SlideShare a Scribd company logo
1 of 14
Download to read offline
Ir.Unggang Emban (PE.No.: 16877)
No. 33 Taman Evergreen Residency,
Jalan Sibiew , 97000 , Bintulu, Sarawak, Malaysia
PERSONAL DETAILS
Age: 44 years old
Date of Birth: 09 December 1971
Marital Status: Married
Identity Card: 711209-13-5661
Sex: Male
Race: Iban
Nationality: Malaysian (Sarawak)
Language: Bahasa Malaysia, English and Iban
Health: Excellent
Interest: Sports, Traveling, Gardening
Telephone No: 013- 831 7173
Email Address: Blessingpu@yahoo.com
POSITION: Competent Electrical Engineer
Qualification: Bachelor of Electrical Engineering (UTM), Malaysia
Present Organization: Self-employed.
Present Post:
Expected Salary:
Year of Service: 18 years
PROFESSIONAL QUALIFICATION ACHIEVEMENT
Certified as a Professional Engineer by Board of Engineers Malaysia.
COMPETENCY QUALIFICATION
1. Holding Competency of Competent Electrical Engineer(CE00088):
a. Substation Installation: up to 33KV
b. Underground cable: up to 11KV
c. LV equipment installation
d. Authorized to perform switching: up to 11KV
e. Electrical Installation Contractor & Authorized To Test (C010036)
2. Holding IECEX Competency Cert. – Cert No. : IECEx CPSRM14.0086
EDUCATION BACKGROUND
Year 1979-1984 - Sekolah Rendah Kerajaan Batu 36 Sg. Tamin, Jalan Oya,
Sibu, Sarawak,Malaysia.
Year 1985-1987 - Sekolah Menengah Luar Bandar Sibu, Batu 21, Jalan Oya
Sibu,Sarawak, Malaysia.
Year 1988-1989 - Sekolah Menengah Teknik Bintulu, Jalan Tanjong
Kidurong, Bintulu, Sarawak, Malaysia.
July 1990-July 1993 - University Teknologi Malaysia, Sekudai Johor
Baharu, Malaysia.
- Diploma in Electrical Engineering (Communication)
June 1994-April 1997 - Bachelor Degree in Electrical Engineering from University
Teknologi Malaysia, Sekudai Johor Baharu,Malaysia.
GPA: 3.53 CGPA:2.96
SKILLS & PERSONALITY TRAITS
 Strong problem solving, organizational and communicative skills.
 Welcome new challenges, and willing to learn new skills.
 Responsible, trustworthy, cooperative, and able to work in team.
 Able to develop a good relationship with people from all levels.
COMPUTER LITERACY
 Computer: Proficient in the use of Microsoft Words, Excel, and Power point
WORKING EXPERIENCES
April 2012 – April 2015:
Competent Electrical Engineer in Murphy Sarawak Oil Company,
Bintulu,Sarawak, Malaysia
A. Murphy’s Gas Turbine Compressor project at BORF
1. Involved in installation, inspection, testing and commissioning of electrical
installation system as below:
a. 6.6KV switchgear,
b. 6.6KV/415V step down transformer
c. UPS system
d. Gas Turbine unit fire fighting
e. LV Main Switchboard
f. Protection Relay Testing
g. Electrical Motor
h. Earthing system.
i. HV and LV cable, Control cable laying.
2. Involved in Gas Turbine Compressor Installation, Testing and commissioning system
as below:
a. Cooling water system.
b. Hydraulic oil system.
c. Lube oil system
d. Unit Fire system( water mist system)
e. Ventilation system.
f. Electrical motor ( Emergency lube pump, hydraulic pump, lube oil pump)
g. Spark plugs
h. Pressure switches
i. Thermocouple
j. Vibration monitoring system.
k. Flame detector
l. Servo ratio valve
m. Compressor dry gas seal dismantled and reassembled
B. Murphy’s Offshore Facilities
1. Involved in Gas Engine Generator maintenance and troubleshooting:
a. AVR inspection and replacement
b. Generator RTD, vibration sensor, diode
c. Generator winding insulation megger.
d. Current Transformer inspection.
e. Generator Relay protection inspection and testing.
f. Synchronizing system
g. Generator Circuit Breaker.
h. Dismantle and installation of generator.
i. Familiar with generator operation
2. Involved in Low Voltage Main Switchboard Maintenance
a. Inspection Busbar
b. Relay Protection inspection, Testing
c. Inspection, testing on motor feeders
d. Function testing and maintenance of ACB.
e. Testing Thermal overload
f. Check current transformer terminal connection.
g. Perform isolation and switching of the ACB as required.
3. Involved in UPS system Maintenance and Troubleshooting
a. Replacement of Battery
b. Troubleshooting of UPS panel
c. Servicing UPS panel.
d. Battery discharge test.
e. Battery inspection and maintenance
f. Function test of the MCB.
Sept 2010- April 2012
Divisional Engineer in-charge SEB Sri Aman division , Sarawak, Malaysia.
1. Plan, develop and monitor SESCO Sri Aman Station budgets to ensure it meets
company’s overall business goals and objectives.
2. To monitor all assets such as land, building and furniture, power transformer,
underground cable, distribution pillar, overhead line, auto voltage regulator, auto
