Libya Universities: What you can do in 1 year
Multi-disciplinary collaboration
2D-3D workflow
Bespoke modeling
Lessons learned
Structural Model:
Foundations
Columns
Shear walls
Structural floor slab
Steelwork
Stairs
No MEP model
Architectural Model:
External envelope
Internal walls
Doors, Windows
Floor slab & floor finish
Stairs
Overlaps:
Columns
Shear walls
Floor slab
Coordinated Model
Microstation ElevationsRevit Elevations
Pros:
Improved inter-disciplinary coordination
Less mistakes
Reduced resource requirements
Design in 3D
Instant synchronization of plans, sections, elevations
Intuitive functionality (holes in slabs)
Improved output for presentation material
Makes repetitive drafting components easier to
deliver
Scheduling
Organization of drawings and project. Single
repository of information
Cons:
Large investment in training.
High cost of investment. Subscription services
High computing power requirements
Slow working time
Poor line weight control. Bad at basic 2D CAD
Drawings look flat
Require intermediate to advanced knowledge to
deliver a bespoke model
Non-intuitive functionality (floor, wall, ceiling joins)
Additional view creation for every view on sheet
Parameters, parameters, more parameters
User becomes further removed from drawing and
more an administrator
Do we do things because we can, or because we
need to do them?
Richard Kuppusamy
Keppie Design | Architect

More Related Content

Similar to GRUG 2 Keppie Design 20100817

Similar to GRUG 2 Keppie Design 20100817 (20)

Revit architecture brochure
Revit architecture    brochureRevit architecture    brochure
Revit architecture brochure
 
caddcentre_certificate
caddcentre_certificatecaddcentre_certificate
caddcentre_certificate
 
CodeBook at the Conferences
CodeBook at the ConferencesCodeBook at the Conferences
CodeBook at the Conferences
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
Eng Cal Reduced1
Eng Cal Reduced1Eng Cal Reduced1
Eng Cal Reduced1
 
Building Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdfBuilding Information Modelling M.arch.pdf
Building Information Modelling M.arch.pdf
 
Neanex - Semantic Construction with Graphs
Neanex - Semantic Construction with GraphsNeanex - Semantic Construction with Graphs
Neanex - Semantic Construction with Graphs
 
RELM Overview
RELM OverviewRELM Overview
RELM Overview
 
unit 3 Design 1
unit 3 Design 1unit 3 Design 1
unit 3 Design 1
 
Architecture principles in relation to TYPO3
Architecture principles in relation to TYPO3Architecture principles in relation to TYPO3
Architecture principles in relation to TYPO3
 
James LaPan Resume
James LaPan ResumeJames LaPan Resume
James LaPan Resume
 
Wireframes, Mockups and Prototyping: Beyond 2D Web Page/App and Towards a 3D ...
Wireframes, Mockups and Prototyping: Beyond 2D Web Page/App and Towards a 3D ...Wireframes, Mockups and Prototyping: Beyond 2D Web Page/App and Towards a 3D ...
Wireframes, Mockups and Prototyping: Beyond 2D Web Page/App and Towards a 3D ...
 
Software app present (QS)
Software app present (QS)Software app present (QS)
Software app present (QS)
 
MEP Coordination for Residential Buildings-Challenges Solutions.pptx
MEP Coordination for Residential Buildings-Challenges Solutions.pptxMEP Coordination for Residential Buildings-Challenges Solutions.pptx
MEP Coordination for Residential Buildings-Challenges Solutions.pptx
 
09 10 05 Presentation Spekkink Changing Roles 09
09 10 05 Presentation Spekkink Changing Roles 0909 10 05 Presentation Spekkink Changing Roles 09
09 10 05 Presentation Spekkink Changing Roles 09
 
Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...
Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...
Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...
 
