Part I City Scale: Vector relationships in partnering simulations help to deploy complex lens and window relationships. LIFT and LIFE certifications supply access to Cloud-Star portal arrangements in the Glass system.
1. Slide 1
Simulations
Project
Glass Systems| Brij Consulting, LLC
| Jean A. Marshall
Part I: City Scale
SIMULATIONS
MDIA
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 1
LIFT & LIFE
Certified
Part I of the Simulations Project is at the diminishing scale of the City.
2. Slide 2
Project Goals
Ultimate goal of project.
Relationship to other projects.
High-level timing goals.
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 2
The modulation of scale can not be
superficial since it will become a dynamic
agile arrangement
V1 MULTI-AGENCY
The Work of a Simulations Model depends on whether it is a one lead simulation given a
specified ID or a Multi-Agency Model. We are describing the work of this model as a multi-
agency model because there are multiple companies and groups relying on the outcome of such
a model. The key behaviors of this model are described in this paper.
3. Slide 3
There are two partnering arrangements specified in this paper, one having to do with being
ready for remote assimilate and partnering which comes toward the end of the glass path. The
special lens requirements necessary to the specific phases of the project have windows and
portal assessments throughout the project. Specialized groups will need to accommodate
simulations for the purpose of streamlining operations, and developing complex arrangements
for the success of projects. We had originally recommended a certain banking and accessible
corporate arrangement.
4. Slide 4
Both Production and Simulation Strategies are
improved by Glass systems
The best system of BIM Building Information
Modeling may be won over from glass
We will constructively work
on the simulation purpose
of this model first.
Glass and Green in
our papers are not
on a meta basis
Glass Fabrications are
what makes building
and manufacturing
similar.
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 4
Glass systems provide for production and simulation strategies. Even the simplest read only
method of design supplies for modeling a project and communicating its requirements to
multiple contractors within the supply chain. Glass fabrications are what makes a building
project more like a manufacturing project.
5. Slide 5
CALCULATE LIFT
MODEL SIMULATION LIFT BY INSTANCE
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 5
L1
L2
L3
L1
L2
L3
Ω1
STRABO DIVISION
85752
63.20580488
1356.71083
2713.42166
2721.9
0.996885139
GATE
0.332295046
MAX YIELD
LIFT and LIFE Certifications
keep Cloud-Star Portal
accessible for Simulations
See Slide 13
V1 MULTI-AGENCY
Certifications for Lift and for LIFE are necessary to be assembled on all the various parts of the
project, but are anticipated throughout. The overall certification of the model itself is necessary
because of the power driven to it from the Cloud-Star and the Morning Star Association that has
oversight on the glass building with it. They will keep it aligned with the Plan and develop the
associated technique for assessing changes in the model due to ongoing project operations.
Markers were established so that LIFT measurements could be taken. A Lift by Instance
schedule was developed so that the phases of the project could be assessed.
6. Slide 6
Phase 1 T3&T4
Componentize
• The Fundamental
Approach to Green is
to Componentize
existing Technologies
– Products will run on a
consortium of green
until the green wall is
built.
Phase 2 T1&T2
Solid State
• Solid State is a Glass
synthetic value of the
Green Approach.
– Products will be built
locally, and windows
enhanced to permit
various build scenarios.
Phase 3 Fin & Br
Remote
• The minitiarization of
scientific assets
provides mobility and
remote building.
– The Streamline
Warehouse, branching
and portals begin to
assist cloud fluency.
Growth Strategy
6
How will we scale in the future?
BRIJ CONSULTING, LLC JEAN MARSHALL
Pre-facts are determined through LIFT simulations
L1
L2
L3
The Pre-Facts of LIFT Simulations
help to keep the project on-
target with series requirements
and other positions
specificationsthat need to be
performed ahead of milestones.
This is especiallytrue in agile
mode due to rapid build-out.
There is a type of Fail-safe
requiring a new instance
captivation for tracking.
