a*-PUNJAB STATE POWER CORPORATION LIMITED
(O/O CE/Commercial, Patiata, Ph.No.0175-221449S)
Regd. Office- PSEB Head Office, The Mall, patiala-14700.1
fele Fax:.0175,2210320 emait: ce-conmercial@ospct.in
Commercial Circular no. 23 tZOls
lo
All Engineer-in-chief/Chief Engineer/DS
Under PSPCL
Memo no. 929/933 / DD/SR-67
Dated: 08/06/2015
Sub:- Regarding interfacing voltage of NRSE/CPP projects and
connectivity of Cluster-Solar projects setected through
Competitive Bidding under NRSE policy of punjab Govt./ any
other Policy of the Central covi. (MNRE)- Amendment of
instruction '125.1(f) and addition of inatruction ,t23(a) of
Electricity Supply Instruclions Manuat.
A) The instruction 125.'1(0 of ES|M is hereby amended to the fo owjng
exent:-
The minimum voltage tevel (depending upon neafest grid
substation) for interfacing of NRSE/CPP projects with State Grid will
be as follows:-
Sr. Capacity of NRSE/CPP project
No
i. Up to 2.5 MW
ii. More than 2.5 lrw & upto 25 tVtW
iii. More than 25 MW
Voltage
1,1 KV
33 KV/66 KV
132 KVt220 KV
B) The following instruction 123(a) is hereby added in the ES VI:-
123 (a),For connectivity of Cluster Solar projects selected through
Compeiitive Bidding under NRSE policy of punjab Govt./ a;y
other Policy of the Cenirat covt. (MNRE) for suppty of power
at tariff other than preferential tariff:
"lnter"connection point / Detivery /Metering poini,, shall mean the
point at 33kV or above where the powef from the Solaf power proiect
is injected into the CTU/STU/transmissron system (inctuding the
dedicated transmission line connecting the Solar power project with
the CTU/STU system). lvletedng shall be done at this interconnection
point where the power is injected into the CTU/STU system, i.e. the
Delivery Point. For interconnection with grid and metering, the Sotar
Power Developers(SPDs) shall abide by the relevant CERC
Regulations, crid Code and Central Electricity Authority (tnstallation
and Operation of Meters) Regulations, 2006 as amended and revised
from time to time:
"Pooling Poinf' shall mean a point where more than one solar pV
Projects may connect to a common transmission line built and
operated by the SPD or any third party or by STU on behalf of the
SPD. This common transmission line shall further connect with the
interconnection/metering point. In this case, metering will be done at
the Interconneciion point along with subsidiary meters at the pooling
point to determine the generation by each Project;
Connectivity with the crid:
i. The transmission of power up to the point of interconnection
where the metering is done for energy accounting shall be the
responsibility of the Solar Power Developer (SPD) at his own cost.
The maintenance of Transmission system up to the Inter-
connection Point sha be the responsibility of the SpD.
ii. The arrangement of connectivity can be made by the SpD
through a dedicated transmission line which the SpD may
construct himself or get constructed by STU or Discom or any
other transmission agency.
