SlideShare a Scribd company logo
1 of 22
Download to read offline
Dhaka WASA - VEI project
11
Preparation
2.3 Long term Urban Dredging Plan (WIT)
• Dredging strategy
• Sediment growth figures
• Clustering drainage units to dredging units
• Needed budgets
5
operational excellence - sustainable services - bilateral cooperation
5
Take-home message(s):
Long term Urban Dredging plans gives insights in needed budgets!
How many years is long term?
What is the difference between drainage unit and dredging unit?
5
operational excellence - sustainable services - bilateral cooperation
5
Learning Objectives of the Topic/Session:
At the end of the session the participants will be able to:
1. Explain the importance of Long term Urban Dredging Plans (LUDP)
2. Identify needed figures for making LUDP’s
3. Explain your dredging strategy
4. Relation between data collection and long term planning
5
operational excellence - sustainable services - bilateral cooperation
5
LUDP gives answers to
1. Where to dredge in order to meet your design and hydraulic
requirements
2. When to dredge in order to meet your design and hydraulic
requirements
3. Costs and thus needed budgets when dredging at a certain
place is required
Floods are caused when your drainage system does not fulfill your design
and hydraulic requirements
5
operational excellence - sustainable services - bilateral cooperation
5
WIT: Data information
Feasibility plan
Dredging plan
Do: dredging!
Framework assessment: from required
hydraulic dimensions to dredging
strategy
LUDP
Side selection
5
operational excellence - sustainable services - bilateral cooperation
5
Generating LUDP’s you need:
1. WIT data information: what is in there?
Hydrographic survey and sampling (2 out of 7 catchments are known)
2. Framework assessment = Dredging strategy
3. Operational “Do” methods & Unit prices (unit prices x amounts = costs)
4. Sediment growth figures
5. Defined dredging units (side selection)
6. LUDP module WIT
5
operational excellence - sustainable services - bilateral cooperation
5
Dredging strategy (important!)
• Dredging strategy = Dhaka WASA policy!
• Highly related with hydraulic capacity of your drainage system!
• Budgets and dredging strategies are strongly related!
• Dredging strategy = intervention depth and corresponding
dredging profile (with or without base layer)
5
operational excellence - sustainable services - bilateral cooperation
5
Dredging strategy: required hydraulic dimensions
intervention depths
Intervention depth
Question: how much you should remove to fulfill your requirements above?
What does this picture mean?
Answer: nothing! Actual sediment is still below intervention depth!
Which year do you have to intervene when requirements do not fullfill anymore (when
does sediment reach intervention depth)?
WIT calculates year and corresponding amounts and costs!
5
operational excellence - sustainable services - bilateral cooperation
5
Dredging strategy Kalyanpur: redefined canal contruction to dredging profile
(in this case: intervention = dredging profile)
Define your dredging strategy in WIT
754 + 112 = 866 m3
Question 1: Dredging amount in
this drainage unit?
Question 2: dredging strategy in
Segunbagicha box culvert?
WIT: all & only sediment
(Or 50 %)
5
operational excellence - sustainable services - bilateral cooperation
5
Operational “Do” methods and unit prices (1)
• Define dredging-, transport and disposal methods and link to
drainage units in WIT
• WIT visualize defined methods on maps,
Question: What characteristics has the drainage unit Segunbagicha Box culvert if it will be dredged?
5
operational excellence - sustainable services - bilateral cooperation
5
• Over-estimated unit prices used in WIT
WIT calculation: 49.283 m3 sediment in Segunbagicha Box Culvert
Dredging costs Segunbagicha: amount of sediment x unit prices
Operational “Do” methods and unit prices (2)
5
operational excellence - sustainable services - bilateral cooperation
5
Sediment growth figures
1. Only Agargeon figures are known based on construction year and survey
0,25 meter/year
2. Currently, sediment growth survey: Kallyanpur Canals & Segunbagicha drains
Cross section ID Location Previous done
measured by
Date of previous
measurement
Survey
round 1
Survey
round 2
Survey
round 3
Survey
round 4
Kallyanpur_Main_D-39 Main Canal Globe survey January 2014 Week 45
2014
Week 06
2015
Week 19
2015
Week 32
2015
Kallyanpur_Main_D-13 Main Canal Globe survey January 2014 Week 45
2014
Week 06
2015
Week 19
2015
Week 32
2015
Kallyanpur_Main_UP-13 Main Canal Globe survey January 2014 Week 45
2014
Week 06
2015
Week 19
2015
Week 32
2015
Kallyanpur_Side3_25 Side Canal
3
BIDCON survey July 2014 Week 45
2014
Week 06
2015
Week 19
2015
Week 32
2015
Kallyanpur_Side4_55 Side Canal
4
BIDCON survey July 2014 Week 45
2014
Week 06
2015
Week 19
2015
Week 32
2015
Kallyanpur_Side6_38 Side Canal
6
BIDCON survey July 2014 Week 45
2014
Week 06
2015
Week 19
2015
Week 32
2015
Kallyanpur survey schedule
5
operational excellence - sustainable services - bilateral cooperation
5
Defined dredging units
Drainage unit
(specific characteristics: dimensions,
dredging methods, etc.)
Dredging unit
(project)
Catchment Area
Give examples
…….
…….
…….
Segunbagicha
Segunbagicha upstream box culvert
Segunbagicha box culvert
cluster
5
operational excellence - sustainable services - bilateral cooperation
5
LUDP WIT (1)
• Detail information drainage unit
- Dredging strategy
- Amounts of sediment calculations
- Dredging-, transport- and disposal method
• Unit costs
• Compose/cluster dredging units
• Planning dredging units
• Export planning en key parameters
Drainage unit
Dredging unit
Planning
5
operational excellence - sustainable services - bilateral cooperation
5
LUDP WIT (2)
• Planning dredging units
Drainage unit
Dredging unit
Planning
- Required year of dredging? WIT calculates the year of
intervention with sediment growth figures: signaling
function on maps (e.g. 2018)
(not obligatory to use)
- Use WIT dredging calendar: WIT calculates needed
budgets in annual dredging calendar with unit prices,
sediment growth figures and amounts (m3)
- WIT users are able to slide dredging units in annual
calendar to optimize budgets!
5
operational excellence - sustainable services - bilateral cooperation
5
LUDP WIT (3)
• Planning dredging units
- WIT annual dredging calendar
5
operational excellence - sustainable services - bilateral cooperation
5
WIT demonstration!!
Results:
Amounts and needed budgets if Kallyanpur Main Canal, Agargeon,
Segunbagicha Box culvert and Segunbagicha side drains will be dredged in this year!
Or later……. If the WIT LUDP method is used
5
operational excellence - sustainable services - bilateral cooperation
5
Dhaka data in WIT
- GIS data set with drainage network Dhaka WASA
Provided by Dhaka WASA GIS department
- Hydrographic survey
Globe survey: January 2014, Kallyanpur main Canal
BIDCON survey: August 2014, Kallyanpur side Canals
BIDCON survey: September 2014, Segunbagicha side drains
UDDP survey: December 2013, Segunbagicha Box culvert
Currently: rest of Kallyanpur catchment (closed drains), Segunbagicha Khal, sediment growth survey
- Dredging strategy
Kallyanpur Main Canal: designed dredging profile, Agargeon and Segunbagicha: only all sediment
- Chemical quality sediment
Laboratory results: Kallyanpur = uncontaminated & Segunbagicha = contaminated
- Defined dredging units
Kallyanpur Main Canal (UDDP project),
Agareon (UDDP project),
Segunbagicha Box culvert (UDDP project),
Segunbagicha side drains (surveyed and direct related with UDDP project)
5
operational excellence - sustainable services - bilateral cooperation
5
Remaining WIT necessaires
- Dhaka WASA employees to be trained
WIT users at O&M
WIT maintenance at GIS department
- Annual dredging budgets coming 10 years (requirement)
- Intervention levels (requirement)
This represents the minimum hydraulic capacity of your drainage system.
Intervention levels might be designed in the Drainage Master Plan (?)
- If available, dimensions of closed drains
To compare with measurements of hydrographic surveys (data validation)
- If available, hydrographic survey data from other catchment areas
5
operational excellence - sustainable services - bilateral cooperation
5
Take-home message(s):
Long term Urban Dredging plans gives insights in needed budgets!
How many years is long term?
What is the difference between drainage unit and dredging unit?
Questions?
Thank you for your attention!

