J.Manoharan has a wealth of experience in Design, Design review,
Sustainable design and significant practical knowledge in HVAC
Engineering. He has more than 20 years of Consultancy experience in
HVAC field.
He has proven Middle East experience, executing MEP aspects on a
variety of Commercial, Residential, Hotel, Hospital and Mixed use
development.
He has been responsible for the design of district cooling plants for large
scale projects such as Qatar Petroleum Head office (QP District, West
bay), Doha , Qatar and Salwa Beach Resort for PEO , Doha, Qatar.
He has design experience in Tier-3 Data Centre for QP District project.
He has worked as the Technical Lead on large scale mixed use
development such as QP District project which has 9 office tower (ranges
from 20 storey to 45 storey), 3 podium level, 3 level of basement car park,
Auditorium building, 4 star Hotel tower, parking building, Energy Centre
building. The Energy centre cooling plant capacity is 19000 TR. The
project cost is 6 billion QR.
He has also worked as Senior Engineer in the prestigious 250 Bed Al
Zahra Hospital, Dubai, 200 bed Umm Al Quwain Hospital, Type A, B and
C clinic for General Health Authority, Abu Dhabi .
J.Manoharan has been involved in projects going through the process of
Sustainable design, Estidama and LEED Certification namely Salwa
Beach Resort, Doha (1 Pearl), Carina View Residential Tower, Abu
Dhabi, QP District Doha (2 Pearl).
He has worked as Lead/ Project Engineer for Salwa Beach Resort project
which is 5 Star hotel development for PEO, Doha with Hilton as Hotel
operator. This project is a development in Sea front which has 200 nos.
Executive villas with VRF system, Main Hotel, Mosque, Sports Centre,
150 nos Arabic type villa, Staff village , Community Centre, Marina Asian
fusion restaurant, Utility Hub buildings, Light house, Substation’s,
Generator Building, Energy centre, Car park building and shopping mail
etc. The cooling load of this project is 10,000 TR. The project has multiple
restaurant such as Marina Asian Fusion, Sea food Restaurant etc around
10 nos. restaurant. The project cost is 3.2 billion QR.
He has also involved as Principal Engineer for major Car show room
projects such as Infiniti, Nissan and Hyundai show room in Kuwait and
Toyota Show room cum Corporate office at Muscat.
J.Manoharan is an excellent team player who can support and lead a
team effectively in successful completion of large projects, effectively
coordinating requirements with all parties involved. Involved in all aspects
of the project life cycle from life cycle analysis, design, review, value
engineering and finalization of tender documents to taking a lead role in
completing the project delivery through active participation, planning and
execution of design.
2. J.Manoharan, B.E. LEED AP
Principal Engineer/ Dy. Head of HVAC Engg.
jmanoharan2000@yahoo.co.in Page 2
Summary of Experience
Project Type
Mixed Use
Office
Residential
Hospital
Hotel
Project Location
Kuwait
Doha
Dubai
Abu dhabi
Oman
India
HVAC System
District Cooling
Water cooled CHW
Air Cooled CHW
DX Package
VRF
Scope of work
Principal/ Dy Head
Senior Engineer
Design Engineer
3. J.Manoharan, B.E. LEED AP
Principal Engineer/ Dy. Head of HVAC Engg.
jmanoharan2000@yahoo.co.in Page 3
Professional Qualification
Bachelor of Engineering, Mechanical Engg,Thiagarajar College of Engg, Madurai, India.
USGBC LEED Accredited Professional.
Professional Membership
Member, Society of Engineers, UAE
Member, ASHRAE, Kuwait Chapter
Member, ISHRAE, Delhi Chapter
Personal Details
Date of Birth: 05/05/1966
Nationality: Indian
Marital Status: Married
Driving Licence: UAE, Kuwait, India
Languages: Tamil, English, Hindi
Contact no: 00965 65024035
E mail: jmanoharan2000@yahoo.co.in
jmanoharan2007@gmail.com
Professional Seminar/ Workshop attended
3weeks Coordination workshop with Project Architect HDR and MEP designer TED Jacob.
Engineers at Los Angeles,USA for Cleveland Clinic, Abu Dhabi on May 2008
Attended 2 weeks Site visit and workshop to Non human Primates facility at New Orelans,
USA, Oct 2000 for designing the Animal house facility in India Under technology transfer
program between Govt. Of India & US Government
Attended 1 week seminar on Green building aspects by National Productivity Council,
Singapore on August 2000
Efficient Green Building Design and Sustainability seminar at Big 5, Kuwait 2015 by KEO
Sustainability Team
Technical skills
HAP
Trace
Elite
Taco HSS
Autocad/ revit
MS Office/ Excel
Working knowledge of selection software of various manufacturer
4. J.Manoharan, B.E. LEED AP
Principal Engineer/ Dy. Head of HVAC Engg.
jmanoharan2000@yahoo.co.in Page 4
Employment History
1) Principal Engineer/ Dy. Head of HVAC Engg July 2014--- Till date
KEO International Consultant, Kuwait
Job Profile
Report to Director- MEP in regards to technical issues, progress and performance issues,
personnel management and resolution of issues.
