IOSR Journal of Engineering (IOSRJEN) www.iosrjen.org
ISSN (e): 2250-3021, ISSN (p): 2278-8719
Vol. 04, Issue 06 (June. 2014), ||V3|| PP 32-38
International organization of Scientific Research 32 | P a g e
Feasibility Study for Dredging of Khaprabhanga Chapalir Don
River in Patuakhali District for Improvement of Navigability
Mohammad Ziaur Rahman1*
, Shume Akhter 2
, Md. Saiful Islam3
,
Zahirul Haque Khan4
1
Junior Specialist, Coast Port and Estuary Management Division, Institute of Water Modelling, Bangladesh
2
Associate Specialist, Coast Port and Estuary Management Division, Institute of Water Modelling, Bangladesh
3
Junior Engineer, Coast Port and Estuary of Water Modelling, Bangladesh mds@iwmbd.org
4
Director, Coast Port and Estuary Management Division, Institute of Water Modelling, Bangladesh
Abstract: - The Khaprabhanga Chapalir Don River (Mohipur channel), an important navigation route, is situated
in the Upazilla Kalapara under the administrative district of Patuakhali. The sea going engine boats used to take
shelter in this river during cyclone. The river has been experiencing siltation over the years. Boat cannot enter
from Rabnabad and Andarmanik Channel to the Mohipur channel during the ebb tide. A comprehensive
mathematical modelling study has been carried out to assess the capital dredging volume, resiltation rate,
maintenance dredging, and dredge spoil locations. In the existing condition the navigation depth in the channel
varies from 1.25m to 2.00m in the western stretch and in the eastern it is 0.50 m to 1.25m, which implies 4.00 m
dredging is required to improve the navigability of the channel for movement of ships and engine boats. Model
result shows that, for option-2 tidal flow/prism in the channel is increased by 21% during high tide compared to
existing condition which indicates sustainable deeper channel compared to present condition. Navigable depth
3.60m to 4.60m can be achieved in this option. The capital dredging is about 3.40 million m3 and re-siltation
rate is the least compared to the other options. However, the annual maintenance dredging is about 60% of the
capital dredging. If high tide followed then maintenance dredging may be required after 6 months.
Keywords: - Navigability, Capital and Maintenance Dredging, Dredged Volume, Tidal prism, Siltation.
I. INTRODUCTION
The Khaprabhanga Chapalir Don River (Mohipur channel), river plays an important role on sea and river borne
trade and socio-economic activities. The sea going engine boats used to take shelter in this river during cyclone.
The river has been experiencing siltation over the years and navigability of the river has become very poor. Boat
cannot enter from Rabnabad and Andarmanik Channel to the Mohipur channel during the ebb tide. The total
study area is about 15000 ha. This river is one of the main drainage routes of the Polder 48 and 47. In view of
the above a project has been undertaken by Bangladesh Water Development Board to dredge 24.00 km of the
Mohipur channel by dredger. The study area is shown in the Fig 1.The main objectives of the feasibility study
are:
ď‚· Planning and design of effective dredging alignment
ď‚· Assessment of capital and maintenance dredging volume
ď‚· Selection of suitable location for disposal of dredged spoil.
II. METHODOLOGY
The overall methodology is to define a base line condition and assessment of hydro-morphological
condition with the aid of data and numerical modelling. In this study the existing Bay of Bengal model has been
updated with the recently surveyed hydro-morphological data and latest satellite imagery. These available
models updated using primary and secondary data. The secondary data collected from various sources. The
primary data collected under this study. The updated model has been used for this study. IWM maintains Bay of
Bengal Model (BoB) for simulation of hydrodynamic condition, morphology, salinity, wave, storm surge &
Tsunami. The updated model domain extends from Chandpur on the Lower Meghna river in the north to about
160 Latitude in the Bay of Bengal in the south. The mathematical modelling tool applied in this study is MIKE
21 FM (Flexible Mesh), a two dimensional modelling system of DHI Water•Environment•Health based on
flexible mesh approach. In this study Hydrodynamic Module and Mud Transport Module have been used in
simultaneously for hydro-morphological investigation around the study area. The two dimensional (2-D)
flexible mesh model (MIKE21 FM) has been applied to produce the existing water depth, water flow, water
level and current speed of the river. The Morphological model has been used to predict the existing siltation and
erosion pattern in the river.
Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for
Improvement of Navigability
International organization of Scientific Research 33 | P a g e
III. ILLUSTRATION
3.1 Hydrodynamic Model
In this study the existing Bay of Bengal model has been updated with the recently surveyed hydro-
morphological data and latest satellite imagery. The updated model domain extends from Chandpur on the
Lower Meghna River in the north to about 160
Latitude in the Bay of Bengal in the south. The coverage of the
numerical model is shown in Fig 2. There are two open boundaries in the model, one is in the Lower Meghna
River at Chandpur (northern boundary) and another one is in the Bay of Bengal (southern boundary). Predicted
tide has been used in the southern boundary and observed water level at Chandpur BIWTA Station has been
used in the northern boundary.
The riverbank alignment (land boundary) in the northern part of the model has been updated on the
basis of the mosaic of IRS P6 LISS III satellite image 2008 provided by EDP. The model applies PWD datum,
which is equivalent to 0.46 m SoB. The southern part of the Bay of Bengal is quite deep and the maximum
depth along the southern open boundary is more than 3,000 meter. The computational grid or mesh size
decreases (or the resolution increases) towards coastlines and Islands. Inter-tidal areas are flooded and dried
during a tidal cycle, both in nature and in the model. Model has been upgraded within the Mohipur channel with
the recent bathymetric data in 2010.
3.2 Sediment Transport Model
The cohesive sediment transport module is coupled to the hydrodynamic module and they run in
parallel. The governing equation for sediment transport is solved on the same mesh and applies information on
water levels and currents from the hydrodynamic module to calculate the sediment transport. One layer
describes the sea bed in the sediment transport model. In the upstream boundary on the Lower Meghna River,
suspended sediment concentration time-series has been applied based on past measurements. Zero sediment
concentration has been assumed at the south boundary. Initial sediment concentration in the Meghna Estuary is
also based on the field measurement and MES measurement.
3.3 Calibration of Model
The updated and upgraded two-dimensional hydrodynamic model of the Bay of Bengal has been
calibrated against water level, water flow at different locations comparing the model results with field
measurement to make the model performance to a satisfactory level. The model results have also been examined
with other set of data of different year and location compared to the data used in the calibration to validate the
model. The validation has been made only with the available data for a recent year. Locations of water level and
flow calibration areas is shown in Fig 3 and some calibration plots of flow and water level have been presented
in Fig 4 and Fig 5 respectively.
3.4 Potential Options of Dredging:
Based on bathymetric data, tidal characteristics and requirement of navigability of the river
Khprabanga four potential options have been considered in the study for capital dredging with the aim to
improve the navigability of the river, reduce the drainage congestions and to develop harbor for sea going
vessels and boats. The details of the potential options are described in Table 1.
3.5 Effectiveness of Dredging Options:
A tidal meeting zone is observed at 15.00km from the western end of the channel, when tide
approaches from the east and west and meets at this point. The navigation depth is very low and river condition
is shallow and narrow. Efforts have been made to assess the effectiveness of four potential options to select the
best suited option for improvement of navigation and drainage conditions.
In designing the navigation channel the main elements are the channel alignment, width, depth and the