More Related Content

What's hot

What's hot (9)

EWB-SFP/UC Berkeley Project: Water Pumping, Storage, and Distribution System...
EWB-SFP/UC Berkeley Project: Water Pumping, Storage, and  Distribution System...EWB-SFP/UC Berkeley Project: Water Pumping, Storage, and  Distribution System...
EWB-SFP/UC Berkeley Project: Water Pumping, Storage, and Distribution System...
 
Environmental Research & Asphalt Pavements
Environmental Research & Asphalt PavementsEnvironmental Research & Asphalt Pavements
Environmental Research & Asphalt Pavements
 
CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016
 
March 14th Public Meeting
March 14th Public MeetingMarch 14th Public Meeting
March 14th Public Meeting
 
Wb final presentation
Wb final presentationWb final presentation
Wb final presentation
 
Perez adventures in cooperative conservation
Perez   adventures in cooperative conservationPerez   adventures in cooperative conservation
Perez adventures in cooperative conservation
 
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
 
YVW council reinstatement presenation v2
YVW council reinstatement presenation v2YVW council reinstatement presenation v2
YVW council reinstatement presenation v2
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 

Viewers also liked

Residential Development and Buffers
Residential Development and BuffersResidential Development and Buffers
Residential Development and BuffersBSH Admin
 
Planning for the Future: Sea Level Rise in California
Planning for the Future: Sea Level Rise in CaliforniaPlanning for the Future: Sea Level Rise in California
Planning for the Future: Sea Level Rise in CaliforniaLaura Rinaldi
 