Involved in maintaing existing and new Client relationships.
Preparation of budgetary man hour schedule for new marketing projects.
Liaison with Team member in Qatar and Abu Dhabi office for various projects of Doha and Abu
Dhabi.
Provide assistance in preparing man hours schedule for new projects.
Support HR in resource control and technical assessment of candidates.
Lead the Project Engineering design effort and act as the Deputy head.
Being Core Team member of the office, to ensure the HVAC design meets the local and
international code requirements.
Perform QA/QC review of all the projects during the various stage of design such as Concept,
Schematic, Design development, Working drawing and Tender stage so that standard QA/QC
check list are followed for design, Code, Coordination and production requirements.
Assist the Project Manager/ Project Architect in man power resource planning and job
coordination.
Initiate and respond to Client and design team correspondence in regards to design and project
requirements.
Coordinating with Lead Architect, Specialist Consultants (such as Kitchen, Laundry, Fire & Life
safety, Hospital planner and Acoustic) and operators ( including Hotel operator) for space
planning, coordination of relationship between various spaces and provide robust HVAC solutions
to meet the aesthetic intent of the design team.
Coordinating with Structural ,Plumbing and Electrical team for floor and wall opening, shaft, make
up water, condensate drain and electrical power requirements.
Coordinating with Interior design for Reflected ceiling plan (RCP) and false ceiling level
requirements.
Coordinating with Sustainability team for LEED, Estidama and GSAS rating requirements.
Responsible for the day to day management of the HVAC design team activities and
implementation of the scope of work in accordance with the project schedule and project
requirements.
Direct and coordinate the design team in the project execution, respond to RFI and site design
queries.
Ensure adequate procedure are in place for maintaining the integrity of all the design and
calculation carried out by the HVAC staff.
Foster an environment for building team morale and generate a sense of ownership,
accountability and urgency within the team and ensuring that the team members are trained to be
suitably qualified and experienced engineers.
Update/ Prepare HVAC specification based on Master specs to ensure that consistency &
compliance with applicable codes & standards including HVAC BMS point list.
Assist/ Prepare the Authority submission drawing, its report and calculation such as KFD, QCDD,
MEW and Kharamma etc.
Standardizing the MEP calculation worksheets to control quality and ensure consistency in
information and calculation delivery by all team members.
Tender technical assessment & attend tender query.
5. J.Manoharan, B.E. LEED AP
Principal Engineer/ Dy. Head of HVAC Engg.
jmanoharan2000@yahoo.co.in Page 5
Regular site visit to rectify the site related design query.
Responsible for HVAC team attendance, time sheet, leave and vacation schedule.
Assist / Perform the performance review of HVAC design team members.
Currently managing 2 Senior Engineers, 6 Junior Engineers and 10 CAD/ BIM technician.
Project Involved
Mixed use development of QP District, Doha, Qatar
Salwa Beach Resort, Doha, Qatar
Infiniti Show room, Kuwait
Hyundai Show room, Kuwait
Nissan Show room, Kuwait
Abraj Quartiar AQ 3 &4 and 5&6, Doha, Qatar
Babel Restaurant, Kuwait
Novotel Hotel, Kuwait
Hala Hotel, Doha, Qatar
2) Senior Engineer- HVAC Dec 2008—April 2010 and
KEO International Consultant, Dubai/ Abu Dhabi/ Kuwait May 2010---June 2014
Job Profile
Report to Head – HVAC in regards to technical issues, progress and performance issues,
personnel management and resolution of issues.
Liaison with Team member in Qatar and Abu Dhabi office for various projects of Doha and Abu
Dhabi.
Perform QA/QC review of all the projects during the various stage of design such as Concept,
Schematic, Design development, Working drawing and Tender stage so that standard QA/QC
check list are followed for design, Code, Coordination and production requirements.
Initiate and respond to Client and design team correspondence in regards to design and project
requirements.
Coordinating with Lead Architect, Specialist Consultants (such as Kitchen, Laundry, Fire & Life
safety, Hospital planner and Acoustic) and operators ( including Hotel operator) for space
planning, coordination of relationship between various spaces and provide robust HVAC solutions
to meet the aesthetic intent of the design team.
Coordinating with Structural ,Plumbing and Electrical team for floor and wall opening, shaft, make
up water, condensate drain and electrical power requirements.
