INDUSTRY DEFINED PROBLEM REPORT
PROJECT 1
PREPARED BY ENROLLMENT NO.
BHALIYA JAGDISH HARSHADBHAI 136480319003
IDP TITLE: - PROBLEM FACED DURING OPERATION ON
LATHE, DRILLING, MILLING, AND GRINDING
ABSTRACT:
• With the development of modern manufacturing
Engineering, Faster Manufacturing Systems (FMS) have
become key equipment in factory automation. Machine
tools are heart of the Faster Manufacturing Systems. Lathe,
milling, drilling and grinding machines are the general type
of machine tools used by almost all the Manufacturing
system. During the operation of these machine tools,
different kinds of failures are faced by me. Like ‘Taper
Turning Problem In Lathe Machine;
• A Systematic Solution based on the failure data is defined
by me for different type of machine tools.
list of Common machine using
manufacturing systems
• Lathe
• Drilling
• Grinding
• Milling
• With the proper maintaining of above
machines the process become fast.
• The main goal of a faster manufacturing
system is to offer the speed needed to change
with market conditions quickly, but not
sacrifice any quality.
The potential benefits from the
implementation and utilization of a faster
manufacturing system have been detailed by
numerous researchers on the subject.
Advantages:
 Faster manufacturing process
 Easy operation
 Fast production
 Long life of machines
 Higher productivity
Other benefits
 Better control over quality
 Reduced labor
 More efficient use of machinery
 Work-in-process inventory reduced
 Increased capacity
 Increased production flexibility
 Increased system reliability
 Less waste
 Fewer workstations
 Reduced downtime
To reduce set up and queue times
Reduce time for product completion
Utilize human workers better
Produce more product more quickly
CONCLUSION:-
• From the observations we learned about machinery,
equipment’s and other accessories used in manufacturing
of the components.
•
• The primary role of this project is to solve the problems of
machine and to make easy manufacturing process.
•
•
• From this project we conclude that solving the problem of
machine we can reduce the rejection of the work piece,
save the time get perfect tolerance and gat more profit of
industry.

More Related Content

What's hot

Unit III - Solved Question Bank- Robotics Engineering -
Unit III - Solved Question Bank-  Robotics Engineering -Unit III - Solved Question Bank-  Robotics Engineering -
Unit III - Solved Question Bank- Robotics Engineering -Sanjay Singh
 
PID controller in control systems
PID controller in control systemsPID controller in control systems
PID controller in control systemskhalaf Gaeid
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
CASE STUDY OF DIGITAL CAMERA HARDWARE AND SOFT WARE ARCHITECTURECASE STUDY OF...
CASE STUDY OF DIGITAL CAMERAHARDWARE AND SOFT WAREARCHITECTURECASE STUDY OF...CASE STUDY OF DIGITAL CAMERAHARDWARE AND SOFT WAREARCHITECTURECASE STUDY OF...
CASE STUDY OF DIGITAL CAMERA HARDWARE AND SOFT WARE ARCHITECTURECASE STUDY OF...JOLLUSUDARSHANREDDY
 
Power point presentation on Industrial Automation
Power point presentation on Industrial AutomationPower point presentation on Industrial Automation
Power point presentation on Industrial AutomationJaiPrakash337
 
Industrial robots presentation
Industrial robots presentationIndustrial robots presentation
Industrial robots presentationPratik Thorat
 
Robotics and Autoamtion_ manipulators, actuators and end effectors
Robotics and Autoamtion_ manipulators, actuators and end effectorsRobotics and Autoamtion_ manipulators, actuators and end effectors
Robotics and Autoamtion_ manipulators, actuators and end effectorsJAIGANESH SEKAR
 
Process control
Process control Process control
Process control Sadiq Rahim
 
Ec8791 unit 5 processes and operating systems
Ec8791 unit 5 processes and operating systemsEc8791 unit 5 processes and operating systems
Ec8791 unit 5 processes and operating systemsRajalakshmiSermadurai
 
Real Time Kernels
Real Time KernelsReal Time Kernels
Real Time KernelsArnav Soni
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)sundar sivam
 
Robotics - unit-2-- Drive Systems
Robotics - unit-2-- Drive SystemsRobotics - unit-2-- Drive Systems
Robotics - unit-2-- Drive SystemsDr.G.Saravanan
 
Simulated Annealing - A Optimisation Technique
Simulated Annealing - A Optimisation TechniqueSimulated Annealing - A Optimisation Technique
Simulated Annealing - A Optimisation TechniqueAUSTIN MOSES
 

What's hot (20)