re-closer in distribution system to be registered in computerized system.
3. To approve list of disposal asset submitted to Board of Survey (BOS).
4. To monitor and ensure all the approved items listed in BOS for disposal to
dispose in proper manner as per guideline.
5. Develop and create sound strategies to achieve objectives and target with respect
to safety, quality and reliability of power supply.
6. To provide accurate and up-to-date dissemination of corporate information to
subordinates, electrical consultants, electrical contractors and developers.
7. Provide input and recommendation to management with regards to enhancing
safety, reliability and quality electricity supply and good customer services.
8. Direct and manage the day-to-day function to ensure the smooth running of Sri
Aman Station and its Outstations.
9. Manage and oversee the operation of Sri Aman Station to ensure KPIs are
achieved and budgets effectively utilised.
10. Provide guidance and directions to subordinates in terms of executing
responsibilities to ensure a competent and motivated team.
11. Sararawak Energy Berhad(SEB)'s Project - Erection and installation, testing and
commissioning of 33KV overhead line from Engkili to Betong, Sri Aman.
12. SEB's Project - Erection and installation, testing and commissioning of 33KV
overhead line from Betong to Debak, Sri Aman.
13. SEB's Project - Laying, testing and commissioning of 33KV underground cable
from Temudok to 33KV substation, Sri Aman.
14. SEB's Project - Erection and installation, testing and commissioning of 33KV
overhead line from Lubok Antu junction to Lubok Antu Bazaar.
15. SEB's Project - Erection and installation, testing and commissioning of 33KV
overhead line from Selalang to Seratok, Sri Aman.
16. SEB's Project - Erection and installation, testing and commissioning of 33KV
overhead line from Debak to Pusa, Sri Aman.
17. SEB's Project - Installation, testing and commissioning of 5MVA 33/11KV
stepdown transformer at Lubok Antu, Sri Aman.
18. SEB's Project - Installation, testing and commissioning of 5MVA 33/11KV
stepdown transformer at Betong, Sri Aman.
19. SEB's Project - Erection, installation, testing and commissioning of 11/.415KV
distribution power transformer in Sri Aman.
20. SEB's Project - Installation, Testing, and commissioning of 33KV new Sri Aman
substation in Sri Aman.
21. SEB's Project - Laying, testing and commissioning of 33KV and 11KV
underground in Sri Aman division.
22. SEB's Project - Erection and installation, testing and commissioning of 33KV
voltage regulator install at 33KV overhead line from Engkili to Seratok.
23. SEB's Project - Erection and installation, testing and commissioning of 33KV
Auto-Voltage regulator installed at 33KV overhead line from Engkili to Seratok.
24. Carry out switching power isolation for maintenance purpose, and power
restoration during power failure.
Aug 2005 – Sept 2010
Customer Services and Revenue Management Engineer -Syarikat SESCO Regional
Office in Bintulu, Sarawak, Malaysia.
1. To plan and monitor all yearly activities related to customer service section.
2. To monitor energy meter registration in computerized system.
3. To approve list of faulty/dismantled energy meter submitted to Board of Survey
(BOS) for approval.
4. To monitor and ensure approved faulty/dismantled energy meter listed in BOS for
disposal to dispose in proper manner as guideline.
5. Develop and create sound strategies to achieve objectives and target with respect
to safety, quality and reliability of power supply.
6. To provide feedback to customers (Internal and External) enquiry and complaints.
7. To monitor and control the age of debtor (AOD).
8. To open CWO and implement approved projects.
9. To arrange and coordinate of meter maintenance in the region.
10. To verify and approve the payments certificate for CD refund
11. To plan, manage, & control the overall of the section man-power & budget.
12. To conduct any training or coaching to his subordinates and other staffs.
13. Carry out maintenance of 33KV power transformer at Jepak Substation, SESCO.
14. Carry out maintenance of 33KV ABB switchgear at Kemena Substation, SESCO.
15. Carry out maintenance of 11KV Tamco switchgear at Kidjun Substation, SESCO.
16. Carry out maintenance of 33KV overhead line from Sebauh Junction to Sebauh
Bazaar.
17. Carry out cable fault locating at Kemena Industrial area, Bintulu
18. Check and approve Main Switchboard drawing submitted by
consultant/contractor.
19. Check and approve internal wiring drawing submitted by contractor.
20. Carry out Inspection, testing and commissioning of main switchboard
