RECONFIGURING THE SUPPLY CHAIN
AT XTRA POWER ENERGY SYSTEMS
SUBMITTEDBY
AKSHITJAIN
ALI MAVLI
ALMASFIROZ
AMANBAIJAL
AMANSWARUPSRIVASTAVA
AMBERBHARDWAJ
Xtra Power needs to make
changes in order to grow
Key issues to address
LOGISTICS
-Lead time
-Retail needs
DEMAND
-Growing
-Production capacity
-Potential for
reconditioned peaks
CONSUMER
-After sales service
-Competitive Product
Xtra Power Energy Systems
They are one of the leading suppliers of automotive components in the
domestic market (2 WHEELERS)
They have 2 separate business divisions
Xtra Power
Auto
Industries
Xtra Power
Energy
Systems
Demand is growing for batteries
Industrial sector and economy are developing
 Battery market is estimated to be Rs. 200 billions
 Organized/unorganized market: 45% of the market
 Imports: 55% of the market
 Market for batteries is growing at an annual rate of 25%
 Lead acid batteries (account for 70% - 75% share of the market)
 Guided by frequent power cuts
 Replacement battery market is Rs. 5b units/year
Bank batteries account for the largest
percentage of sales for your company
65%5%
30%
REVENUES SOURCE NEW BANK BATTERIES
RECONDITIONED BANK
BATTERIES
SINE
WAVES/INVETORS/UPS
SYSTEMS
You don’t have the total control of
your value chain
Suppliers Manufacturer Sales After‐sales
Lead time:
2
days
Raw
materials
To retailers
TransportationTransportation
Changing your value chain will
decrease lead time and help you
meet demand
LEAD TIME
(DAYS)
8 6
Avani International Galaxy Electrical Cretto
SERVICE 2 imp. Components -Plastic container
-Internal Lead plates -Lead terminals
-Battery acid - Others
Transportation
12
Able to slash prices
down
Good relationship
with clients
Larger player
Highest lead time
Retailer
dissatisfaction
COST LOW Rs.200/Unit
(Rs.400 to Rs.1450/cell)
STRENGTHS Market share almost 20% Quality supplies
WEAKNESSES Market share is been
declining
The average lead time of the
industry is 7 days
Dolphin Power
SERVICE
LEAD TIME
(DAYS)
4 Reduced
More expensive
STRENGTHS Reduced lead times
Proximity to your
Company’s plant
Haley Power &
Electricals
DLSP
-Plastic casing -Battery leads
-Lead terminals -Electrolyte
Transportation
4
More expensive
Reliable and
consistent in
services
Least lead time in
the industry
COST Rs. 220/unit
Weaknesses
How does the future looks like?
The market for batteries is expected to keep growing
at an annual rate of 25% (till 2015)
 Both new and reconditioned batteries
Total demand for your company bank batteries would
be 2.000 units/year
Your supply chain would only be able to cate
25% of that demand
S
W
O
T
Good customer service
Diversified Product portfolio
Total supply chain lead time highly dependable on the logistics
partner
Ineffective response to demand peaks
Gap between demand and supply of lead acid batteriesr
Energy demand growth rate higher than electrical energy system
expansion rate
Increase adoption and necessity for renewable energies (solar PV)
Many players in the battery market
High fragmentation of lead acid battery market
Your company has many options
for changing the supply chain
Supply Chain Shift
logistics
6 day lead
time is already
lowest
Higher cost
Not highest
priority
Higher cost
8 day lead
time
still not most
pressing issue
Too much all
at once
Not smart to
replace all
parts of mostly
functioning
business
Take over most
pressing problem
Logistics/lead
Time core to
Business success&
reconditioned
Replace Galaxy
with Haley
Replace Avani
and Cretto
with Dolphin
Replace all
suppliers an
d logistics
Internal
Strategies
Strategy 1: Internalize logistics
 Cretto lead time unacceptably high
 Lack of response from Cretto
 Dependence of external company for core business fac
tor
 Retailer dissatisfaction
 Agility for peak time hindered
PROBLEM
Strategy 1: Internalize logistics
 Start internal logistics department
 Slowly over time to learn and not disrupt business or value chain
 Year 1-‐2 : 25%, Year 2-‐3 : 50%, Year 4 and on :75%