Shoreline Bugs, the Smalltalk way
Shoreline Bugs, the Smalltalk wayShoreline Bugs, the Smalltalk way
Shoreline Bugs, the Smalltalk wayESUG
 
IAHR 2015 - Sediment transport and underwater light climate affected by flexi...
IAHR 2015 - Sediment transport and underwater light climate affected by flexi...IAHR 2015 - Sediment transport and underwater light climate affected by flexi...
IAHR 2015 - Sediment transport and underwater light climate affected by flexi...Deltares
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
 
Impacts of climate change on the coasts of
Impacts of climate change on the coasts ofImpacts of climate change on the coasts of
Impacts of climate change on the coasts ofjorubelle
 
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Stephen Flood
 
Shoreline Change in Urban Massachusetts, Time for Retreat?
Shoreline Change in Urban Massachusetts, Time for Retreat?Shoreline Change in Urban Massachusetts, Time for Retreat?
Shoreline Change in Urban Massachusetts, Time for Retreat?Lisa Granquist
 
Hydrodynamics Modelling in Seashore Jogjakarta’s Airport
Hydrodynamics Modelling in Seashore Jogjakarta’s AirportHydrodynamics Modelling in Seashore Jogjakarta’s Airport
Hydrodynamics Modelling in Seashore Jogjakarta’s AirportFaisal Purnawarman
 
120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik Havinga120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik HavingaRESTORE
 
Coastal Geologic Hazards and Sea-Level Rise: Climate Change in Rhode Island
Coastal Geologic Hazards and Sea-Level Rise: Climate Change in Rhode IslandCoastal Geologic Hazards and Sea-Level Rise: Climate Change in Rhode Island
Coastal Geologic Hazards and Sea-Level Rise: Climate Change in Rhode Islandriseagrant
 
DSD-INT 2014 - Delft3D Users Meeting - Application of Delft3D in an Operation...
DSD-INT 2014 - Delft3D Users Meeting - Application of Delft3D in an Operation...DSD-INT 2014 - Delft3D Users Meeting - Application of Delft3D in an Operation...
DSD-INT 2014 - Delft3D Users Meeting - Application of Delft3D in an Operation...Deltares
 
Shoreline Change Special Area Management Plan Overview
Shoreline Change Special Area Management Plan OverviewShoreline Change Special Area Management Plan Overview
Shoreline Change Special Area Management Plan Overviewriseagrant
 
Coastal Management
Coastal ManagementCoastal Management
Coastal ManagementJames Foster
 
Maritime Archaeological Modelling using MIKE 21
Maritime Archaeological Modelling using MIKE 21Maritime Archaeological Modelling using MIKE 21
Maritime Archaeological Modelling using MIKE 21Stephen Flood
 
Smp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSmp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSevern Estuary
 

Viewers also liked (20)

Kitsap Alliance Critique of the County's SMP
Kitsap Alliance Critique of the County's SMPKitsap Alliance Critique of the County's SMP
Kitsap Alliance Critique of the County's SMP
 
Residential Development and Buffers
Residential Development and BuffersResidential Development and Buffers
Residential Development and Buffers
 
Planning for the Future: Sea Level Rise in California
Planning for the Future: Sea Level Rise in CaliforniaPlanning for the Future: Sea Level Rise in California
Planning for the Future: Sea Level Rise in California
 
Shoreline Bugs, the Smalltalk way
Shoreline Bugs, the Smalltalk wayShoreline Bugs, the Smalltalk way
Shoreline Bugs, the Smalltalk way
 
IAHR 2015 - Sediment transport and underwater light climate affected by flexi...
IAHR 2015 - Sediment transport and underwater light climate affected by flexi...IAHR 2015 - Sediment transport and underwater light climate affected by flexi...
IAHR 2015 - Sediment transport and underwater light climate affected by flexi...
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Impacts of climate change on the coasts of
Impacts of climate change on the coasts ofImpacts of climate change on the coasts of
Impacts of climate change on the coasts of
 
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
 
SRDG April2011
SRDG April2011SRDG April2011
SRDG April2011
 
Shoreline Change in Urban Massachusetts, Time for Retreat?
Shoreline Change in Urban Massachusetts, Time for Retreat?Shoreline Change in Urban Massachusetts, Time for Retreat?
Shoreline Change in Urban Massachusetts, Time for Retreat?
 
