AKPO DEBOTTLENECKING PROJECT
PROCESS DISCIPLINE PROGRESS REVIEWS 02
PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 2
CONTENT
• MAIN FINDINGS
• P&ID’s MARK-UPS
• SEPARATOR “B” RATING
• CONCLUSIONS
PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 3
Main Findings
• The Separator B, oily water level control valve LDV31160B shall be increased
in the port size diameter flow capacity from CV=56 to a New valve CV= 150, in
order to cover the de-rating pressure to 22.5 Barg.
• A new set point was provided to be 32 barg for the PSV’s of separator B, New
Datasheet has been calculated (IFR) and the results are pointing out a change
in the following items:
3 New PSV’s (1,2,3) Type according API526 is: 8T10
Inlet pipeline reducer: 12”x8”
Outlet full bore block valve: 10”
Outlet pipeline expander 20”x10”
PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 4
Main Findings
• The Separator B, Pressure Control valve gas to Flare header PV31111B shall
be increased in the port size diameter flow capacity from CV=260 to a New
valve CV= 900, in order to cover the de-rating pressure to 22.5 Barg.
• The Separator B, Oil level control valve LV31105B and the Flow control valve
FV31113B do not need a change/replacement for the de-rating pressure to
22.5 Barg.
• Separator B capacity Datasheet (IFR) shows the separator capacity suitable
for the de-rating pressure to 22.5 barg.
PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 16.01.15 5
P&ID’s Mark-Ups
PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 6
P&ID’s Mark-Ups
PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 7
Separator B de-rating
1
2 Hydrocarbon Gas and Liquid
3 N/A
4 m³ N/A
5 barg Note 6
6 barg 93/FV
7 ºC 51
8 ºC 93 / -20
9 ENGINEERING DATA DESIGN
10 Inside diameter mm 4408 NOTE 1 & NOTE 2
11 Height tan/tan mm 15816.304.1 APPLIED SEE
12 Elevation mm CALC. SHEET
13 Corrosion allowance mm
14 Insulation mm
15 Personal Protection
16 PROCESS CASE Note 1
17 RATING
18 Operating Pressure barg 22.5 22.5
19 Hydrocarbon Liquid
20 Flow Rate kg/hr kg/hr(bbopd) 361790 (69127) bbopd 74996
21 Density at T & P kg / m3
779.3
22 Viscosity cP 0.8045
23 Surface Tension dyn / cm 18.78
24 API 47.42
25 Gas / Vapour
26 Flow Rate kg / hr (MMscfd) kg/hr(MMscfd) 195796(261.3) MMscfd 627
27 Molecular Weight 15.04
28 Density at T & P kg / m3
13.96
29 Viscosity cP 0.0103
30 Water
31 Flow Rate kg/hr kg/hr(bbwpd) 100775(15243) bbwpd 15666
32 Specific Gravity @ 15.6 °C N/A
33 Density at T & P kg / m3
988.2
34 Viscosity cP 0.5353
35 Notes 1, 2, 3, 4 and 7
167000.00
N/A
1005
0.36
76
237000 (227.7)
20.85
66.67
0.015
79
53600.00
681.0
1.10
-
Design temperature
4,400
15,800
DESIGN
55850.0
3
YES
N/A
MAX IMUM CAPACITY
Max. spec. Gravity @ 15.6 °C
Operating volume
Operating pressure 22.5
Design pressure
Operating temperature
DESIGN DATA
Contents
PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 8
CONCLUSIONS
• Separator B capacity check DATASHEET (IFR) at 22.5 barg, shows no
limitation for a maximum of 4 lines from loops 10, 20 and 30, reservoir A.
• PSV 1,2,3 on Separator B, have been designed to protect the vessel for a
block outlet scenario with Set Point=93 barg. The request change in Set
Point to 32 barg, needs the following equipment list to change/replace :
• 3 New PSV’s (1,2,3) Type according API526 is: 8T10.
• Inlet pipeline reducer: 12”x8”
• Outlet full bore block valve: 10”
• Outlet pipeline expander 20”x10”
PROJECT STATUS 07-02-2015
DW TS - ECP – AKPO debottlenecking– 07.02.15 9
CONCLUSION CONT…
• The Separator B, PV31111B and LDV31160B shall be increased in the port
size diameter flow to cover the de-rating pressure at 22.5 Barg.
• The Separator B, LV31105B and FV31113B do not need a
change/replacement for the de-rating pressure at 22.5 Barg.