 Don’t do 100% in order to accommodate additional peak time capacity
 Adjust in-‐house capacity based on success and future demand
 Remain control of crucial supply chain element
 Evaluate other aspects of supply chain after this period to lower
lead time & increase capacity further
SOLUTIONS
Strategy 2: Meet growing demand
and increase production
PROBLEM
 Can’t meet demand
 Not taking advantage of peaks/not agile
 Production capacity will need to increase with lower lead time
SOLUTION SHORT TERM
 Evaluating existing facility capacity‐> increase shifts if possible (up to 3 a day)
 Reinforce maintenance of production machinery, ensure quality control and staff
training
 Optimize production process(lean manufacturing) Use “just in time” logistics
possibly increase warehouse capacity
 Add capacity for inverter production to take advantage of solar
Strategy 2: Meet growing demand
and increase production (CONTD)
SOLUTION LONG TERM
 Build additional production line if needed
 Designed production line according to “guaranteed”
demand,
 increase shift to meet peaks
 Continue to increase inverter capacity
Strategy 3: Ensure superior after
sales service
POSTIONING
Position yourself as the quickest problem solving
battery supplier to be depended on in all heat
Satisfy retailers AND end users
COMMUNICATION
PEOPLE e
Create IT platforms to connect retailers, suppliers and
internal
-Optimization of supplies, ensure quality, price and
inventory
- Management of product on according to inventory
Ensure training and relationship with retailers
Implementation proper response/maintenance team for repairs
and quick response
Keep up staffing levels with increased production and
market share
financials
Main Assumptions
– 1. Xtra Power uses only ONE shift per day in production
– 2. In/house logistics cost will increase to Rs.1.6/kg/km to
Rs, 2.5/kg/km
3. In-house logistics needs 100 trucks to replace 100% of Cretto
services
4. Marketing expenses increase of 50%
Total investment of RS 610
2013 2014 2015 2016 2017 2018
Trucks (M RS)
LogisIcs LogisIcs facility (M RS)
IT monitoring and control
systems (M RS)
Maintenance & Quality Control
Production
Staff training
Warehousing
Inverters production
IT platform Development
Implementation & OpImizaIon
TOTAL (M RS)
0.75 0 0 0.75 0 0.75
20 20 40 40 60 60
15 15 15 15 15 15
5 5 5 5 5 5
7 7 7 7 7 7
20 20
25 26
34.5 34.5
16.75 16.75 4 4 4
127 144 84 72 91 92
Sales will increase 3x and direct
costs will increase 3.6x
OVERHEADS
SALARIES
UTILITIES
MARKETING
TOTAL
SALES 2013 2014 2015 2016 2017 2018
HEAT SHIELDED BATTERY (IN RS)
OPEN SHIELDED BATTERY (IN RS)
RECONDITIONED SHIELDED BAT.
OTHERS
TOTAL (IN RS)
DIRECT COSTS (IN RS)
RAW MATERIALS
PACKAGING
LOGISTICS
TOTAL
90 180 180 270 270 270
126 252 252 379 379 379
18 36 36 53 53 53
126 252 252 378 378 378
360 720 720 1080 1080 1080
2013 2014 2015 2016 2017 2018
90 179 179 269 269 269
8 17 17 25 25 25
95 297 297 446 393 393
193 493 493 740 686 686
2013 2014 2015 2016 2017 2018
41 83 83 124 124 124
37 37 37 37 37 37
1 1 2 3 4 6
80 121 122 164 166 168
NPV of the project is Rs 1050
-40 -39 21 104 137 134
KEY ISSUE ANALYSIS RECOMMENDATION FINANCIALS RISKS & PLA
IRR = 62%NPV = M RS 1050
2013 2014 2015 2016 2017 2018
Profit (M RS)
Free Cash Flow (M RS)
87 105 105 176 228 226
RISKS & PLAN
Risks & Mitigation
Cost will go
up
You will become more agile
75% of untapped demandImpact
Demand might
slow
India Energy consumption
is growing at a higher rate
than
India Electrical Power Systems
Production/Transport/Distributio
n
Impact
Changing the value
chain, might create
problems in our
process
Slower and flexible
changing
Impact
Prob.Prob.Prob.
Implementation Plan
SUMMARY
XTRA POWER
LOGISTICS
-Lead time
-Retail needs
DEMAND
-Growing
-Production capacity
-Potential for
reconditioned peaks
CONSUMER
-After sales service
-Competitive Product
RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS

