1One roof – all solutions. Gunnar Godawa – 18/03/2014
Introduction to 4D and 5D Modeling
Gunnar Godawa – Senior Project Manager IPMA-D
2One roof – all solutions. Gunnar Godawa – 18/03/2014
Introduction to 4D and 5D Modeling
Agenda
1. Introduction to BIM
2. Fundamentals and Benefits of 4D and 5D
3. Selection of Project experiences
3One roof – all solutions. Gunnar Godawa – 18/03/2014
Selection of our Middle East Projects
• Lusail City Project, Doha, Qatar
• Nile Corniche Project, Cairo, Egypt
• Barwa Commercial Avenue, Doha, Qatar
• National Museum of Qatar, Doha, Qatar
• Al Wakra Stadium, Doha Qatar
• Metro – Green Line, Doha, Qatar
• Metro – Red Line, Doha, Qatar
• Doha Expressways Group 5, Qatar
4One roof – all solutions. Gunnar Godawa – 18/03/2014
HOCHTIEF ViCon
An international Team
• Three offices in different markets
• Services offered world-wide
• Strong cultural competence in
focused markets
• Supported more than 350 projects
• Network of experienced suppliers
5One roof – all solutions. Gunnar Godawa – 18/03/2014
Data security and user management
Certified hardware and software
Data formats and structure
Data versioning
Internet
Collaboration and communication
Knowledge and experience
Roles and responsibilities
Trust and commitment
Culture
Building standards
Risks and insurance
Ownership of deliverables
Project guidelines and contracts
Quantity take-off
Cost estimation
Change management
Operation and maintenance
Design creation and coordination
Scheduling and progress monitoring
1. Introduction to BIM
The Five Components
© HOCHTIEF ViCon
6One roof – all solutions. Gunnar Godawa – 18/03/2014
Creating 3D models,
adding information to them,
and using for many purposes.
1. Introduction to BIM
What is BIM?
7One roof – all solutions. Gunnar Godawa – 18/03/2014
1. Introduction to BIM
Extension of 3D Models
Other information
Specifications
Costs
Time
Space utilization
+
3D CAD
8One roof – all solutions. Gunnar Godawa – 18/03/2014
1. Introduction to BIM
Added Information to a 3D Model
information associated with building element
+ = BIM
9One roof – all solutions. Gunnar Godawa – 18/03/2014
Life-Cycle Development of 3D models
PhaseModelType
Concept Conceptual Design
Tender & Construction
Documents
Construction Operation
3D Marketing
Model
3D Design
Model
3D Construction
Model
3D Asset
Model
3D Schematic
Model
3D Quantity
Model
© HOCHTIEF ViCon
10One roof – all solutions. Gunnar Godawa – 18/03/2014
2. Fundamentals and Benefits of 4D and 5D
Information provided by a 4D and 5D model
A 4D/ 5D Model gives comprehensive answers to the above questions
Where? What?When? How much?
How many?
11One roof – all solutions. Gunnar Godawa – 18/03/2014
2. Fundamentals and Benefits of 4D and 5D
Importance of common model and data breakdown
Slab A
Slab B
Columns
Slab Concrete 10 m³
Columns C 40 5 m³
Columns C 50 5 m³
Material??
Joint??
12One roof – all solutions. Gunnar Godawa – 18/03/2014
2. Fundamentals and Benefits of 4D and 5D
System architecture of 4D and 5D data development (Creation Process)
ProjectBIMExpert
Linking Process
On-site Usage (3D Model + Numerical Data)
Construction
Program
Model-based
BOQ Quantities
4D Database
3D Model
© HOCHTIEF ViCon
13One roof – all solutions. Gunnar Godawa – 18/03/2014
Scheduler
Draftsman
Qto specialist
Client/Management
Estimator
global
projectdata
base
Objectives
Ensure quality and save time
and costs through:
• Improved data
interoperability
• Traceable change process
• Geometry combined with
other data
O&M
Procurement
Project
database
Contractor
2. Fundamentals and Benefits of 4D and 5D
Single source access 4D and 5D data
© HOCHTIEF ViCon
14One roof – all solutions. Gunnar Godawa – 18/03/2014
Slab
Columns
2. Fundamentals and Benefits of 4D and 5D
Linking 3D model with time schedule activities
50%
100%
50%
100%
15One roof – all solutions. Gunnar Godawa – 18/03/2014
Quantities available
• Direct from 3D model to
BoQ, e.g. plaster,
concrete, pipes
• Indirect from 3D model
to BoQ, e.g. rebar from
concrete volume
• Indirect with manual
input using 3D model,
e.g. FF&E in rooms
2. Fundamentals and Benefits of 4D and 5D
How can Quantities be derived from 3D
16One roof – all solutions. Gunnar Godawa – 18/03/2014
2D Concept Design
3D Model Model-based Quantities
Construction Schedule
4D / 5D Model
Design
Schedule
Quantities
2. Fundamentals and Benefits of 4D and 5D
Process to create 4D / 5D Models
© HOCHTIEF ViCon
17One roof – all solutions. Gunnar Godawa – 18/03/2014
2. Fundamentals and Benefits of 4D and 5D
5D Software features and requirements
• Common exchange format with 3D authoring SW
• How is the model imported to the SW (export from
3D, API connection, plugin)
• Where are basic quantities derived from (native
model, external calculation)
• What Standards / Rules of Measurement have to
be supported
• How much information (attributes) is required from
the 3D model
• How is the update process
18One roof – all solutions. Gunnar Godawa – 18/03/2014
• Integration of Design, Planning and Scope definition
• Holistic overview and consistent break down of
entire project information
• Better re-usage of information through project life-
cycle
• Integrated quantities, schedule and cost information
add value to project reporting
• Impact from changes can be better evaluated
• Quantities can identified in the 3D model (traceable)
• Visual representation supports understanding of
sequencing
2. Fundamentals and Benefits of 4D and 5D
Benefits for 4D and 5D
19One roof – all solutions. Gunnar Godawa – 18/03/2014
3. Selection of Project Experiences
20One roof – all solutions. Gunnar Godawa – 18/03/2014
Presenter
Gunnar Godawa
Senior Project Manager
www.hochtief-vicon.de
One step ahead.
Build digitally first.
Building Information Modeling (BIM)

