SlideShare a Scribd company logo
1 of 27
BOTTOM-UP BUDGETING
Draft Planning Guidelines
for FY 2015
OBJECTIVES
BUDGET REFORM
- making the national budget more responsive to local
needs
LOCAL GOVERNANCE REFORM
- providing incentives for local good governance
- strengthening the devolution of basic services delivery
DEMOCRATIC AND EMPOWERMENT PROJECT
- creating a conducive environment for people’s
participation
- generating demand for good governance at the
local level
11
22
33
OBJECTIVES
COMMUNITY /
CIVIL SOCIETY
ORGANIZATIONS
COMMUNITY /
CIVIL SOCIETY
ORGANIZATIONS
BUDGET
FORMULATION
LEGISLATIVE
APPROVAL
BUDGET
IMPLEMENTATION
EVALUATION /
ACCOUNTABILITY
LOCAL
GOVERNMENTS
LOCAL
GOVERNMENTS
BUDGET PROCESS
PARTICIPATOR
Y POVERTY
REDUCTION
PLANNING
COVERAGE
2013:
609
2014:
1,233
2015:
1,634
2016:
1,634
2017:
???
Cities & Municipalities
Participating Agencies (for FY 2015):
DA, DAR, DEPED, DOE, DENR, DOH, DILG,
DOLE, DSWD, DOT, DTI, TESDA and NEA
Oversight Agencies:
DBM, DILG, DSWD, NAPC and NEDA
COVERAGE
Allocations per city/ municipality
- Formula:
No. of poor x P700
(Rounded up to nearest million)
- Minimum of P15million, Maximum of P50 million
BUDGET CAP
HARMONIZATION WITH LOCAL
PLANNING PROCESSES
– Two modes of BuB
• Regular:
– LPRAT as a sub-committee of the LDC (Non-
functionality of LDC should not be an obstacle for the
LPRAT to meet)
• Enhanced Process
– To be undertaken in 270 municipalities that have
graduated from or are currently implementing KALAHI-
CIDSS
– LPRAT to serve as a technical working group of an
“Enhanced LDC”; Final decisions to be made in the
“Enhanced” LDC
LPRAT
• Under Regular BuB, LPRAT composed of:
– Mayor, Sanggunian Appropriations Committee Chair,
local department heads and representatives of NGAs
at the city/municipal level (50% of LPRAT members)
– Representatives of CSOs elected during the CSO
assembly + 1 business group representative (50% of
LPRAT members)
– Elected officials, their immediate relatives (spouse,
parent, sibling, child) and LGU employees are
ineligible to be elected as CSO representatives
Regular BuB Process
STEPS
• 1: Civil Society Assemblies
– Orientation on BuB
– Election of LPRAT representatives and 3 CSO
signatories to the LPRAP (including LPRAT
co-chair)
– Report of LCE on status of 2013 BuB Projects
– Poverty Situation Analysis
STEPS
• 2: Local Poverty Reduction Action Planning
Workshop
– Use LPRAP workshop modules which will be
distributed
– Multi-year planning (submission of indicative list of
projects for 2016 and 2017)
– Project Identification
• 80% within Menu of Programs (to be reviewed and validated
by RPRAT)
• 20% outside of the Menu (to be reviewed and validated by
NPRAT)
STEPS
• 3: Submission of List of Priority Projects and
other supporting documents (hard and soft copy)
– Cover letter signed by mayor
– List of projects using template signed by LCE and 3
CSO representatives on every page
– Project brief for each project
– Report on compliance with participatory processes
• Conduct of CSO assembly – attendance sheet, photo of
participants, documentation of election report, LGU report on
status of BuB 2013 projects
• Conduct of LPRAP workshop – photo of participants,
attendance sheet, minutes or highlights of the LPRAP
workshop
STEPS
• 4: Consolidation of list of projects by DILG RO
and submission to NAPC and distribution to
RPRAT members
• 5: Validation, Review and Replacement of
Projects
– Review / Validation by RPRAT and NPRAT
– RPRAT meeting/workshop with LPRAT to replace
rejected projects
– Submission to NAPC of final list of projects
STEPS
• 6: Adoption of final list of priority projects
by local Sanggunian (to be submitted
to DILG RO)
• 7: Integration into the National Budget
• 8: Provision of funding for LGU
Counterpart in local budget
Counterpart Requirements
Proportion of BuB plus
KALAHI-CIDSS funding to LDF
Required Cash Counterpart
Up to 100% of LDF 10% of LDF
Over 100% up to 150% 15% of LDF
Over 150% 20% of LDF
• For Municipalities: cash counterpart will be a %
of the local development fund
• For Cities: cash counterpart will be 40% of the
BuB budget cap
Counterpart Requirements
• Counterpart funding need not be allocated on a per
project basis.
• Cash counterpart may be used to fund projects that are
100% funded by the LGU.
• Projects to be funded by the LGU cash counterpart
should be determined by the LPRAT, effectively adding
it to the ‘BuB Funding Pot’.
• KALAHI-CIDSS will no longer ask for other cash
counterpart, however, additional non-cash counterpart
may be required
Project Identification
• Project Identification: NEGATIVE LIST
– Projects below P500,000
– Expansion of Pantawid Pamilya, Social Pension for Indigents
Senior Citizens, PhilHEALTH coverage, vaccination programs
– Housing Projects
– Construction of school buildings, classrooms and rural health
units
– Farm to Market Roads
– Law enforcement, fire protection and jail management related
projects