Hydrodynamics Modelling in Seashore Jogjakarta’s Airport
Hydrodynamics Modelling in Seashore Jogjakarta’s AirportHydrodynamics Modelling in Seashore Jogjakarta’s Airport
Hydrodynamics Modelling in Seashore Jogjakarta’s Airport
 
120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik Havinga120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik Havinga
 
Coastal Geologic Hazards and Sea-Level Rise: Climate Change in Rhode Island
Coastal Geologic Hazards and Sea-Level Rise: Climate Change in Rhode IslandCoastal Geologic Hazards and Sea-Level Rise: Climate Change in Rhode Island
Coastal Geologic Hazards and Sea-Level Rise: Climate Change in Rhode Island
 
Shoreline Processes
Shoreline ProcessesShoreline Processes
Shoreline Processes
 
DSD-INT 2014 - Delft3D Users Meeting - Application of Delft3D in an Operation...
DSD-INT 2014 - Delft3D Users Meeting - Application of Delft3D in an Operation...DSD-INT 2014 - Delft3D Users Meeting - Application of Delft3D in an Operation...
DSD-INT 2014 - Delft3D Users Meeting - Application of Delft3D in an Operation...
 
Shoreline Change Special Area Management Plan Overview
Shoreline Change Special Area Management Plan OverviewShoreline Change Special Area Management Plan Overview
Shoreline Change Special Area Management Plan Overview
 
Coastal Management
Coastal ManagementCoastal Management
Coastal Management
 
Sediment transport-Environmental Health
Sediment  transport-Environmental HealthSediment  transport-Environmental Health
Sediment transport-Environmental Health
 
Maritime Archaeological Modelling using MIKE 21
Maritime Archaeological Modelling using MIKE 21Maritime Archaeological Modelling using MIKE 21
Maritime Archaeological Modelling using MIKE 21
 
Smp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSmp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_final
 

Similar to Powerpoint long term dredging plan using W.I.T.

DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...Deltares
 
training rep (1).pdf
training rep (1).pdftraining rep (1).pdf
training rep (1).pdfhiranpeiris3
 
Atal_Bhujal_Yojana_Overview.pptx
Atal_Bhujal_Yojana_Overview.pptxAtal_Bhujal_Yojana_Overview.pptx
Atal_Bhujal_Yojana_Overview.pptxdcsgsda
 
CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016Kushal Gowda
 
Regional Sanitary Services - from Policies to Capital Projects
Regional Sanitary Services - from Policies to Capital ProjectsRegional Sanitary Services - from Policies to Capital Projects
Regional Sanitary Services - from Policies to Capital ProjectsUrbanSystemsCanada
 
Comprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance ReviewComprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance ReviewCity of College Station
 
Performance Improvement Plan Water Utilities
Performance Improvement Plan  Water Utilities Performance Improvement Plan  Water Utilities
Performance Improvement Plan Water Utilities Abid Hussainy
 
Accountability : approaches, mechanisms & tools
Accountability : approaches, mechanisms & toolsAccountability : approaches, mechanisms & tools
Accountability : approaches, mechanisms & toolsIRC
 
Bu b fy2015 guidelines 0910
Bu b fy2015 guidelines 0910Bu b fy2015 guidelines 0910
Bu b fy2015 guidelines 0910Aubry Fara-on
 
20120516 Triple-S Ghana legacies and scaling up
20120516 Triple-S Ghana legacies and scaling up20120516 Triple-S Ghana legacies and scaling up
20120516 Triple-S Ghana legacies and scaling upIRC
 
IWRM in Karnataka India. Crafting a New Future
IWRM in Karnataka India. Crafting a New FutureIWRM in Karnataka India. Crafting a New Future
IWRM in Karnataka India. Crafting a New FutureOswar Mungkasa
 
Results WFP West Bengal case study
Results WFP West Bengal case studyResults WFP West Bengal case study
Results WFP West Bengal case studyIRC
 
NSUSC Urban Service Delivery Model in Sindh, Asian Development Bank
NSUSC Urban Service Delivery Model in Sindh,  Asian Development Bank NSUSC Urban Service Delivery Model in Sindh,  Asian Development Bank
NSUSC Urban Service Delivery Model in Sindh, Asian Development Bank Abid Hussainy
 
IWRM in Karnataka, India. Crafting a New Future
IWRM in Karnataka, India. Crafting a New FutureIWRM in Karnataka, India. Crafting a New Future
IWRM in Karnataka, India. Crafting a New FutureOswar Mungkasa
 
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...Rajnish Bajaj
 

Similar to Powerpoint long term dredging plan using W.I.T. (20)

DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
DSD-INT 2023 Integrated modelling to support Strategic Basin Planning for the...
 
training rep (1).pdf
training rep (1).pdftraining rep (1).pdf
training rep (1).pdf
 
Atal_Bhujal_Yojana_Overview.pptx
Atal_Bhujal_Yojana_Overview.pptxAtal_Bhujal_Yojana_Overview.pptx
Atal_Bhujal_Yojana_Overview.pptx
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
 
CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016
 
Regional Sanitary Services - from Policies to Capital Projects
Regional Sanitary Services - from Policies to Capital ProjectsRegional Sanitary Services - from Policies to Capital Projects
Regional Sanitary Services - from Policies to Capital Projects
 
Comprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance ReviewComprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance Review
 
Performance Improvement Plan Water Utilities
Performance Improvement Plan  Water Utilities Performance Improvement Plan  Water Utilities
Performance Improvement Plan Water Utilities
 