More Related Content

What's hot

What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?Chun Keung Ng
 
Building information modelling
Building information modellingBuilding information modelling
Building information modellingKiran Birdi
 
2D to 3D modeling and why you need BIM
2D to 3D modeling and why you need BIM2D to 3D modeling and why you need BIM
2D to 3D modeling and why you need BIMMECandPMV
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentationryanabarton
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for constructionCesare Caoduro
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)Franco Bontempi Org Didattica
 
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012HOCHTIEF ViCon
 
Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS GIM_nv
 
Digital construction for integrated project delivery
Digital construction for integrated project deliveryDigital construction for integrated project delivery
Digital construction for integrated project deliveryStephen Au
 
Brochure BIM
Brochure BIM Brochure BIM
Brochure BIM UTHM
 

What's hot (20)

What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
Building information modelling
Building information modellingBuilding information modelling
Building information modelling
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM
BIMBIM
BIM
 
2D to 3D modeling and why you need BIM
2D to 3D modeling and why you need BIM2D to 3D modeling and why you need BIM
2D to 3D modeling and why you need BIM
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)
 
Bim overview
Bim overviewBim overview
Bim overview
 
A gentle introduction to BIM
A gentle introduction to BIMA gentle introduction to BIM
A gentle introduction to BIM
 
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
CIOB in Doha, Qatar - ViCon BIM Introduction | 23rd October 2012
 
Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS
 
APM London branch BIM Breakfast: Introduction to BIM
APM London branch BIM Breakfast: Introduction to BIM APM London branch BIM Breakfast: Introduction to BIM
APM London branch BIM Breakfast: Introduction to BIM
 
Synergis University 2014-BIM for Construction
Synergis University 2014-BIM for ConstructionSynergis University 2014-BIM for Construction
Synergis University 2014-BIM for Construction
 
Digital construction for integrated project delivery
Digital construction for integrated project deliveryDigital construction for integrated project delivery
Digital construction for integrated project delivery
 
Bim
BimBim
Bim
 
BIM & Sustainability
BIM & SustainabilityBIM & Sustainability
BIM & Sustainability
 
Brochure BIM
Brochure BIM Brochure BIM
Brochure BIM
 

Viewers also liked

Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMBe2camp Admin
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!bimservicesindia1
 
5D Must Be Better Than 4D
5D Must Be Better Than 4D5D Must Be Better Than 4D
5D Must Be Better Than 4DTaiheon Choi
 
Building Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to CompletionBuilding Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to CompletionHitech CADD Services
 
싱크로 4D BIM 서비스
싱크로 4D BIM 서비스싱크로 4D BIM 서비스
싱크로 4D BIM 서비스Taiheon Choi
 
3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction3 d and 4d modeling for design and construction
3 d and 4d modeling for design and constructionAnkit Singhai
 
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modelingAdvantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modelingbimservicesindia1
 