size and shape of manoeuvring spaces. Design channel width is defined as the width measured at the bottom of
the side slopes on side of the channel at the design depth. Design section of navigational channel of the Mohipur
channel has shown in Fig 6.For 4 meter draft ship and 10m width of the beam the design width of the navigation
channel is considered 30m, 60m width for only 5km at the western stretch of the channel for allowing higher
draft ship to the fish market. It is assumed that the navigability of the river for ship movement is required for 24
hours operation. In the existing condition the navigation depth in the channel varies from 1.25 m to 2.00 m in
the western stretch and in the eastern stretch available navigation depth is 0.50 m to 1.25m, which implies
dredging is required to improve the navigability of the channel for movement of ships.
Fig 7, Fig 8 and Fig 9, Fig 10 shows the available navigation depth in the existing condition and
Option-2 respectively. In the existing condition the navigation depth in the channel varies from 1.25m to 2m in
the western stretch of the river and in the eastern stretch available navigation depth is 0.50m to 1.25m, which
Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for
Improvement of Navigability
International organization of Scientific Research 34 | P a g e
implies dredging is required to improve the navigability of the channel for movement of ships and engine boats.
Simulations of dredging of the channel along the existing alignment for all options have been carried out to find
out the increase of navigation depth and re-siltation rate. For option -1 navigation depth is increased from 2.60
to 3.60 m in the channel but required navigable depth (4.00m) is not achieved. Re-siltation rate is higher. Model
result shows that the option-1 is not suitable to improve navigability of the river. In case of option-2 model
result shows that tidal flow/prism in the channel is increased by 21% during high tide compared to existing
condition which indicates sustainable deeper channel compared to present condition. Navigable depth 3.60 to
4.60 m can be achieved in this option. The capital dredging is about 3.40 million m3 and re-siltation rate is the
least compared to the other options. However, the annual maintenance dredging is about 60% of the capital
dredging. Under Option-2, the required navigation depth of 4.00m is feasible to maintain operation of ship
movement round the clock if the river is dredged and maintained after 3 months. The average tidal range of the
channel is about 2 m. If high tide followed then maintenance dredging may be required after 6 months. Capital
dredging is reduced in Option -3 but required navigable depth is not sustained along the whole channel for 24
hours operation of fish port. Tidal prism is increased about 18 %, which would not able to sustain the deeper
channel like option-2 also re-siltation rate is quite high, which is 69% in a year. The required navigation depth is
achieved in the Option-4 along the deeper channel of the river except at the tidal meeting zone. Since required
navigation depth is not achieved at the tidal meeting zone it would restrict the ship movement in the eastern part
of the channel. Table 2 shows the tidal prism, average tidal volume in one tidal cycle, and Table 3 shows the
Capital & Annual Maintenance dredging volume and different options.
TABLES AND FIGURES
Fig 1: Map Showing the Study Area
Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for
Improvement of Navigability
International organization of Scientific Research 35 | P a g e
Fig 2: Bathymetry of the Bay of Bengal Model with flexible triangular computational mesh
Fig 3: Field measurement locations
Fig 4: Water Flow Calibration at Mohipur and Islampur
Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for
Improvement of Navigability
International organization of Scientific Research 36 | P a g e
Fig 5: Water level calibration at Kalghara and Peshimmanashtola.
Fig 6: Design section of navigational channel of the Mohipur channel
Fig 7: Navigation Water Depth for Base Condition
Fig 8: Navigation Water Depth for Base Condition
Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for
Improvement of Navigability
International organization of Scientific Research 37 | P a g e
Fig 9: Navigation Water Depth for Option-2
Fig 10: Navigation Water Depth for Option-2
Table 1: Description of four different options
Table 2: Description of Tidal Prism for Base and four different options
Scenario
Tidal
Prism(Mm3
)
% increase
Base 7.17 -
Option-1 8.29 15.62
Option-2 8.69 21.20
Option-3 8.44 17.71
Option-4 8.40 17.15
Options Chainage
(Mohipur
West to
East)
Dredging
Length
[km]
Dredging
Width
[m]
Dredged
River Bed
Level
[m, PWD]
Slope
Option-1 0-5 km 5 km 60 -4.0 1:3
5-24 km 19 km 30 -4.0 1:3
Option-2
0-5 km 5 km 60 -5.0 1:3
5-24 km 19 km 30 -5.0 1:3
Option-3
0-5 km 5 km 60 -4.0 1:3
5-24 km 19 km 30 -5.0 1:3
Option-4 0-5 km 5 km 60 -5.0 1:3
5-15 km 10 km 30 -5.0 1:3
15-19 km 4 km 30 -4.0 1:3
19-24 km 5 km 30 -5.0 1:3
Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for
Improvement of Navigability
International organization of Scientific Research 38 | P a g e
Table 3: Capital and Annual Maintenance Dredging Volume:
Event
Capital
Dredging(Mm3
)
Backfilling (Mm3
)
% of
Backfilling
Rate
(One Year)
Dry Monsoon Annual
Maintenance
Dredging
( after 6
month)
( after 6
month)
Option-1 2.27 0.9 0.76 1.66 73
Option-2 3.4 1.2 0.85 2.05 60
Option-3 2.77 1.1 0.8 1.9 69
Option-4 3.05 1.12 0.81 1.93 63
IV. CONCLUSION
The Khaprabhanga Chapalir Don River is an important navigation route in the Patuakhali district and
main drainage channel of the polders 47/4 and 48. The sea going engine boats used to take shelter in this river
during cyclone. The river has been experiencing huge siltation over the years and navigability of the river has
become inadequate for 4m draft vessel. The river plays an important role on river borne trade and socio-
economic activities of the area. Siltation caused deterioration of the navigability of the river that leads to
declining of trade and socio-economic activities of the area. A comprehensive survey, hydrological and
morphological investigations have been carried out to find out the causes of siltation and potential solutions of
improvement of the navigability. There is a strong tidal influence in the river. Initially tide enters into Mohipur
Channel from the Andar Manik River and flows to the east since tide arrives faster at the western channel
compared to the eastern side of the channel. A tidal meeting zone is observed near the eastern zone when tide
approaches from the east and west and meets at this point. The navigation depth is very low and river condition
is shallow and narrow at this location. Four potentials options have been investigated using state of art
mathematical modelling technology under the present study. The whole 24.00 km of the Khaprabhanga Chapalir
Don River is suggested to dredge at -5.00 mPWD (Option -2) to improve navigability for enhancing river borne
trade, development of harbor, improvement of drainage of the polder 47 and 48 and socio-economic activities.
The option-2 is technically feasible, economically viable and environment friendly.
V. ACKNOWLEDGEMENTS
The authors express their gratitude to Institute of Water Modelling (IWM) and Bangladesh Water Development
Board (BWDB) for the support to use their joint study findings in the paper.
REFERENCES
[1] AIT, Nguten Huong Thuy Phan (1998), “Field Application of 2D Morphological Modelling for Estuarine
and Coastal Areas”
[2] DHV Consultants BV (2001). Hydro-morphological Dynamics of the Meghna Estuary (MES II)
[3] IWM (2010), Updating of Hydrodynamic & Morphological Models to Investigate Land Accretion &
Erosion in the Estuary Development Program (EDP) Area.
[4] IWM (2009), “Survey and Modelling Study of Sandwip-Urirchar-Noakhali Cross-Dam(s)”, Final Report
submitted to Char Development and Settlement Project-III (CDSP-III) by IWM.
[5] O’ Brien, M.P. (1969). “Equilibrium Flow Areas of Inlets on Sandy Coast”, Journal of the Water Ways
and Harbours, DIV, Proc. ASCE.
[6] O’ Conor, B.A., Nicholson, J. (1989), “Modelling Changes in Coastal Morphology”, Proc. A.S.C.E. Int.
Symposium on Sediment Transport Modelling, S.Y. Wang (Ed.), pp. 160165.
[7] SWMC (2001), “Two-dimensional General Model of the Meghna Estuary”, Second Update Report,
submitted to Meghna Estuary Study (MES) by Surface Water Modelling Center.
[8] Wallingford (1984), “Mathematical model Studies of Schemes Designed to Improve Depth at the Port”,
Port of Chalna Bangladesh, April 1984.