Three Pillar Global Design For Use
Three Pillar Global   Design For UseThree Pillar Global   Design For Use
Three Pillar Global Design For Use
 
Revit structure brochure
Revit structure    brochureRevit structure    brochure
Revit structure brochure
 
Architecting ASP.NET MVC Applications
Architecting ASP.NET MVC ApplicationsArchitecting ASP.NET MVC Applications
Architecting ASP.NET MVC Applications
 
atb-brochure.pdf
atb-brochure.pdfatb-brochure.pdf
atb-brochure.pdf
 

More from Glasgow Revit User Group

More from Glasgow Revit User Group (20)

GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025
GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025
GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025
 
GRUG 2.0 8 October opening presentation 20181025
GRUG 2.0 8 October opening presentation 20181025GRUG 2.0 8 October opening presentation 20181025
GRUG 2.0 8 October opening presentation 20181025
 
GRUG 2.0 7 Roles and Responsibilities 20180809
GRUG 2.0 7 Roles and Responsibilities 20180809GRUG 2.0 7 Roles and Responsibilities 20180809
GRUG 2.0 7 Roles and Responsibilities 20180809
 
GRUG 2.0 7 Impress IES presentation 20180809
GRUG 2.0 7 Impress IES presentation 20180809GRUG 2.0 7 Impress IES presentation 20180809
GRUG 2.0 7 Impress IES presentation 20180809
 
GRUG 2.0 7 OOBE BIM for landscape 20180809
GRUG 2.0 7 OOBE BIM for landscape 20180809GRUG 2.0 7 OOBE BIM for landscape 20180809
GRUG 2.0 7 OOBE BIM for landscape 20180809
 
GRUG 2.0 7 August Opening presentation 20180809
GRUG 2.0 7 August Opening presentation 20180809GRUG 2.0 7 August Opening presentation 20180809
GRUG 2.0 7 August Opening presentation 20180809
 
GRUG 2.0 6 Digital Guerrilla Validation 20180503
GRUG 2.0 6 Digital Guerrilla Validation 20180503GRUG 2.0 6 Digital Guerrilla Validation 20180503
GRUG 2.0 6 Digital Guerrilla Validation 20180503
 
GRUG 2.0 4 December opening presentation 20171214
GRUG 2.0 4 December opening presentation 20171214GRUG 2.0 4 December opening presentation 20171214
GRUG 2.0 4 December opening presentation 20171214
 
GRUG 2.0 3 October opening presentation 20171026
GRUG 2.0 3 October opening presentation 20171026GRUG 2.0 3 October opening presentation 20171026
GRUG 2.0 3 October opening presentation 20171026
 
GRUG 2.0 2 Keppies Dynamo 20170917
GRUG 2.0 2 Keppies Dynamo 20170917GRUG 2.0 2 Keppies Dynamo 20170917
GRUG 2.0 2 Keppies Dynamo 20170917
 
GRUG 2.0 2 Keppies Uniclass BS Naming 20170917
GRUG 2.0 2 Keppies Uniclass BS Naming 20170917GRUG 2.0 2 Keppies Uniclass BS Naming 20170917
GRUG 2.0 2 Keppies Uniclass BS Naming 20170917
 
GRUG 2.0 2 Sept Opening Presentation 20170917
GRUG 2.0 2 Sept Opening Presentation 20170917GRUG 2.0 2 Sept Opening Presentation 20170917
GRUG 2.0 2 Sept Opening Presentation 20170917
 
GRUG 2.0 1 look back 2010-2013 presentations 20170801
GRUG 2.0 1 look back 2010-2013 presentations 20170801GRUG 2.0 1 look back 2010-2013 presentations 20170801
GRUG 2.0 1 look back 2010-2013 presentations 20170801
 
GRUG 2.0 1 August 2017 opening presentation 20170801
GRUG 2.0 1 August 2017 opening presentation 20170801GRUG 2.0 1 August 2017 opening presentation 20170801
GRUG 2.0 1 August 2017 opening presentation 20170801
 
GRUG 12 April 2013 opening presentation 20130423
GRUG 12 April 2013 opening presentation 20130423GRUG 12 April 2013 opening presentation 20130423
GRUG 12 April 2013 opening presentation 20130423
 
GRUG 11 AU2012 gunslinger presentation 20130220
GRUG 11 AU2012 gunslinger presentation 20130220GRUG 11 AU2012 gunslinger presentation 20130220
GRUG 11 AU2012 gunslinger presentation 20130220
 