iii. The entire cost of transmission including cost of construction of
line, wheeling charges, losses etc. from the project up to the
Delivery Point will be borne by the SpD and dill not be met by the
STU/Discom. This connectivity can atso be achieved through a
shared line with any agency or any existing line of Discom or
STU, provided the ene.gy accounts are bifurcated and clearly
demarcated for the power generated at solar project and are
issued by the STU/SLDC concerned.
iv. The SPD may, however, shift Interconnection point closer to his
Project if 33 kV substation comes closer to the project during the
tenure of the PPA provided that the interconnection sha be
maintained at 33 KV or above and energy at the Solar project is
clearly demarcated for the power generated at Solar project and
energy accounts are issued by the STU/SLDC concerned. The
costs associated with this arrangement will also be borne by the
SPD includjng the wheeling charges and tosses up to the
Interconnection Point. The SPDS may decide to share the cost of
transmission charges and other associated charges from the
Pooling Point up to the Interconnection point, amongst
themselves.
v. ln case of Bidding Consortium, jf the STU connectivity letter js in
the name of non-Lgad lrember, the same shall be accebted
against application of one Project only and would be required to
be kansferred to the Project Company befofe signing of ppA.
This issues with the approval of competent authority.
Meticulous compliance of the above may be ensured by a the field
officers.
nf6 xf{s ?i:/_._9}4929_.lDD/sR-67
. gri-f,r e. grt t6 16ft?n d
d:-
for EIC/Commercial,
PSPCL, Patiala.
flr$: 8.6.2015
Es6' ).,1? &tS d-d=d 6et aft}e n'€'
1 ir"-.,]a-d?-iH-ar J?+dad. F€ e.- rre< aorrsF6 tr.,
Lfa1|.sr I
2. FA fitderd, ri+ry en rr.<s a'<&tsrr fux, uftry.s- i
3. fuJ dfl+.F6d/e'ft-6'F ? ffiiz {ila +dF 4.# #Fd,
rfi.rh.e1.r"a.o.x1, iiatarg r
-
 vyJk.6 )
SE/Regulation,
4. FiJd/ ffi fus.dT, riaq rea-e, ristJH I
5. F{rd. ria's ;ea-o1ft.;a: ars d-i.flF 1g5-dT. rlq'e rea.g. d*ae I
6 t+i" F^-?^ ffi€" ffi dfl.F6 Lfq"s, SCo 6: 3009-t0.
Sec-22- BEfdr3
7. fiq fr:/ A4raild (+dH), ri.-l, €€tr d,gF, r!.Er d&61, rrfual,sr I
8. HiiF, PSERC, SCo.?i: 220-221, i-{ed-34 g, trSdH
9. Ombudsman. Electricity punjab 66 KV Grid Sub Stn. ptot no. A_2.
lndustria, Area.
-Phase-t.
SAS Nagaf ( I/ohatr)_160055
10. fil FfJd <'tEd r-H. ri*': }-ss piis * ric'E. FrdE .idrdE
11. sl-€ n-ard*-.d, gru-dT Fa'fr-d a.F+*-d rrre ffiire-+* ri*,a
Sec-17. fS t I
12. ChiefAdministfa tion & tR, pSpCL. patiata.
13. !u fi+ro? €ntrae, fma FTa'd, Lfbat'6'
14. ChiefAuditor, PSPCL. patiata.
'15. Chief Engineer / ARR & TR, pSpCL, patiata.
'16. {+ fur+:,ta'f.2L, u?.Dx.ut.n1.'}s., ufu,nry r
'17. *.f,1.t}./hrd.A.,(DE.B1.hr] 4{€1.) fi.ftF.f.n1.ri.o., uftra,o,t
18. Dy.CE/Sales-|, Dy.CE/Sates-2andDy.CElBilting, pSpCL
'19. AllAddiSEs / Sr.Xens / AEES under Commercjal organization, pSpCL.
20. This circular can be downJoaded from pSpCL website (www.pspct.in).
ut *q.fi.F1.+6.,uEhrg' I

