PORTFOLIO - MLADEN LUKIC- “Sogeco “
- bigger and more important projects -
.
2007 - Avenue Hasan II – Malabo, E. Guinea, value of the project - 9 million EUR
My responsibility: senior site superintendent.
My job: earthworks, excavation, subbase, base, pipeline, buried networks, curbs, sidewalks, fit-
out, finishing. Direct supervision of 30 workmen and four groups contractors.
2008 - Expressway Malabo II, E. Guinea, value of the project - 72 million EUR
My responsibility: senior site superintendent.
My job: earthworks,sewer lines, curbs, concrete form work, concrete finishing, fit-out, finishing.
Direct supervision of 20 workmen and five groups contractors.
2009 and 2010 - Highway Bata - Mongomo , E. Guinea, value of the project - 720million EUR
My responsibility: senior site superintendent.
My job: Site installation, Camp Building, capacity of 300 workers, earthworks, concrete form
work, concrete finishing, installing Concrete factory, installation workshops, accompanying
facilities for the quarry, Installation precasт concrete factory ,overpass, bridge. . Direct
supervision of 75 workmen and four groups contractors.
2011- “ Sipopo” Urbanisation exclusive diplomatic Village, Malabo, E. Guinea,value of the
project - 80million EUR
My responsibility: senior site superintendent
My job: earthworks,preparation for 28 km streets asphalting, subbase and base, landscaping and
buried networks (cable lines, pipeline, sewerlines ) fit-out, finishing. Direct supervision of 25
workmen and five groups contractors.
2012 -2013 - “Santa Maria” The urbanization part of town, Malabo, E. Guinea, value of the
project - 21million EUR
My responsibility: senior site superintendent
My job: earthworks, excavation, subbase, base, pipeline, buried networks, curbs, sidewalks, fit-
out, finishing. Direct supervision of 15 workmen and four groups contractors.
2013 - 2014 - “Streets reconstruction- Malabo”, E. Guinea, value of the project - 34million EUR
My responsibility: senior site superintendent
My job: demolition, cleaning, preparation for streets asphalting, subbase and base, cable lines,
pipeline, sewerlines,fit-out, finishing. Direct supervision of 15 workmen and seven groups
contractors.
Jobs for “Besix”: (as a subcontractor within SOGECO) 2012 -management building
Marathon- company, Malabo, value of the project- unknown
My responsibility: senior site superintendent
My job : Buildingparkinglot . (nopictures)
2016: Protection of the Punta Cristina Cliffs –Malabo value of the project-unknown
My responsibility: senior site superintendent
My job: earthworks, incorporation approximately 60 000 m3 of compacted material. Direct
supervision of 6-8 heavy machinery operator and 15 truck driver
All projects listed in the portfolio have been constructed successfully and according to all the
r equirements ofinvestors and in within the stipulated timeframe.
The truthfulness ofthe data in the portfolio and the quality of my work, you can check with:
 Мr. Vlastimir Radovic CEO of"SOGECO-ECOCSA" Equatorial Guinea e-
mail vlastimir.radovic@sogeco-ecocsa.com tel. +240 222 258505 and +240 222 555
267284
 Mr. Predrag Milenkovic Deputy General Manager "SOGECO-
ECOCSA" predrag.milenkovic@sogeco-ecocsa.com tel.+240 222 268922
Please note: The photos are taken with the consent of the owner of the
official archives SOGECO-ECOCSA and their purpose is only for this portfolio
-PORTFOLIO     MLADEN LUKIC

More Related Content

Viewers also liked

Music magazine questionnaire analysis
Music magazine questionnaire analysisMusic magazine questionnaire analysis
Music magazine questionnaire analysismeganalicia187
 
муканова айзада+почта красоты+идея
муканова айзада+почта красоты+идеямуканова айзада+почта красоты+идея
муканова айзада+почта красоты+идеяАйзада Муканова
 
Boondoggle University: Google Tag Manager
Boondoggle University: Google Tag ManagerBoondoggle University: Google Tag Manager
Boondoggle University: Google Tag ManagerBoondoggle
 
Inspirational lean quotes from successful leaders
Inspirational lean quotes from successful leadersInspirational lean quotes from successful leaders
Inspirational lean quotes from successful leadersValue Stream Experts
 
film magazine analysis presentation no 3
film magazine analysis presentation no 3film magazine analysis presentation no 3
film magazine analysis presentation no 3Hamza Hasan
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management BasicsUpendra K
 
farhan cv with passport detail
farhan cv with passport detailfarhan cv with passport detail
farhan cv with passport detailFarhan Arif
 

Viewers also liked (11)

KAMO Profile
KAMO ProfileKAMO Profile
KAMO Profile
 
Music magazine questionnaire analysis
Music magazine questionnaire analysisMusic magazine questionnaire analysis
Music magazine questionnaire analysis
 