More Related Content

What's hot

BDC VUB # 150 TTRC modified oct 26_KDK
BDC VUB # 150 TTRC modified oct 26_KDKBDC VUB # 150 TTRC modified oct 26_KDK
BDC VUB # 150 TTRC modified oct 26_KDKKevin Kelley
 
CV_Myster slickline supervisor
CV_Myster slickline supervisorCV_Myster slickline supervisor
CV_Myster slickline supervisorMyster BOUBANGA
 
3- uni cec-contenido de humedad_jc
 3- uni cec-contenido de humedad_jc 3- uni cec-contenido de humedad_jc
3- uni cec-contenido de humedad_jcSEICAN SAC
 
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing Workover
SELA Region Q4-2013 Thru-tubing Recompletion  and Thru-tubing WorkoverSELA Region Q4-2013 Thru-tubing Recompletion  and Thru-tubing Workover
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing WorkoverKevin Kelley
 
Heatpulse 8108 rapid thermal processor
Heatpulse 8108 rapid thermal processorHeatpulse 8108 rapid thermal processor
Heatpulse 8108 rapid thermal processorEmily Tan
 
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...Neil Woodward
 
Material Balance Equation Presentation
Material Balance Equation PresentationMaterial Balance Equation Presentation
Material Balance Equation PresentationMohamed Yassin
 
Technology development in Statoil
Technology development in Statoil Technology development in Statoil
Technology development in Statoil Statoil
 
20 preliminary fy17 dry run tests boukhalfa la-ur-17-24114
20 preliminary fy17 dry run tests boukhalfa la-ur-17-2411420 preliminary fy17 dry run tests boukhalfa la-ur-17-24114
20 preliminary fy17 dry run tests boukhalfa la-ur-17-24114leann_mays
 
CCM Mega Presentation
CCM Mega PresentationCCM Mega Presentation
CCM Mega Presentationstevesabo
 
Why do I Need SURFsara Cloud Facility in My Research?
Why do I Need SURFsara Cloud Facility in My Research?Why do I Need SURFsara Cloud Facility in My Research?
Why do I Need SURFsara Cloud Facility in My Research?Ali Abbasi
 
Subsea Hyperbaric Welding for Pipeline Repair
Subsea Hyperbaric Welding for Pipeline RepairSubsea Hyperbaric Welding for Pipeline Repair
Subsea Hyperbaric Welding for Pipeline RepairNeil Woodward
 

What's hot (14)

BDC VUB # 150 TTRC modified oct 26_KDK
BDC VUB # 150 TTRC modified oct 26_KDKBDC VUB # 150 TTRC modified oct 26_KDK
BDC VUB # 150 TTRC modified oct 26_KDK
 
CV_Myster slickline supervisor
CV_Myster slickline supervisorCV_Myster slickline supervisor
CV_Myster slickline supervisor
 
3- uni cec-contenido de humedad_jc
 3- uni cec-contenido de humedad_jc 3- uni cec-contenido de humedad_jc
3- uni cec-contenido de humedad_jc
 
Presentation
PresentationPresentation
Presentation
 
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing Workover
SELA Region Q4-2013 Thru-tubing Recompletion  and Thru-tubing WorkoverSELA Region Q4-2013 Thru-tubing Recompletion  and Thru-tubing Workover
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing Workover
 
Heatpulse 8108 rapid thermal processor
Heatpulse 8108 rapid thermal processorHeatpulse 8108 rapid thermal processor
Heatpulse 8108 rapid thermal processor
 
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
 
Material Balance Equation Presentation
Material Balance Equation PresentationMaterial Balance Equation Presentation
Material Balance Equation Presentation
 
Technology development in Statoil
Technology development in Statoil Technology development in Statoil
Technology development in Statoil
 
20 preliminary fy17 dry run tests boukhalfa la-ur-17-24114
20 preliminary fy17 dry run tests boukhalfa la-ur-17-2411420 preliminary fy17 dry run tests boukhalfa la-ur-17-24114
20 preliminary fy17 dry run tests boukhalfa la-ur-17-24114
 
CCM Mega Presentation
CCM Mega PresentationCCM Mega Presentation
CCM Mega Presentation
 
GT-SSR
GT-SSRGT-SSR
GT-SSR
 
Why do I Need SURFsara Cloud Facility in My Research?
Why do I Need SURFsara Cloud Facility in My Research?Why do I Need SURFsara Cloud Facility in My Research?
Why do I Need SURFsara Cloud Facility in My Research?
 