More Related Content

What's hot

chandan gitam 1424
chandan gitam 1424chandan gitam 1424
chandan gitam 1424
power system
 
TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIA
Arun Muraleedharan
 
Redline Bats M Econnect
Redline Bats M EconnectRedline Bats M Econnect
Redline Bats M Econnect
guest89f4d134
 
RESUME_Dinesh Sarda 2
RESUME_Dinesh Sarda 2RESUME_Dinesh Sarda 2
RESUME_Dinesh Sarda 2
Dinesh Sarda
 

What's hot (19)

New control of pv solar farm as statcom (pv statcom) for increasing grid powe...
New control of pv solar farm as statcom (pv statcom) for increasing grid powe...New control of pv solar farm as statcom (pv statcom) for increasing grid powe...
New control of pv solar farm as statcom (pv statcom) for increasing grid powe...
 
EEE 33rd 971 & 975
EEE 33rd 971 & 975EEE 33rd 971 & 975
EEE 33rd 971 & 975
 
chandan gitam 1424
chandan gitam 1424chandan gitam 1424
chandan gitam 1424
 
Fg25969973
Fg25969973Fg25969973
Fg25969973
 
TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIA
 
Sensitivity Analysis for Transmission Planning
Sensitivity Analysis for Transmission PlanningSensitivity Analysis for Transmission Planning
Sensitivity Analysis for Transmission Planning
 
Industry connections
Industry connectionsIndustry connections
Industry connections
 
Intro imi
Intro imiIntro imi
Intro imi
 
Elk 24-5-32-1410-127
Elk 24-5-32-1410-127Elk 24-5-32-1410-127
Elk 24-5-32-1410-127
 
FIWARE Global Summit - FISMEP: a FIWARE-based Platform for Energy Applications
FIWARE Global Summit - FISMEP: a FIWARE-based Platform for Energy ApplicationsFIWARE Global Summit - FISMEP: a FIWARE-based Platform for Energy Applications
FIWARE Global Summit - FISMEP: a FIWARE-based Platform for Energy Applications
 
Load flow analysis of 132 kv substation using etap
Load flow analysis of 132 kv substation using etapLoad flow analysis of 132 kv substation using etap
Load flow analysis of 132 kv substation using etap
 
Redline Bats M Econnect
Redline Bats M EconnectRedline Bats M Econnect
Redline Bats M Econnect
 
Power quality using statcom
Power quality using statcomPower quality using statcom
Power quality using statcom
 
Satellite ground station
Satellite ground stationSatellite ground station
Satellite ground station
 
RESUME_Dinesh Sarda 2
RESUME_Dinesh Sarda 2RESUME_Dinesh Sarda 2
RESUME_Dinesh Sarda 2
 
Fault level calculations
Fault level calculationsFault level calculations
Fault level calculations
 
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
 
alloy_aaac
alloy_aaacalloy_aaac
alloy_aaac
 
Equipments in distribution system
Equipments in distribution systemEquipments in distribution system
Equipments in distribution system
 

Viewers also liked

AungKhantResume2016
AungKhantResume2016AungKhantResume2016
AungKhantResume2016
Aung Khant
 
Презинтация кафедра Казахской и Мировой Истории
Презинтация кафедра Казахской и Мировой ИсторииПрезинтация кафедра Казахской и Мировой Истории
Презинтация кафедра Казахской и Мировой Истории
Nikolay39-108
 
HARTEK DISTRIBUTION TRANSFOMERS
HARTEK DISTRIBUTION TRANSFOMERS HARTEK DISTRIBUTION TRANSFOMERS
HARTEK DISTRIBUTION TRANSFOMERS
HARTEK POWER
 
Invoice interchange – invoice trading for sm es
Invoice interchange – invoice trading for sm esInvoice interchange – invoice trading for sm es
Invoice interchange – invoice trading for sm es
nalinee_c1
 

Viewers also liked (15)

AungKhantResume2016
AungKhantResume2016AungKhantResume2016
AungKhantResume2016
 
Leadership skills
Leadership skillsLeadership skills
Leadership skills
 
OKMPI
OKMPIOKMPI
OKMPI
 
ОҢТҮСТІК ҚАЗАҚСТАН МЕМЛЕКЕТТІК ПЕДАГОГИКАЛЫҚ ИНСТИТУТЫ
ОҢТҮСТІК ҚАЗАҚСТАН МЕМЛЕКЕТТІК ПЕДАГОГИКАЛЫҚ ИНСТИТУТЫОҢТҮСТІК ҚАЗАҚСТАН МЕМЛЕКЕТТІК ПЕДАГОГИКАЛЫҚ ИНСТИТУТЫ
ОҢТҮСТІК ҚАЗАҚСТАН МЕМЛЕКЕТТІК ПЕДАГОГИКАЛЫҚ ИНСТИТУТЫ
 