V1 MULTI-AGENCY
The Growth Strategy stated in this paper is based on multi-agency participation in a process to
develop green energy, to build with glass arrangements and in union with the Morning Star
accomplish a remote building and branching arrangement leading to cloud fluency. The Lift
Cycle helps to achieve this and the Life Cycle guarantees its performance equity.
7. Slide 7
A New affluency in Lens
commutations
Other benefits include
Glass System Windows and Portal arrangements
Green Energy passivity
Better Health Maintenance
Multiple lens fields and dimensional
scale attribution within the ring star
Variegated Lens Ring Assimilation
Variegated
like ring facets
BRIJ CONSULTING, LLC JEAN MARSHALL 7
Slide 15, see more on topic…
The correctly augmented tooling and performance mechanics are depending upon the lens
arrangement of the specified ring design. All of the work will take place within the glass table
arrangement. The work does not leave the glass system because it is sponsored out of the
Morning Star warehouse arrangement for the continuous monitoring of Intellectual properties.
8. Slide 8
Test Analysis
P Factors
– Strengths
• We would suggest the use of the
standard P-Factor did not
compromise our test because
when substituted we gained back
the golden ratio within an
acceptable limit
Here we substituted
standard p (black) and
derived the golden ratio
(green)
Yield
Parameters
Push Test
• The P-Factor in its digital form was
also a digital contender.
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 8
885 Table
885 Table
P
p
V1 MULTI-AGENCY
We pushed our P factors through the 885 All Trig Table to determine if we had adequately
devised the ring test with a standard P. We noted that the value returned the golden ratio and
felt comfortable that this was adequate to the portal testing we had done previously and seen
on Appendix II. Using the standard digital ‘p’ we tested and received .365 result which was
prevalent in digital tests performed. We are satisfied with our metric push for P.
9. Slide 9
Supply Chain to Gate
The Big Push at the Gate delivery of
the vector completion finishes off
all of the metric remainders
demonstrating the compilation was
successful from beginning to end.
We determined the correctly
scaled vector from the Ring Test.
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 9
See Schedule, Slide 11, for more details
BIG
Push
885 Table
V1 MULTI-AGENCY
Ring Test
Appendix IV
All major ends of the process were satisfied with our Ring Test and big push of the metric
relationships. We derived a 315 factor for build conversion. The clapping hands icon show that
the derived facts from the 885 table agree to the portal product. The Big Push test was so
successful that it supplied a perfect pass certification as a preliminary event to the test.
Oversight board would have to agree and pass it finally.
10. Slide 10
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 10
New technology recommended.
– Digital Standards built advanced to Ark
Standards being adopted.
– Ark Sciences advance
Standards specifically being ignored.
– Meta Standards subsist
Simulations advance agile designs
– Miniaturizationmay require digital P
Technology
The Mountain of the House of the LORD
…3Then He will judge between many peoples and arbitrate for strong nations far and wide.
Then they will beat their swords into plowshares and their spears into pruning hooks. Nation
will no longer take up the sword against nation, nor will they train anymore for war. 4And each
man will sit under his own vine and under his own fig tree, with no one to frighten him. For the
mouth of the LORD of Hosts has spoken
Arrangements for this model appear to fit many biblical eschatological topics and events related
to Marian Apparitions as well as timeline arrangements in the Book of Enoch. Our work is
based largely on Ark based design of plait glass described to us by our mentors who guide
vocational progress along the lines of the Eternal Plan of God. We have not skimped on
describing these relationship such as the NEW STONE of Daniel and the SEA OF GLASS stated in
the biblical apocryphal books.
11. Slide 11
BRIJ CONSULTING, LLC JEAN MARSHALL 11
ScheduleReview high-level schedule and details.
Lift
885 Table
V1 MULTI-AGENCY
JM0
The Lift Schedule and other applications of metric relationships were tested against new parts
of the assembly including the ring test. All tests produced valid responses against the 885 table
which is the “All Trig” table. This included Gate and Load.