GRUG 11 February opening presentation 20130220
GRUG 11 February opening presentation 20130220GRUG 11 February opening presentation 20130220
GRUG 11 February opening presentation 20130220
 
GRUG 10 D Philp BIM Presentation 20121113
GRUG 10 D Philp BIM Presentation 20121113GRUG 10 D Philp BIM Presentation 20121113
GRUG 10 D Philp BIM Presentation 20121113
 
GRUG 10 November opening presentation 20121113
GRUG 10 November opening presentation 20121113GRUG 10 November opening presentation 20121113
GRUG 10 November opening presentation 20121113
 
GRUG 9 august opening presentation 20120829
GRUG 9 august opening presentation 20120829GRUG 9 august opening presentation 20120829
GRUG 9 august opening presentation 20120829
 

Recently uploaded

Recently uploaded (14)

BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
SaaStr Workshop Wednesday with CEO of Guru
SaaStr Workshop Wednesday with CEO of GuruSaaStr Workshop Wednesday with CEO of Guru
SaaStr Workshop Wednesday with CEO of Guru
 
Databricks Machine Learning Associate Exam Dumps 2024.pdf
Databricks Machine Learning Associate Exam Dumps 2024.pdfDatabricks Machine Learning Associate Exam Dumps 2024.pdf
Databricks Machine Learning Associate Exam Dumps 2024.pdf
 
The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...
 
2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdfMicrosoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
 
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
 
"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR
 
Modernizing The Transport System:Dhaka Metro Rail
Modernizing The Transport System:Dhaka Metro RailModernizing The Transport System:Dhaka Metro Rail
Modernizing The Transport System:Dhaka Metro Rail
 
TSM unit 5 Toxicokinetics seminar by Ansari Aashif Raza.pptx
TSM unit 5 Toxicokinetics seminar by  Ansari Aashif Raza.pptxTSM unit 5 Toxicokinetics seminar by  Ansari Aashif Raza.pptx
TSM unit 5 Toxicokinetics seminar by Ansari Aashif Raza.pptx
 
Using AI to boost productivity for developers
Using AI to boost productivity for developersUsing AI to boost productivity for developers
Using AI to boost productivity for developers
 
2024-05-15-Surat Meetup-Hyperautomation.pptx
2024-05-15-Surat Meetup-Hyperautomation.pptx2024-05-15-Surat Meetup-Hyperautomation.pptx
2024-05-15-Surat Meetup-Hyperautomation.pptx
 
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
 

GRUG 2 Keppie Design 20100817

  • 1.
  • 2. Libya Universities: What you can do in 1 year Multi-disciplinary collaboration 2D-3D workflow Bespoke modeling Lessons learned
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. Structural Model: Foundations Columns Shear walls Structural floor slab Steelwork Stairs No MEP model
  • 14. Architectural Model: External envelope Internal walls Doors, Windows Floor slab & floor finish Stairs Overlaps: Columns Shear walls Floor slab
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31. Pros: Improved inter-disciplinary coordination Less mistakes Reduced resource requirements Design in 3D Instant synchronization of plans, sections, elevations Intuitive functionality (holes in slabs) Improved output for presentation material Makes repetitive drafting components easier to deliver Scheduling Organization of drawings and project. Single repository of information Cons: Large investment in training. High cost of investment. Subscription services High computing power requirements Slow working time Poor line weight control. Bad at basic 2D CAD Drawings look flat Require intermediate to advanced knowledge to deliver a bespoke model Non-intuitive functionality (floor, wall, ceiling joins) Additional view creation for every view on sheet Parameters, parameters, more parameters User becomes further removed from drawing and more an administrator Do we do things because we can, or because we need to do them?

Editor's Notes

  1. NSGH first model Sept 2009
  2. Using Revit as an area analysis tool. Good at communicating diagram, fast to assess design options
  3. Central CAD standards file
  4. Keynoting. Bespoke T-codes system. Link to NBS
  5. Comparison to Microstation 2D. Similar drawing quality
  6. Instant coordination 2D and 3D. All views
  7. Ability to design in 3D
  8. Improving presentation models by exporting from Revit FBX