ОҢТҮСТІК ҚАЗАҚСТАН МЕМЛЕКЕТТІК ПЕДАГОГИКАЛЫҚ ИНСТИТУТЫ
ОҢТҮСТІК ҚАЗАҚСТАН МЕМЛЕКЕТТІК ПЕДАГОГИКАЛЫҚ ИНСТИТУТЫОҢТҮСТІК ҚАЗАҚСТАН МЕМЛЕКЕТТІК ПЕДАГОГИКАЛЫҚ ИНСТИТУТЫ
ОҢТҮСТІК ҚАЗАҚСТАН МЕМЛЕКЕТТІК ПЕДАГОГИКАЛЫҚ ИНСТИТУТЫ
 
Тарих және педагогика факультеті
Тарих және педагогика факультетіТарих және педагогика факультеті
Тарих және педагогика факультеті
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
 
ОҚМПИ
ОҚМПИОҚМПИ
ОҚМПИ
 
InvoiceInterchange – Introduction to InvoiceTrading
InvoiceInterchange – Introduction to InvoiceTradingInvoiceInterchange – Introduction to InvoiceTrading
InvoiceInterchange – Introduction to InvoiceTrading
 
HARTEK POWER - SOLAR PROFILE
HARTEK POWER - SOLAR PROFILE HARTEK POWER - SOLAR PROFILE
HARTEK POWER - SOLAR PROFILE
 
Презинтация кафедра Казахской и Мировой Истории
Презинтация кафедра Казахской и Мировой ИсторииПрезинтация кафедра Казахской и Мировой Истории
Презинтация кафедра Казахской и Мировой Истории
 
Презентация Кластера №4
Презентация Кластера №4Презентация Кластера №4
Презентация Кластера №4
 
Презентация Кластера №3
Презентация Кластера №3Презентация Кластера №3
Презентация Кластера №3
 
HARTEK DISTRIBUTION TRANSFOMERS
HARTEK DISTRIBUTION TRANSFOMERS HARTEK DISTRIBUTION TRANSFOMERS
HARTEK DISTRIBUTION TRANSFOMERS
 
Invoice interchange – invoice trading for sm es
Invoice interchange – invoice trading for sm esInvoice interchange – invoice trading for sm es
Invoice interchange – invoice trading for sm es
 

Similar to The minimum voltage tevel for interfacing of NRSE/CPP projects with State Grid (Punjab)

Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Matthew Behrens
 

Similar to The minimum voltage tevel for interfacing of NRSE/CPP projects with State Grid (Punjab) (20)

Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind Energy
 
Eskom - Grid Connectivity
Eskom - Grid ConnectivityEskom - Grid Connectivity
Eskom - Grid Connectivity
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
IRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy Logic
IRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy LogicIRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy Logic
IRJET- Improvement of Voltage Stability by Placing UPFC using Fuzzy Logic
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
 
Design of Low-Voltage Distributed Photovoltaic Systems Oriented to Improve ...
Design of Low-Voltage Distributed Photovoltaic Systems Oriented to   Improve ...Design of Low-Voltage Distributed Photovoltaic Systems Oriented to   Improve ...
Design of Low-Voltage Distributed Photovoltaic Systems Oriented to Improve ...
 
EirGrid NATIONAL CONTROL CENTRE
EirGrid NATIONAL CONTROL CENTREEirGrid NATIONAL CONTROL CENTRE
EirGrid NATIONAL CONTROL CENTRE
 
Dynamic performance comparison of DFIG and FCWECS during grid faults
Dynamic performance comparison of DFIG and FCWECS during grid faultsDynamic performance comparison of DFIG and FCWECS during grid faults
Dynamic performance comparison of DFIG and FCWECS during grid faults
 
ACTIVE DISTRIBUTION SYSTEM MANAGEMENT
ACTIVE DISTRIBUTION SYSTEM MANAGEMENTACTIVE DISTRIBUTION SYSTEM MANAGEMENT
ACTIVE DISTRIBUTION SYSTEM MANAGEMENT
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
 
Grid diagnostic study Philippines - ETP.pdf
Grid diagnostic study Philippines - ETP.pdfGrid diagnostic study Philippines - ETP.pdf
Grid diagnostic study Philippines - ETP.pdf
 
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
 
PSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptxPSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptx
 
IRJET- Power Management System for Electric Vehicle Charging Stations using F...
IRJET- Power Management System for Electric Vehicle Charging Stations using F...IRJET- Power Management System for Electric Vehicle Charging Stations using F...
IRJET- Power Management System for Electric Vehicle Charging Stations using F...
 
