SlideShare a Scribd company logo
1 of 3
JADESH.M
Hospet Karnataka – 583 201 +91 9880546863 JADESHM@GMAIL.COM
Maintenance Manager
Industrious, performance-driven leader with 11 years of experience in large, fast-paced,
multi-line facilities organizations. Recognized for expertise in execution of lean
manufacturing/ engineering principles utilizing theory of constraints. Kaizen and Value
Stream Mapping Promote standardized work practices to drive strong and sustainable cost
savings. Proven track record cultivating strategic partnerships with executives, customers and
employees. Possess strong technical and analytical skills with attention to detail and problem
resolution.
Top flight qualifications include:
EXECUTIVE NARRATIVE
Present from Dec 2005 Kirloskar Ferrous Industries Ltd
A high-growth company objective of manufacturing walled quality grey iron castings to cater
the growing demand in industry sectors such as Tractors, Automotives and Diesel Engines.
KFIL has been accredited with ISO / TS 16949, ISO 14001 and OHSAS 18001.
Major Projects Handled and achievements
 Erection and commissioning of Hot air circulation blower for Oven conveyor to avoid
re-heating of cores.
 Major modification done by removing Vertical pumps and introduced Mono block
pumps to save power and reduce breakdowns.
 Revamping of cooling towers.
 Reduced hydraulic related breakdowns in core shooter machines by implementing
Hydraulic oil level sensor using PDCA and now monthly oil consumption is now
200litres only.
 Break through achievement award in Kirloskar groups
 Manufacturing Maintenance  Continual improvement practices
 Spares Planning & Procurement  Execution Lean principles
 Preventive Maintenance  Training / Team Building
 Implementation of IR LIGHT heating system with stopper arrangements for pre
heating of cores to avoid wet cores.
MANAGER – MAINTENANCE
 Managing all Mechanical maintenance activities
 Maintenance of EOT crane, Induction Furnace
 Planning, managing and controlling the maintenance budget.
 Ensuring that all statutory maintenance and testing is carried out to the relevant
standards and properly recorded
 SMED implementation done to auto process machineries
 Energy consumption and action plan to save the energy cost
 Executing inventory control and spares development
 Attain a sustained 9% in maintenance down time over the last year
 Develop and track cost improvement projects to reduce maintenance costs
 Lead, Develop and Evaluate maintenance workforce of 30 members
 Ensure safe work environment through implementation of safety awareness programs
 Achieved a consistent record of improving machine uptime and reducing costs
 To reduce equipment breakdown time & improve Equipment Effectiveness Index (EEI)
 Analyzing root causes for the breakdown/ other problems, preparing action plan for
the same & reporting it to the Management
 Implementing the action plans & monitoring their effectiveness
 Spares planning, development, indenting and Procurement
 MTTR and MTBF analysis and action plan, Revising of equipments checklists based on
breakdowns & root cause analysis. Implementation of kaizen activities
 Planning & execution of preventive maintenance jobs as per schedule, Shutdown jobs
planning and materials arrangement for the same. Carrying out replacement schedules
as per plan
 Monitor the implementation and documentation of systems and procedure laid down
under ISO14001 & TS 16949 specifications
EDUCATION & CERTIFICATIONS
 B.E Degree in Mechanical Engineering (Full Time) – 2005
 Basic Hydraulics Training at YUKEN INDIA LIMITED, Bangalore.
 Training on ISO/TS 16949 Audit by Nathan & Nathan Consultancy and Certified for
Internal Auditing.
 5S training held by QUALICON SERVICES, Pune.
 Training on Management Development Program conducted by SHINE.
REFERENCES
 Available on Request

More Related Content

What's hot

Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.fxudegbu
 
Facility engineering and Maintenance
Facility engineering and MaintenanceFacility engineering and Maintenance
Facility engineering and MaintenancePat Cabangis
 