BIM specification and the supply chain
BIM specification and the supply chainBIM specification and the supply chain
BIM specification and the supply chainThe NBS
 
Elecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB GuildfordElecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB GuildfordBen Taunt
 
PPM5D - The BIM Integrated Project Delivery Specialists
PPM5D -  The  BIM Integrated Project Delivery SpecialistsPPM5D -  The  BIM Integrated Project Delivery Specialists
PPM5D - The BIM Integrated Project Delivery Specialistsinistioge
 
Arrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominativeArrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominativeSociété Tripalio
 
BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...
BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...
BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...BimSrv
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)Sara Teymoor
 
Intergraph Insight Article - Virtual Construction - The Next Step
Intergraph Insight Article - Virtual Construction - The Next StepIntergraph Insight Article - Virtual Construction - The Next Step
Intergraph Insight Article - Virtual Construction - The Next StepJill Clelland
 
BIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksBIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksLe Zhang
 
4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. project4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. projectDat Lien
 
4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case StudyBIM User Day
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 waleed hamdy
 
01. 한국의 조선해양산업 (조상래 교수)
01. 한국의 조선해양산업 (조상래 교수)01. 한국의 조선해양산업 (조상래 교수)
01. 한국의 조선해양산업 (조상래 교수)University of Ulsan
 

Viewers also liked (20)

Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIM
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
 
5D Must Be Better Than 4D
5D Must Be Better Than 4D5D Must Be Better Than 4D
5D Must Be Better Than 4D
 
Building Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to CompletionBuilding Information Modeling - From Concept to Completion
Building Information Modeling - From Concept to Completion
 
싱크로 4D BIM 서비스
싱크로 4D BIM 서비스싱크로 4D BIM 서비스
싱크로 4D BIM 서비스
 
BIM 4D Services
BIM 4D ServicesBIM 4D Services
BIM 4D Services
 
3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction
 
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modelingAdvantages offered by 3D, 4D, 5D and 6D BIM modeling
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
 
BIM specification and the supply chain
BIM specification and the supply chainBIM specification and the supply chain
BIM specification and the supply chain
 
Elecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB GuildfordElecosoft 4D BIM for CIOB Guildford
Elecosoft 4D BIM for CIOB Guildford
 
PPM5D - The BIM Integrated Project Delivery Specialists
PPM5D -  The  BIM Integrated Project Delivery SpecialistsPPM5D -  The  BIM Integrated Project Delivery Specialists
PPM5D - The BIM Integrated Project Delivery Specialists
 
Arrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominativeArrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominative
 
BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...
BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...
BIM (Building Information Modeling) Outsourcing Services | Revit Modeling Ser...
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)
 
Intergraph Insight Article - Virtual Construction - The Next Step
Intergraph Insight Article - Virtual Construction - The Next StepIntergraph Insight Article - Virtual Construction - The Next Step
Intergraph Insight Article - Virtual Construction - The Next Step
 
BIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksBIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in Navisworks
 
4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. project4D bim construction scheduling on the 1885 St. James pl. project
4D bim construction scheduling on the 1885 St. James pl. project
 
4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01
 
01. 한국의 조선해양산업 (조상래 교수)
01. 한국의 조선해양산업 (조상래 교수)01. 한국의 조선해양산업 (조상래 교수)
01. 한국의 조선해양산업 (조상래 교수)
 

Similar to CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014

A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...lindlar
 
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...BIM User Day
 
Lifecycle MEP design for buildings
Lifecycle MEP design for buildingsLifecycle MEP design for buildings
Lifecycle MEP design for buildingsTero Järvinen
 
D-studio 4D visualisation for Google SketchUp
D-studio 4D visualisation for Google SketchUpD-studio 4D visualisation for Google SketchUp
D-studio 4D visualisation for Google SketchUpKoenraad Nys
 
Introduction to the 3DPDF Consortium
Introduction to the 3DPDF ConsortiumIntroduction to the 3DPDF Consortium
Introduction to the 3DPDF Consortium3dpdfconsortium
 
Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...
Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...
Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...FIDE Master Tihomir Dovramadjiev PhD
 
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...Behzad Katirachi
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET Journal
 
bim and project controls
 bim and project controls bim and project controls
bim and project controlsOmar Selim
 
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013Koenraad Nys
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectIRJET Journal
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectNguyen Manh Tuan
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfle canh
 
Bim pres 120319
Bim pres  120319Bim pres  120319
Bim pres 120319nadia1w
 
Transforming the Central Office: Implementing CORD
Transforming the Central Office:  Implementing CORDTransforming the Central Office:  Implementing CORD
Transforming the Central Office: Implementing CORDRadisys Corporation
 