More Related Content

What's hot

Grid connected Solar Rooftop
Grid connected Solar Rooftop Grid connected Solar Rooftop
Grid connected Solar Rooftop medors
 
SOLAR GRID SYSTEM.pdf
SOLAR GRID SYSTEM.pdfSOLAR GRID SYSTEM.pdf
SOLAR GRID SYSTEM.pdfEhsan ul Haq
 
Supply Chain Management at MTC
Supply Chain Management at MTCSupply Chain Management at MTC
Supply Chain Management at MTCMD. Symum Rezwan
 
Mini grid and Solar home system
Mini grid and Solar home systemMini grid and Solar home system
Mini grid and Solar home systemTuong Do
 
impact of renewable energy sources on power system opeartion
impact of renewable energy sources on power system opeartionimpact of renewable energy sources on power system opeartion
impact of renewable energy sources on power system opeartionVipin Pandey
 
Electricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignElectricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignLeonardo ENERGY
 
Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Urval Chotalia
 
Samsung SDI energy storage system
Samsung SDI energy storage systemSamsung SDI energy storage system
Samsung SDI energy storage systemSAMSUNG SDI
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)Ravi Pohani
 
Energy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment AnalysisEnergy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment AnalysisGensol Engineering Limited
 
Strategic Sourcing And Supplier Development Strategy
Strategic Sourcing And Supplier Development StrategyStrategic Sourcing And Supplier Development Strategy
Strategic Sourcing And Supplier Development Strategymashley
 
Introduction to energy storage
Introduction to energy storageIntroduction to energy storage
Introduction to energy storagePhilip Fischer
 
20171011 美國電力市場可靠度近況與未來
20171011 美國電力市場可靠度近況與未來20171011 美國電力市場可靠度近況與未來
20171011 美國電力市場可靠度近況與未來懂能源團隊
 
Smart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunitiesSmart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunitiesCapgemini
 
Tedarik zinciri Yönetimi
Tedarik zinciri YönetimiTedarik zinciri Yönetimi
Tedarik zinciri YönetimiErol Cengiz
 

What's hot (20)

Grid connected Solar Rooftop
Grid connected Solar Rooftop Grid connected Solar Rooftop
Grid connected Solar Rooftop
 
SOLAR GRID SYSTEM.pdf
SOLAR GRID SYSTEM.pdfSOLAR GRID SYSTEM.pdf
SOLAR GRID SYSTEM.pdf
 
Supply Chain Management at MTC
Supply Chain Management at MTCSupply Chain Management at MTC
Supply Chain Management at MTC
 
Mini grid and Solar home system
Mini grid and Solar home systemMini grid and Solar home system
Mini grid and Solar home system
 
Transmission system
Transmission systemTransmission system
Transmission system
 
impact of renewable energy sources on power system opeartion
impact of renewable energy sources on power system opeartionimpact of renewable energy sources on power system opeartion
impact of renewable energy sources on power system opeartion
 
Electricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignElectricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market Design
 
Bullwhip effect ch3
Bullwhip effect ch3Bullwhip effect ch3
Bullwhip effect ch3
 
Transmission line Project
Transmission line ProjectTransmission line Project
Transmission line Project
 
Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Basic Introduction to solar PV System.
Basic Introduction to solar PV System.
 
OPEN ACCESS REGULATION
OPEN ACCESS REGULATIONOPEN ACCESS REGULATION
OPEN ACCESS REGULATION
 
Samsung SDI energy storage system
Samsung SDI energy storage systemSamsung SDI energy storage system
Samsung SDI energy storage system
 
Supply chain resilience
Supply chain resilienceSupply chain resilience
Supply chain resilience
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)
 
Energy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment AnalysisEnergy Storage Solutions - Technology Deployment Analysis
Energy Storage Solutions - Technology Deployment Analysis
 
Strategic Sourcing And Supplier Development Strategy
Strategic Sourcing And Supplier Development StrategyStrategic Sourcing And Supplier Development Strategy
Strategic Sourcing And Supplier Development Strategy
 
Introduction to energy storage
Introduction to energy storageIntroduction to energy storage
Introduction to energy storage
 
20171011 美國電力市場可靠度近況與未來
20171011 美國電力市場可靠度近況與未來20171011 美國電力市場可靠度近況與未來
20171011 美國電力市場可靠度近況與未來
 
Smart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunitiesSmart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunities
 
Tedarik zinciri Yönetimi
Tedarik zinciri YönetimiTedarik zinciri Yönetimi
Tedarik zinciri Yönetimi
 

Viewers also liked

Partesdelteclado 160422011122
Partesdelteclado 160422011122Partesdelteclado 160422011122
Partesdelteclado 160422011122lizdegarcia
 