More Related Content

What's hot

Presentation on expertise services
Presentation on expertise servicesPresentation on expertise services
Presentation on expertise servicesWATER HARVESTERS
 
AHMED A. M. FATH ELBAB
AHMED A. M. FATH ELBABAHMED A. M. FATH ELBAB
AHMED A. M. FATH ELBABAhmed Fath el-bab
 
Download-manuals-surface water-software-investigation&selectionofhydrologica...
 Download-manuals-surface water-software-investigation&selectionofhydrologica... Download-manuals-surface water-software-investigation&selectionofhydrologica...
Download-manuals-surface water-software-investigation&selectionofhydrologica...hydrologyproject0
 
Nih sw hydrological assessment of ungauged catchments (small catchments) maha...
Nih sw hydrological assessment of ungauged catchments (small catchments) maha...Nih sw hydrological assessment of ungauged catchments (small catchments) maha...
Nih sw hydrological assessment of ungauged catchments (small catchments) maha...hydrologyproject2
 
Simulation of Sediment Transport in the Canal Using the Hec-Ras (Hydrologic E...
Simulation of Sediment Transport in the Canal Using the Hec-Ras (Hydrologic E...Simulation of Sediment Transport in the Canal Using the Hec-Ras (Hydrologic E...
Simulation of Sediment Transport in the Canal Using the Hec-Ras (Hydrologic E...inventionjournals
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_riverRavi Naid Gorle
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Stephen Flood
 