Subsea Hyperbaric Welding for Pipeline Repair
Subsea Hyperbaric Welding for Pipeline RepairSubsea Hyperbaric Welding for Pipeline Repair
Subsea Hyperbaric Welding for Pipeline Repair
 

Similar to AKPO PROCESS PROGRESS linkedin

Original N-Channel Mosfet IRFZ14PBF TO-220 New Vishay Semiconductors
Original N-Channel Mosfet IRFZ14PBF TO-220 New Vishay SemiconductorsOriginal N-Channel Mosfet IRFZ14PBF TO-220 New Vishay Semiconductors
Original N-Channel Mosfet IRFZ14PBF TO-220 New Vishay SemiconductorsAUTHELECTRONIC
 
SPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic SimulationSPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic SimulationSaleh Lari Mojarrad
 
Original N-Chanel Mosfet IRFBC30 IRFBC 600v 3.6A TO-220 New STMicroelectronics
Original N-Chanel Mosfet IRFBC30 IRFBC 600v 3.6A TO-220 New STMicroelectronicsOriginal N-Chanel Mosfet IRFBC30 IRFBC 600v 3.6A TO-220 New STMicroelectronics
Original N-Chanel Mosfet IRFBC30 IRFBC 600v 3.6A TO-220 New STMicroelectronicsAUTHELECTRONIC
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPChris Galeotti
 
Original Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay Siliconix
Original Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay SiliconixOriginal Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay Siliconix
Original Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay SiliconixAUTHELECTRONIC
 
Giuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendioGiuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendioGiulianoBozzo98
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTManohar Tatwawadi
 
Genie GTH 55-19 Telehandler Service Repair Manual.pdf
Genie GTH 55-19 Telehandler Service Repair Manual.pdfGenie GTH 55-19 Telehandler Service Repair Manual.pdf
Genie GTH 55-19 Telehandler Service Repair Manual.pdf8fuusejkdkdmm3e
 
Genie GTH 55-19 Telehandler Service Repair Manual.pdf
Genie GTH 55-19 Telehandler Service Repair Manual.pdfGenie GTH 55-19 Telehandler Service Repair Manual.pdf
Genie GTH 55-19 Telehandler Service Repair Manual.pdffyhsejkdm8u
 
Msv f2 dn15-400
Msv f2 dn15-400Msv f2 dn15-400
Msv f2 dn15-400logenatech
 
0102070018-21+24.PDF
0102070018-21+24.PDF0102070018-21+24.PDF
0102070018-21+24.PDFJamie Emmart
 
Compact Differential Pressure Transmitters: Series 668B/D
Compact Differential Pressure Transmitters: Series 668B/DCompact Differential Pressure Transmitters: Series 668B/D
Compact Differential Pressure Transmitters: Series 668B/DDwyer Instruments
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS STedyChriswanda1
 
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...exergyorc
 

Similar to AKPO PROCESS PROGRESS linkedin (20)

Original N-Channel Mosfet IRFZ14PBF TO-220 New Vishay Semiconductors
Original N-Channel Mosfet IRFZ14PBF TO-220 New Vishay SemiconductorsOriginal N-Channel Mosfet IRFZ14PBF TO-220 New Vishay Semiconductors
Original N-Channel Mosfet IRFZ14PBF TO-220 New Vishay Semiconductors
 
SPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic SimulationSPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic Simulation
 
Original N-Chanel Mosfet IRFBC30 IRFBC 600v 3.6A TO-220 New STMicroelectronics
Original N-Chanel Mosfet IRFBC30 IRFBC 600v 3.6A TO-220 New STMicroelectronicsOriginal N-Chanel Mosfet IRFBC30 IRFBC 600v 3.6A TO-220 New STMicroelectronics
Original N-Chanel Mosfet IRFBC30 IRFBC 600v 3.6A TO-220 New STMicroelectronics
 