21. Carry out Inspection and testing internal wiring for domestic, commercial and
industrial installation
22. Witness testing of LV switchboard.
Dec 1997- Oct 2005
Electrical and Instrument Engineer (Maintenance)- SESCO GAS Turbine Power
Station in Bintulu, Sarawak, Malaysia.
1. Involved in Electrical and Instrument maintenance activities for Gas turbine
(Frame 6 GEC and Frame 9E –European Gas Turbines) and its auxiliaries
during Combustion inspection, Hot gas path Inspection, Major Inspection and
new installation.
a. Generator maintenance:-
 Dismantling and installation of exciter stator, generator bearing, and
generator rotor
 Rewedging of generator stator winding.
 Generator busbar inspection,
 Generator stator winding insulation testing
 Stator winding resistance test.
 Resistance Temperature Detectors test
 Bearing insulation test.
 Air gap measuring between stator and rotor winding.
 Generator relay protection testing and servicing
 Servicing, Maintenance and calibration of Pressure Transmitter, Pressure
switches, Limit switches, Thermocouple, Thermistor, Vibration sensor,
Resistance Temperature Detector(RTD), and Pressure Gauges,
 Vibration monitoring system.
 Servo ratio valve and dump valve servicing and maintenance.
 Spark plugs servicing and maintenance.
 Mark IV and V Gas Turbine control system maintenance.
 Electrical motor maintenance
 Gas turbine and station fire protection system maintenance.
2. Involved in Electrical maintenance in SESCO Gas Turbine Power Plant Station
in Bintulu, Sarawak, Malaysia as follows:
a. Station Fire protection system maintenance.
b. UPS and Station battery maintenance.
c. Step up transformer routine maintenance.
d. Collecting oil sample and perform oil breakdown voltage.
e. LV switchgear maintenance.
f. Gas Station and water heating system maintenance.
g. 11KV and 6.6KV Switchgear maintenance.
h. Electrical motor maintenance
July 1992- July 1993
Electrical Engineering Assistant (Electrical Maintenance) - SESCO hydro Power
Plant in Batang Ai , Sarawak, Malaysia.
1. Carry out routine maintenance for station power transformer.
2. Generators relay protection calibration and servicing.
3. UPS and battery maintenance.
4. LV Main Switchboard servicing and maintenance.
5. Electrical Motor maintenance.
6. Compound Lighting Maintenance.
7. Earthing system maintenance.
8. Fire fighting servicing and maintenance.
9. Generator routine maintenance and servicing.
PERSONAL DEVELOPMENT/ COURSES ATTENDED
a. GEC Alsthom/GE – Gas Turbine Power Plant and compressor Training
1. Site training on Frame 6 GEC/GE Frame 5 Gas Turbines
(a) Maintenance
(b) Operation
(c) Generator Excitation And Controls
(d) Mark IV and Mark V
(e) Aux./Supports Systems.
(f) Gas Station and Hot Water Heating Systems
2. Frame 9E EGT Gas Turbine Factory Based Training (BELFORT, France)
(a) Maintenance
(b) Operation
(c) Generator Excitation And Controls
(d) Mark V
(e) Aux. System
(f) Witnessed Generator testing
(g) Visited Gas Turbine Assembly Line
b. STEAMSAFE -Internal Combustion Engine course to DOSH certified.
c. SESCO- Internal Wiring Installation Course
d. SESCO - Internal Wiring Testing Course
e. Rockwell - Programmable controller
f. Asia Consultants - Safety Induction for construction workers (CIDB)
g. Dwell - Finance for non- financial managers
h. SESCO - 11KV Distribution System Practices Course
i. SESCO - Refresher Course for Switching Personnel
j. SESCO - 33KV Swiching Requirements Course
k. ESECO - IEE 16th
Edition Wiring Regulations.
l. SESCO – 33KV Switching Requirements Course
m. SESCO – Refresher Course for Engineers Series 3
n. SESCO – IHE3 Electrical Distribution Systems.
o. TNB – Condition Monitoring – Vibration Based
p. SEB – Distribution Substation Design Course
q. Sirim – IECEx Cerificate Personnel Competece
r. MSTS ASIA- Fire Team Member Level 1
s. WSO- Supervising Health, Safety & Environment
t. SESCO – Basic First Aid
u. GEC Alsthom – Gas Turbine Power Plant Training
v. VI Power – Switchgear, Protection & Safety
w. SESCO - Refresher Course For Enguneer Series 4
x. VI Power – Specialised Course in Industrial Power System Protection
y. SESCO - Refresher Course for 132/275KV Switching Personnel
z. SESCO - Safety Courses
aa. ISO 9001, ISO 14001 and OSHSAS18001
bb. SESCO -Switching Requirement for Major power stations.
REFERENCES:
1. Henry Uliu Jenang(SSO No.:300011930)
GE Energy Management
H/p no.: 012-9045860
2. Justin Padan
Murphy Sarawak Oil Co. Ltd
Gas Turbine Compressor
Bintulu Onshore Receiving Facility (BORF)
Jalan Tg. Kidurong,Sarawak, Malaysia
H/p no.:019-8671066
Ir. Unggang CV latest
Ir. Unggang CV latest
Ir. Unggang CV latest
Ir. Unggang CV latest