Impact of A Paleochannel on Hydrogeochemistry of A Quaternary Aquifer: Case S...
Impact of A Paleochannel on Hydrogeochemistry of A Quaternary Aquifer: Case S...Impact of A Paleochannel on Hydrogeochemistry of A Quaternary Aquifer: Case S...
Impact of A Paleochannel on Hydrogeochemistry of A Quaternary Aquifer: Case S...QUESTJOURNAL
 
Irrigation system by umar khan
Irrigation system by umar khanIrrigation system by umar khan
Irrigation system by umar khanengnr_umar
 
D212529
D212529D212529
D212529irjes
 
EXTENDED ABSTRACT REVISION 3
EXTENDED ABSTRACT REVISION 3EXTENDED ABSTRACT REVISION 3
EXTENDED ABSTRACT REVISION 3Prakash Peechmani
 
WREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution systemWREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution systemMitaliShelke
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPPSaad Raja
 
Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21Stephen Flood
 
Lined or non erodible design channel study
Lined or non erodible design channel studyLined or non erodible design channel study
Lined or non erodible design channel studyroidghozi
 

What's hot (20)

Presentation on expertise services
Presentation on expertise servicesPresentation on expertise services
Presentation on expertise services
 
AHMED A. M. FATH ELBAB
AHMED A. M. FATH ELBABAHMED A. M. FATH ELBAB
AHMED A. M. FATH ELBAB
 
Download-manuals-surface water-software-investigation&selectionofhydrologica...
 Download-manuals-surface water-software-investigation&selectionofhydrologica... Download-manuals-surface water-software-investigation&selectionofhydrologica...
Download-manuals-surface water-software-investigation&selectionofhydrologica...
 
Nih sw hydrological assessment of ungauged catchments (small catchments) maha...
Nih sw hydrological assessment of ungauged catchments (small catchments) maha...Nih sw hydrological assessment of ungauged catchments (small catchments) maha...
Nih sw hydrological assessment of ungauged catchments (small catchments) maha...
 
Simulation of Sediment Transport in the Canal Using the Hec-Ras (Hydrologic E...
Simulation of Sediment Transport in the Canal Using the Hec-Ras (Hydrologic E...Simulation of Sediment Transport in the Canal Using the Hec-Ras (Hydrologic E...
Simulation of Sediment Transport in the Canal Using the Hec-Ras (Hydrologic E...
 
Abstract
AbstractAbstract
Abstract
 
1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river1.2 iii-gl for-planning_the_projects_on_run_of_river
1.2 iii-gl for-planning_the_projects_on_run_of_river
 
Flood Routing
Flood RoutingFlood Routing
Flood Routing
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
 
Impact of A Paleochannel on Hydrogeochemistry of A Quaternary Aquifer: Case S...
Impact of A Paleochannel on Hydrogeochemistry of A Quaternary Aquifer: Case S...Impact of A Paleochannel on Hydrogeochemistry of A Quaternary Aquifer: Case S...
Impact of A Paleochannel on Hydrogeochemistry of A Quaternary Aquifer: Case S...
 
Irrigation system by umar khan
Irrigation system by umar khanIrrigation system by umar khan
Irrigation system by umar khan
 
D212529
D212529D212529
D212529
 
EXTENDED ABSTRACT REVISION 3
EXTENDED ABSTRACT REVISION 3EXTENDED ABSTRACT REVISION 3
EXTENDED ABSTRACT REVISION 3
 
WREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution systemWREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution system
 
AGU_Poster
AGU_PosterAGU_Poster
AGU_Poster
 
Doc
DocDoc
Doc
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21Sharing Experiences of Flood Modelling Using MIKE 21
Sharing Experiences of Flood Modelling Using MIKE 21
 
5.1 reservoir planning
5.1 reservoir planning5.1 reservoir planning
5.1 reservoir planning
 
Lined or non erodible design channel study
Lined or non erodible design channel studyLined or non erodible design channel study
Lined or non erodible design channel study
 

Similar to F04633238

IRJET- Prospects of Inland Water Transportation in the River Drainage System ...
IRJET- Prospects of Inland Water Transportation in the River Drainage System ...IRJET- Prospects of Inland Water Transportation in the River Drainage System ...
IRJET- Prospects of Inland Water Transportation in the River Drainage System ...IRJET Journal
 
A review on managed aquifer recharge by check dams a case study near chenna...
A review on managed aquifer recharge by check dams   a case study near chenna...A review on managed aquifer recharge by check dams   a case study near chenna...
A review on managed aquifer recharge by check dams a case study near chenna...eSAT Journals
 
A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...eSAT Publishing House
 
G04633950
G04633950G04633950
G04633950IOSR-JEN
 
Hydrodynamics and Morphological Changes Numerical Model of the Jeneberang Est...
Hydrodynamics and Morphological Changes Numerical Model of the Jeneberang Est...Hydrodynamics and Morphological Changes Numerical Model of the Jeneberang Est...
Hydrodynamics and Morphological Changes Numerical Model of the Jeneberang Est...AM Publications
 
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...ijiert bestjournal
 
Exaple of use of decision support system planning dss (p) kerala state
Exaple of use of decision support system planning dss (p)   kerala stateExaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p) kerala statehydrologyproject0
 
Sediment control at the source for a bulk water supply scheme in mysore, india
Sediment control at the source for a bulk water supply scheme in mysore, indiaSediment control at the source for a bulk water supply scheme in mysore, india
Sediment control at the source for a bulk water supply scheme in mysore, indiaIAEME Publication
 
Runoff modelling using hec hms for rural watershed
Runoff modelling using hec hms for rural watershedRunoff modelling using hec hms for rural watershed
Runoff modelling using hec hms for rural watershedEditorIJAERD
 