CNCF Technology Radar - Continuous Delivery, June 2020
CNCF Technology Radar - Continuous Delivery, June 2020CNCF Technology Radar - Continuous Delivery, June 2020
CNCF Technology Radar - Continuous Delivery, June 2020Cheryl Hung
 
Practical bim collaboration in a ppp
Practical bim collaboration in a pppPractical bim collaboration in a ppp
Practical bim collaboration in a pppVivi Nyehuus
 
Early-Stage Design Simulation for Architects
Early-Stage Design Simulation for ArchitectsEarly-Stage Design Simulation for Architects
Early-Stage Design Simulation for ArchitectsSimScale
 

Similar to CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014 (20)

A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
A Domain-driven Approach to Digital Curation and Preservation of 3D Architect...
 
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
 
Lifecycle MEP design for buildings
Lifecycle MEP design for buildingsLifecycle MEP design for buildings
Lifecycle MEP design for buildings
 
D-studio 4D visualisation for Google SketchUp
D-studio 4D visualisation for Google SketchUpD-studio 4D visualisation for Google SketchUp
D-studio 4D visualisation for Google SketchUp
 
Introduction to the 3DPDF Consortium
Introduction to the 3DPDF ConsortiumIntroduction to the 3DPDF Consortium
Introduction to the 3DPDF Consortium
 
Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...
Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...
Calculating Mass Properties of the 3D geometry. Connection between SolidWorks...
 
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
EXPERIENCE DURING ' AS-BUILT ' SERVICES IN INDUSTRIAL PROJECT USING LASER 3D ...
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot Project
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
 
Bim pres 120319
Bim pres  120319Bim pres  120319
Bim pres 120319
 
Transforming the Central Office: Implementing CORD
Transforming the Central Office:  Implementing CORDTransforming the Central Office:  Implementing CORD
Transforming the Central Office: Implementing CORD
 
CNCF Technology Radar - Continuous Delivery, June 2020
CNCF Technology Radar - Continuous Delivery, June 2020CNCF Technology Radar - Continuous Delivery, June 2020
CNCF Technology Radar - Continuous Delivery, June 2020
 
Practical bim collaboration in a ppp
Practical bim collaboration in a pppPractical bim collaboration in a ppp
Practical bim collaboration in a ppp
 
Early-Stage Design Simulation for Architects
Early-Stage Design Simulation for ArchitectsEarly-Stage Design Simulation for Architects
Early-Stage Design Simulation for Architects
 
BEP
BEPBEP
BEP
 
AF2018 Day 1 Ibbs
AF2018 Day 1 IbbsAF2018 Day 1 Ibbs
AF2018 Day 1 Ibbs
 

Recently uploaded

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Recently uploaded (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

