydraulic beginnerHydraulic beginner
Hydraulic beginner
 
Lecture 18 directional valves and symbols
Lecture 18   directional valves and symbolsLecture 18   directional valves and symbols
Lecture 18 directional valves and symbols
 
Hydraulics & pneumatics (AU) Unit-II
Hydraulics & pneumatics (AU)   Unit-IIHydraulics & pneumatics (AU)   Unit-II
Hydraulics & pneumatics (AU) Unit-II
 
Hydraulic ciruits
Hydraulic ciruitsHydraulic ciruits
Hydraulic ciruits
 

Similar to Electro Pneumatic Valve Positioner Operation

Similar to Electro Pneumatic Valve Positioner Operation (20)

i to p conveter
i to p  conveteri to p  conveter
i to p conveter
 
1&2.pptx
1&2.pptx1&2.pptx
1&2.pptx
 
Operational Amplifiers
Operational Amplifiers Operational Amplifiers
Operational Amplifiers
 
Process control 3 chapter
Process control 3 chapterProcess control 3 chapter
Process control 3 chapter
 
Electromagnetic flow meter wiring for output
Electromagnetic flow meter wiring for outputElectromagnetic flow meter wiring for output
Electromagnetic flow meter wiring for output
 
Process control 3 chapter
Process control 3 chapterProcess control 3 chapter
Process control 3 chapter
 
Uenr5223sist. electrico excavadora 336 f
Uenr5223sist. electrico excavadora 336 fUenr5223sist. electrico excavadora 336 f
Uenr5223sist. electrico excavadora 336 f
 
SINGLE PHASE OUTPUT INVERTER
SINGLE PHASE OUTPUT INVERTERSINGLE PHASE OUTPUT INVERTER
SINGLE PHASE OUTPUT INVERTER
 
KENR82440001.pdf
KENR82440001.pdfKENR82440001.pdf
KENR82440001.pdf
 
Operational amplifier
Operational amplifierOperational amplifier
Operational amplifier
 
OP-AMP.pptx
OP-AMP.pptxOP-AMP.pptx
OP-AMP.pptx
 
Sistema electrico 950 h
Sistema electrico 950 hSistema electrico 950 h
Sistema electrico 950 h
 
SISTEMA ELÉCTRICO LBS-420F2.pdf
SISTEMA ELÉCTRICO LBS-420F2.pdfSISTEMA ELÉCTRICO LBS-420F2.pdf
SISTEMA ELÉCTRICO LBS-420F2.pdf
 
Operationamplifier
OperationamplifierOperationamplifier
Operationamplifier
 
unit 3.ppt
unit 3.pptunit 3.ppt
unit 3.ppt
 
I_P Converter final
I_P Converter finalI_P Converter final
I_P Converter final
 
Single Stage Single Phase Active Power Factor Corrected Ĉuk Topology Based AC...
Single Stage Single Phase Active Power Factor Corrected Ĉuk Topology Based AC...Single Stage Single Phase Active Power Factor Corrected Ĉuk Topology Based AC...
Single Stage Single Phase Active Power Factor Corrected Ĉuk Topology Based AC...
 
Operational amplifier
Operational amplifierOperational amplifier
Operational amplifier
 
025738888.pdf
025738888.pdf025738888.pdf
025738888.pdf
 
Final Control Element.pptx
Final Control Element.pptxFinal Control Element.pptx
Final Control Element.pptx
 

Recently uploaded

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 

Recently uploaded (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 

Electro Pneumatic Valve Positioner Operation

  • 2. A simple design and concept equals a simple operation of these components: •A pneumatic positioner •A manifold coupled I/P converter
  • 3. Supply pressure up to 145 PSI is connected to the supply port of the unit (marked S on the gauge block side), and the actuator ports (marked C+ and C-) are connected to either a double or single acting (spring return actuator-rotary or linear) actuator. The C+ port is the positioners opening port. An Instrument signal (generally 4-20 mA) is then connected to the I/P connection block. The pneumatic I/P port (located on the ¼” porting side) should be plugged. With no electronic signal on the unit, the positioner is stable, but no actuator movement has occurred. The I/P is directly coupled with the pneumatic positioner; either internally mounted our externally mounted (EX and FF units) with a custom designed adapter. Air supply for the I/P (up to 145 psi) is provided through the positioners supply port. The I/P converter will convert the 0-10V DC signal to a 3-15 psi signal sent internally to the positioner diaphragm. A voltage change causes the I/P to respond and sends a pneumatic signal (internally) to the positioner diaphragm, causing the diaphragm to move and the spool valve (air shuttle valve) to move, sending air to the actuator.
  • 4. As the actuator moves, feedback to the positioner is provided through the actuator linkage and the positioner spindle/cam assembly. As the actuator moves the spindle/cam rotates and turns to the desired “set point” based on the mA input signal. Once the set point is achieved a steady state position is maintained, and the supply air is “balanced” between ports.