– Construction of city hall, training centers and other multi-purpose
buildings
– Purchase of motor vehicles, except those used for rescue in
times of disaster
– International Training, scholarships
Governance Requirements
• Attain Seal of Good Housekeeping for 2013 assessment
• Develop a PFM Improvement Plan or attain 2014 targets if already
developed
• Counterpart requirements are provided for BuB 2014 budget
• Submission of proper financial and physical accomplishment reports for
LGU implemented BuB 2014 projects
• Compliance with intent of BuB for meaningful participation
– Conduct of CSO assembly and LPRAT workshop
– Conduct of Quarterly LPRAT meetings
IDENTIFIED PROJECTS WILL NOT BE FUNDED AND WILL NOT BE
IMPLEMENTED IF THESE CONDITIONS ARE NOT MET
Enhanced BuB Process
(For Municipalities that have
graduated from or are currently
implementing KALAHI-CIDSS)
Variances in the Process
• Barangay level planning
– Conduct of barangay poverty situation analysis and barangay
assemblies (to be facilitated/ conducted by DSWD KALAHI-
CIDSS)
• ‘Enhanced’ Local Development Council
– CSO members:
• Barangay Development Council Vice-Chairs to be elected from
KALAHI-CIDSS volunteers (1 per barangay)
• 5 CSO representatives elected during the CSO assembly
– LPRAT to be created as a technical working group of the
Enhanced LDC
• With 10 members from government, 5 members from Barangay
BDC Vice-Chairs, and the 5 CSOs elected during the CSO
assembly
Variances in the Process
• ‘Enhanced’ Local Development Council to
approve list of priority projects prepared by the
LPRAT
• List of projects to be submitted to also contain
KALAHI-CIDSS and LGU funded projects
• Planning process to be harmonized with crafting
of Comprehensive Development Plan
Menu of Programs
DA - Irrigation projects (SIP/STW/OSP)
- Infrastructure support to Agri and Fishery production (Tractor, Planter/Seeder,
Harvester, Thresher, Sheller, Motorized Fishing Boat, Fish Nets)
- Agro-Processing Facilities and Expanded Agri-Business Activities
- Post-harvest Facilities and Equipment (Mechanical Dryers, Multi-Purpose
Drying Pavement)
- Cold Storage Facilities/Vans
- Ports and Wharves
- Trading Posts
- Sustainable Agri-Fishery Based Livelihood and other Agri-Fishery Business
Investments
- Tramlines
- Farm implements/ tools
- Agri-Fishery training
- Marine Reserve and Fish Sanctuaries
- Marine protected areas
- Organic fertilizer production
Menu of Programs
DA - Irrigation projects (SIP/STW/OSP)
- Infrastructure support to Agri and Fishery production (Tractor, Planter/Seeder,
Harvester, Thresher, Sheller, Motorized Fishing Boat, Fish Nets)
- Agro-Processing Facilities and Expanded Agri-Business Activities
- Post-harvest Facilities and Equipment (Mechanical Dryers, Multi-Purpose
Drying Pavement)
- Cold Storage Facilities/Vans
- Ports and Wharves
- Trading Posts
- Sustainable Agri-Fishery Based Livelihood and other Agri-Fishery Business
Investments
- Tramlines
- Farm implements/ tools
- Agri-Fishery training
- Marine Reserve and Fish Sanctuaries
- Marine protected areas
- Organic fertilizer production
Menu of Programs
DENR - National Greening Program
DTI - Local Regional Economic Development
- Yaman Pinoy’
- Rural Micro Enterprise Development Program
- Shared Service Facility
- OTOP Store Express
- Industry Clustering Development Program
- Philippine Traceability for Revitalized Agricultural Competitiveness
Enhancement Program (P-Trace)
DOT
DOE
NEA - On-grid Sitio Electrification Program
- Barangay Line Enhancement Program
Menu of Programs
DSWD - Sustainable Livelihood Program: Microenterprise Development Track
- Sustainable Livelihood Program: Employment Facilitation Track
- KALAHI-CIDSS
- Protective Services – Infrastructure Projects
- Protective Services – Capacity Building
DOLE - Workers Income Augmentation Program (WIN AP)
- TUlong Panghanapbuhay para sa Ating mga Disadvantaged Workers
(TUPAD)
- DOLE-AMP (DOLE- Adjustment Measures Program)
- OFWs REINTEGRATION PROGRAM
- SPES (Special Program for the Employment of Students)
TESDA
Menu of Programs
DepEd -Basic Education Facilities: Repair / rehabilitation of classrooms
- Basic Education Facilities: Provision of school furniture
- Gulayan sa Paaralan
- Innovative programs to promote access to Education/ Abot-Alam Program
DOH - Maternal, neonatal, child health and nutrition (MNCHN)
- Community Health Team (CHT) mobilization
- Infectious diseases (Filariasis Elimination, Schistosomiasis and Malaria
Control, Rabies Elimination, Leprosy, TB Control, STI/HIV and AIDS
Prevention, Dengue Control
- Health Emergency Mangement
- RNheals
- Rural Health Midwife Placement Program
- Health Facilities Enhancement Program
Menu of Programs
DILG - SALINTUBIG
- Capacity Building for CSOs
- School Computer Laboratory
- Birthing Facility
- Core Local Road Construction/ Maintenance / Rehabilitation
- Tourism Facility
- Public Market
- Slaughterhouse
- Transport Terminal
- Evacuation Facility
- Rescue Equipment
- Flood Control