Coordinating with Interior design for Reflected ceiling plan (RCP) and false ceiling level
requirements.
Coordinating with Sustainability team for LEED, Estidama and GSAS rating requirements.
Design and use of software on excel and other utilities for design calculation.
Duct sizer/ Pipe Sizer
Ventilation schedule
Expansion tank calculation
Completed Cooling load estimate, Psychometric analysis, Equipment Schedule and MEW
calculation.
Smoke ventilation & Pressurization calculation sheets as per KFD & QCD requirements.
Direct and coordinate the design team in the project execution, respond to RFI and site design
queries.
Ensure adequate procedure are in place for maintaining the integrity of all the design and
calculation carried out by the HVAC staff.
6. J.Manoharan, B.E. LEED AP
Principal Engineer/ Dy. Head of HVAC Engg.
jmanoharan2000@yahoo.co.in Page 6
Foster an environment for building team morale and generate a sense of ownership,
accountability and urgency within the team and ensuring that the team members are trained to be
suitably qualified and experienced engineers.
Update/ Prepare HVAC specification based on Master specs to ensure that consistency &
compliance with applicable codes & standards including HVAC BMS point list.
Assist/ Prepare the Authority submission drawing, its report and calculation such as KFD, QCDD,
MEW and Kharamma etc.
Tender technical assessment & attend tender query.
Regular site visit to rectify the site related design query.
Managing 4 Junior Engineers and 4 CAD/ BIM technician.
Project Involved
Dubai Mixed Use development, DMUD, Dubai
PJA Residential Tower, Jebel Ali, Dubai
Carina view Residential Tower, Abu Dhabi
Meydan Mixed use development, Dubai
3) Mechanical Engineer April 2007—Nov 2008
HDP (OS) LTD, Abu Dhabi
Job Profile
Report to Head – GM in regards to technical issues, progress and performance issues, personnel
management and resolution of issues.
Liaison with Team member in Jordan office.
Initiate and respond to Client and design team correspondence in regards to design and project
requirements.
Coordinating with Lead Architect, Specialist Consultants (such as Kitchen, Laundry, Fire & Life
safety, Hospital planner and Acoustic) for space planning, coordination of relationship between
various spaces and provide robust HVAC solutions to meet the aesthetic intent of the design team.
Coordinating with Structural ,Plumbing and Electrical team for floor and wall opening, shaft, make
up water, condensate drain and electrical power requirements.
Coordinating with Interior design for Reflected ceiling plan (RCP) and false ceiling level
requirements.
Design and use of software on excel and other utilities for design calculation.
Duct sizer/ Pipe Sizer
Ventilation schedule
Expansion tank calculation
Completed Cooling load estimate, Psychometric analysis, Equipment Schedule and MEW
calculation.
Smoke ventilation & Pressurization calculation sheets as per Abu Dhabi Civil Defence
requirements.
Direct and coordinate with the project team in the project execution, respond to RFI and site
design queries.
Update/ Prepare HVAC specification based on Master specs to ensure that consistency &
compliance with applicable codes & standards including HVAC BMS point list.
Assist/ Prepare the Authority submission drawing, its report and calculation.
Regular site visit to rectify the site related design query.
7. J.Manoharan, B.E. LEED AP
Principal Engineer/ Dy. Head of HVAC Engg.
jmanoharan2000@yahoo.co.in Page 7
Project Involved
MIS Hospital, Dubai
Umm Al Quwain Hospital
Type A, B and C clinic in Abu Dhabi
Cleveland Clinic, Abu Dhabi
Hatta Hospital
4) MEP Engineer Oct 2005—March 2007
RSP ME FZCO, Dubai
Job Profile
Report to Head – VP ( Mechanical ) in regards to technical issues, progress and performance
issues, personnel management and resolution of issues.
Liaison with Team member in Singapore office for various projects of Dubai and Abu Dhabi.
Initiate and respond to Client and design team correspondence in regards to design and project
requirements.
Coordinating with Lead Architect, Specialist Consultants (such as Kitchen, Laundry, Fire & Life
safety, Hospital planner and Acoustic) and operators ( including Hotel operator) for space
planning, coordination of relationship between various spaces and provide robust HVAC solutions
to meet the aesthetic intent of the design team.
Coordinating with Structural ,Plumbing and Electrical team for floor and wall opening, shaft, make
up water, condensate drain and electrical power requirements.
Coordinating with Interior design for Reflected ceiling plan (RCP) and false ceiling level
requirements.
Coordinating with Sustainability team for LEED, Estidama rating requirements.
Design and use of software on excel and other utilities for design calculation.