Coupling of Surface water and Groundwater Models
Coupling of Surface water and Groundwater Models Coupling of Surface water and Groundwater Models
Coupling of Surface water and Groundwater Models TIPU SULTAN BADAGAN
 
Assessment Of Hydro-Morphological Change Of Surma-Kushiyara River System
Assessment Of Hydro-Morphological Change Of Surma-Kushiyara River SystemAssessment Of Hydro-Morphological Change Of Surma-Kushiyara River System
Assessment Of Hydro-Morphological Change Of Surma-Kushiyara River SystemJose Katab
 
Flood modeling of river godavari using hec ras
Flood modeling of river godavari using hec rasFlood modeling of river godavari using hec ras
Flood modeling of river godavari using hec raseSAT Publishing House
 
NUMERICAL MODELLING OF BRINE DISPERSION IN SHALLOW COASTAL WATERS
NUMERICAL MODELLING OF BRINE DISPERSION IN SHALLOW COASTAL WATERSNUMERICAL MODELLING OF BRINE DISPERSION IN SHALLOW COASTAL WATERS
NUMERICAL MODELLING OF BRINE DISPERSION IN SHALLOW COASTAL WATERSIAEME Publication
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERAnonymouslVQ83F8mC
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERpijans
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERpijans
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERpijans
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERamsjournal1
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERamsjournal
 
Remote sensing and GIS in the morphometric analysis of macro-watersheds for h...
Remote sensing and GIS in the morphometric analysis of macro-watersheds for h...Remote sensing and GIS in the morphometric analysis of macro-watersheds for h...
Remote sensing and GIS in the morphometric analysis of macro-watersheds for h...IRJET Journal
 

Similar to F04633238 (20)

IRJET- Prospects of Inland Water Transportation in the River Drainage System ...
IRJET- Prospects of Inland Water Transportation in the River Drainage System ...IRJET- Prospects of Inland Water Transportation in the River Drainage System ...
IRJET- Prospects of Inland Water Transportation in the River Drainage System ...
 
A review on managed aquifer recharge by check dams a case study near chenna...
A review on managed aquifer recharge by check dams   a case study near chenna...A review on managed aquifer recharge by check dams   a case study near chenna...
A review on managed aquifer recharge by check dams a case study near chenna...
 
A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...A review on managed aquifer recharge by check dams a case study near chennai,...
A review on managed aquifer recharge by check dams a case study near chennai,...
 
G04633950
G04633950G04633950
G04633950
 
Hydrodynamics and Morphological Changes Numerical Model of the Jeneberang Est...
Hydrodynamics and Morphological Changes Numerical Model of the Jeneberang Est...Hydrodynamics and Morphological Changes Numerical Model of the Jeneberang Est...
Hydrodynamics and Morphological Changes Numerical Model of the Jeneberang Est...
 
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
 
Exaple of use of decision support system planning dss (p) kerala state
Exaple of use of decision support system planning dss (p)   kerala stateExaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p) kerala state
 
Sediment control at the source for a bulk water supply scheme in mysore, india
Sediment control at the source for a bulk water supply scheme in mysore, indiaSediment control at the source for a bulk water supply scheme in mysore, india
Sediment control at the source for a bulk water supply scheme in mysore, india
 
Runoff modelling using hec hms for rural watershed
Runoff modelling using hec hms for rural watershedRunoff modelling using hec hms for rural watershed
Runoff modelling using hec hms for rural watershed
 
Coupling of Surface water and Groundwater Models
Coupling of Surface water and Groundwater Models Coupling of Surface water and Groundwater Models
Coupling of Surface water and Groundwater Models
 
Assessment Of Hydro-Morphological Change Of Surma-Kushiyara River System
Assessment Of Hydro-Morphological Change Of Surma-Kushiyara River SystemAssessment Of Hydro-Morphological Change Of Surma-Kushiyara River System
Assessment Of Hydro-Morphological Change Of Surma-Kushiyara River System
 
Flood modeling of river godavari using hec ras
Flood modeling of river godavari using hec rasFlood modeling of river godavari using hec ras
Flood modeling of river godavari using hec ras
 
NUMERICAL MODELLING OF BRINE DISPERSION IN SHALLOW COASTAL WATERS
NUMERICAL MODELLING OF BRINE DISPERSION IN SHALLOW COASTAL WATERSNUMERICAL MODELLING OF BRINE DISPERSION IN SHALLOW COASTAL WATERS
NUMERICAL MODELLING OF BRINE DISPERSION IN SHALLOW COASTAL WATERS
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
 
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFERTHE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
THE APPLICATION OF MATHEMATICAL MODELS IN MANAGEMENT OF AQUIFER
 
Remote sensing and GIS in the morphometric analysis of macro-watersheds for h...
Remote sensing and GIS in the morphometric analysis of macro-watersheds for h...Remote sensing and GIS in the morphometric analysis of macro-watersheds for h...
Remote sensing and GIS in the morphometric analysis of macro-watersheds for h...
 