More Related Content

What's hot

Newburgh Heights Planning & Zoning Ordinance and Zoning Map Update
Newburgh Heights Planning & Zoning Ordinance and Zoning Map UpdateNewburgh Heights Planning & Zoning Ordinance and Zoning Map Update
Newburgh Heights Planning & Zoning Ordinance and Zoning Map UpdateCuyahoga County Planning Commission
 
Mpumalanga - South Africa
Mpumalanga - South AfricaMpumalanga - South Africa
Mpumalanga - South AfricaIRC
 
Governance structure mahesana nagarpalika
Governance structure mahesana nagarpalikaGovernance structure mahesana nagarpalika
Governance structure mahesana nagarpalikaABHI PATEL
 
Introduction to Mahatma Gandhi NREGA for the Programme Officers
Introduction to Mahatma Gandhi NREGA for the Programme OfficersIntroduction to Mahatma Gandhi NREGA for the Programme Officers
Introduction to Mahatma Gandhi NREGA for the Programme OfficersDibyendu Sarkar, IAS
 

What's hot (8)

2nd VRU RAC Meeting: FPE Organizational Structure and Mandates
2nd VRU RAC Meeting: FPE Organizational Structure and Mandates2nd VRU RAC Meeting: FPE Organizational Structure and Mandates
2nd VRU RAC Meeting: FPE Organizational Structure and Mandates
 
Newburgh Heights Planning & Zoning Ordinance and Zoning Map Update
Newburgh Heights Planning & Zoning Ordinance and Zoning Map UpdateNewburgh Heights Planning & Zoning Ordinance and Zoning Map Update
Newburgh Heights Planning & Zoning Ordinance and Zoning Map Update
 
MPDPIP concept & organisation
MPDPIP concept & organisationMPDPIP concept & organisation
MPDPIP concept & organisation
 
