Total Area of the StateTotal Area of the State :: 38,863 Km38,863 Km22
Total No of BasinsTotal No of Basins :: 4444
No. of...
Major BasinMajor Basin BharathapuzhaBharathapuzha
Basin area 6186 KM2
(4400 KM2
in Kerala)
LatitudeLatitude 101000
25’ to ...
Hydrological parameters (including groundwater parameters in accordance
with the latest GEC) in the basin was fine tuned u...
Application 1 – Conjunctive UseApplication 1 – Conjunctive Use
Scenario
User
areas
Total
Demand
(Mm3
/Yr)
SW
Abstractio
n
...
Application II - Artificial RechargeApplication II - Artificial Recharge
Viability AnalysisViability Analysis
A project pr...
Application III - Inter Sub Basin TransferApplication III - Inter Sub Basin Transfer
This application was to study the via...
Application IV – Inter basin transfer withApplication IV – Inter basin transfer with
Hydropower moduleHydropower module
Di...
Application V – Inter Basin transferApplication V – Inter Basin transfer
The application was
envisaged for providing
irrig...
Application VI – Water Quality moduleApplication VI – Water Quality module
 The optimised 2m3
/sec of the present study c...
Application VII – Water Availability ofApplication VII – Water Availability of
Bharathapuzha BasinBharathapuzha Basin
Spec...
Application VIII – Inter sub basin transfer-Application VIII – Inter sub basin transfer-
Silent Valley to Malampuzha reser...
Application IX – Reservoir OperationApplication IX – Reservoir Operation
Simulated data of seven reservoirs in the Study B...
Application X – Irrigation moduleApplication X – Irrigation module
Using Water User & Scripts
Using Irrigation node (attem...
Karamana river basin 513 Km2
Peppara Dam
88.27 Km2
(effective storage 40
Mm3
at FRL 104.5 M)
(design storage 70
Mm3 at FRL...
Water availability study based on
the representative catchment
revealed that the proposal for
supplementing the storage of...
Field investigation is in
progress
Study using DSS tools suggested three possible locations for the storage
reservoirs. Location Kannankuzhy has been selecte...
Submitted to Addl. Chief Secretary to Government (Water Resources), Govt. Of
Kerala. The findings were approved and the pr...
A new ambitious project of modelling all the riverA new ambitious project of modelling all the river
basins in Kerala is u...
Achieved a lotAchieved a lot
But…….But…….
1. License1. License
2. AMC2. AMC
3. Trainings3. Trainings
4. Updation4. Updatio...
Thank YouThank You
Exaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p)   kerala state
Exaple of use of decision support system planning dss (p)   kerala state
Upcoming SlideShare
Loading in …5
×