10 inch Intel Atom N2600 Industrial Fanless Touch Screen Panel PC (EB-10PCN)
10 inch Intel Atom N2600 Industrial Fanless Touch Screen Panel PC (EB-10PCN)10 inch Intel Atom N2600 Industrial Fanless Touch Screen Panel PC (EB-10PCN)
10 inch Intel Atom N2600 Industrial Fanless Touch Screen Panel PC (EB-10PCN)robin smith
 
Industrial Touch Screen Panel PC with RFID / Wireless / Fanless
Industrial Touch Screen Panel PC with RFID / Wireless / FanlessIndustrial Touch Screen Panel PC with RFID / Wireless / Fanless
Industrial Touch Screen Panel PC with RFID / Wireless / Fanlessrobin smith
 
Linda Lloyd Resume
Linda Lloyd ResumeLinda Lloyd Resume
Linda Lloyd ResumeLinda Lloyd
 
matematicas-5o-grado-cuaderno-de-ejercicios
matematicas-5o-grado-cuaderno-de-ejerciciosmatematicas-5o-grado-cuaderno-de-ejercicios
matematicas-5o-grado-cuaderno-de-ejerciciosAndres Trompa
 
10 行銷活動作品集
10 行銷活動作品集10 行銷活動作品集
10 行銷活動作品集Hannah Lin
 
ประวัติส่วนตัว
ประวัติส่วนตัวประวัติส่วนตัว
ประวัติส่วนตัวMiw Prakaikarn
 

Viewers also liked (12)

Partesdelteclado 160422011122
Partesdelteclado 160422011122Partesdelteclado 160422011122
Partesdelteclado 160422011122
 
10 inch Intel Atom N2600 Industrial Fanless Touch Screen Panel PC (EB-10PCN)
10 inch Intel Atom N2600 Industrial Fanless Touch Screen Panel PC (EB-10PCN)10 inch Intel Atom N2600 Industrial Fanless Touch Screen Panel PC (EB-10PCN)
10 inch Intel Atom N2600 Industrial Fanless Touch Screen Panel PC (EB-10PCN)
 
Appriciation Certificate
Appriciation CertificateAppriciation Certificate
Appriciation Certificate
 
Industrial Touch Screen Panel PC with RFID / Wireless / Fanless
Industrial Touch Screen Panel PC with RFID / Wireless / FanlessIndustrial Touch Screen Panel PC with RFID / Wireless / Fanless
Industrial Touch Screen Panel PC with RFID / Wireless / Fanless
 
stage TT
stage TTstage TT
stage TT
 
Etapa 1. bases de la lectura
Etapa 1.  bases de la lecturaEtapa 1.  bases de la lectura
Etapa 1. bases de la lectura
 
Linda Lloyd Resume
Linda Lloyd ResumeLinda Lloyd Resume
Linda Lloyd Resume
 
Test
TestTest
Test
 
Japanese economy
Japanese economy Japanese economy
Japanese economy
 
matematicas-5o-grado-cuaderno-de-ejercicios
matematicas-5o-grado-cuaderno-de-ejerciciosmatematicas-5o-grado-cuaderno-de-ejercicios
matematicas-5o-grado-cuaderno-de-ejercicios
 
10 行銷活動作品集
10 行銷活動作品集10 行銷活動作品集
10 行銷活動作品集
 
ประวัติส่วนตัว
ประวัติส่วนตัวประวัติส่วนตัว
ประวัติส่วนตัว
 

Similar to RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS

Supply Chain Management.ppt
Supply Chain Management.pptSupply Chain Management.ppt
Supply Chain Management.pptAhmed Ali
 
Supply Chain Mangement - Introduction and concepts
Supply Chain Mangement - Introduction and conceptsSupply Chain Mangement - Introduction and concepts
Supply Chain Mangement - Introduction and conceptsShreyasDash2
 
scm intro.ppt
scm intro.pptscm intro.ppt
scm intro.pptjagtamil1
 
Deployment of smarter commerce concepts in B2B electronics environments
Deployment of smarter commerce concepts in B2B electronics environmentsDeployment of smarter commerce concepts in B2B electronics environments
Deployment of smarter commerce concepts in B2B electronics environmentsThorsten Schroeer
 
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridIncreasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridTata Power Delhi Distribution Limited
 