More Related Content

What's hot

Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin Jose
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16mujahid nawaz
 
Abi Aad CV. English New
Abi Aad CV. English NewAbi Aad CV. English New
Abi Aad CV. English NewFarid Abiaad
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.docAbdul Razzaq
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3fawzey mukhtar
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copyarmando doria
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 

What's hot (20)

Kazunda Simon CV1
Kazunda Simon CV1Kazunda Simon CV1
Kazunda Simon CV1
 
F Bryce CV
F Bryce CVF Bryce CV
F Bryce CV
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
ZISHAN
ZISHANZISHAN
ZISHAN
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16
 
cv umar
cv umarcv umar
cv umar
 
Abi Aad CV. English New
Abi Aad CV. English NewAbi Aad CV. English New
Abi Aad CV. English New
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
Glad CV
Glad CVGlad CV
Glad CV
 
RSR LATEST TRESUME
RSR LATEST TRESUMERSR LATEST TRESUME
RSR LATEST TRESUME
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Nazar Abbas CV
Nazar Abbas CVNazar Abbas CV
Nazar Abbas CV
 

Viewers also liked

Resume_Hafizah_2016_v2
Resume_Hafizah_2016_v2Resume_Hafizah_2016_v2
Resume_Hafizah_2016_v2Nur Yusof
 
Electrical engineer resume
Electrical engineer resumeElectrical engineer resume
Electrical engineer resumeEric Crowder
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Engyoseph prakosa S
 
Marlon P. Carrillo -RESUME
Marlon P. Carrillo -RESUMEMarlon P. Carrillo -RESUME
Marlon P. Carrillo -RESUMEMarlon Carrillo
 