More from IOSR-JEN

C05921721
C05921721C05921721
C05921721IOSR-JEN
 
B05921016
B05921016B05921016
B05921016IOSR-JEN
 
A05920109
A05920109A05920109
A05920109IOSR-JEN
 
J05915457
J05915457J05915457
J05915457IOSR-JEN
 
I05914153
I05914153I05914153
I05914153IOSR-JEN
 
H05913540
H05913540H05913540
H05913540IOSR-JEN
 
G05913234
G05913234G05913234
G05913234IOSR-JEN
 
F05912731
F05912731F05912731
F05912731IOSR-JEN
 
E05912226
E05912226E05912226
E05912226IOSR-JEN
 
D05911621
D05911621D05911621
D05911621IOSR-JEN
 
C05911315
C05911315C05911315
C05911315IOSR-JEN
 
B05910712
B05910712B05910712
B05910712IOSR-JEN
 
A05910106
A05910106A05910106
A05910106IOSR-JEN
 
B05840510
B05840510B05840510
B05840510IOSR-JEN
 
I05844759
I05844759I05844759
I05844759IOSR-JEN
 
H05844346
H05844346H05844346
H05844346IOSR-JEN
 
G05843942
G05843942G05843942
G05843942IOSR-JEN
 
F05843238
F05843238F05843238
F05843238IOSR-JEN
 
E05842831
E05842831E05842831
E05842831IOSR-JEN
 
D05842227
D05842227D05842227
D05842227IOSR-JEN
 

More from IOSR-JEN (20)

C05921721
C05921721C05921721
C05921721
 
B05921016
B05921016B05921016
B05921016
 
A05920109
A05920109A05920109
A05920109
 
J05915457
J05915457J05915457
J05915457
 
I05914153
I05914153I05914153
I05914153
 
H05913540
H05913540H05913540
H05913540
 
G05913234
G05913234G05913234
G05913234
 
F05912731
F05912731F05912731
F05912731
 
E05912226
E05912226E05912226
E05912226
 
D05911621
D05911621D05911621
D05911621
 
C05911315
C05911315C05911315
C05911315
 
B05910712
B05910712B05910712
B05910712
 
A05910106
A05910106A05910106
A05910106
 
B05840510
B05840510B05840510
B05840510
 
I05844759
I05844759I05844759
I05844759
 
H05844346
H05844346H05844346
H05844346
 
G05843942
G05843942G05843942
G05843942
 
F05843238
F05843238F05843238
F05843238
 
E05842831
E05842831E05842831
E05842831
 
D05842227
D05842227D05842227
D05842227
 

Recently uploaded

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Hyundai Motor Group
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
WhatsApp 9892124323 âś“Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 âś“Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 âś“Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 âś“Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 

Recently uploaded (20)

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
WhatsApp 9892124323 âś“Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 âś“Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 âś“Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 âś“Call Girls In Kalyan ( Mumbai ) secure service
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 