Supply Chain Planning ^0 Operations Part 10 B.pptx
Supply Chain Planning ^0 Operations Part 10 B.pptxSupply Chain Planning ^0 Operations Part 10 B.pptx
Supply Chain Planning ^0 Operations Part 10 B.pptxSheldon Byron
 
Supply Chain & Logistics Basics: The Automotive Supply Chain
Supply Chain & Logistics Basics:  The Automotive Supply ChainSupply Chain & Logistics Basics:  The Automotive Supply Chain
Supply Chain & Logistics Basics: The Automotive Supply ChainAngela Carver
 
Operations management analysis of DUBAL
Operations management analysis of DUBALOperations management analysis of DUBAL
Operations management analysis of DUBALMurthy Ranjit
 
Parcel Shipping by Geoff Light
Parcel Shipping by Geoff LightParcel Shipping by Geoff Light
Parcel Shipping by Geoff LightWJ
 
Global Supply Chain
Global Supply ChainGlobal Supply Chain
Global Supply Chainpirama2000
 
Summit 05 Presentations 06d Gerwing
Summit 05   Presentations   06d   GerwingSummit 05   Presentations   06d   Gerwing
Summit 05 Presentations 06d Gerwingbwatson
 
Oil And Gas Processing
Oil And Gas ProcessingOil And Gas Processing
Oil And Gas Processingmubarak2009
 
TECNICHE INNOVATIVE DI OTTIMIZZAZIONE PER GARANTIRE GLI OBIETTIVI DI SERVIZIO...
TECNICHE INNOVATIVE DI OTTIMIZZAZIONE PER GARANTIRE GLI OBIETTIVI DI SERVIZIO...TECNICHE INNOVATIVE DI OTTIMIZZAZIONE PER GARANTIRE GLI OBIETTIVI DI SERVIZIO...
TECNICHE INNOVATIVE DI OTTIMIZZAZIONE PER GARANTIRE GLI OBIETTIVI DI SERVIZIO...logisticaefficiente
 
Supply Chain Cost-Cutting Strategies
Supply Chain Cost-Cutting StrategiesSupply Chain Cost-Cutting Strategies
Supply Chain Cost-Cutting StrategiesFindWhitePapers
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncObject Automation
 

Similar to RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS (20)

Supply Chain Management.ppt
Supply Chain Management.pptSupply Chain Management.ppt
Supply Chain Management.ppt
 
scintro.ppt
scintro.pptscintro.ppt
scintro.ppt
 
Supply Chain Mangement - Introduction and concepts
Supply Chain Mangement - Introduction and conceptsSupply Chain Mangement - Introduction and concepts
Supply Chain Mangement - Introduction and concepts
 
scintro.ppt
scintro.pptscintro.ppt
scintro.ppt
 
scm intro.ppt
scm intro.pptscm intro.ppt
scm intro.ppt
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Deployment of smarter commerce concepts in B2B electronics environments
Deployment of smarter commerce concepts in B2B electronics environmentsDeployment of smarter commerce concepts in B2B electronics environments
Deployment of smarter commerce concepts in B2B electronics environments
 
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridIncreasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
 
Supply Chain Planning ^0 Operations Part 10 B.pptx
Supply Chain Planning ^0 Operations Part 10 B.pptxSupply Chain Planning ^0 Operations Part 10 B.pptx
Supply Chain Planning ^0 Operations Part 10 B.pptx
 
Supply Chain & Logistics Basics: The Automotive Supply Chain
Supply Chain & Logistics Basics:  The Automotive Supply ChainSupply Chain & Logistics Basics:  The Automotive Supply Chain
Supply Chain & Logistics Basics: The Automotive Supply Chain
 
Driving uncertainty from your supply chain final
Driving uncertainty from your supply chain finalDriving uncertainty from your supply chain final
Driving uncertainty from your supply chain final
 
Supply Chain Basic
Supply Chain BasicSupply Chain Basic
Supply Chain Basic
 
Operations management analysis of DUBAL
Operations management analysis of DUBALOperations management analysis of DUBAL
Operations management analysis of DUBAL
 
Parcel Shipping by Geoff Light
Parcel Shipping by Geoff LightParcel Shipping by Geoff Light
Parcel Shipping by Geoff Light
 
Global Supply Chain
Global Supply ChainGlobal Supply Chain
Global Supply Chain
 
Summit 05 Presentations 06d Gerwing
Summit 05   Presentations   06d   GerwingSummit 05   Presentations   06d   Gerwing
Summit 05 Presentations 06d Gerwing
 