Duct sizer/ Pipe Sizer
Ventilation schedule
Expansion tank calculation
Completed Cooling load estimate, Psychometric analysis, Equipment Schedule and Dubai
Municipality calculation.
Smoke ventilation & Pressurization calculation sheets as per Dubai Civil Defence requirements.
Direct and coordinate the design team in the project execution, respond to RFI and site design
queries.
Update/ Prepare HVAC specification based on Master specs to ensure that consistency &
compliance with applicable codes & standards including HVAC BMS point list.
Assist/ Prepare the Authority submission drawing, its report and calculation such as Dubai Civil
Defence etc.
Tender technical assessment & attend tender query.
Regular site visit to rectify the site related design query.
Project Involved
250 Bed Al Zahra Hospital, Dubai
Sidhra office Tower, Dubai.
Palm Gateway Mixed use development
60 story mixed use development in Sheik Zayed Road
8. J.Manoharan, B.E. LEED AP
Principal Engineer/ Dy. Head of HVAC Engg.
jmanoharan2000@yahoo.co.in Page 8
5) Manager (Mechanical ) Oct 2004—Sep 2005
Galfar Engineering Company, Muscat, Oman
Job Profile
Report to Head – GM ( U&S) in regards to technical issues, progress and performance issues,
personnel management and resolution of issues.
Performing Heat load calculation and other HVAC calculation.
Assisting in the preparation of shop drawing
Liaison with MEP consultant for Technical submittal review and shop drawing review and its
approval.
Raising RFI to consultant
Attending the site coordination meeting with various consultants and resolving the MEP
coordination issues.
Arranging man and material for HVAC execution.
Attending & coordinating site installation, testing and commissioning activities of HVAC system.
Project Involved
Toyota corporate office cum show room at Muscat, Oman.
6) Manager (Mechanical ) Oct 1995—Sep 2004
Hospital Services Consultancy Corporation (India )Ltd, Noida, India
Job Profile
Report to GM – Mechanical in regards to technical issues, progress and performance issues,
personnel management and resolution of issues.
Performing QA/QC review of all the projects during the various stage of design such as Concept,
Schematic, Design development, Working drawing and Tender stage.
Initiate and respond to Client and design team correspondence in regards to design and project
requirements.
Coordinating with Lead Architect, Specialist Consultants (such as Kitchen, Laundry, Fire & Life
safety, Hospital planner and Acoustic) for space planning, coordination of relationship between
various spaces and provide robust HVAC solutions to meet the aesthetic intent of the design team.
Coordinating with Structural ,Plumbing and Electrical team for floor and wall opening, shaft, make
up water, condensate drain and electrical power requirements.
Coordinating with Interior design for Reflected ceiling plan (RCP) and false ceiling level
requirements.
Design and use of software on excel and other utilities for design calculation.
Duct sizer/ Pipe Sizer and Ventilation Schedule
Completed Cooling load estimate, Psychometric analysis, Equipment Schedule.
Direct and coordinate the design team in the project execution, respond to RFI and site design
queries.
Ensure adequate procedure are in place for maintaining the integrity of all the design and
calculation carried out by the HVAC staff.
Update/ Prepare HVAC specification based on Master specs to ensure that consistency &
compliance with applicable codes & standards including HVAC BMS point list.
9. J.Manoharan, B.E. LEED AP
Principal Engineer/ Dy. Head of HVAC Engg.
jmanoharan2000@yahoo.co.in Page 9
Tender technical assessment & attend tender query.
Regular site visit to rectify the site related design query.
Managing 2 Assistant Managers and 2 CAD technician.
Project Involved
300 bed hospital for Rotary Cancer Institute, AIIMS, New Delhi, India
ICU block for TB Institute, New Delhi, India
400 bed hospital for Gas tragedy victims, Bhopal, India
500 bed hospital and medical college for NEIGRIHMS, Shillong, India
Dental hospital and College, AIIMS, New Delhi, India
200 bed Trauma and Emergency centre, AIIMS, New Delhi, India
Trauma centre for RML Hospital, New Delhi, India
500 bed hospital, Tanda, HP, India
500 bed hospital cum medical college, Cochin, India
Clean room manufacturing & quality control facility for DPT and Tetanus vaccine, CRI ,Kasauli
Auditorium cum convention centre, NIMHANS, Bangalore, India
Administrative building for National Institute of Biologicals, India
7) Manager (Utilities) June 1989—Sep 1995
BIBCOL, UP, India
Job Profile
Report to GM – Utilities in regards to technical issues, progress and performance issues,
personnel management and resolution of issues.
Responsibilities included design review and site supervision of HVAC system for Oral polio
Vaccine (OPV) manufacturing facility. Witnessing testing and commissioning of clean rooms of
OPV facility. Managing operation and maintenance of the facility.