Exaple of use of decision support system planning dss (p) kerala state

380 views

Published on

Published in: Technology, Business
  • Be the first to comment

  • Be the first to like this

Exaple of use of decision support system planning dss (p) kerala state

  1. 1. Total Area of the StateTotal Area of the State :: 38,863 Km38,863 Km22 Total No of BasinsTotal No of Basins :: 4444 No. of East flowing riversNo. of East flowing rivers :: 33 ArabianSea Tamilnadu State Karnataka State
  2. 2. Major BasinMajor Basin BharathapuzhaBharathapuzha Basin area 6186 KM2 (4400 KM2 in Kerala) LatitudeLatitude 101000 25’ to 1125’ to 1100 15’ N15’ N Longitude 7500 50’ to 7650’ to 7600 55’ E55’ E TributariesTributaries 43 Nos43 Nos
  3. 3. Hydrological parameters (including groundwater parameters in accordance with the latest GEC) in the basin was fine tuned using NAM & Mike Basin
  4. 4. Application 1 – Conjunctive UseApplication 1 – Conjunctive Use Scenario User areas Total Demand (Mm3 /Yr) SW Abstractio n (Mm3 /Yr) GW Abstractio n (Mm3 /Yr) Demand Deficit (Mm3 /Yr) Base Head 19.32 19.33 0 0 Middle 32.34 7.9 6.32 18.2 Tail 20.32 5.97 5.94 8.43 Optimal Head 19.32 9.66 9.66 0 Middle 32.34 23.45 4.89 4 Tail 20.32 9.36 5.46 5.5
  5. 5. Application II - Artificial RechargeApplication II - Artificial Recharge Viability AnalysisViability Analysis A project proposal amounting to 7.5 crores was submitted before the Kerala State Ground Water Authority which in turn has recommended to the Government for the final approval. Total ground water recharge from all the structures – 1.919 MCM/Year
  6. 6. Application III - Inter Sub Basin TransferApplication III - Inter Sub Basin Transfer This application was to study the viability of inter sub basin water transfer during monsoon season to rain shadow regions and there by to augment the ground resource of the area.
  7. 7. Application IV – Inter basin transfer withApplication IV – Inter basin transfer with Hydropower moduleHydropower module Different scenarios were developed on varying tunnel capacities and generated hydropower was compared
  8. 8. Application V – Inter Basin transferApplication V – Inter Basin transfer The application was envisaged for providing irrigation to Kanjikode - Kozhijampara area. The project was conceived 2 decades ago but did not materialize due to submergence of forest area. In the optimum scenario developed, it has been observed that maximum water (164.3Mm3 ) can be transferred to Contour canal from Karapara and Upper Kuriarkuty and getting back a stable flow of 88.6Mm3 in summer months for power and Irrigation with minimum submergence of forest area. Addl. Chief Secretary to Govt., Water Resources is convinced about the new proposal and is in active consideration for the implementation.
  9. 9. Application VI – Water Quality moduleApplication VI – Water Quality module  The optimised 2m3 /sec of the present study can be changed to 1.5, 1.75, 2.25, 2.5 etc based on the priorities  Integrated operation of the reservoirs in the future will help in maintaining the environmental flow.  A discharge of 2m3 /sec in the upstream will considerably reduce the BOD values at Kuttippuram.
  10. 10. Application VII – Water Availability ofApplication VII – Water Availability of Bharathapuzha BasinBharathapuzha Basin Specific runoff in the basinRain fall distribution Sub Basin Wise Specific run off
  11. 11. Application VIII – Inter sub basin transfer-Application VIII – Inter sub basin transfer- Silent Valley to Malampuzha reservoirSilent Valley to Malampuzha reservoir Preliminary runs have been made and the results are encouraging.
  12. 12. Application IX – Reservoir OperationApplication IX – Reservoir Operation Simulated data of seven reservoirs in the Study Basin was integrated using DSS (P) Software. Inflow (including dependability), Water level, Demands etc. can be viewed and exported to MS Excel. This will help Officers involved in Water Resources planning to take decisions on Water allocation.
  13. 13. Application X – Irrigation moduleApplication X – Irrigation module Using Water User & Scripts Using Irrigation node (attempt)
  14. 14. Karamana river basin 513 Km2 Peppara Dam 88.27 Km2 (effective storage 40 Mm3 at FRL 104.5 M) (design storage 70 Mm3 at FRL 110.5 M) Aruvikkara Dam 165.43 Km2 Four scenarios were preparedFour scenarios were prepared  No release from Peppara  FRL increased to 110.5m  Water released from Peppara only when water level in Aruvikkara is below 43m Release as per Reservoir Operation rule from Peppara for power generation. Using the DSS tools we could evolve reservoir operation rules to efficiently manage the available water in a better way. And even during the 2013 drought Peppara did not go dry and water supply to Trivandrum city was not affected.
  15. 15. Water availability study based on the representative catchment revealed that the proposal for supplementing the storage of Pattisserry dam is a viable option. DSS Team could present our viability study to the Addl Chief Secretary to Govt, who gave Sanction to the project. This project has been included in the State plan budget for the financial year 2013-14. Design work and soil exploration work is in progress.
  16. 16. Field investigation is in progress
  17. 17. Study using DSS tools suggested three possible locations for the storage reservoirs. Location Kannankuzhy has been selected for the purpose.
  18. 18. Submitted to Addl. Chief Secretary to Government (Water Resources), Govt. Of Kerala. The findings were approved and the project proposal was dropped. Submitted to Addl. Chief Secretary to Government (Water Resources), Govt. Of Kerala. The project is under consideration.
  19. 19. A new ambitious project of modelling all the riverA new ambitious project of modelling all the river basins in Kerala is under way and is in progress.basins in Kerala is under way and is in progress. Initially 20 basins have been selected forInitially 20 basins have been selected for modelling using the DSS tools and work has beenmodelling using the DSS tools and work has been started.started. Six groups headed by a DSS Team member wasSix groups headed by a DSS Team member was formed and the work is in progress.formed and the work is in progress.
  20. 20. Achieved a lotAchieved a lot But…….But……. 1. License1. License 2. AMC2. AMC 3. Trainings3. Trainings 4. Updation4. Updation 5. Support5. Support
  21. 21. Thank YouThank You

×