Wellborn Community Plan
Wellborn Community PlanWellborn Community Plan
Wellborn Community Plan
 
Accountability : approaches, mechanisms & tools
Accountability : approaches, mechanisms & toolsAccountability : approaches, mechanisms & tools
Accountability : approaches, mechanisms & tools
 
Bu b fy2015 guidelines 0910
Bu b fy2015 guidelines 0910Bu b fy2015 guidelines 0910
Bu b fy2015 guidelines 0910
 
20120516 Triple-S Ghana legacies and scaling up
20120516 Triple-S Ghana legacies and scaling up20120516 Triple-S Ghana legacies and scaling up
20120516 Triple-S Ghana legacies and scaling up
 
S_S_Kushwah_CV_-_Copy
S_S_Kushwah_CV_-_CopyS_S_Kushwah_CV_-_Copy
S_S_Kushwah_CV_-_Copy
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 
IWRM in Karnataka India. Crafting a New Future
IWRM in Karnataka India. Crafting a New FutureIWRM in Karnataka India. Crafting a New Future
IWRM in Karnataka India. Crafting a New Future
 
Results WFP West Bengal case study
Results WFP West Bengal case studyResults WFP West Bengal case study
Results WFP West Bengal case study
 
NSUSC Urban Service Delivery Model in Sindh, Asian Development Bank
NSUSC Urban Service Delivery Model in Sindh,  Asian Development Bank NSUSC Urban Service Delivery Model in Sindh,  Asian Development Bank
NSUSC Urban Service Delivery Model in Sindh, Asian Development Bank
 
Jyothirgamaya2
Jyothirgamaya2Jyothirgamaya2
Jyothirgamaya2
 
IWRM in Karnataka, India. Crafting a New Future
IWRM in Karnataka, India. Crafting a New FutureIWRM in Karnataka, India. Crafting a New Future
IWRM in Karnataka, India. Crafting a New Future
 
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
 

More from JetzeGenee

Lizard experience processen sytemen en organisatie van waterbodembeheer wf,...
Lizard experience   processen sytemen en organisatie van waterbodembeheer wf,...Lizard experience   processen sytemen en organisatie van waterbodembeheer wf,...
Lizard experience processen sytemen en organisatie van waterbodembeheer wf,...JetzeGenee
 
Bedrijfspresentatie Tijhuis Ingenieurs BV
Bedrijfspresentatie Tijhuis Ingenieurs BVBedrijfspresentatie Tijhuis Ingenieurs BV
Bedrijfspresentatie Tijhuis Ingenieurs BVJetzeGenee
 
Presentatie Baggernet juni 2015 waterkwaliteitsbaggeren
Presentatie Baggernet  juni 2015   waterkwaliteitsbaggeren Presentatie Baggernet  juni 2015   waterkwaliteitsbaggeren
Presentatie Baggernet juni 2015 waterkwaliteitsbaggeren JetzeGenee
 
Pdf presentatie baggernet waterkwaliteitsbaggeren
Pdf presentatie baggernet   waterkwaliteitsbaggerenPdf presentatie baggernet   waterkwaliteitsbaggeren
Pdf presentatie baggernet waterkwaliteitsbaggerenJetzeGenee
 
Pdf presentatie baggernet waterkwaliteitsbaggeren
Pdf presentatie baggernet waterkwaliteitsbaggerenPdf presentatie baggernet waterkwaliteitsbaggeren
Pdf presentatie baggernet waterkwaliteitsbaggerenJetzeGenee
 
Seminar geïntegreerd aanbesteden en werkbezoek Nieuwegein
Seminar geïntegreerd aanbesteden en werkbezoek NieuwegeinSeminar geïntegreerd aanbesteden en werkbezoek Nieuwegein
Seminar geïntegreerd aanbesteden en werkbezoek NieuwegeinJetzeGenee
 
Verslag 5e bijeenkomst platform depotbeheer
Verslag 5e bijeenkomst platform depotbeheerVerslag 5e bijeenkomst platform depotbeheer
Verslag 5e bijeenkomst platform depotbeheerJetzeGenee
 
Toekomst en nazorg doorgangsdepots provincie fryslân
Toekomst en nazorg doorgangsdepots provincie fryslânToekomst en nazorg doorgangsdepots provincie fryslân
Toekomst en nazorg doorgangsdepots provincie fryslânJetzeGenee
 
Depotbeheer noorderzijlvest bert jan pol
Depotbeheer noorderzijlvest bert jan polDepotbeheer noorderzijlvest bert jan pol
Depotbeheer noorderzijlvest bert jan polJetzeGenee
 
Afdichting vuilstorten at osborne
Afdichting vuilstorten at osborneAfdichting vuilstorten at osborne
Afdichting vuilstorten at osborneJetzeGenee
 
Socialmediatijhuis 111011151548 Phpapp02
Socialmediatijhuis 111011151548 Phpapp02Socialmediatijhuis 111011151548 Phpapp02
Socialmediatijhuis 111011151548 Phpapp02JetzeGenee
 