Oil And Gas Processing
Oil And Gas ProcessingOil And Gas Processing
Oil And Gas Processing
 
TECNICHE INNOVATIVE DI OTTIMIZZAZIONE PER GARANTIRE GLI OBIETTIVI DI SERVIZIO...
TECNICHE INNOVATIVE DI OTTIMIZZAZIONE PER GARANTIRE GLI OBIETTIVI DI SERVIZIO...TECNICHE INNOVATIVE DI OTTIMIZZAZIONE PER GARANTIRE GLI OBIETTIVI DI SERVIZIO...
TECNICHE INNOVATIVE DI OTTIMIZZAZIONE PER GARANTIRE GLI OBIETTIVI DI SERVIZIO...
 
Supply Chain Cost-Cutting Strategies
Supply Chain Cost-Cutting StrategiesSupply Chain Cost-Cutting Strategies
Supply Chain Cost-Cutting Strategies
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation Inc
 

More from AKSHIT JAIN

Banking in india
Banking in indiaBanking in india
Banking in indiaAKSHIT JAIN
 
Brand extention of MCdonalds
Brand extention of MCdonaldsBrand extention of MCdonalds
Brand extention of MCdonaldsAKSHIT JAIN
 
ALL VIEW REARVIEW MIRROR
ALL VIEW REARVIEW MIRRORALL VIEW REARVIEW MIRROR
ALL VIEW REARVIEW MIRRORAKSHIT JAIN
 
CASH MANAGEMENT OF INDIAN OIL CORP.
CASH MANAGEMENT OF INDIAN OIL CORP.CASH MANAGEMENT OF INDIAN OIL CORP.
CASH MANAGEMENT OF INDIAN OIL CORP.AKSHIT JAIN
 
WORKING CAPITAL OF 2 & 3 AUTO WHEELERS
WORKING CAPITAL OF 2 & 3 AUTO WHEELERSWORKING CAPITAL OF 2 & 3 AUTO WHEELERS
WORKING CAPITAL OF 2 & 3 AUTO WHEELERSAKSHIT JAIN
 
CASE STUDY ON PEPE JEANS
 CASE STUDY ON PEPE JEANS CASE STUDY ON PEPE JEANS
CASE STUDY ON PEPE JEANSAKSHIT JAIN
 
AMUL PRESENTATION
AMUL PRESENTATIONAMUL PRESENTATION
AMUL PRESENTATIONAKSHIT JAIN
 
ACTIVITY BASED COSTING
ACTIVITY BASED COSTINGACTIVITY BASED COSTING
ACTIVITY BASED COSTINGAKSHIT JAIN
 
Itc rural marketing
Itc rural marketingItc rural marketing
Itc rural marketingAKSHIT JAIN
 
secondary market
 secondary market secondary market
secondary marketAKSHIT JAIN
 
North east hill stations
North east hill stationsNorth east hill stations
North east hill stationsAKSHIT JAIN
 

More from AKSHIT JAIN (16)

Digital
DigitalDigital
Digital
 
Banking in india
Banking in indiaBanking in india
Banking in india
 
Brand extention of MCdonalds
Brand extention of MCdonaldsBrand extention of MCdonalds
Brand extention of MCdonalds
 
Richard pascale
Richard pascaleRichard pascale
Richard pascale
 
ALL VIEW REARVIEW MIRROR
ALL VIEW REARVIEW MIRRORALL VIEW REARVIEW MIRROR
ALL VIEW REARVIEW MIRROR
 
Dove baby
Dove babyDove baby
Dove baby
 
CASH MANAGEMENT OF INDIAN OIL CORP.
CASH MANAGEMENT OF INDIAN OIL CORP.CASH MANAGEMENT OF INDIAN OIL CORP.
CASH MANAGEMENT OF INDIAN OIL CORP.
 