Electrical Engineer having Experience (1)
Electrical Engineer having Experience (1)Electrical Engineer having Experience (1)
Electrical Engineer having Experience (1)s4over
 
Naveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Rengasamy
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin ResumeVipin Das
 

Viewers also liked (12)

Hassby's CV 2015
Hassby's CV 2015Hassby's CV 2015
Hassby's CV 2015
 
Resume_Hafizah_2016_v2
Resume_Hafizah_2016_v2Resume_Hafizah_2016_v2
Resume_Hafizah_2016_v2
 
New CV Profile1 2016
New CV  Profile1 2016New CV  Profile1 2016
New CV Profile1 2016
 
Electrical engineer resume
Electrical engineer resumeElectrical engineer resume
Electrical engineer resume
 
jragojo CV
jragojo CVjragojo CV
jragojo CV
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Eng
 
Nazh cv rev.2
Nazh cv  rev.2Nazh cv  rev.2
Nazh cv rev.2
 
Marlon P. Carrillo -RESUME
Marlon P. Carrillo -RESUMEMarlon P. Carrillo -RESUME
Marlon P. Carrillo -RESUME
 
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
 
Electrical Engineer having Experience (1)
Electrical Engineer having Experience (1)Electrical Engineer having Experience (1)
Electrical Engineer having Experience (1)
 
Naveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Curriculum vitae Project manager
Naveen Curriculum vitae Project manager
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin Resume
 

Similar to Ir. Unggang CV latest

Similar to Ir. Unggang CV latest (20)

CV
CVCV
CV
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 
Resume
ResumeResume
Resume
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
RATHEESH - CV - 19-08-2015
RATHEESH  - CV - 19-08-2015RATHEESH  - CV - 19-08-2015
RATHEESH - CV - 19-08-2015
 
M Imran
M ImranM Imran
M Imran
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
WHO final
WHO  finalWHO  final
WHO final
 
C.V
C.VC.V
C.V
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
bernie final cv update
bernie final cv updatebernie final cv update
bernie final cv update
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 