Pragnesh Gadaria resume planning
Pragnesh Gadaria resume planningPragnesh Gadaria resume planning
Pragnesh Gadaria resume planningPragnesh Gadaria
 
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...Sagar Sangam Sahu
 
trentgreen_resume_v1
trentgreen_resume_v1trentgreen_resume_v1
trentgreen_resume_v1Trent Green
 
Dayton Schneider Resume_LinkedIn_June 2015
Dayton Schneider Resume_LinkedIn_June 2015Dayton Schneider Resume_LinkedIn_June 2015
Dayton Schneider Resume_LinkedIn_June 2015Dayton Schneider
 
Plan layout
Plan layoutPlan layout
Plan layoutDemon x
 
Dan Luebbers resume 3-22-16
Dan Luebbers resume 3-22-16Dan Luebbers resume 3-22-16
Dan Luebbers resume 3-22-16Dan Luebbers
 
Decision Optimization for Manufacturing
Decision Optimization for ManufacturingDecision Optimization for Manufacturing
Decision Optimization for ManufacturingOptimiser.com
 
Amr mohy mechanical Engineer
Amr mohy mechanical EngineerAmr mohy mechanical Engineer
Amr mohy mechanical EngineerAmr Mohy
 
Curriculum Viate
Curriculum ViateCurriculum Viate
Curriculum ViateHimal Sheth
 
10 Keys to CMMS Implementation Success
10 Keys to CMMS Implementation Success10 Keys to CMMS Implementation Success
10 Keys to CMMS Implementation SuccesseMaint Enterprises
 
Maintenance Department of Hotels
Maintenance Department of HotelsMaintenance Department of Hotels
Maintenance Department of HotelsNishisarin
 

What's hot (20)

James p 3 2016 word
James p 3 2016 wordJames p 3 2016 word
James p 3 2016 word
 
BIO DATA
BIO DATABIO DATA
BIO DATA
 
Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.Tips on Cost optimization For Process Plants.
Tips on Cost optimization For Process Plants.
 
Facility engineering and Maintenance
Facility engineering and MaintenanceFacility engineering and Maintenance
Facility engineering and Maintenance
 
Pragnesh Gadaria resume planning
Pragnesh Gadaria resume planningPragnesh Gadaria resume planning
Pragnesh Gadaria resume planning
 
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
 
trentgreen_resume_v1
trentgreen_resume_v1trentgreen_resume_v1
trentgreen_resume_v1
 
Dayton Schneider Resume_LinkedIn_June 2015
Dayton Schneider Resume_LinkedIn_June 2015Dayton Schneider Resume_LinkedIn_June 2015
Dayton Schneider Resume_LinkedIn_June 2015
 
Plan layout
Plan layoutPlan layout
Plan layout
 
CAM
CAMCAM
CAM
 
Dan Luebbers resume 3-22-16
Dan Luebbers resume 3-22-16Dan Luebbers resume 3-22-16
Dan Luebbers resume 3-22-16
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume
ResumeResume
Resume
 
Decision Optimization for Manufacturing
Decision Optimization for ManufacturingDecision Optimization for Manufacturing
Decision Optimization for Manufacturing
 
Amr mohy mechanical Engineer
Amr mohy mechanical EngineerAmr mohy mechanical Engineer
Amr mohy mechanical Engineer
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Curriculum Viate
Curriculum ViateCurriculum Viate
Curriculum Viate
 
Plant layout
Plant layoutPlant layout
Plant layout
 
10 Keys to CMMS Implementation Success
10 Keys to CMMS Implementation Success10 Keys to CMMS Implementation Success
10 Keys to CMMS Implementation Success
 
Maintenance Department of Hotels
Maintenance Department of HotelsMaintenance Department of Hotels
Maintenance Department of Hotels
 

Viewers also liked

San josé de cúcuta
San josé de cúcutaSan josé de cúcuta
San josé de cúcutayefriyesi21
 