WORKING CAPITAL OF 2 & 3 AUTO WHEELERS
WORKING CAPITAL OF 2 & 3 AUTO WHEELERSWORKING CAPITAL OF 2 & 3 AUTO WHEELERS
WORKING CAPITAL OF 2 & 3 AUTO WHEELERS
 
CASE STUDY ON PEPE JEANS
 CASE STUDY ON PEPE JEANS CASE STUDY ON PEPE JEANS
CASE STUDY ON PEPE JEANS
 
AMUL PRESENTATION
AMUL PRESENTATIONAMUL PRESENTATION
AMUL PRESENTATION
 
ACTIVITY BASED COSTING
ACTIVITY BASED COSTINGACTIVITY BASED COSTING
ACTIVITY BASED COSTING
 
Itc rural marketing
Itc rural marketingItc rural marketing
Itc rural marketing
 
Microsoft
MicrosoftMicrosoft
Microsoft
 
secondary market
 secondary market secondary market
secondary market
 
Micromax plan
Micromax planMicromax plan
Micromax plan
 
North east hill stations
North east hill stationsNorth east hill stations
North east hill stations
 

Recently uploaded

CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
crisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptxcrisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptxSamahhassan30
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 

Recently uploaded (17)

sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
crisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptxcrisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptx
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 

RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS

  • 1. RECONFIGURING THE SUPPLY CHAIN AT XTRA POWER ENERGY SYSTEMS SUBMITTEDBY AKSHITJAIN ALI MAVLI ALMASFIROZ AMANBAIJAL AMANSWARUPSRIVASTAVA AMBERBHARDWAJ
  • 2. Xtra Power needs to make changes in order to grow Key issues to address LOGISTICS -Lead time -Retail needs DEMAND -Growing -Production capacity -Potential for reconditioned peaks CONSUMER -After sales service -Competitive Product
  • 3. Xtra Power Energy Systems They are one of the leading suppliers of automotive components in the domestic market (2 WHEELERS) They have 2 separate business divisions Xtra Power Auto Industries Xtra Power Energy Systems
  • 4. Demand is growing for batteries Industrial sector and economy are developing  Battery market is estimated to be Rs. 200 billions  Organized/unorganized market: 45% of the market  Imports: 55% of the market  Market for batteries is growing at an annual rate of 25%  Lead acid batteries (account for 70% - 75% share of the market)  Guided by frequent power cuts  Replacement battery market is Rs. 5b units/year
  • 5. Bank batteries account for the largest percentage of sales for your company 65%5% 30% REVENUES SOURCE NEW BANK BATTERIES RECONDITIONED BANK BATTERIES SINE WAVES/INVETORS/UPS SYSTEMS
  • 6. You don’t have the total control of your value chain Suppliers Manufacturer Sales After‐sales Lead time: 2 days Raw materials To retailers TransportationTransportation
  • 7. Changing your value chain will decrease lead time and help you meet demand LEAD TIME (DAYS) 8 6 Avani International Galaxy Electrical Cretto SERVICE 2 imp. Components -Plastic container -Internal Lead plates -Lead terminals -Battery acid - Others Transportation 12 Able to slash prices down Good relationship with clients Larger player Highest lead time Retailer dissatisfaction COST LOW Rs.200/Unit (Rs.400 to Rs.1450/cell) STRENGTHS Market share almost 20% Quality supplies WEAKNESSES Market share is been declining
  • 8. The average lead time of the industry is 7 days Dolphin Power SERVICE LEAD TIME (DAYS) 4 Reduced More expensive STRENGTHS Reduced lead times Proximity to your Company’s plant Haley Power & Electricals DLSP -Plastic casing -Battery leads -Lead terminals -Electrolyte Transportation 4 More expensive Reliable and consistent in services Least lead time in the industry COST Rs. 220/unit Weaknesses
  • 9. How does the future looks like? The market for batteries is expected to keep growing at an annual rate of 25% (till 2015)  Both new and reconditioned batteries Total demand for your company bank batteries would be 2.000 units/year Your supply chain would only be able to cate 25% of that demand
  • 10. S W O T Good customer service Diversified Product portfolio Total supply chain lead time highly dependable on the logistics partner Ineffective response to demand peaks Gap between demand and supply of lead acid batteriesr Energy demand growth rate higher than electrical energy system expansion rate Increase adoption and necessity for renewable energies (solar PV) Many players in the battery market High fragmentation of lead acid battery market
  • 11. Your company has many options for changing the supply chain Supply Chain Shift logistics 6 day lead time is already lowest Higher cost Not highest priority Higher cost 8 day lead time still not most pressing issue Too much all at once Not smart to replace all parts of mostly functioning business Take over most pressing problem Logistics/lead Time core to Business success& reconditioned Replace Galaxy with Haley Replace Avani and Cretto with Dolphin Replace all suppliers an d logistics Internal
  • 13. Strategy 1: Internalize logistics  Cretto lead time unacceptably high  Lack of response from Cretto  Dependence of external company for core business fac tor  Retailer dissatisfaction  Agility for peak time hindered PROBLEM
  • 14. Strategy 1: Internalize logistics  Start internal logistics department  Slowly over time to learn and not disrupt business or value chain  Year 1-‐2 : 25%, Year 2-‐3 : 50%, Year 4 and on :75%  Don’t do 100% in order to accommodate additional peak time capacity  Adjust in-‐house capacity based on success and future demand  Remain control of crucial supply chain element  Evaluate other aspects of supply chain after this period to lower lead time & increase capacity further SOLUTIONS
  • 15. Strategy 2: Meet growing demand and increase production PROBLEM  Can’t meet demand  Not taking advantage of peaks/not agile  Production capacity will need to increase with lower lead time SOLUTION SHORT TERM  Evaluating existing facility capacity‐> increase shifts if possible (up to 3 a day)  Reinforce maintenance of production machinery, ensure quality control and staff training  Optimize production process(lean manufacturing) Use “just in time” logistics possibly increase warehouse capacity  Add capacity for inverter production to take advantage of solar
  • 16. Strategy 2: Meet growing demand and increase production (CONTD) SOLUTION LONG TERM  Build additional production line if needed  Designed production line according to “guaranteed” demand,  increase shift to meet peaks  Continue to increase inverter capacity
  • 17. Strategy 3: Ensure superior after sales service POSTIONING Position yourself as the quickest problem solving battery supplier to be depended on in all heat Satisfy retailers AND end users COMMUNICATION PEOPLE e Create IT platforms to connect retailers, suppliers and internal -Optimization of supplies, ensure quality, price and inventory - Management of product on according to inventory Ensure training and relationship with retailers Implementation proper response/maintenance team for repairs and quick response Keep up staffing levels with increased production and market share
  • 19. Main Assumptions – 1. Xtra Power uses only ONE shift per day in production – 2. In/house logistics cost will increase to Rs.1.6/kg/km to Rs, 2.5/kg/km 3. In-house logistics needs 100 trucks to replace 100% of Cretto services 4. Marketing expenses increase of 50%
  • 20. Total investment of RS 610 2013 2014 2015 2016 2017 2018 Trucks (M RS) LogisIcs LogisIcs facility (M RS) IT monitoring and control systems (M RS) Maintenance & Quality Control Production Staff training Warehousing Inverters production IT platform Development Implementation & OpImizaIon TOTAL (M RS) 0.75 0 0 0.75 0 0.75 20 20 40 40 60 60 15 15 15 15 15 15 5 5 5 5 5 5 7 7 7 7 7 7 20 20 25 26 34.5 34.5 16.75 16.75 4 4 4 127 144 84 72 91 92
  • 21. Sales will increase 3x and direct costs will increase 3.6x OVERHEADS SALARIES UTILITIES MARKETING TOTAL SALES 2013 2014 2015 2016 2017 2018 HEAT SHIELDED BATTERY (IN RS) OPEN SHIELDED BATTERY (IN RS) RECONDITIONED SHIELDED BAT. OTHERS TOTAL (IN RS) DIRECT COSTS (IN RS) RAW MATERIALS PACKAGING LOGISTICS TOTAL 90 180 180 270 270 270 126 252 252 379 379 379 18 36 36 53 53 53 126 252 252 378 378 378 360 720 720 1080 1080 1080 2013 2014 2015 2016 2017 2018 90 179 179 269 269 269 8 17 17 25 25 25 95 297 297 446 393 393 193 493 493 740 686 686 2013 2014 2015 2016 2017 2018 41 83 83 124 124 124 37 37 37 37 37 37 1 1 2 3 4 6 80 121 122 164 166 168
  • 22. NPV of the project is Rs 1050 -40 -39 21 104 137 134 KEY ISSUE ANALYSIS RECOMMENDATION FINANCIALS RISKS & PLA IRR = 62%NPV = M RS 1050 2013 2014 2015 2016 2017 2018 Profit (M RS) Free Cash Flow (M RS) 87 105 105 176 228 226
  • 24. Risks & Mitigation Cost will go up You will become more agile 75% of untapped demandImpact Demand might slow India Energy consumption is growing at a higher rate than India Electrical Power Systems Production/Transport/Distributio n Impact Changing the value chain, might create problems in our process Slower and flexible changing Impact Prob.Prob.Prob.
  • 26. SUMMARY XTRA POWER LOGISTICS -Lead time -Retail needs DEMAND -Growing -Production capacity -Potential for reconditioned peaks CONSUMER -After sales service -Competitive Product