F04633238

  • 1. IOSR Journal of Engineering (IOSRJEN) www.iosrjen.org ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 04, Issue 06 (June. 2014), ||V3|| PP 32-38 International organization of Scientific Research 32 | P a g e Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for Improvement of Navigability Mohammad Ziaur Rahman1* , Shume Akhter 2 , Md. Saiful Islam3 , Zahirul Haque Khan4 1 Junior Specialist, Coast Port and Estuary Management Division, Institute of Water Modelling, Bangladesh 2 Associate Specialist, Coast Port and Estuary Management Division, Institute of Water Modelling, Bangladesh 3 Junior Engineer, Coast Port and Estuary of Water Modelling, Bangladesh mds@iwmbd.org 4 Director, Coast Port and Estuary Management Division, Institute of Water Modelling, Bangladesh Abstract: - The Khaprabhanga Chapalir Don River (Mohipur channel), an important navigation route, is situated in the Upazilla Kalapara under the administrative district of Patuakhali. The sea going engine boats used to take shelter in this river during cyclone. The river has been experiencing siltation over the years. Boat cannot enter from Rabnabad and Andarmanik Channel to the Mohipur channel during the ebb tide. A comprehensive mathematical modelling study has been carried out to assess the capital dredging volume, resiltation rate, maintenance dredging, and dredge spoil locations. In the existing condition the navigation depth in the channel varies from 1.25m to 2.00m in the western stretch and in the eastern it is 0.50 m to 1.25m, which implies 4.00 m dredging is required to improve the navigability of the channel for movement of ships and engine boats. Model result shows that, for option-2 tidal flow/prism in the channel is increased by 21% during high tide compared to existing condition which indicates sustainable deeper channel compared to present condition. Navigable depth 3.60m to 4.60m can be achieved in this option. The capital dredging is about 3.40 million m3 and re-siltation rate is the least compared to the other options. However, the annual maintenance dredging is about 60% of the capital dredging. If high tide followed then maintenance dredging may be required after 6 months. Keywords: - Navigability, Capital and Maintenance Dredging, Dredged Volume, Tidal prism, Siltation. I. INTRODUCTION The Khaprabhanga Chapalir Don River (Mohipur channel), river plays an important role on sea and river borne trade and socio-economic activities. The sea going engine boats used to take shelter in this river during cyclone. The river has been experiencing siltation over the years and navigability of the river has become very poor. Boat cannot enter from Rabnabad and Andarmanik Channel to the Mohipur channel during the ebb tide. The total study area is about 15000 ha. This river is one of the main drainage routes of the Polder 48 and 47. In view of the above a project has been undertaken by Bangladesh Water Development Board to dredge 24.00 km of the Mohipur channel by dredger. The study area is shown in the Fig 1.The main objectives of the feasibility study are: ď‚· Planning and design of effective dredging alignment ď‚· Assessment of capital and maintenance dredging volume ď‚· Selection of suitable location for disposal of dredged spoil. II. METHODOLOGY The overall methodology is to define a base line condition and assessment of hydro-morphological condition with the aid of data and numerical modelling. In this study the existing Bay of Bengal model has been updated with the recently surveyed hydro-morphological data and latest satellite imagery. These available models updated using primary and secondary data. The secondary data collected from various sources. The primary data collected under this study. The updated model has been used for this study. IWM maintains Bay of Bengal Model (BoB) for simulation of hydrodynamic condition, morphology, salinity, wave, storm surge & Tsunami. The updated model domain extends from Chandpur on the Lower Meghna river in the north to about 160 Latitude in the Bay of Bengal in the south. The mathematical modelling tool applied in this study is MIKE 21 FM (Flexible Mesh), a two dimensional modelling system of DHI Water•Environment•Health based on flexible mesh approach. In this study Hydrodynamic Module and Mud Transport Module have been used in simultaneously for hydro-morphological investigation around the study area. The two dimensional (2-D) flexible mesh model (MIKE21 FM) has been applied to produce the existing water depth, water flow, water level and current speed of the river. The Morphological model has been used to predict the existing siltation and erosion pattern in the river.
  • 2. Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for Improvement of Navigability International organization of Scientific Research 33 | P a g e III. ILLUSTRATION 3.1 Hydrodynamic Model In this study the existing Bay of Bengal model has been updated with the recently surveyed hydro- morphological data and latest satellite imagery. The updated model domain extends from Chandpur on the Lower Meghna River in the north to about 160 Latitude in the Bay of Bengal in the south. The coverage of the numerical model is shown in Fig 2. There are two open boundaries in the model, one is in the Lower Meghna River at Chandpur (northern boundary) and another one is in the Bay of Bengal (southern boundary). Predicted tide has been used in the southern boundary and observed water level at Chandpur BIWTA Station has been used in the northern boundary. The riverbank alignment (land boundary) in the northern part of the model has been updated on the basis of the mosaic of IRS P6 LISS III satellite image 2008 provided by EDP. The model applies PWD datum, which is equivalent to 0.46 m SoB. The southern part of the Bay of Bengal is quite deep and the maximum depth along the southern open boundary is more than 3,000 meter. The computational grid or mesh size decreases (or the resolution increases) towards coastlines and Islands. Inter-tidal areas are flooded and dried during a tidal cycle, both in nature and in the model. Model has been upgraded within the Mohipur channel with the recent bathymetric data in 2010. 3.2 Sediment Transport Model The cohesive sediment transport module is coupled to the hydrodynamic module and they run in parallel. The governing equation for sediment transport is solved on the same mesh and applies information on water levels and currents from the hydrodynamic module to calculate the sediment transport. One layer describes the sea bed in the sediment transport model. In the upstream boundary on the Lower Meghna River, suspended sediment concentration time-series has been applied based on past measurements. Zero sediment concentration has been assumed at the south boundary. Initial sediment concentration in the Meghna Estuary is also based on the field measurement and MES measurement. 3.3 Calibration of Model The updated and upgraded two-dimensional hydrodynamic model of the Bay of Bengal has been calibrated against water level, water flow at different locations comparing the model results with field measurement to make the model performance to a satisfactory level. The model results have also been examined with other set of data of different year and location compared to the data used in the calibration to validate the model. The validation has been made only with the available data for a recent year. Locations of water level and flow calibration areas is shown in Fig 3 and some calibration plots of flow and water level have been presented in Fig 4 and Fig 5 respectively. 3.4 Potential Options of Dredging: Based on bathymetric data, tidal characteristics and requirement of navigability of the river Khprabanga four potential options have been considered in the study for capital dredging with the aim to improve the navigability of the river, reduce the drainage congestions and to develop harbor for sea going vessels and boats. The details of the potential options are described in Table 1. 3.5 Effectiveness of Dredging Options: A tidal meeting zone is observed at 15.00km from the western end of the channel, when tide approaches from the east and west and meets at this point. The navigation depth is very low and river condition is shallow and narrow. Efforts have been made to assess the effectiveness of four potential options to select the best suited option for improvement of navigation and drainage conditions. In designing the navigation channel the main elements are the channel alignment, width, depth and the size and shape of manoeuvring spaces. Design channel width is defined as the width measured at the bottom of the side slopes on side of the channel at the design depth. Design section of navigational channel of the Mohipur channel has shown in Fig 6.For 4 meter draft ship and 10m width of the beam the design width of the navigation channel is considered 30m, 60m width for only 5km at the western stretch of the channel for allowing higher draft ship to the fish market. It is assumed that the navigability of the river for ship movement is required for 24 hours operation. In the existing condition the navigation depth in the channel varies from 1.25 m to 2.00 m in the western stretch and in the eastern stretch available navigation depth is 0.50 m to 1.25m, which implies dredging is required to improve the navigability of the channel for movement of ships. Fig 7, Fig 8 and Fig 9, Fig 10 shows the available navigation depth in the existing condition and Option-2 respectively. In the existing condition the navigation depth in the channel varies from 1.25m to 2m in the western stretch of the river and in the eastern stretch available navigation depth is 0.50m to 1.25m, which