12. Slide 12
The structure of the factory load system helped to identify the instance testing necessary in
these circumstances. The Ring test would be included in the transformational staging of the
Simulations, the lens, for example, is required at f parameters. Dimensional testing proved no
loss of scale at the manufacturing performance level, in this city model.
13. Slide 13
BRIJ CONSULTING, LLC JEAN MARSHALL
13
Portal Resources
LIFT and LIFE Certifications
are necessary to utilize portal
resources
Yield
Parameters
LIFT Comparative
Facts
Yield Parameters:
Instance Facts
adjusted to avoid
exceeding Yield
Ω1
LIFE Certification is Omega guaranteed
885 Table
Ω1
LIFT and LIFE Facts
Certifications
Certifications are necessary for all Portal
Arrangements including Prototyping,
Production Book, Engineering of Utilities.
Production and Simulation works.
LIFT Certifications are engineering tested.
LIFE Certifications are equity interfaced.
Authentication of the Morning Star
Oversight is essential for system
Performance mechanics.
LIFT & LIFE
α,Ω1
BENCHMARK
No loss to benchmark
All Trig
V1 MULTI-AGENCY
Lift and Life facts are shown on this slide with notes that there is no loss against the benchmark
in this remaining econometric with the asterisk. The ALL TRIG table is an important tool used to
measure in our last paper and supplies statistical challenges to our metrics going forward.
Dimensional systems for modeling outcomes have not ever had build characteristics before
glass. And this is because of the Ark design and secant engineering.
14. Slide 14
We will highlight the Phases and
Interoperability of Projects
Discuss requirements, benefits, and
issues of using new procedures.
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 14
See Slide 3
Phase 1 T3&T4
Componentize
V2 INTEROPERABILITY
L1
See Slide 17
Each Phase will have its own
commutative properties
New Form
The intellectual property acquired from the Green Wall arrangement and the process associated
from the initial phase makes it over to the last branch test on our interim testing scheme, but on
the Final Forward Statement the results have been reconfigured for the community
arrangements. So, we will have to produce interim phase reporting statements to assess each
Instance in the Model.
15. Slide 15
Metric Moving Phase Changes
Sum by Phase and System Task
Detail of Moving Average Changes
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 15
See App I
Here we have begun to arrange our testing mechanic using the moving average change of four
of the strata of the project. We can see these arguments by system task and by system feature.
We will add more information on subsequent slides.
16. Slide 16
Impacts of Model Development
High-level overview of progress against schedule.
– On-track in what areas
– Behind in what areas
– Ahead in what areas
Unexpected delays or issues.
Synthesis, Miniaturization, and Remote Delivery
– Require a highly developed angular acuity.
– Remote Building requires a positional aspect
that has both reach and angular acuity.
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 16
V3 LENS EVOLUTION
Lens Status
Slide 19, Dig-P4;
885 Table
App IV, Ark-P4
5.78
7.76
Lens Acuity=
Lens and Window
relationships are a matter
of process associations
Events Compilation
Assists the compiled
form with metric
parameter, slide 17
New Form
7.07966
The various impacts of model development are highlighted in conjunction with the Lens Status
reporting that needs to emerge from simulations. We will study this in greater detail in our next
paper and continue to assimilate data for the testing purpose of the model here.
17. Slide 17
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 17
Ring Test for digital/miniaturization
– Digital Standards built advanced to Ark
Reconcile Phases with Instances
– Ark Sciences advance
Simulate to advance agile designs
Varying States require variegated lens
– Discuss requirements for VRD on x products (planning of
instances)
– Use of compiled events produce objectives of new lens, etc..
To Do
Instances divide the load
and bifurcate the margin.
These are important clues in
finding simulation events. In
the affluent cloud they will
not be divided but in the
instances of forms and mix
this is a challenge.