Ir. Unggang CV latest

  • 1. Ir.Unggang Emban (PE.No.: 16877) No. 33 Taman Evergreen Residency, Jalan Sibiew , 97000 , Bintulu, Sarawak, Malaysia PERSONAL DETAILS Age: 44 years old Date of Birth: 09 December 1971 Marital Status: Married Identity Card: 711209-13-5661 Sex: Male Race: Iban Nationality: Malaysian (Sarawak) Language: Bahasa Malaysia, English and Iban Health: Excellent Interest: Sports, Traveling, Gardening Telephone No: 013- 831 7173 Email Address: Blessingpu@yahoo.com POSITION: Competent Electrical Engineer Qualification: Bachelor of Electrical Engineering (UTM), Malaysia Present Organization: Self-employed. Present Post: Expected Salary: Year of Service: 18 years
  • 2. PROFESSIONAL QUALIFICATION ACHIEVEMENT Certified as a Professional Engineer by Board of Engineers Malaysia. COMPETENCY QUALIFICATION 1. Holding Competency of Competent Electrical Engineer(CE00088): a. Substation Installation: up to 33KV b. Underground cable: up to 11KV c. LV equipment installation d. Authorized to perform switching: up to 11KV e. Electrical Installation Contractor & Authorized To Test (C010036) 2. Holding IECEX Competency Cert. – Cert No. : IECEx CPSRM14.0086 EDUCATION BACKGROUND Year 1979-1984 - Sekolah Rendah Kerajaan Batu 36 Sg. Tamin, Jalan Oya, Sibu, Sarawak,Malaysia. Year 1985-1987 - Sekolah Menengah Luar Bandar Sibu, Batu 21, Jalan Oya Sibu,Sarawak, Malaysia. Year 1988-1989 - Sekolah Menengah Teknik Bintulu, Jalan Tanjong Kidurong, Bintulu, Sarawak, Malaysia. July 1990-July 1993 - University Teknologi Malaysia, Sekudai Johor Baharu, Malaysia. - Diploma in Electrical Engineering (Communication) June 1994-April 1997 - Bachelor Degree in Electrical Engineering from University Teknologi Malaysia, Sekudai Johor Baharu,Malaysia. GPA: 3.53 CGPA:2.96 SKILLS & PERSONALITY TRAITS  Strong problem solving, organizational and communicative skills.  Welcome new challenges, and willing to learn new skills.
  • 3.  Responsible, trustworthy, cooperative, and able to work in team.  Able to develop a good relationship with people from all levels. COMPUTER LITERACY  Computer: Proficient in the use of Microsoft Words, Excel, and Power point WORKING EXPERIENCES April 2012 – April 2015: Competent Electrical Engineer in Murphy Sarawak Oil Company, Bintulu,Sarawak, Malaysia A. Murphy’s Gas Turbine Compressor project at BORF 1. Involved in installation, inspection, testing and commissioning of electrical installation system as below: a. 6.6KV switchgear, b. 6.6KV/415V step down transformer c. UPS system d. Gas Turbine unit fire fighting e. LV Main Switchboard f. Protection Relay Testing g. Electrical Motor h. Earthing system. i. HV and LV cable, Control cable laying. 2. Involved in Gas Turbine Compressor Installation, Testing and commissioning system as below: a. Cooling water system. b. Hydraulic oil system. c. Lube oil system d. Unit Fire system( water mist system) e. Ventilation system. f. Electrical motor ( Emergency lube pump, hydraulic pump, lube oil pump) g. Spark plugs h. Pressure switches i. Thermocouple j. Vibration monitoring system. k. Flame detector l. Servo ratio valve m. Compressor dry gas seal dismantled and reassembled
  • 4. B. Murphy’s Offshore Facilities 1. Involved in Gas Engine Generator maintenance and troubleshooting: a. AVR inspection and replacement b. Generator RTD, vibration sensor, diode c. Generator winding insulation megger. d. Current Transformer inspection. e. Generator Relay protection inspection and testing. f. Synchronizing system g. Generator Circuit Breaker. h. Dismantle and installation of generator. i. Familiar with generator operation 2. Involved in Low Voltage Main Switchboard Maintenance a. Inspection Busbar b. Relay Protection inspection, Testing c. Inspection, testing on motor feeders d. Function testing and maintenance of ACB. e. Testing Thermal overload f. Check current transformer terminal connection. g. Perform isolation and switching of the ACB as required. 3. Involved in UPS system Maintenance and Troubleshooting a. Replacement of Battery b. Troubleshooting of UPS panel c. Servicing UPS panel. d. Battery discharge test. e. Battery inspection and maintenance f. Function test of the MCB. Sept 2010- April 2012 Divisional Engineer in-charge SEB Sri Aman division , Sarawak, Malaysia. 1. Plan, develop and monitor SESCO Sri Aman Station budgets to ensure it meets company’s overall business goals and objectives. 2. To monitor all assets such as land, building and furniture, power transformer, underground cable, distribution pillar, overhead line, auto voltage regulator, auto re-closer in distribution system to be registered in computerized system. 3. To approve list of disposal asset submitted to Board of Survey (BOS).