Fuel For Sales
Fuel For SalesFuel For Sales
Fuel For Salesunleaded
 
Colored marking tape
Colored marking tapeColored marking tape
Colored marking tapeMagplastic
 
Cagri Merkezi Mesleki Yabanci Dil Ornek Diyalog 6
Cagri Merkezi Mesleki Yabanci Dil Ornek Diyalog 6Cagri Merkezi Mesleki Yabanci Dil Ornek Diyalog 6
Cagri Merkezi Mesleki Yabanci Dil Ornek Diyalog 6Aretiasus
 
Tpperiodismodigital2016
Tpperiodismodigital2016Tpperiodismodigital2016
Tpperiodismodigital2016Zahira Estefan
 
Condición final prof bonano
Condición final prof bonanoCondición final prof bonano
Condición final prof bonanoZahira Estefan
 
Reading Models and Schema Theory
Reading Models and Schema TheoryReading Models and Schema Theory
Reading Models and Schema TheoryAbbie Laudato
 

Viewers also liked (14)

Gmail - Fwd_ Resume
Gmail - Fwd_ ResumeGmail - Fwd_ Resume
Gmail - Fwd_ Resume
 
San josé de cúcuta
San josé de cúcutaSan josé de cúcuta
San josé de cúcuta
 
Fuel For Sales
Fuel For SalesFuel For Sales
Fuel For Sales
 
Gacetilla de prensa 17 12-2015
Gacetilla de prensa 17 12-2015Gacetilla de prensa 17 12-2015
Gacetilla de prensa 17 12-2015
 
Colored marking tape
Colored marking tapeColored marking tape
Colored marking tape
 
Redes sociales
Redes socialesRedes sociales
Redes sociales
 
Texto 130926100335-phpapp02
Texto 130926100335-phpapp02Texto 130926100335-phpapp02
Texto 130926100335-phpapp02
 
Internet. concepto
Internet. conceptoInternet. concepto
Internet. concepto
 
Cagri Merkezi Mesleki Yabanci Dil Ornek Diyalog 6
Cagri Merkezi Mesleki Yabanci Dil Ornek Diyalog 6Cagri Merkezi Mesleki Yabanci Dil Ornek Diyalog 6
Cagri Merkezi Mesleki Yabanci Dil Ornek Diyalog 6
 
Tpperiodismodigital2016
Tpperiodismodigital2016Tpperiodismodigital2016
Tpperiodismodigital2016
 
Condición final prof bonano
Condición final prof bonanoCondición final prof bonano
Condición final prof bonano
 
Tp 8 periodismo ip y tele 2016
Tp 8 periodismo ip y tele 2016Tp 8 periodismo ip y tele 2016
Tp 8 periodismo ip y tele 2016
 
Tp nº 3 noticia cronica
Tp nº 3 noticia cronicaTp nº 3 noticia cronica
Tp nº 3 noticia cronica
 
Reading Models and Schema Theory
Reading Models and Schema TheoryReading Models and Schema Theory
Reading Models and Schema Theory
 

Similar to JADESH CV (20)

Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
praveen
praveenpraveen
praveen
 
Viresh Jugali CV
Viresh Jugali CVViresh Jugali CV
Viresh Jugali CV
 
Looking for an opportunity Resume updated
Looking for an opportunity Resume updatedLooking for an opportunity Resume updated
Looking for an opportunity Resume updated
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
 
Linked in attach
Linked in attachLinked in attach
Linked in attach
 
Sandeep raj mechanical engineer(Resume)
Sandeep raj mechanical engineer(Resume)Sandeep raj mechanical engineer(Resume)
Sandeep raj mechanical engineer(Resume)
 
Resume
ResumeResume
Resume
 
Vijayaraj CV
Vijayaraj CVVijayaraj CV
Vijayaraj CV
 
Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
 
Thangamani CV -Sept 2016
Thangamani CV -Sept 2016Thangamani CV -Sept 2016
Thangamani CV -Sept 2016
 