PPR brochure
PPR brochurePPR brochure
PPR brochure
 
Urban CHPS
Urban CHPSUrban CHPS
Urban CHPS
 
Mpumalanga - South Africa
Mpumalanga - South AfricaMpumalanga - South Africa
Mpumalanga - South Africa
 
Governance structure mahesana nagarpalika
Governance structure mahesana nagarpalikaGovernance structure mahesana nagarpalika
Governance structure mahesana nagarpalika
 
Introduction to Mahatma Gandhi NREGA for the Programme Officers
Introduction to Mahatma Gandhi NREGA for the Programme OfficersIntroduction to Mahatma Gandhi NREGA for the Programme Officers
Introduction to Mahatma Gandhi NREGA for the Programme Officers
 

Similar to Bu b fy2015 guidelines 0910

Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)malapatansarangani
 
Davao bottom up budgeting
Davao bottom up budgetingDavao bottom up budgeting
Davao bottom up budgetingWBKDC
 
Bottom up budgeting-by_kuki
Bottom up budgeting-by_kukiBottom up budgeting-by_kuki
Bottom up budgeting-by_kukiWBKDC
 
Institutional arrangements for implementation of rwss program in nigeria
Institutional arrangements for implementation of rwss program in nigeriaInstitutional arrangements for implementation of rwss program in nigeria
Institutional arrangements for implementation of rwss program in nigeriaDogara Bashir
 
BuB: A Philippine Experiment
BuB: A Philippine ExperimentBuB: A Philippine Experiment
BuB: A Philippine ExperimentRegina Zagala
 
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WRI Ross Center for Sustainable Cities
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)urbanranchi
 
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015Robust Marketing & Consulting (Pty) Ltd
 
Place, productivity and prosperity
Place, productivity and prosperityPlace, productivity and prosperity
Place, productivity and prosperityOECDregions
 
Davao conduct of cso assembly usep
Davao conduct of cso assembly usepDavao conduct of cso assembly usep
Davao conduct of cso assembly usepWBKDC
 
Planning Checklist and Selected Guidelines for Cooperative Operation and Mana...
Planning Checklist and Selected Guidelines for Cooperative Operation and Mana...Planning Checklist and Selected Guidelines for Cooperative Operation and Mana...
Planning Checklist and Selected Guidelines for Cooperative Operation and Mana...jo bitonio
 
Pres_Brain_Storming_Swach bha20_10_14.ppt
Pres_Brain_Storming_Swach bha20_10_14.pptPres_Brain_Storming_Swach bha20_10_14.ppt
Pres_Brain_Storming_Swach bha20_10_14.pptsfmentors4
 
African Uran Matters - Rudy Abrahams
African Uran Matters - Rudy AbrahamsAfrican Uran Matters - Rudy Abrahams
African Uran Matters - Rudy AbrahamsRudy Abrahams
 
Draft Baseline Survey Status (Updated Punjab).pptx
Draft Baseline Survey Status (Updated Punjab).pptxDraft Baseline Survey Status (Updated Punjab).pptx
Draft Baseline Survey Status (Updated Punjab).pptximranzafar55
 
Comprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance ReviewComprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance ReviewCity of College Station
 
MLPS Presentation for the Steering Committee Session from February 21, 2014
MLPS Presentation for the Steering Committee Session from February 21, 2014MLPS Presentation for the Steering Committee Session from February 21, 2014
MLPS Presentation for the Steering Committee Session from February 21, 2014GIZ Moldova
 

Similar to Bu b fy2015 guidelines 0910 (20)

Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)
 
Davao bottom up budgeting
Davao bottom up budgetingDavao bottom up budgeting
Davao bottom up budgeting
 
2015 bub
2015 bub2015 bub
2015 bub
 
Bottom up budgeting-by_kuki
Bottom up budgeting-by_kukiBottom up budgeting-by_kuki
Bottom up budgeting-by_kuki
 
Institutional arrangements for implementation of rwss program in nigeria
Institutional arrangements for implementation of rwss program in nigeriaInstitutional arrangements for implementation of rwss program in nigeria
Institutional arrangements for implementation of rwss program in nigeria
 