Unit III - Solved Question Bank- Robotics Engineering -
Unit III - Solved Question Bank-  Robotics Engineering -Unit III - Solved Question Bank-  Robotics Engineering -
Unit III - Solved Question Bank- Robotics Engineering -
 
PID controller in control systems
PID controller in control systemsPID controller in control systems
PID controller in control systems
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
Robot work cell layout
Robot work cell layoutRobot work cell layout
Robot work cell layout
 
CASE STUDY OF DIGITAL CAMERA HARDWARE AND SOFT WARE ARCHITECTURECASE STUDY OF...
CASE STUDY OF DIGITAL CAMERAHARDWARE AND SOFT WAREARCHITECTURECASE STUDY OF...CASE STUDY OF DIGITAL CAMERAHARDWARE AND SOFT WAREARCHITECTURECASE STUDY OF...
CASE STUDY OF DIGITAL CAMERA HARDWARE AND SOFT WARE ARCHITECTURECASE STUDY OF...
 
Trajectory
TrajectoryTrajectory
Trajectory
 
Power point presentation on Industrial Automation
Power point presentation on Industrial AutomationPower point presentation on Industrial Automation
Power point presentation on Industrial Automation
 
Industrial Automation
Industrial AutomationIndustrial Automation
Industrial Automation
 
Robot applications
Robot applicationsRobot applications
Robot applications
 
End effectors
End effectorsEnd effectors
End effectors
 
Industrial robots presentation
Industrial robots presentationIndustrial robots presentation
Industrial robots presentation
 
Robotics and Autoamtion_ manipulators, actuators and end effectors
Robotics and Autoamtion_ manipulators, actuators and end effectorsRobotics and Autoamtion_ manipulators, actuators and end effectors
Robotics and Autoamtion_ manipulators, actuators and end effectors
 
Process control
Process control Process control
Process control
 
Ec8791 unit 5 processes and operating systems
Ec8791 unit 5 processes and operating systemsEc8791 unit 5 processes and operating systems
Ec8791 unit 5 processes and operating systems
 
Real Time Kernels
Real Time KernelsReal Time Kernels
Real Time Kernels
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
 
Robotics - unit-2-- Drive Systems
Robotics - unit-2-- Drive SystemsRobotics - unit-2-- Drive Systems
Robotics - unit-2-- Drive Systems
 
Simulated Annealing - A Optimisation Technique
Simulated Annealing - A Optimisation TechniqueSimulated Annealing - A Optimisation Technique
Simulated Annealing - A Optimisation Technique
 
Drone project report
Drone project reportDrone project report
Drone project report
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
 

Similar to Industry defined problem report jagdish

Cam 1 unit palanivendhan manufacturin systems
Cam 1 unit palanivendhan manufacturin systemsCam 1 unit palanivendhan manufacturin systems
Cam 1 unit palanivendhan manufacturin systemspalanivendhan
 
01 05 11 31 35 ( Team Work )
01 05 11 31 35 ( Team Work )01 05 11 31 35 ( Team Work )
01 05 11 31 35 ( Team Work )Sadam Hussain
 
Production and operation management
Production and operation managementProduction and operation management
Production and operation managementHarsha Mathad
 
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...JothiSankar7
 
Manufacturing Technology..pptx
Manufacturing Technology..pptxManufacturing Technology..pptx
Manufacturing Technology..pptxJulius55232
 
Introduction to Automation.ppt
Introduction to Automation.pptIntroduction to Automation.ppt
Introduction to Automation.pptPrateek573064
 
01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.ppt01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.pptHarinathC5
 
Automation Notes on Manufacturing in Industries.ppt
Automation Notes on Manufacturing in Industries.pptAutomation Notes on Manufacturing in Industries.ppt
Automation Notes on Manufacturing in Industries.pptPrabhuSwamy24
 
Flexible Manufacturing System of Toyota (FMS)
Flexible Manufacturing System of Toyota (FMS)Flexible Manufacturing System of Toyota (FMS)
Flexible Manufacturing System of Toyota (FMS)Neha Khan
 
Unit 1-automation of assembly lines
Unit 1-automation of assembly linesUnit 1-automation of assembly lines
Unit 1-automation of assembly linesjoemaxagu
 
History of Automation and Process Introduction
History of Automation and Process IntroductionHistory of Automation and Process Introduction
History of Automation and Process IntroductionPranavAutomation
 
Organisation's operation's management
Organisation's operation's managementOrganisation's operation's management
Organisation's operation's managementdarious demus
 
Om module i
Om module iOm module i
Om module iRatan479
 

Similar to Industry defined problem report jagdish (20)

Cam 1 unit palanivendhan manufacturin systems
Cam 1 unit palanivendhan manufacturin systemsCam 1 unit palanivendhan manufacturin systems
Cam 1 unit palanivendhan manufacturin systems
 
01 05 11 31 35 ( Team Work )
01 05 11 31 35 ( Team Work )01 05 11 31 35 ( Team Work )
01 05 11 31 35 ( Team Work )
 
plant layout
plant layoutplant layout
plant layout
 
Production and operation management
Production and operation managementProduction and operation management
Production and operation management
 
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
FALLSEM2022-23_MCDM505L_TH_VL2022230106501_Reference_Material_I_27-09-2022_Mo...
 