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptxUtility Basic Details in Ahmedabad Railway Station Re Development.pptx
Utility Basic Details in Ahmedabad Railway Station Re Development.pptx
 
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
 
IRJET- Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
IRJET-	 Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...IRJET-	 Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
IRJET- Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
 
IRJET- High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...
IRJET-  	  High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...IRJET-  	  High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...
IRJET- High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...
 
IRJET- Comparative Simulation Study of Grid Connected Perturb & Observe a...
IRJET-  	  Comparative Simulation Study of Grid Connected Perturb & Observe a...IRJET-  	  Comparative Simulation Study of Grid Connected Perturb & Observe a...
IRJET- Comparative Simulation Study of Grid Connected Perturb & Observe a...
 

Recently uploaded

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Recently uploaded (20)

Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

The minimum voltage tevel for interfacing of NRSE/CPP projects with State Grid (Punjab)

  • 1. a*-PUNJAB STATE POWER CORPORATION LIMITED (O/O CE/Commercial, Patiata, Ph.No.0175-221449S) Regd. Office- PSEB Head Office, The Mall, patiala-14700.1 fele Fax:.0175,2210320 emait: ce-conmercial@ospct.in Commercial Circular no. 23 tZOls lo All Engineer-in-chief/Chief Engineer/DS Under PSPCL Memo no. 929/933 / DD/SR-67 Dated: 08/06/2015 Sub:- Regarding interfacing voltage of NRSE/CPP projects and connectivity of Cluster-Solar projects setected through Competitive Bidding under NRSE policy of punjab Govt./ any other Policy of the Central covi. (MNRE)- Amendment of instruction '125.1(f) and addition of inatruction ,t23(a) of Electricity Supply Instruclions Manuat. A) The instruction 125.'1(0 of ES|M is hereby amended to the fo owjng exent:- The minimum voltage tevel (depending upon neafest grid substation) for interfacing of NRSE/CPP projects with State Grid will be as follows:- Sr. Capacity of NRSE/CPP project No i. Up to 2.5 MW ii. More than 2.5 lrw & upto 25 tVtW iii. More than 25 MW Voltage 1,1 KV 33 KV/66 KV 132 KVt220 KV B) The following instruction 123(a) is hereby added in the ES VI:- 123 (a),For connectivity of Cluster Solar projects selected through Compeiitive Bidding under NRSE policy of punjab Govt./ a;y other Policy of the Cenirat covt. (MNRE) for suppty of power at tariff other than preferential tariff: "lnter"connection point / Detivery /Metering poini,, shall mean the point at 33kV or above where the powef from the Solaf power proiect is injected into the CTU/STU/transmissron system (inctuding the dedicated transmission line connecting the Solar power project with the CTU/STU system). lvletedng shall be done at this interconnection point where the power is injected into the CTU/STU system, i.e. the Delivery Point. For interconnection with grid and metering, the Sotar Power Developers(SPDs) shall abide by the relevant CERC Regulations, crid Code and Central Electricity Authority (tnstallation and Operation of Meters) Regulations, 2006 as amended and revised from time to time: "Pooling Poinf' shall mean a point where more than one solar pV Projects may connect to a common transmission line built and