BuB: A Philippine Experiment
BuB: A Philippine ExperimentBuB: A Philippine Experiment
BuB: A Philippine Experiment
 
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)
 
AMRUT MoUD
AMRUT MoUDAMRUT MoUD
AMRUT MoUD
 
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
 
Place, productivity and prosperity
Place, productivity and prosperityPlace, productivity and prosperity
Place, productivity and prosperity
 
Davao conduct of cso assembly usep
Davao conduct of cso assembly usepDavao conduct of cso assembly usep
Davao conduct of cso assembly usep
 
Planning Checklist and Selected Guidelines for Cooperative Operation and Mana...
Planning Checklist and Selected Guidelines for Cooperative Operation and Mana...Planning Checklist and Selected Guidelines for Cooperative Operation and Mana...
Planning Checklist and Selected Guidelines for Cooperative Operation and Mana...
 
DSWD LPRAT Orientation
DSWD LPRAT OrientationDSWD LPRAT Orientation
DSWD LPRAT Orientation
 
Pres_Brain_Storming_Swach bha20_10_14.ppt
Pres_Brain_Storming_Swach bha20_10_14.pptPres_Brain_Storming_Swach bha20_10_14.ppt
Pres_Brain_Storming_Swach bha20_10_14.ppt
 
African Uran Matters - Rudy Abrahams
African Uran Matters - Rudy AbrahamsAfrican Uran Matters - Rudy Abrahams
African Uran Matters - Rudy Abrahams
 
UWA REVENUE SHARING GUIDELINES
UWA REVENUE SHARING GUIDELINESUWA REVENUE SHARING GUIDELINES
UWA REVENUE SHARING GUIDELINES
 
Draft Baseline Survey Status (Updated Punjab).pptx
Draft Baseline Survey Status (Updated Punjab).pptxDraft Baseline Survey Status (Updated Punjab).pptx
Draft Baseline Survey Status (Updated Punjab).pptx
 
Comprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance ReviewComprehensive Plan and Unified Development Ordinance Review
Comprehensive Plan and Unified Development Ordinance Review
 
MLPS Presentation for the Steering Committee Session from February 21, 2014
MLPS Presentation for the Steering Committee Session from February 21, 2014MLPS Presentation for the Steering Committee Session from February 21, 2014
MLPS Presentation for the Steering Committee Session from February 21, 2014
 