Manufacturing Technology..pptx
Manufacturing Technology..pptxManufacturing Technology..pptx
Manufacturing Technology..pptx
 
Introduction to Automation.ppt
Introduction to Automation.pptIntroduction to Automation.ppt
Introduction to Automation.ppt
 
01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.ppt01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.ppt
 
Automation Notes on Manufacturing in Industries.ppt
Automation Notes on Manufacturing in Industries.pptAutomation Notes on Manufacturing in Industries.ppt
Automation Notes on Manufacturing in Industries.ppt
 
Introduction to computer Integrated Manufacturing (CIM)
Introduction to computer Integrated Manufacturing (CIM)Introduction to computer Integrated Manufacturing (CIM)
Introduction to computer Integrated Manufacturing (CIM)
 
Facility Layout,PPT.pptx
Facility Layout,PPT.pptxFacility Layout,PPT.pptx
Facility Layout,PPT.pptx
 
UNIT-I SYLABUS-2.ppt
UNIT-I SYLABUS-2.pptUNIT-I SYLABUS-2.ppt
UNIT-I SYLABUS-2.ppt
 
Flexible Manufacturing System of Toyota (FMS)
Flexible Manufacturing System of Toyota (FMS)Flexible Manufacturing System of Toyota (FMS)
Flexible Manufacturing System of Toyota (FMS)
 
Unit 1-automation of assembly lines
Unit 1-automation of assembly linesUnit 1-automation of assembly lines
Unit 1-automation of assembly lines
 
men operation.docx
men operation.docxmen operation.docx
men operation.docx
 
Production system
Production systemProduction system
Production system
 
History of Automation and Process Introduction
History of Automation and Process IntroductionHistory of Automation and Process Introduction
History of Automation and Process Introduction
 
Production management
Production managementProduction management
Production management
 
Organisation's operation's management
Organisation's operation's managementOrganisation's operation's management
Organisation's operation's management
 
Om module i
Om module iOm module i
Om module i
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Industry defined problem report jagdish

  • 1. INDUSTRY DEFINED PROBLEM REPORT PROJECT 1 PREPARED BY ENROLLMENT NO. BHALIYA JAGDISH HARSHADBHAI 136480319003 IDP TITLE: - PROBLEM FACED DURING OPERATION ON LATHE, DRILLING, MILLING, AND GRINDING
  • 2. ABSTRACT: • With the development of modern manufacturing Engineering, Faster Manufacturing Systems (FMS) have become key equipment in factory automation. Machine tools are heart of the Faster Manufacturing Systems. Lathe, milling, drilling and grinding machines are the general type of machine tools used by almost all the Manufacturing system. During the operation of these machine tools, different kinds of failures are faced by me. Like ‘Taper Turning Problem In Lathe Machine; • A Systematic Solution based on the failure data is defined by me for different type of machine tools.
  • 3. list of Common machine using manufacturing systems • Lathe • Drilling • Grinding • Milling • With the proper maintaining of above machines the process become fast.
  • 4. • The main goal of a faster manufacturing system is to offer the speed needed to change with market conditions quickly, but not sacrifice any quality. The potential benefits from the implementation and utilization of a faster manufacturing system have been detailed by numerous researchers on the subject.
  • 5. Advantages:  Faster manufacturing process  Easy operation  Fast production  Long life of machines  Higher productivity
  • 6. Other benefits  Better control over quality  Reduced labor  More efficient use of machinery  Work-in-process inventory reduced  Increased capacity  Increased production flexibility  Increased system reliability  Less waste  Fewer workstations  Reduced downtime
  • 7. To reduce set up and queue times Reduce time for product completion Utilize human workers better Produce more product more quickly
  • 8. CONCLUSION:- • From the observations we learned about machinery, equipment’s and other accessories used in manufacturing of the components. • • The primary role of this project is to solve the problems of machine and to make easy manufacturing process. • • • From this project we conclude that solving the problem of machine we can reduce the rejection of the work piece, save the time get perfect tolerance and gat more profit of industry.