CIOB in Doha, Qatar - Introduction to 4D and 5D Modeling | 18th March 2014

  • 1. 1One roof – all solutions. Gunnar Godawa – 18/03/2014 Introduction to 4D and 5D Modeling Gunnar Godawa – Senior Project Manager IPMA-D
  • 2. 2One roof – all solutions. Gunnar Godawa – 18/03/2014 Introduction to 4D and 5D Modeling Agenda 1. Introduction to BIM 2. Fundamentals and Benefits of 4D and 5D 3. Selection of Project experiences
  • 3. 3One roof – all solutions. Gunnar Godawa – 18/03/2014 Selection of our Middle East Projects • Lusail City Project, Doha, Qatar • Nile Corniche Project, Cairo, Egypt • Barwa Commercial Avenue, Doha, Qatar • National Museum of Qatar, Doha, Qatar • Al Wakra Stadium, Doha Qatar • Metro – Green Line, Doha, Qatar • Metro – Red Line, Doha, Qatar • Doha Expressways Group 5, Qatar
  • 4. 4One roof – all solutions. Gunnar Godawa – 18/03/2014 HOCHTIEF ViCon An international Team • Three offices in different markets • Services offered world-wide • Strong cultural competence in focused markets • Supported more than 350 projects • Network of experienced suppliers
  • 5. 5One roof – all solutions. Gunnar Godawa – 18/03/2014 Data security and user management Certified hardware and software Data formats and structure Data versioning Internet Collaboration and communication Knowledge and experience Roles and responsibilities Trust and commitment Culture Building standards Risks and insurance Ownership of deliverables Project guidelines and contracts Quantity take-off Cost estimation Change management Operation and maintenance Design creation and coordination Scheduling and progress monitoring 1. Introduction to BIM The Five Components © HOCHTIEF ViCon
  • 6. 6One roof – all solutions. Gunnar Godawa – 18/03/2014 Creating 3D models, adding information to them, and using for many purposes. 1. Introduction to BIM What is BIM?
  • 7. 7One roof – all solutions. Gunnar Godawa – 18/03/2014 1. Introduction to BIM Extension of 3D Models Other information Specifications Costs Time Space utilization + 3D CAD
  • 8. 8One roof – all solutions. Gunnar Godawa – 18/03/2014 1. Introduction to BIM Added Information to a 3D Model information associated with building element + = BIM
  • 9. 9One roof – all solutions. Gunnar Godawa – 18/03/2014 Life-Cycle Development of 3D models PhaseModelType Concept Conceptual Design Tender & Construction Documents Construction Operation 3D Marketing Model 3D Design Model 3D Construction Model 3D Asset Model 3D Schematic Model 3D Quantity Model © HOCHTIEF ViCon
  • 10. 10One roof – all solutions. Gunnar Godawa – 18/03/2014 2. Fundamentals and Benefits of 4D and 5D Information provided by a 4D and 5D model A 4D/ 5D Model gives comprehensive answers to the above questions Where? What?When? How much? How many?
  • 11. 11One roof – all solutions. Gunnar Godawa – 18/03/2014 2. Fundamentals and Benefits of 4D and 5D Importance of common model and data breakdown Slab A Slab B Columns Slab Concrete 10 m³ Columns C 40 5 m³ Columns C 50 5 m³ Material?? Joint??
  • 12. 12One roof – all solutions. Gunnar Godawa – 18/03/2014 2. Fundamentals and Benefits of 4D and 5D System architecture of 4D and 5D data development (Creation Process) ProjectBIMExpert Linking Process On-site Usage (3D Model + Numerical Data) Construction Program Model-based BOQ Quantities 4D Database 3D Model © HOCHTIEF ViCon
  • 13. 13One roof – all solutions. Gunnar Godawa – 18/03/2014 Scheduler Draftsman Qto specialist Client/Management Estimator global projectdata base Objectives Ensure quality and save time and costs through: • Improved data interoperability • Traceable change process • Geometry combined with other data O&M Procurement Project database Contractor 2. Fundamentals and Benefits of 4D and 5D Single source access 4D and 5D data © HOCHTIEF ViCon
  • 14. 14One roof – all solutions. Gunnar Godawa – 18/03/2014 Slab Columns 2. Fundamentals and Benefits of 4D and 5D Linking 3D model with time schedule activities 50% 100% 50% 100%
  • 15. 15One roof – all solutions. Gunnar Godawa – 18/03/2014 Quantities available • Direct from 3D model to BoQ, e.g. plaster, concrete, pipes • Indirect from 3D model to BoQ, e.g. rebar from concrete volume • Indirect with manual input using 3D model, e.g. FF&E in rooms 2. Fundamentals and Benefits of 4D and 5D How can Quantities be derived from 3D
  • 16. 16One roof – all solutions. Gunnar Godawa – 18/03/2014 2D Concept Design 3D Model Model-based Quantities Construction Schedule 4D / 5D Model Design Schedule Quantities 2. Fundamentals and Benefits of 4D and 5D Process to create 4D / 5D Models © HOCHTIEF ViCon
  • 17. 17One roof – all solutions. Gunnar Godawa – 18/03/2014 2. Fundamentals and Benefits of 4D and 5D 5D Software features and requirements • Common exchange format with 3D authoring SW • How is the model imported to the SW (export from 3D, API connection, plugin) • Where are basic quantities derived from (native model, external calculation) • What Standards / Rules of Measurement have to be supported • How much information (attributes) is required from the 3D model • How is the update process
  • 18. 18One roof – all solutions. Gunnar Godawa – 18/03/2014 • Integration of Design, Planning and Scope definition • Holistic overview and consistent break down of entire project information • Better re-usage of information through project life- cycle • Integrated quantities, schedule and cost information add value to project reporting • Impact from changes can be better evaluated • Quantities can identified in the 3D model (traceable) • Visual representation supports understanding of sequencing 2. Fundamentals and Benefits of 4D and 5D Benefits for 4D and 5D
  • 19. 19One roof – all solutions. Gunnar Godawa – 18/03/2014 3. Selection of Project Experiences
  • 20. 20One roof – all solutions. Gunnar Godawa – 18/03/2014 Presenter Gunnar Godawa Senior Project Manager www.hochtief-vicon.de One step ahead. Build digitally first. Building Information Modeling (BIM)