  • 5. 4. To monitor and ensure all the approved items listed in BOS for disposal to dispose in proper manner as per guideline. 5. Develop and create sound strategies to achieve objectives and target with respect to safety, quality and reliability of power supply. 6. To provide accurate and up-to-date dissemination of corporate information to subordinates, electrical consultants, electrical contractors and developers. 7. Provide input and recommendation to management with regards to enhancing safety, reliability and quality electricity supply and good customer services. 8. Direct and manage the day-to-day function to ensure the smooth running of Sri Aman Station and its Outstations. 9. Manage and oversee the operation of Sri Aman Station to ensure KPIs are achieved and budgets effectively utilised. 10. Provide guidance and directions to subordinates in terms of executing responsibilities to ensure a competent and motivated team. 11. Sararawak Energy Berhad(SEB)'s Project - Erection and installation, testing and commissioning of 33KV overhead line from Engkili to Betong, Sri Aman. 12. SEB's Project - Erection and installation, testing and commissioning of 33KV overhead line from Betong to Debak, Sri Aman. 13. SEB's Project - Laying, testing and commissioning of 33KV underground cable from Temudok to 33KV substation, Sri Aman. 14. SEB's Project - Erection and installation, testing and commissioning of 33KV overhead line from Lubok Antu junction to Lubok Antu Bazaar. 15. SEB's Project - Erection and installation, testing and commissioning of 33KV overhead line from Selalang to Seratok, Sri Aman. 16. SEB's Project - Erection and installation, testing and commissioning of 33KV overhead line from Debak to Pusa, Sri Aman. 17. SEB's Project - Installation, testing and commissioning of 5MVA 33/11KV stepdown transformer at Lubok Antu, Sri Aman. 18. SEB's Project - Installation, testing and commissioning of 5MVA 33/11KV stepdown transformer at Betong, Sri Aman.
  • 6. 19. SEB's Project - Erection, installation, testing and commissioning of 11/.415KV distribution power transformer in Sri Aman. 20. SEB's Project - Installation, Testing, and commissioning of 33KV new Sri Aman substation in Sri Aman. 21. SEB's Project - Laying, testing and commissioning of 33KV and 11KV underground in Sri Aman division. 22. SEB's Project - Erection and installation, testing and commissioning of 33KV voltage regulator install at 33KV overhead line from Engkili to Seratok. 23. SEB's Project - Erection and installation, testing and commissioning of 33KV Auto-Voltage regulator installed at 33KV overhead line from Engkili to Seratok. 24. Carry out switching power isolation for maintenance purpose, and power restoration during power failure. Aug 2005 – Sept 2010 Customer Services and Revenue Management Engineer -Syarikat SESCO Regional Office in Bintulu, Sarawak, Malaysia. 1. To plan and monitor all yearly activities related to customer service section. 2. To monitor energy meter registration in computerized system. 3. To approve list of faulty/dismantled energy meter submitted to Board of Survey (BOS) for approval. 4. To monitor and ensure approved faulty/dismantled energy meter listed in BOS for disposal to dispose in proper manner as guideline. 5. Develop and create sound strategies to achieve objectives and target with respect to safety, quality and reliability of power supply. 6. To provide feedback to customers (Internal and External) enquiry and complaints. 7. To monitor and control the age of debtor (AOD). 8. To open CWO and implement approved projects. 9. To arrange and coordinate of meter maintenance in the region. 10. To verify and approve the payments certificate for CD refund
  • 7. 11. To plan, manage, & control the overall of the section man-power & budget. 12. To conduct any training or coaching to his subordinates and other staffs. 13. Carry out maintenance of 33KV power transformer at Jepak Substation, SESCO. 14. Carry out maintenance of 33KV ABB switchgear at Kemena Substation, SESCO. 15. Carry out maintenance of 11KV Tamco switchgear at Kidjun Substation, SESCO. 16. Carry out maintenance of 33KV overhead line from Sebauh Junction to Sebauh Bazaar. 17. Carry out cable fault locating at Kemena Industrial area, Bintulu 18. Check and approve Main Switchboard drawing submitted by consultant/contractor. 19. Check and approve internal wiring drawing submitted by contractor. 20. Carry out Inspection, testing and commissioning of main switchboard 21. Carry out Inspection and testing internal wiring for domestic, commercial and industrial installation 22. Witness testing of LV switchboard. Dec 1997- Oct 2005 Electrical and Instrument Engineer (Maintenance)- SESCO GAS Turbine Power Station in Bintulu, Sarawak, Malaysia. 1. Involved in Electrical and Instrument maintenance activities for Gas turbine (Frame 6 GEC and Frame 9E –European Gas Turbines) and its auxiliaries during Combustion inspection, Hot gas path Inspection, Major Inspection and new installation. a. Generator maintenance:-