Bu b fy2015 guidelines 0910

  • 1. BOTTOM-UP BUDGETING Draft Planning Guidelines for FY 2015
  • 2. OBJECTIVES BUDGET REFORM - making the national budget more responsive to local needs LOCAL GOVERNANCE REFORM - providing incentives for local good governance - strengthening the devolution of basic services delivery DEMOCRATIC AND EMPOWERMENT PROJECT - creating a conducive environment for people’s participation - generating demand for good governance at the local level 11 22 33
  • 3. OBJECTIVES COMMUNITY / CIVIL SOCIETY ORGANIZATIONS COMMUNITY / CIVIL SOCIETY ORGANIZATIONS BUDGET FORMULATION LEGISLATIVE APPROVAL BUDGET IMPLEMENTATION EVALUATION / ACCOUNTABILITY LOCAL GOVERNMENTS LOCAL GOVERNMENTS BUDGET PROCESS PARTICIPATOR Y POVERTY REDUCTION PLANNING
  • 5. Participating Agencies (for FY 2015): DA, DAR, DEPED, DOE, DENR, DOH, DILG, DOLE, DSWD, DOT, DTI, TESDA and NEA Oversight Agencies: DBM, DILG, DSWD, NAPC and NEDA COVERAGE
  • 6. Allocations per city/ municipality - Formula: No. of poor x P700 (Rounded up to nearest million) - Minimum of P15million, Maximum of P50 million BUDGET CAP
  • 7. HARMONIZATION WITH LOCAL PLANNING PROCESSES – Two modes of BuB • Regular: – LPRAT as a sub-committee of the LDC (Non- functionality of LDC should not be an obstacle for the LPRAT to meet) • Enhanced Process – To be undertaken in 270 municipalities that have graduated from or are currently implementing KALAHI- CIDSS – LPRAT to serve as a technical working group of an “Enhanced LDC”; Final decisions to be made in the “Enhanced” LDC
  • 8. LPRAT • Under Regular BuB, LPRAT composed of: – Mayor, Sanggunian Appropriations Committee Chair, local department heads and representatives of NGAs at the city/municipal level (50% of LPRAT members) – Representatives of CSOs elected during the CSO assembly + 1 business group representative (50% of LPRAT members) – Elected officials, their immediate relatives (spouse, parent, sibling, child) and LGU employees are ineligible to be elected as CSO representatives
  • 10. STEPS • 1: Civil Society Assemblies – Orientation on BuB – Election of LPRAT representatives and 3 CSO signatories to the LPRAP (including LPRAT co-chair) – Report of LCE on status of 2013 BuB Projects – Poverty Situation Analysis
  • 11. STEPS • 2: Local Poverty Reduction Action Planning Workshop – Use LPRAP workshop modules which will be distributed – Multi-year planning (submission of indicative list of projects for 2016 and 2017) – Project Identification • 80% within Menu of Programs (to be reviewed and validated by RPRAT) • 20% outside of the Menu (to be reviewed and validated by NPRAT)
  • 12. STEPS • 3: Submission of List of Priority Projects and other supporting documents (hard and soft copy) – Cover letter signed by mayor – List of projects using template signed by LCE and 3 CSO representatives on every page – Project brief for each project – Report on compliance with participatory processes • Conduct of CSO assembly – attendance sheet, photo of participants, documentation of election report, LGU report on status of BuB 2013 projects • Conduct of LPRAP workshop – photo of participants, attendance sheet, minutes or highlights of the LPRAP workshop
  • 13. STEPS • 4: Consolidation of list of projects by DILG RO and submission to NAPC and distribution to RPRAT members • 5: Validation, Review and Replacement of Projects – Review / Validation by RPRAT and NPRAT – RPRAT meeting/workshop with LPRAT to replace rejected projects – Submission to NAPC of final list of projects
  • 14. STEPS • 6: Adoption of final list of priority projects by local Sanggunian (to be submitted to DILG RO) • 7: Integration into the National Budget • 8: Provision of funding for LGU Counterpart in local budget
  • 15. Counterpart Requirements Proportion of BuB plus KALAHI-CIDSS funding to LDF Required Cash Counterpart Up to 100% of LDF 10% of LDF Over 100% up to 150% 15% of LDF Over 150% 20% of LDF • For Municipalities: cash counterpart will be a % of the local development fund • For Cities: cash counterpart will be 40% of the BuB budget cap
  • 16. Counterpart Requirements • Counterpart funding need not be allocated on a per project basis. • Cash counterpart may be used to fund projects that are 100% funded by the LGU. • Projects to be funded by the LGU cash counterpart should be determined by the LPRAT, effectively adding it to the ‘BuB Funding Pot’. • KALAHI-CIDSS will no longer ask for other cash counterpart, however, additional non-cash counterpart may be required
  • 17. Project Identification • Project Identification: NEGATIVE LIST – Projects below P500,000 – Expansion of Pantawid Pamilya, Social Pension for Indigents Senior Citizens, PhilHEALTH coverage, vaccination programs – Housing Projects – Construction of school buildings, classrooms and rural health units – Farm to Market Roads – Law enforcement, fire protection and jail management related projects – Construction of city hall, training centers and other multi-purpose buildings – Purchase of motor vehicles, except those used for rescue in times of disaster – International Training, scholarships
