1. Page 1 of 3
Personal Information
Address:
Religion:
Date of Birth:
CNIC #:
Tel:
E-mail:
Objective
To become the part of a competent organization where I can utilize my professional and technical skills
and prove myself as a responsible for the development of the organization and for the appraisal of my
career.
Academic Qualifications
2005-2009
2003-2005
2001-2003
Training Courses
15th
- 19th
April 2013
24th
-27th
June 2014
Jawad Ahmad
337-A Block B, Faisal Town, Lahore, Pakistan
Islam
20th
October 1987
35103-7235006-5
92 345 4636905 / 92 300 8425906
jawadahmad381@gmail.com
Bachelor in Mechanical Engineering (PEC Reg. # MECH/22292)
University of Azad Jammu & Kashmir (3.63/4.00 CGPA)
F.Sc. Pre-Engineering
Government College of Science, Lahore (1st
Division)
Matriculation
Muslim Model High School Pattoki District Kasur (1st
Division)
05 days IRCA approved Lead Auditor Course on ISO 9001:2008
SGS Pakistan (Passed)
Economical Design of efficient bottle coolers utilizing Carbon Dioxide
(R744) as refrigerant
Creative Thermal Solutions (CTS), Inc.
Urbana, Illinois, USA
2. Page 2 of 3
Internship
Century Paper & Board Mills Ltd.
(62 km Multan Road Lahore)
August 2007 – September 2007
Professional Experience
Assistant Manger
(Product & Engineering)
Royal Pools Pvt. Ltd.
(E-10 Al-Qadir Heights New
Garden Town Lahore)
March 2010 – September 2011
Project Head/Management
Representative (MR)
Cool Point Pvt. Ltd
(Subsidiary of Cool Industries.
WAVES)
(Adda Plot, Sharaiz Avenue,
Jatti Umra Road, Raiwind Road,
Lahore)
www.coolpoint.net.pk
November 2011 – To Date
Final Year Project/ Thesis
Study, Fabrication and
Efficiency Improvements of
Combined Cycle Power Plant
Had a thorough visit of all plant and paper manufacturing
machinery
Worked on process flow diagram of plant
Got practical understanding of pumps (single and multistage
centrifugal) compressors (single and multistage centrifugal)
digesters, cyclones, paper mill operations and their
maintenance procedure along with some auxiliary equipment
(conveyer, blowers, packing equipment etc.)
Worked on
Project Planning of different swimming pool
projects (PERT, CPM & Gantt Charts)
Proposal Formatting
Quality Assurance
Team Management
Being a Project Head at Cool Point I have hand-on
experience on
Research & Development in Visi coolers and
Chest Coolers (e.g. Development of CO2 (R744)
refrigerant based coolers)
Cooler testing and certification as per Coca Cola
global testing standards & procedures
Plant certification from Coca Cola system
Cool Point IMS certification & implementation of
(ISO 9001:2008 & ISO 14001:2004)
Planning & Supervision of departments which
includes Procurement, Production, QC &
Customer care
Product costing
Coca Cola global bid negotiation
Building relationship with corporate clients
Study of Combined Cycle Power Plant and its Parts
(Filter, Compressor, Blades, parts of Combustion
Chamber, Gas turbine, Heat Recovery Steam
Generator, Boiler (Water Tube, Fire Tube), Boiler
Accessories (Economizer, Super heater, air Pre-heater),
Turbines (Impulse and Reaction), Cooling Tower
Fabricated a Prototype Model of CCPP
Studied CCPP Faisalabad
Suggested Improvements in CCPP
3. Page 3 of 3
Semester Projects
Study of Turbo Charger & Supercharger
Study of Steam Power Plant and Steam Turbine
Study of Boilers & Economizers
Study of 2-Stroke & 4-Stroke Petrol and Diesel I-C Engines
Study of Industrial Management
Study of 6 stroke I-C engine
Skills
Computer Skills
Microsoft Office
AutoCAD
Web Browsing
Adobe Photoshop
Operating System
Have good working experience in most of the Windows Operating Systems
(2000, XP, Windows 7)
Achievements & Personal Skills
Always finished given assignments/tasks before deadline
I am an enthusiastic, creative, punctual and adaptable to new projects and situations
A dedicated and level-headed individual
Apt at interpersonal skills and team work, as well as personal efforts.
Hobbies include reading newspapers, web browsing and playing cricket
References
Available on Request