  • 2. operated by the SPD or any third party or by STU on behalf of the SPD. This common transmission line shall further connect with the interconnection/metering point. In this case, metering will be done at the Interconneciion point along with subsidiary meters at the pooling point to determine the generation by each Project; Connectivity with the crid: i. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the Solar Power Developer (SPD) at his own cost. The maintenance of Transmission system up to the Inter- connection Point sha be the responsibility of the SpD. ii. The arrangement of connectivity can be made by the SpD through a dedicated transmission line which the SpD may construct himself or get constructed by STU or Discom or any other transmission agency. iii. The entire cost of transmission including cost of construction of line, wheeling charges, losses etc. from the project up to the Delivery Point will be borne by the SpD and dill not be met by the STU/Discom. This connectivity can atso be achieved through a shared line with any agency or any existing line of Discom or STU, provided the ene.gy accounts are bifurcated and clearly demarcated for the power generated at solar project and are issued by the STU/SLDC concerned. iv. The SPD may, however, shift Interconnection point closer to his Project if 33 kV substation comes closer to the project during the tenure of the PPA provided that the interconnection sha be maintained at 33 KV or above and energy at the Solar project is clearly demarcated for the power generated at Solar project and energy accounts are issued by the STU/SLDC concerned. The costs associated with this arrangement will also be borne by the SPD includjng the wheeling charges and tosses up to the Interconnection Point. The SPDS may decide to share the cost of transmission charges and other associated charges from the Pooling Point up to the Interconnection point, amongst themselves. v. ln case of Bidding Consortium, jf the STU connectivity letter js in the name of non-Lgad lrember, the same shall be accebted against application of one Project only and would be required to be kansferred to the Project Company befofe signing of ppA. This issues with the approval of competent authority. Meticulous compliance of the above may be ensured by a the field officers. nf6 xf{s ?i:/_._9}4929_.lDD/sR-67 . gri-f,r e. grt t6 16ft?n d d:- for EIC/Commercial, PSPCL, Patiala. flr$: 8.6.2015 Es6' ).,1? &tS d-d=d 6et aft}e n'€' 1 ir"-.,]a-d?-iH-ar J?+dad. F€ e.- rre< aorrsF6 tr., Lfa1|.sr I 2. FA fitderd, ri+ry en rr.<s a'<&tsrr fux, uftry.s- i 3. fuJ dfl+.F6d/e'ft-6'F ? ffiiz {ila +dF 4.# #Fd, rfi.rh.e1.r"a.o.x1, iiatarg r - vyJk.6 ) SE/Regulation,
  • 3. 4. FiJd/ ffi fus.dT, riaq rea-e, ristJH I 5. F{rd. ria's ;ea-o1ft.;a: ars d-i.flF 1g5-dT. rlq'e rea.g. d*ae I 6 t+i" F^-?^ ffi€" ffi dfl.F6 Lfq"s, SCo 6: 3009-t0. Sec-22- BEfdr3 7. fiq fr:/ A4raild (+dH), ri.-l, €€tr d,gF, r!.Er d&61, rrfual,sr I 8. HiiF, PSERC, SCo.?i: 220-221, i-{ed-34 g, trSdH 9. Ombudsman. Electricity punjab 66 KV Grid Sub Stn. ptot no. A_2. lndustria, Area. -Phase-t. SAS Nagaf ( I/ohatr)_160055 10. fil FfJd <'tEd r-H. ri*': }-ss piis * ric'E. FrdE .idrdE 11. sl-€ n-ard*-.d, gru-dT Fa'fr-d a.F+*-d rrre ffiire-+* ri*,a Sec-17. fS t I 12. ChiefAdministfa tion & tR, pSpCL. patiata. 13. !u fi+ro? €ntrae, fma FTa'd, Lfbat'6' 14. ChiefAuditor, PSPCL. patiata. '15. Chief Engineer / ARR & TR, pSpCL, patiata. '16. {+ fur+:,ta'f.2L, u?.Dx.ut.n1.'}s., ufu,nry r '17. *.f,1.t}./hrd.A.,(DE.B1.hr] 4{€1.) fi.ftF.f.n1.ri.o., uftra,o,t 18. Dy.CE/Sales-|, Dy.CE/Sates-2andDy.CElBilting, pSpCL '19. AllAddiSEs / Sr.Xens / AEES under Commercjal organization, pSpCL. 20. This circular can be downJoaded from pSpCL website (www.pspct.in). ut *q.fi.F1.+6.,uEhrg' I