Pipeline b
Pipeline bPipeline b
Pipeline b
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEP
 
Original Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay Siliconix
Original Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay SiliconixOriginal Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay Siliconix
Original Power MOSFET IRFBF30 IRFBF30PBF 900V 3.6A New Vishay Siliconix
 
Yokogawa Variable Area Flowmeter
Yokogawa Variable Area FlowmeterYokogawa Variable Area Flowmeter
Yokogawa Variable Area Flowmeter
 
Giuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendioGiuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendio
 
Mosfet irfz44
Mosfet irfz44Mosfet irfz44
Mosfet irfz44
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
 
Genie GTH 55-19 Telehandler Service Repair Manual.pdf
Genie GTH 55-19 Telehandler Service Repair Manual.pdfGenie GTH 55-19 Telehandler Service Repair Manual.pdf
Genie GTH 55-19 Telehandler Service Repair Manual.pdf
 
Genie GTH 55-19 Telehandler Service Repair Manual.pdf
Genie GTH 55-19 Telehandler Service Repair Manual.pdfGenie GTH 55-19 Telehandler Service Repair Manual.pdf
Genie GTH 55-19 Telehandler Service Repair Manual.pdf
 
Plumbing Design
Plumbing DesignPlumbing Design
Plumbing Design
 
Msv f2 dn15-400
Msv f2 dn15-400Msv f2 dn15-400
Msv f2 dn15-400
 
0102070018-21+24.PDF
0102070018-21+24.PDF0102070018-21+24.PDF
0102070018-21+24.PDF
 
Compact Differential Pressure Transmitters: Series 668B/D
Compact Differential Pressure Transmitters: Series 668B/DCompact Differential Pressure Transmitters: Series 668B/D
Compact Differential Pressure Transmitters: Series 668B/D
 
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S4DES-7; R404A; t0 -5; tc 45.pdf for CS S
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
 
Olga Software
Olga SoftwareOlga Software
Olga Software
 
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
 

More from Heli Diaz MSCHE BSE PSM HSE (9)

Experience_Sheet_HeliDiaz
Experience_Sheet_HeliDiazExperience_Sheet_HeliDiaz
Experience_Sheet_HeliDiaz
 
NigeriaExeAward2015
NigeriaExeAward2015NigeriaExeAward2015
NigeriaExeAward2015
 
Total reference signed
Total reference signedTotal reference signed
Total reference signed
 
refletterSenior3.PDF
refletterSenior3.PDFrefletterSenior3.PDF
refletterSenior3.PDF
 
Carta Referencia Heli Diaz NTC
Carta Referencia Heli Diaz NTCCarta Referencia Heli Diaz NTC
Carta Referencia Heli Diaz NTC
 
PAI recommendation080515
PAI recommendation080515PAI recommendation080515
PAI recommendation080515
 
heliAmazonworkletterNigeria
heliAmazonworkletterNigeriaheliAmazonworkletterNigeria
heliAmazonworkletterNigeria
 
PAI recommendation080515
PAI recommendation080515PAI recommendation080515
PAI recommendation080515
 