Bedrijfspresentatie.Juni 2011
Bedrijfspresentatie.Juni 2011Bedrijfspresentatie.Juni 2011
Bedrijfspresentatie.Juni 2011JetzeGenee
 
Presentatie Recreatief Water
Presentatie Recreatief WaterPresentatie Recreatief Water
Presentatie Recreatief WaterJetzeGenee
 
Recreatief water Leaflet
Recreatief water LeafletRecreatief water Leaflet
Recreatief water LeafletJetzeGenee
 
Tijhuis Ingenieurs presentatie KRW
Tijhuis Ingenieurs presentatie KRWTijhuis Ingenieurs presentatie KRW
Tijhuis Ingenieurs presentatie KRWJetzeGenee
 
Leaflet Weilanddepot.260111
Leaflet Weilanddepot.260111Leaflet Weilanddepot.260111
Leaflet Weilanddepot.260111JetzeGenee
 

More from JetzeGenee (16)

Lizard experience processen sytemen en organisatie van waterbodembeheer wf,...
Lizard experience   processen sytemen en organisatie van waterbodembeheer wf,...Lizard experience   processen sytemen en organisatie van waterbodembeheer wf,...
Lizard experience processen sytemen en organisatie van waterbodembeheer wf,...
 
Bedrijfspresentatie Tijhuis Ingenieurs BV
Bedrijfspresentatie Tijhuis Ingenieurs BVBedrijfspresentatie Tijhuis Ingenieurs BV
Bedrijfspresentatie Tijhuis Ingenieurs BV
 
Presentatie Baggernet juni 2015 waterkwaliteitsbaggeren
Presentatie Baggernet  juni 2015   waterkwaliteitsbaggeren Presentatie Baggernet  juni 2015   waterkwaliteitsbaggeren
Presentatie Baggernet juni 2015 waterkwaliteitsbaggeren
 
Pdf presentatie baggernet waterkwaliteitsbaggeren
Pdf presentatie baggernet   waterkwaliteitsbaggerenPdf presentatie baggernet   waterkwaliteitsbaggeren
Pdf presentatie baggernet waterkwaliteitsbaggeren
 
Pdf presentatie baggernet waterkwaliteitsbaggeren
Pdf presentatie baggernet waterkwaliteitsbaggerenPdf presentatie baggernet waterkwaliteitsbaggeren
Pdf presentatie baggernet waterkwaliteitsbaggeren
 
Seminar geïntegreerd aanbesteden en werkbezoek Nieuwegein
Seminar geïntegreerd aanbesteden en werkbezoek NieuwegeinSeminar geïntegreerd aanbesteden en werkbezoek Nieuwegein
Seminar geïntegreerd aanbesteden en werkbezoek Nieuwegein
 
Verslag 5e bijeenkomst platform depotbeheer
Verslag 5e bijeenkomst platform depotbeheerVerslag 5e bijeenkomst platform depotbeheer
Verslag 5e bijeenkomst platform depotbeheer
 
Toekomst en nazorg doorgangsdepots provincie fryslân
Toekomst en nazorg doorgangsdepots provincie fryslânToekomst en nazorg doorgangsdepots provincie fryslân
Toekomst en nazorg doorgangsdepots provincie fryslân
 
Depotbeheer noorderzijlvest bert jan pol
Depotbeheer noorderzijlvest bert jan polDepotbeheer noorderzijlvest bert jan pol
Depotbeheer noorderzijlvest bert jan pol
 
Afdichting vuilstorten at osborne
Afdichting vuilstorten at osborneAfdichting vuilstorten at osborne
Afdichting vuilstorten at osborne
 
Socialmediatijhuis 111011151548 Phpapp02
Socialmediatijhuis 111011151548 Phpapp02Socialmediatijhuis 111011151548 Phpapp02
Socialmediatijhuis 111011151548 Phpapp02
 
Bedrijfspresentatie.Juni 2011
Bedrijfspresentatie.Juni 2011Bedrijfspresentatie.Juni 2011
Bedrijfspresentatie.Juni 2011
 
Presentatie Recreatief Water
Presentatie Recreatief WaterPresentatie Recreatief Water
Presentatie Recreatief Water
 
Recreatief water Leaflet
Recreatief water LeafletRecreatief water Leaflet
Recreatief water Leaflet
 
Tijhuis Ingenieurs presentatie KRW
Tijhuis Ingenieurs presentatie KRWTijhuis Ingenieurs presentatie KRW
Tijhuis Ingenieurs presentatie KRW
 
Leaflet Weilanddepot.260111
Leaflet Weilanddepot.260111Leaflet Weilanddepot.260111
Leaflet Weilanddepot.260111
 

Recently uploaded

Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfLars Albertsson
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAroojKhan71
 
VidaXL dropshipping via API with DroFx.pptx
VidaXL dropshipping via API with DroFx.pptxVidaXL dropshipping via API with DroFx.pptx
VidaXL dropshipping via API with DroFx.pptxolyaivanovalion
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfMarinCaroMartnezBerg
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxStephen266013
 
Unveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystUnveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystSamantha Rae Coolbeth
 
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
BigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxBigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxolyaivanovalion
 
BabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxBabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxolyaivanovalion
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Invezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz1
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsappssapnasaifi408
 
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
Smarteg dropshipping via API with DroFx.pptx
Smarteg dropshipping via API with DroFx.pptxSmarteg dropshipping via API with DroFx.pptx
Smarteg dropshipping via API with DroFx.pptxolyaivanovalion
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionfulawalesam
 

Recently uploaded (20)

Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdf
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
 
VidaXL dropshipping via API with DroFx.pptx
VidaXL dropshipping via API with DroFx.pptxVidaXL dropshipping via API with DroFx.pptx
VidaXL dropshipping via API with DroFx.pptx
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
 
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in  KishangarhDelhi 99530 vip 56974 Genuine Escort Service Call Girls in  Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docx
 
Unveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystUnveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data Analyst
 
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Punjabi Bagh 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
 
BigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxBigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptx
 
BabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxBabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptx
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
 
Invezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signalsInvezz.com - Grow your wealth with trading signals
Invezz.com - Grow your wealth with trading signals
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
 
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
Smarteg dropshipping via API with DroFx.pptx
Smarteg dropshipping via API with DroFx.pptxSmarteg dropshipping via API with DroFx.pptx
Smarteg dropshipping via API with DroFx.pptx
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interaction
 

Powerpoint long term dredging plan using W.I.T.