  • 3. Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for Improvement of Navigability International organization of Scientific Research 34 | P a g e implies dredging is required to improve the navigability of the channel for movement of ships and engine boats. Simulations of dredging of the channel along the existing alignment for all options have been carried out to find out the increase of navigation depth and re-siltation rate. For option -1 navigation depth is increased from 2.60 to 3.60 m in the channel but required navigable depth (4.00m) is not achieved. Re-siltation rate is higher. Model result shows that the option-1 is not suitable to improve navigability of the river. In case of option-2 model result shows that tidal flow/prism in the channel is increased by 21% during high tide compared to existing condition which indicates sustainable deeper channel compared to present condition. Navigable depth 3.60 to 4.60 m can be achieved in this option. The capital dredging is about 3.40 million m3 and re-siltation rate is the least compared to the other options. However, the annual maintenance dredging is about 60% of the capital dredging. Under Option-2, the required navigation depth of 4.00m is feasible to maintain operation of ship movement round the clock if the river is dredged and maintained after 3 months. The average tidal range of the channel is about 2 m. If high tide followed then maintenance dredging may be required after 6 months. Capital dredging is reduced in Option -3 but required navigable depth is not sustained along the whole channel for 24 hours operation of fish port. Tidal prism is increased about 18 %, which would not able to sustain the deeper channel like option-2 also re-siltation rate is quite high, which is 69% in a year. The required navigation depth is achieved in the Option-4 along the deeper channel of the river except at the tidal meeting zone. Since required navigation depth is not achieved at the tidal meeting zone it would restrict the ship movement in the eastern part of the channel. Table 2 shows the tidal prism, average tidal volume in one tidal cycle, and Table 3 shows the Capital & Annual Maintenance dredging volume and different options. TABLES AND FIGURES Fig 1: Map Showing the Study Area
  • 4. Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for Improvement of Navigability International organization of Scientific Research 35 | P a g e Fig 2: Bathymetry of the Bay of Bengal Model with flexible triangular computational mesh Fig 3: Field measurement locations Fig 4: Water Flow Calibration at Mohipur and Islampur
  • 5. Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for Improvement of Navigability International organization of Scientific Research 36 | P a g e Fig 5: Water level calibration at Kalghara and Peshimmanashtola. Fig 6: Design section of navigational channel of the Mohipur channel Fig 7: Navigation Water Depth for Base Condition Fig 8: Navigation Water Depth for Base Condition
  • 6. Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for Improvement of Navigability International organization of Scientific Research 37 | P a g e Fig 9: Navigation Water Depth for Option-2 Fig 10: Navigation Water Depth for Option-2 Table 1: Description of four different options Table 2: Description of Tidal Prism for Base and four different options Scenario Tidal Prism(Mm3 ) % increase Base 7.17 - Option-1 8.29 15.62 Option-2 8.69 21.20 Option-3 8.44 17.71 Option-4 8.40 17.15 Options Chainage (Mohipur West to East) Dredging Length [km] Dredging Width [m] Dredged River Bed Level [m, PWD] Slope Option-1 0-5 km 5 km 60 -4.0 1:3 5-24 km 19 km 30 -4.0 1:3 Option-2 0-5 km 5 km 60 -5.0 1:3 5-24 km 19 km 30 -5.0 1:3 Option-3 0-5 km 5 km 60 -4.0 1:3 5-24 km 19 km 30 -5.0 1:3 Option-4 0-5 km 5 km 60 -5.0 1:3 5-15 km 10 km 30 -5.0 1:3 15-19 km 4 km 30 -4.0 1:3 19-24 km 5 km 30 -5.0 1:3
  • 7. Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for Improvement of Navigability International organization of Scientific Research 38 | P a g e Table 3: Capital and Annual Maintenance Dredging Volume: Event Capital Dredging(Mm3 ) Backfilling (Mm3 ) % of Backfilling Rate (One Year) Dry Monsoon Annual Maintenance Dredging ( after 6 month) ( after 6 month) Option-1 2.27 0.9 0.76 1.66 73 Option-2 3.4 1.2 0.85 2.05 60 Option-3 2.77 1.1 0.8 1.9 69 Option-4 3.05 1.12 0.81 1.93 63 IV. CONCLUSION The Khaprabhanga Chapalir Don River is an important navigation route in the Patuakhali district and main drainage channel of the polders 47/4 and 48. The sea going engine boats used to take shelter in this river during cyclone. The river has been experiencing huge siltation over the years and navigability of the river has become inadequate for 4m draft vessel. The river plays an important role on river borne trade and socio- economic activities of the area. Siltation caused deterioration of the navigability of the river that leads to declining of trade and socio-economic activities of the area. A comprehensive survey, hydrological and morphological investigations have been carried out to find out the causes of siltation and potential solutions of improvement of the navigability. There is a strong tidal influence in the river. Initially tide enters into Mohipur Channel from the Andar Manik River and flows to the east since tide arrives faster at the western channel compared to the eastern side of the channel. A tidal meeting zone is observed near the eastern zone when tide approaches from the east and west and meets at this point. The navigation depth is very low and river condition is shallow and narrow at this location. Four potentials options have been investigated using state of art mathematical modelling technology under the present study. The whole 24.00 km of the Khaprabhanga Chapalir Don River is suggested to dredge at -5.00 mPWD (Option -2) to improve navigability for enhancing river borne trade, development of harbor, improvement of drainage of the polder 47 and 48 and socio-economic activities. The option-2 is technically feasible, economically viable and environment friendly. V. ACKNOWLEDGEMENTS The authors express their gratitude to Institute of Water Modelling (IWM) and Bangladesh Water Development Board (BWDB) for the support to use their joint study findings in the paper. REFERENCES [1] AIT, Nguten Huong Thuy Phan (1998), “Field Application of 2D Morphological Modelling for Estuarine and Coastal Areas” [2] DHV Consultants BV (2001). Hydro-morphological Dynamics of the Meghna Estuary (MES II) [3] IWM (2010), Updating of Hydrodynamic & Morphological Models to Investigate Land Accretion & Erosion in the Estuary Development Program (EDP) Area. [4] IWM (2009), “Survey and Modelling Study of Sandwip-Urirchar-Noakhali Cross-Dam(s)”, Final Report submitted to Char Development and Settlement Project-III (CDSP-III) by IWM. [5] O’ Brien, M.P. (1969). “Equilibrium Flow Areas of Inlets on Sandy Coast”, Journal of the Water Ways and Harbours, DIV, Proc. ASCE. [6] O’ Conor, B.A., Nicholson, J. (1989), “Modelling Changes in Coastal Morphology”, Proc. A.S.C.E. Int. Symposium on Sediment Transport Modelling, S.Y. Wang (Ed.), pp. 160165. [7] SWMC (2001), “Two-dimensional General Model of the Meghna Estuary”, Second Update Report, submitted to Meghna Estuary Study (MES) by Surface Water Modelling Center. [8] Wallingford (1984), “Mathematical model Studies of Schemes Designed to Improve Depth at the Port”, Port of Chalna Bangladesh, April 1984.