764.6 x 2=
1529.3
- 1526.9=
2.8
-3.85 establishes unitary conversion
Events
Compilation
30.8
26.2
18.8 75.8
+3.6
Phase Compilation
-See digital ring slide 20
.00482391 x 2=
0.00964782-.00963409 = .00001373
Critical Path
Goal: Fabrication
at the Construction Site
.963409 -.960734214 = .002674786
411 = ROI, slide 22
Relationship to events can be used to test certain object relationships. Fabrication at the
construction site is considered site delivery. Scientific assets need to be miniaturized to deliver
remotely and conveyed out of a special proprietary warehouse. This was called streamline in
our papers. It is important to remember that we had experienced a unitary discrepancy when
the scientific assets were redeveloped because they became a fixed cost instead of variable.
And it also caused bifurcation of facts which is an important indicator of change at the gate.
These small details will be pivotal in the scheme of this process.
18. Slide 18
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 18
Detail by Phase and System Task Detail of Phase and System Features
JM0
Here we zoned in on system tasks and features that are impacting outcomes.
19. Slide 19
Related Documents
• Perform with each advancing stage
Marketing Plan
• Perform to forecast each LIFE cycle
Phase Budget
• Events preceding the LIFT requirement
Pre-Evident
• Results Assimilated and Variegated
Post-Actuated
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 19
When is it necessary to recertify LIFT and LIFE
requirements? When the stratifications shift
significantly to change the relevant range. These
views will be explored in upcoming papers
We identified the type of reporting necessary for the Lift and Life discrepancies caused by the
actual changes in the model from moving process mechanics for live data. We will devise these
schedules in our next paper.
20. Slide 20
Digital Ring Test
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 20
P
App IV, see Ark-P4
Agreed to the Yield Parameters
Variegated Lens Assimilation
The digital ring test is displayed and its content is examined as the downscale interior test.
21. Slide 21
Simulation Vectors
Part of preparation for each phase is
identification of the intricate requirements
for lens and table arrangements as well as
adequate windows and portals and other
system requirements. The table has to be
ready for miniaturization of scientific assets
where the “M” sits or approximately. This
is from “our” point of view and partners
may have a different set of requirements.
This is also why simulations are group or
multi-agency events.
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 21
Componentization
Solid State (SSE)
Remote Partnering
Local Glass Industry
M
The Almighty
answered Her: “My
Dove, do not fear, for I
will assist thee and
guide thee, directing
thee in all things
necessary for the
service of my only-
begotten Son.”
Componentization Solid State (SSE) Remote/Branch
Digital to Ark Builds
Actual work results will change the
simulation outcome and the dates,
so that lens arrangements in the
supply chain need to be consistently
tested for changes and reported.
We have simulated the before vectors of each highlighted process. We have made notes as to
what should occur in each period of the process. We have highlighted the big dates once again
as products of the agile mechanics. These dates have a key role in keeping the project on track.
22. Slide 22
12 Vector, 4 Strata
The Splice Vector approach uses
both digital splice and ark splice
factors
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 22
Componentization
Solid State (SSE)
Remote Partnering
Local Glass Industry Legacy Glass Industry Architectural Glass Industry
Componentization and the
development of models for solid
state development will help to settle
issues of synergy between
compositional layers
M
City Scale Remote Scale Confluent
7.07966 x 1000 – 4.11 ROI
885 Table See Slide 23
Simulation Strategy
We have examined the “before” vectors of each part of the process and also the strata that the
moving average is based upon. We have made notes regarding various parts of the project and
have found a metric that supplied more information to the portal details on the next slide.
23. Slide 23
Summary
The compilations here will be finished in our next paper to show
how the various forms will produce new and active facts for the
cases presented to the model for each phase. As products advance
new requirements are found.
BRIJ CONSULTING, LLC JEAN MARSHALL 6/23/2023 23
z
Each Phase will have its own
commutative properties
Lens and Window
relationships are a matter
of process associations
1392.744 x 2 = 2784
Documents
V3 LENS EVOLUTION
V2 INTEROPERABILITY
V1 MULTI-AGENCY
Actual work results will change the
simulation outcome and the dates, so
that lens, windows, tooling
arrangements in the supply chain need
to be consistently tested for changes
and reported.