  • 1. Dhaka WASA - VEI project 11 Preparation 2.3 Long term Urban Dredging Plan (WIT) • Dredging strategy • Sediment growth figures • Clustering drainage units to dredging units • Needed budgets
  • 2. 5 operational excellence - sustainable services - bilateral cooperation 5 Take-home message(s): Long term Urban Dredging plans gives insights in needed budgets! How many years is long term? What is the difference between drainage unit and dredging unit?
  • 3. 5 operational excellence - sustainable services - bilateral cooperation 5 Learning Objectives of the Topic/Session: At the end of the session the participants will be able to: 1. Explain the importance of Long term Urban Dredging Plans (LUDP) 2. Identify needed figures for making LUDP’s 3. Explain your dredging strategy 4. Relation between data collection and long term planning
  • 4. 5 operational excellence - sustainable services - bilateral cooperation 5 LUDP gives answers to 1. Where to dredge in order to meet your design and hydraulic requirements 2. When to dredge in order to meet your design and hydraulic requirements 3. Costs and thus needed budgets when dredging at a certain place is required Floods are caused when your drainage system does not fulfill your design and hydraulic requirements
  • 5. 5 operational excellence - sustainable services - bilateral cooperation 5 WIT: Data information Feasibility plan Dredging plan Do: dredging! Framework assessment: from required hydraulic dimensions to dredging strategy LUDP Side selection
  • 6. 5 operational excellence - sustainable services - bilateral cooperation 5 Generating LUDP’s you need: 1. WIT data information: what is in there? Hydrographic survey and sampling (2 out of 7 catchments are known) 2. Framework assessment = Dredging strategy 3. Operational “Do” methods & Unit prices (unit prices x amounts = costs) 4. Sediment growth figures 5. Defined dredging units (side selection) 6. LUDP module WIT
  • 7. 5 operational excellence - sustainable services - bilateral cooperation 5 Dredging strategy (important!) • Dredging strategy = Dhaka WASA policy! • Highly related with hydraulic capacity of your drainage system! • Budgets and dredging strategies are strongly related! • Dredging strategy = intervention depth and corresponding dredging profile (with or without base layer)
  • 8. 5 operational excellence - sustainable services - bilateral cooperation 5 Dredging strategy: required hydraulic dimensions intervention depths Intervention depth Question: how much you should remove to fulfill your requirements above? What does this picture mean? Answer: nothing! Actual sediment is still below intervention depth! Which year do you have to intervene when requirements do not fullfill anymore (when does sediment reach intervention depth)? WIT calculates year and corresponding amounts and costs!
  • 9. 5 operational excellence - sustainable services - bilateral cooperation 5 Dredging strategy Kalyanpur: redefined canal contruction to dredging profile (in this case: intervention = dredging profile) Define your dredging strategy in WIT 754 + 112 = 866 m3 Question 1: Dredging amount in this drainage unit? Question 2: dredging strategy in Segunbagicha box culvert? WIT: all & only sediment (Or 50 %)
  • 10. 5 operational excellence - sustainable services - bilateral cooperation 5 Operational “Do” methods and unit prices (1) • Define dredging-, transport and disposal methods and link to drainage units in WIT • WIT visualize defined methods on maps, Question: What characteristics has the drainage unit Segunbagicha Box culvert if it will be dredged?
  • 11. 5 operational excellence - sustainable services - bilateral cooperation 5 • Over-estimated unit prices used in WIT WIT calculation: 49.283 m3 sediment in Segunbagicha Box Culvert Dredging costs Segunbagicha: amount of sediment x unit prices Operational “Do” methods and unit prices (2)
  • 12. 5 operational excellence - sustainable services - bilateral cooperation 5 Sediment growth figures 1. Only Agargeon figures are known based on construction year and survey 0,25 meter/year 2. Currently, sediment growth survey: Kallyanpur Canals & Segunbagicha drains Cross section ID Location Previous done measured by Date of previous measurement Survey round 1 Survey round 2 Survey round 3 Survey round 4 Kallyanpur_Main_D-39 Main Canal Globe survey January 2014 Week 45 2014 Week 06 2015 Week 19 2015 Week 32 2015 Kallyanpur_Main_D-13 Main Canal Globe survey January 2014 Week 45 2014 Week 06 2015 Week 19 2015 Week 32 2015 Kallyanpur_Main_UP-13 Main Canal Globe survey January 2014 Week 45 2014 Week 06 2015 Week 19 2015 Week 32 2015 Kallyanpur_Side3_25 Side Canal 3 BIDCON survey July 2014 Week 45 2014 Week 06 2015 Week 19 2015 Week 32 2015 Kallyanpur_Side4_55 Side Canal 4 BIDCON survey July 2014 Week 45 2014 Week 06 2015 Week 19 2015 Week 32 2015 Kallyanpur_Side6_38 Side Canal 6 BIDCON survey July 2014 Week 45 2014 Week 06 2015 Week 19 2015 Week 32 2015 Kallyanpur survey schedule
  • 13. 5 operational excellence - sustainable services - bilateral cooperation 5 Defined dredging units Drainage unit (specific characteristics: dimensions, dredging methods, etc.) Dredging unit (project) Catchment Area Give examples ……. ……. ……. Segunbagicha Segunbagicha upstream box culvert Segunbagicha box culvert cluster
  • 14. 5 operational excellence - sustainable services - bilateral cooperation 5 LUDP WIT (1) • Detail information drainage unit - Dredging strategy - Amounts of sediment calculations - Dredging-, transport- and disposal method • Unit costs • Compose/cluster dredging units • Planning dredging units • Export planning en key parameters Drainage unit Dredging unit Planning
  • 15. 5 operational excellence - sustainable services - bilateral cooperation 5 LUDP WIT (2) • Planning dredging units Drainage unit Dredging unit Planning - Required year of dredging? WIT calculates the year of intervention with sediment growth figures: signaling function on maps (e.g. 2018) (not obligatory to use) - Use WIT dredging calendar: WIT calculates needed budgets in annual dredging calendar with unit prices, sediment growth figures and amounts (m3) - WIT users are able to slide dredging units in annual calendar to optimize budgets!
  • 16. 5 operational excellence - sustainable services - bilateral cooperation 5 LUDP WIT (3) • Planning dredging units - WIT annual dredging calendar
  • 17. 5 operational excellence - sustainable services - bilateral cooperation 5 WIT demonstration!! Results: Amounts and needed budgets if Kallyanpur Main Canal, Agargeon, Segunbagicha Box culvert and Segunbagicha side drains will be dredged in this year! Or later……. If the WIT LUDP method is used
  • 18. 5 operational excellence - sustainable services - bilateral cooperation 5 Dhaka data in WIT - GIS data set with drainage network Dhaka WASA Provided by Dhaka WASA GIS department - Hydrographic survey Globe survey: January 2014, Kallyanpur main Canal BIDCON survey: August 2014, Kallyanpur side Canals BIDCON survey: September 2014, Segunbagicha side drains UDDP survey: December 2013, Segunbagicha Box culvert Currently: rest of Kallyanpur catchment (closed drains), Segunbagicha Khal, sediment growth survey - Dredging strategy Kallyanpur Main Canal: designed dredging profile, Agargeon and Segunbagicha: only all sediment - Chemical quality sediment Laboratory results: Kallyanpur = uncontaminated & Segunbagicha = contaminated - Defined dredging units Kallyanpur Main Canal (UDDP project), Agareon (UDDP project), Segunbagicha Box culvert (UDDP project), Segunbagicha side drains (surveyed and direct related with UDDP project)
  • 19. 5 operational excellence - sustainable services - bilateral cooperation 5 Remaining WIT necessaires - Dhaka WASA employees to be trained WIT users at O&M WIT maintenance at GIS department - Annual dredging budgets coming 10 years (requirement) - Intervention levels (requirement) This represents the minimum hydraulic capacity of your drainage system. Intervention levels might be designed in the Drainage Master Plan (?) - If available, dimensions of closed drains To compare with measurements of hydrographic surveys (data validation) - If available, hydrographic survey data from other catchment areas
  • 20. 5 operational excellence - sustainable services - bilateral cooperation 5 Take-home message(s): Long term Urban Dredging plans gives insights in needed budgets! How many years is long term? What is the difference between drainage unit and dredging unit?
  • 22. Thank you for your attention!