Rev Bio Times
Rev Bio TimesRev Bio Times
Rev Bio Times
 
KBM resume18102015
KBM resume18102015KBM resume18102015
KBM resume18102015
 
RKS
RKSRKS
RKS
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
Resume Vijai Nair
Resume Vijai NairResume Vijai Nair
Resume Vijai Nair
 

JADESH CV

  • 1. JADESH.M Hospet Karnataka – 583 201 +91 9880546863 JADESHM@GMAIL.COM Maintenance Manager Industrious, performance-driven leader with 11 years of experience in large, fast-paced, multi-line facilities organizations. Recognized for expertise in execution of lean manufacturing/ engineering principles utilizing theory of constraints. Kaizen and Value Stream Mapping Promote standardized work practices to drive strong and sustainable cost savings. Proven track record cultivating strategic partnerships with executives, customers and employees. Possess strong technical and analytical skills with attention to detail and problem resolution. Top flight qualifications include: EXECUTIVE NARRATIVE Present from Dec 2005 Kirloskar Ferrous Industries Ltd A high-growth company objective of manufacturing walled quality grey iron castings to cater the growing demand in industry sectors such as Tractors, Automotives and Diesel Engines. KFIL has been accredited with ISO / TS 16949, ISO 14001 and OHSAS 18001. Major Projects Handled and achievements  Erection and commissioning of Hot air circulation blower for Oven conveyor to avoid re-heating of cores.  Major modification done by removing Vertical pumps and introduced Mono block pumps to save power and reduce breakdowns.  Revamping of cooling towers.  Reduced hydraulic related breakdowns in core shooter machines by implementing Hydraulic oil level sensor using PDCA and now monthly oil consumption is now 200litres only.  Break through achievement award in Kirloskar groups  Manufacturing Maintenance  Continual improvement practices  Spares Planning & Procurement  Execution Lean principles  Preventive Maintenance  Training / Team Building
  • 2.  Implementation of IR LIGHT heating system with stopper arrangements for pre heating of cores to avoid wet cores. MANAGER – MAINTENANCE  Managing all Mechanical maintenance activities  Maintenance of EOT crane, Induction Furnace  Planning, managing and controlling the maintenance budget.  Ensuring that all statutory maintenance and testing is carried out to the relevant standards and properly recorded  SMED implementation done to auto process machineries  Energy consumption and action plan to save the energy cost  Executing inventory control and spares development  Attain a sustained 9% in maintenance down time over the last year  Develop and track cost improvement projects to reduce maintenance costs  Lead, Develop and Evaluate maintenance workforce of 30 members  Ensure safe work environment through implementation of safety awareness programs  Achieved a consistent record of improving machine uptime and reducing costs  To reduce equipment breakdown time & improve Equipment Effectiveness Index (EEI)  Analyzing root causes for the breakdown/ other problems, preparing action plan for the same & reporting it to the Management  Implementing the action plans & monitoring their effectiveness  Spares planning, development, indenting and Procurement  MTTR and MTBF analysis and action plan, Revising of equipments checklists based on breakdowns & root cause analysis. Implementation of kaizen activities  Planning & execution of preventive maintenance jobs as per schedule, Shutdown jobs planning and materials arrangement for the same. Carrying out replacement schedules as per plan
  • 3.  Monitor the implementation and documentation of systems and procedure laid down under ISO14001 & TS 16949 specifications EDUCATION & CERTIFICATIONS  B.E Degree in Mechanical Engineering (Full Time) – 2005  Basic Hydraulics Training at YUKEN INDIA LIMITED, Bangalore.  Training on ISO/TS 16949 Audit by Nathan & Nathan Consultancy and Certified for Internal Auditing.  5S training held by QUALICON SERVICES, Pune.  Training on Management Development Program conducted by SHINE. REFERENCES  Available on Request