certificates.PDF
certificates.PDFcertificates.PDF
certificates.PDF
 

AKPO PROCESS PROGRESS linkedin

  • 1. AKPO DEBOTTLENECKING PROJECT PROCESS DISCIPLINE PROGRESS REVIEWS 02
  • 2. PROJECT STATUS 07-02-2015 DW TS - ECP – AKPO debottlenecking– 07.02.15 2 CONTENT • MAIN FINDINGS • P&ID’s MARK-UPS • SEPARATOR “B” RATING • CONCLUSIONS
  • 3. PROJECT STATUS 07-02-2015 DW TS - ECP – AKPO debottlenecking– 07.02.15 3 Main Findings • The Separator B, oily water level control valve LDV31160B shall be increased in the port size diameter flow capacity from CV=56 to a New valve CV= 150, in order to cover the de-rating pressure to 22.5 Barg. • A new set point was provided to be 32 barg for the PSV’s of separator B, New Datasheet has been calculated (IFR) and the results are pointing out a change in the following items: 3 New PSV’s (1,2,3) Type according API526 is: 8T10 Inlet pipeline reducer: 12”x8” Outlet full bore block valve: 10” Outlet pipeline expander 20”x10”
  • 4. PROJECT STATUS 07-02-2015 DW TS - ECP – AKPO debottlenecking– 07.02.15 4 Main Findings • The Separator B, Pressure Control valve gas to Flare header PV31111B shall be increased in the port size diameter flow capacity from CV=260 to a New valve CV= 900, in order to cover the de-rating pressure to 22.5 Barg. • The Separator B, Oil level control valve LV31105B and the Flow control valve FV31113B do not need a change/replacement for the de-rating pressure to 22.5 Barg. • Separator B capacity Datasheet (IFR) shows the separator capacity suitable for the de-rating pressure to 22.5 barg.
  • 5. PROJECT STATUS 07-02-2015 DW TS - ECP – AKPO debottlenecking– 16.01.15 5 P&ID’s Mark-Ups
  • 6. PROJECT STATUS 07-02-2015 DW TS - ECP – AKPO debottlenecking– 07.02.15 6 P&ID’s Mark-Ups
  • 7. PROJECT STATUS 07-02-2015 DW TS - ECP – AKPO debottlenecking– 07.02.15 7 Separator B de-rating 1 2 Hydrocarbon Gas and Liquid 3 N/A 4 m³ N/A 5 barg Note 6 6 barg 93/FV 7 ºC 51 8 ºC 93 / -20 9 ENGINEERING DATA DESIGN 10 Inside diameter mm 4408 NOTE 1 & NOTE 2 11 Height tan/tan mm 15816.304.1 APPLIED SEE 12 Elevation mm CALC. SHEET 13 Corrosion allowance mm 14 Insulation mm 15 Personal Protection 16 PROCESS CASE Note 1 17 RATING 18 Operating Pressure barg 22.5 22.5 19 Hydrocarbon Liquid 20 Flow Rate kg/hr kg/hr(bbopd) 361790 (69127) bbopd 74996 21 Density at T & P kg / m3 779.3 22 Viscosity cP 0.8045 23 Surface Tension dyn / cm 18.78 24 API 47.42 25 Gas / Vapour 26 Flow Rate kg / hr (MMscfd) kg/hr(MMscfd) 195796(261.3) MMscfd 627 27 Molecular Weight 15.04 28 Density at T & P kg / m3 13.96 29 Viscosity cP 0.0103 30 Water 31 Flow Rate kg/hr kg/hr(bbwpd) 100775(15243) bbwpd 15666 32 Specific Gravity @ 15.6 °C N/A 33 Density at T & P kg / m3 988.2 34 Viscosity cP 0.5353 35 Notes 1, 2, 3, 4 and 7 167000.00 N/A 1005 0.36 76 237000 (227.7) 20.85 66.67 0.015 79 53600.00 681.0 1.10 - Design temperature 4,400 15,800 DESIGN 55850.0 3 YES N/A MAX IMUM CAPACITY Max. spec. Gravity @ 15.6 °C Operating volume Operating pressure 22.5 Design pressure Operating temperature DESIGN DATA Contents
  • 8. PROJECT STATUS 07-02-2015 DW TS - ECP – AKPO debottlenecking– 07.02.15 8 CONCLUSIONS • Separator B capacity check DATASHEET (IFR) at 22.5 barg, shows no limitation for a maximum of 4 lines from loops 10, 20 and 30, reservoir A. • PSV 1,2,3 on Separator B, have been designed to protect the vessel for a block outlet scenario with Set Point=93 barg. The request change in Set Point to 32 barg, needs the following equipment list to change/replace : • 3 New PSV’s (1,2,3) Type according API526 is: 8T10. • Inlet pipeline reducer: 12”x8” • Outlet full bore block valve: 10” • Outlet pipeline expander 20”x10”
  • 9. PROJECT STATUS 07-02-2015 DW TS - ECP – AKPO debottlenecking– 07.02.15 9 CONCLUSION CONT… • The Separator B, PV31111B and LDV31160B shall be increased in the port size diameter flow to cover the de-rating pressure at 22.5 Barg. • The Separator B, LV31105B and FV31113B do not need a change/replacement for the de-rating pressure at 22.5 Barg.