  • 18. Governance Requirements • Attain Seal of Good Housekeeping for 2013 assessment • Develop a PFM Improvement Plan or attain 2014 targets if already developed • Counterpart requirements are provided for BuB 2014 budget • Submission of proper financial and physical accomplishment reports for LGU implemented BuB 2014 projects • Compliance with intent of BuB for meaningful participation – Conduct of CSO assembly and LPRAT workshop – Conduct of Quarterly LPRAT meetings IDENTIFIED PROJECTS WILL NOT BE FUNDED AND WILL NOT BE IMPLEMENTED IF THESE CONDITIONS ARE NOT MET
  • 19. Enhanced BuB Process (For Municipalities that have graduated from or are currently implementing KALAHI-CIDSS)
  • 20. Variances in the Process • Barangay level planning – Conduct of barangay poverty situation analysis and barangay assemblies (to be facilitated/ conducted by DSWD KALAHI- CIDSS) • ‘Enhanced’ Local Development Council – CSO members: • Barangay Development Council Vice-Chairs to be elected from KALAHI-CIDSS volunteers (1 per barangay) • 5 CSO representatives elected during the CSO assembly – LPRAT to be created as a technical working group of the Enhanced LDC • With 10 members from government, 5 members from Barangay BDC Vice-Chairs, and the 5 CSOs elected during the CSO assembly
  • 21. Variances in the Process • ‘Enhanced’ Local Development Council to approve list of priority projects prepared by the LPRAT • List of projects to be submitted to also contain KALAHI-CIDSS and LGU funded projects • Planning process to be harmonized with crafting of Comprehensive Development Plan
  • 22. Menu of Programs DA - Irrigation projects (SIP/STW/OSP) - Infrastructure support to Agri and Fishery production (Tractor, Planter/Seeder, Harvester, Thresher, Sheller, Motorized Fishing Boat, Fish Nets) - Agro-Processing Facilities and Expanded Agri-Business Activities - Post-harvest Facilities and Equipment (Mechanical Dryers, Multi-Purpose Drying Pavement) - Cold Storage Facilities/Vans - Ports and Wharves - Trading Posts - Sustainable Agri-Fishery Based Livelihood and other Agri-Fishery Business Investments - Tramlines - Farm implements/ tools - Agri-Fishery training - Marine Reserve and Fish Sanctuaries - Marine protected areas - Organic fertilizer production
  • 23. Menu of Programs DA - Irrigation projects (SIP/STW/OSP) - Infrastructure support to Agri and Fishery production (Tractor, Planter/Seeder, Harvester, Thresher, Sheller, Motorized Fishing Boat, Fish Nets) - Agro-Processing Facilities and Expanded Agri-Business Activities - Post-harvest Facilities and Equipment (Mechanical Dryers, Multi-Purpose Drying Pavement) - Cold Storage Facilities/Vans - Ports and Wharves - Trading Posts - Sustainable Agri-Fishery Based Livelihood and other Agri-Fishery Business Investments - Tramlines - Farm implements/ tools - Agri-Fishery training - Marine Reserve and Fish Sanctuaries - Marine protected areas - Organic fertilizer production
  • 24. Menu of Programs DENR - National Greening Program DTI - Local Regional Economic Development - Yaman Pinoy’ - Rural Micro Enterprise Development Program - Shared Service Facility - OTOP Store Express - Industry Clustering Development Program - Philippine Traceability for Revitalized Agricultural Competitiveness Enhancement Program (P-Trace) DOT DOE NEA - On-grid Sitio Electrification Program - Barangay Line Enhancement Program
  • 25. Menu of Programs DSWD - Sustainable Livelihood Program: Microenterprise Development Track - Sustainable Livelihood Program: Employment Facilitation Track - KALAHI-CIDSS - Protective Services – Infrastructure Projects - Protective Services – Capacity Building DOLE - Workers Income Augmentation Program (WIN AP) - TUlong Panghanapbuhay para sa Ating mga Disadvantaged Workers (TUPAD) - DOLE-AMP (DOLE- Adjustment Measures Program) - OFWs REINTEGRATION PROGRAM - SPES (Special Program for the Employment of Students) TESDA
  • 26. Menu of Programs DepEd -Basic Education Facilities: Repair / rehabilitation of classrooms - Basic Education Facilities: Provision of school furniture - Gulayan sa Paaralan - Innovative programs to promote access to Education/ Abot-Alam Program DOH - Maternal, neonatal, child health and nutrition (MNCHN) - Community Health Team (CHT) mobilization - Infectious diseases (Filariasis Elimination, Schistosomiasis and Malaria Control, Rabies Elimination, Leprosy, TB Control, STI/HIV and AIDS Prevention, Dengue Control - Health Emergency Mangement - RNheals - Rural Health Midwife Placement Program - Health Facilities Enhancement Program
  • 27. Menu of Programs DILG - SALINTUBIG - Capacity Building for CSOs - School Computer Laboratory - Birthing Facility - Core Local Road Construction/ Maintenance / Rehabilitation - Tourism Facility - Public Market - Slaughterhouse - Transport Terminal - Evacuation Facility - Rescue Equipment - Flood Control