• Correcting the Agile
composition of the work-
flow and life cycle
• Associating the Supply Chain
in the Simulation to assess
timing, scope and expediting
delivery
• Supplying new tooling to the
job
LIFE and LIFT Assessments
See App II
Here we see the re-computation of the portal basis of the project and agreement now with the
ark ring test. Also we have summarized work that will proceed on the next paper to outline a
standard approach to simulations reporting, commutative property arrangements, and lens and
window process requirements. Major factors are outlined here but as we go on the nuanced
circumstances will become part of the reporting process.
24. Slide 24
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 24
Appendix I
The use of P @Q in this paper is more pronounced and so our Appendix is included.
25. Slide 25
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL
25
Appendix II
Unit
burden
See Slide 3
Evidence of the Impact Factor or IF is necessary to support conclusions about the exterior
market characteristic; Here we left a calculation for next paper because it is a branching
problem. We have added to this page a small script from the “Architectural Builds” paper that
shows the incumbent load is influencing the internal outcome although it is a hidden
characteristic. It is generally the cost of tooling which influences the dimension however here
the whole is bifurcated to branch.
26. Slide 26
T h i s P a p e r i n D e s i g n S e r i e s
Devising a Test Strategy to find
Markers for the Moments in the
Captivation of the Project that
define the wall migration, the
uplift, the distinct change in the
arrays that point to the position
of the project from
componentization to solid state
and other chores that make a
simulation modeling strategy a
great venture for investors and
stakeholders to the project, to
take hold of the imminent
domain.
SSE
Ring Test Background
Appendix III
Reasons for Simulation of Phase Mechanics
BRIJ CONSULTING, LLC JEAN MARSHALL
6/23/2023 26
JM0
Our Design Series papers continue to examine developmental aspects of the project. Cascading
in Green takes us to the Green Wall Requirements and wall migrations, while the next paper
dedicated to scientific solutions for remote ends of the business will delve deeper into the
knowledge necessary to package the scientific assets for mobile use. Transition from Wall to
Portal to Cloud-Star fluency continues with the need to simulate outcomes.
27. Slide 27
Appendix IV
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 27
The Ark ring test supplied in our last paper called “Cloud-Star” is available for review as it was
extensively used within this paper.
28. Slide 28
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 28
Next Pap er in Design Series
1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope
determination of Glass and STRABO serialization for Agile
2. Glass Impact: Streaming the Engineering of Components, Solid State
Assemblage, Table Design Outcomes
3. Cascading in Green: The theories and concepts related to the Green Wall
and the starting compositing of green energy and wall migrations.
4. SSE: The Remote End: How Solid-State Engineering is Performance mined
and delivered remotely
5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency
6. Simulations in Diminishing Scale: The use of Ring and Lens
SSE
CASCADE
IMPACT
SCOPE
CLOUD-STAR
Brij Consulting, LLC | SlideShare
Part I: City Scale
Part II: Remote Scale
Part III: Confluent Scale
Three parts of the
Simulations project
explore cloud depth,
cloud reach and cloud
layers
SIMULATIONS
Part I: City Scale
Part II: Remote Scale
The New Earth
Our next paper in the design series will focus on simulations and specifically Part I: City Scale.
We will begin to highlight the vector requirements for tasking in our current model and the
need for lens facets for scale differentiation.
29. Slide 29
1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 29
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the “cube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects
Building
The Learning Series
30. Slide 30
Simulations
Project
Glass Systems| Brij Consulting, LLC
| Jean A. Marshall
Part II: Remote Scale
SIMULATIONS
6/23/2023
BRIJ CONSULTING, LLC JEAN MARSHALL 30
Our next paper is highlighted as the crystal globe model of glass processes is a reliant fact in the
background, supplied by the Morning Star. This is also true of the Star-Cloud arrangement.