Vico Software: 4D and 5D perspectives on BIM

3,045 views

Published on

Mark Sawyer (CEO of Vico Software) discusses 4D and 5D aspects of building information modelling.

0 Comments
3 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
3,045
On SlideShare
0
From Embeds
0
Number of Embeds
438
Actions
Shares
0
Downloads
67
Comments
0
Likes
3
Embeds 0
No embeds

No notes for slide

Vico Software: 4D and 5D perspectives on BIM

  1. 1. Status  and  Perspec.ve   on 4D  and  5DWednesday, December 14, 2011
  2. 2. Virtual  Construc.on...  Beyond  3D Architect GC/CM  Program  Quality  Design  Schedule  Cost  Safety Owner Engineers  Opera:ons Subs  Performance  MaintenanceWednesday, December 14, 2011
  3. 3. Virtual  Construc.on...  Beyond  3D Architect GC/CM  Program  Quality 3D  Design  Schedule  Cost  Safety Owner Engineers  Opera:ons Subs  Performance  MaintenanceWednesday, December 14, 2011
  4. 4. Virtual  Construc.on...  Beyond  3D Architect GC/CM  Program  Quality 3D+  Design  Schedule  Cost  Safety Owner Engineers  Opera:ons Subs 3D+  Performance  MaintenanceWednesday, December 14, 2011
  5. 5. Virtual  Construc.on...  Beyond  3D Architect GC/CM  Program  Quality  Design  Schedule 4D  Cost  Safety Owner Engineers  Opera:ons Subs  Performance  MaintenanceWednesday, December 14, 2011
  6. 6. Virtual  Construc.on...  Beyond  3D Architect GC/CM  Program  Quality  Design  Schedule  Cost 5D  Safety Owner Engineers  Opera:ons Subs  Performance  MaintenanceWednesday, December 14, 2011
  7. 7. Virtual  Construc.on...  Beyond  3D Architect GC/CM  Program  Quality  Design  Schedule  Cost  Safety Owner Engineers  Opera:ons Subs 6D  Performance  MaintenanceWednesday, December 14, 2011
  8. 8. Virtual  Construc.on...  Beyond  3D Architect GC/CM  Program  Quality   Integrated  Design  Schedule 5D  Cost  Safety Owner Engineers  Opera:ons Subs  Performance  MaintenanceWednesday, December 14, 2011
  9. 9. ...but  Why  Tie  All  This  to  a  3D  BIM? ❖ Qty’s,  Task  Dura:ons,  and  Costs  are  Derived,  Not  Contrived ❖ A  Change  in  One  Place  Updates  Everywhere ❖ Tighter  Project  Controls  and   Field  Integra:on ❖ Visual  Presenta:on  Equals   Rapid  Comprehension  in   Planning  and  in  the  Field Courtesy St. Joseph Health SystemWednesday, December 14, 2011
  10. 10. Real  Usage  Today 100 75 50 25 ram sign e og De nc tion Pr ma ina ule st 0 rfor rd ch ed Co fet y Pe oo S Sa &M C OWednesday, December 14, 2011
  11. 11. Real  Usage  Today 100 75 50 25 ram sign e og De nc tion Pr ma ina ule st 0 rfor rd ch ed Co fet y Pe oo S Sa &M C OWednesday, December 14, 2011
  12. 12. Real  Usage  Today 100 75 50 25 gram esign nc e Pr o D ma t ion ovie for ule ty’s 0 i na er rd 4D M ched os t P oo S Q C fety C Sa O &MWednesday, December 14, 2011
  13. 13. 100 75 50 25 gram esign nc e Pr o D ma t ion ovie for ule ty’s 0 i na er rd 4D M ched os t P oo S Q C fety C Sa O &MWednesday, December 14, 2011
  14. 14. Design-to- Construction Construction -to-Owner 100 75 50 25 gram esign nc e Pr o D ma t ion ovie for ule ty’s 0 i na er rd 4D M ched os t P oo S Q C fety C Sa O &MWednesday, December 14, 2011
  15. 15. Design-­‐to-­‐Construc.on ❖ Data  fit  for  purpose • Design  Intent  vs.  Means  and   Methods ❖ Level  of  Detail • Model  Progression   Specifica:on  (AIA  E-­‐202)Wednesday, December 14, 2011
  16. 16. A  guess  as  to  where  we  are  headed  next... 100 75 50 25 gram esign nc e Pr o D ma t ion ovie for ule ty’s 0 i na er rd 4D M ched os t P oo S Q C fety C Sa O &MWednesday, December 14, 2011
  17. 17. Q  &  AWednesday, December 14, 2011

×