  • 8.  Dismantling and installation of exciter stator, generator bearing, and generator rotor  Rewedging of generator stator winding.  Generator busbar inspection,  Generator stator winding insulation testing  Stator winding resistance test.  Resistance Temperature Detectors test  Bearing insulation test.  Air gap measuring between stator and rotor winding.  Generator relay protection testing and servicing  Servicing, Maintenance and calibration of Pressure Transmitter, Pressure switches, Limit switches, Thermocouple, Thermistor, Vibration sensor, Resistance Temperature Detector(RTD), and Pressure Gauges,  Vibration monitoring system.  Servo ratio valve and dump valve servicing and maintenance.  Spark plugs servicing and maintenance.  Mark IV and V Gas Turbine control system maintenance.  Electrical motor maintenance  Gas turbine and station fire protection system maintenance. 2. Involved in Electrical maintenance in SESCO Gas Turbine Power Plant Station in Bintulu, Sarawak, Malaysia as follows: a. Station Fire protection system maintenance. b. UPS and Station battery maintenance. c. Step up transformer routine maintenance. d. Collecting oil sample and perform oil breakdown voltage. e. LV switchgear maintenance. f. Gas Station and water heating system maintenance. g. 11KV and 6.6KV Switchgear maintenance. h. Electrical motor maintenance
  • 9. July 1992- July 1993 Electrical Engineering Assistant (Electrical Maintenance) - SESCO hydro Power Plant in Batang Ai , Sarawak, Malaysia. 1. Carry out routine maintenance for station power transformer. 2. Generators relay protection calibration and servicing. 3. UPS and battery maintenance. 4. LV Main Switchboard servicing and maintenance. 5. Electrical Motor maintenance. 6. Compound Lighting Maintenance. 7. Earthing system maintenance. 8. Fire fighting servicing and maintenance. 9. Generator routine maintenance and servicing. PERSONAL DEVELOPMENT/ COURSES ATTENDED a. GEC Alsthom/GE – Gas Turbine Power Plant and compressor Training 1. Site training on Frame 6 GEC/GE Frame 5 Gas Turbines (a) Maintenance (b) Operation (c) Generator Excitation And Controls (d) Mark IV and Mark V (e) Aux./Supports Systems. (f) Gas Station and Hot Water Heating Systems 2. Frame 9E EGT Gas Turbine Factory Based Training (BELFORT, France) (a) Maintenance (b) Operation (c) Generator Excitation And Controls (d) Mark V (e) Aux. System (f) Witnessed Generator testing (g) Visited Gas Turbine Assembly Line b. STEAMSAFE -Internal Combustion Engine course to DOSH certified.
  • 10. c. SESCO- Internal Wiring Installation Course d. SESCO - Internal Wiring Testing Course e. Rockwell - Programmable controller f. Asia Consultants - Safety Induction for construction workers (CIDB) g. Dwell - Finance for non- financial managers h. SESCO - 11KV Distribution System Practices Course i. SESCO - Refresher Course for Switching Personnel j. SESCO - 33KV Swiching Requirements Course k. ESECO - IEE 16th Edition Wiring Regulations. l. SESCO – 33KV Switching Requirements Course m. SESCO – Refresher Course for Engineers Series 3 n. SESCO – IHE3 Electrical Distribution Systems. o. TNB – Condition Monitoring – Vibration Based p. SEB – Distribution Substation Design Course q. Sirim – IECEx Cerificate Personnel Competece r. MSTS ASIA- Fire Team Member Level 1 s. WSO- Supervising Health, Safety & Environment t. SESCO – Basic First Aid u. GEC Alsthom – Gas Turbine Power Plant Training v. VI Power – Switchgear, Protection & Safety w. SESCO - Refresher Course For Enguneer Series 4 x. VI Power – Specialised Course in Industrial Power System Protection y. SESCO - Refresher Course for 132/275KV Switching Personnel z. SESCO - Safety Courses aa. ISO 9001, ISO 14001 and OSHSAS18001 bb. SESCO -Switching Requirement for Major power stations. REFERENCES: 1. Henry Uliu Jenang(SSO No.:300011930) GE Energy Management H/p no.: 012-9045860 2. Justin Padan Murphy Sarawak Oil Co. Ltd Gas Turbine Compressor Bintulu Onshore Receiving Facility (BORF) Jalan Tg. Kidurong,Sarawak, Malaysia H/p no.:019-8671066