муканова айзада+почта красоты+идея
муканова айзада+почта красоты+идеямуканова айзада+почта красоты+идея
муканова айзада+почта красоты+идея
 
Evaluation question 4
Evaluation question 4Evaluation question 4
Evaluation question 4
 
Boondoggle University: Google Tag Manager
Boondoggle University: Google Tag ManagerBoondoggle University: Google Tag Manager
Boondoggle University: Google Tag Manager
 
Inspirational lean quotes from successful leaders
Inspirational lean quotes from successful leadersInspirational lean quotes from successful leaders
Inspirational lean quotes from successful leaders
 
Doctoral DIssertation: EAGLE360
Doctoral DIssertation: EAGLE360Doctoral DIssertation: EAGLE360
Doctoral DIssertation: EAGLE360
 
Crm Canvas case study
Crm Canvas case studyCrm Canvas case study
Crm Canvas case study
 
film magazine analysis presentation no 3
film magazine analysis presentation no 3film magazine analysis presentation no 3
film magazine analysis presentation no 3
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management Basics
 
farhan cv with passport detail
farhan cv with passport detailfarhan cv with passport detail
farhan cv with passport detail
 

Similar to -PORTFOLIO MLADEN LUKIC

BBGE - MALABO BY PASS - LOT 5A
BBGE - MALABO BY PASS - LOT 5ABBGE - MALABO BY PASS - LOT 5A
BBGE - MALABO BY PASS - LOT 5AFrancois REMOND
 
METRO RAIL ASIA 2010
METRO RAIL ASIA 2010METRO RAIL ASIA 2010
METRO RAIL ASIA 2010gifanta
 
Port Of Ust Luga
Port Of Ust LugaPort Of Ust Luga
Port Of Ust Lugaustluga
 
Curriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major ProjectsCurriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major ProjectsPapastamatis Zisis
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Muhammad Hegazy
 
Capital Summit 2015: Grad Beograd - infrastrukturni projekti
Capital Summit 2015: Grad Beograd - infrastrukturni projektiCapital Summit 2015: Grad Beograd - infrastrukturni projekti
Capital Summit 2015: Grad Beograd - infrastrukturni projektiNALED Serbia
 
The Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelThe Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelShivam Sood
 

Similar to -PORTFOLIO MLADEN LUKIC (11)

PROJECTS index updated
PROJECTS index updatedPROJECTS index updated
PROJECTS index updated
 
BBGE - MALABO BY PASS - LOT 5A
BBGE - MALABO BY PASS - LOT 5ABBGE - MALABO BY PASS - LOT 5A
BBGE - MALABO BY PASS - LOT 5A
 
METRO RAIL ASIA 2010
METRO RAIL ASIA 2010METRO RAIL ASIA 2010
METRO RAIL ASIA 2010
 
Port Of Ust Luga
Port Of Ust LugaPort Of Ust Luga
Port Of Ust Luga
 
Imathia Presentation. English.
Imathia Presentation. English.Imathia Presentation. English.
Imathia Presentation. English.
 
Curriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major ProjectsCurriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major Projects
 
CV RAFAEL CAMACHO MONTES
CV RAFAEL CAMACHO MONTESCV RAFAEL CAMACHO MONTES
CV RAFAEL CAMACHO MONTES
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
Eng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photoEng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photo
 
Capital Summit 2015: Grad Beograd - infrastrukturni projekti
Capital Summit 2015: Grad Beograd - infrastrukturni projektiCapital Summit 2015: Grad Beograd - infrastrukturni projekti
Capital Summit 2015: Grad Beograd - infrastrukturni projekti
 
The Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelThe Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering Marvel
 

-PORTFOLIO MLADEN LUKIC

  • 1. PORTFOLIO - MLADEN LUKIC- “Sogeco “ - bigger and more important projects -
  • 2. . 2007 - Avenue Hasan II – Malabo, E. Guinea, value of the project - 9 million EUR My responsibility: senior site superintendent. My job: earthworks, excavation, subbase, base, pipeline, buried networks, curbs, sidewalks, fit- out, finishing. Direct supervision of 30 workmen and four groups contractors.
  • 3. 2008 - Expressway Malabo II, E. Guinea, value of the project - 72 million EUR My responsibility: senior site superintendent. My job: earthworks,sewer lines, curbs, concrete form work, concrete finishing, fit-out, finishing. Direct supervision of 20 workmen and five groups contractors.
  • 4. 2009 and 2010 - Highway Bata - Mongomo , E. Guinea, value of the project - 720million EUR
  • 5. My responsibility: senior site superintendent. My job: Site installation, Camp Building, capacity of 300 workers, earthworks, concrete form work, concrete finishing, installing Concrete factory, installation workshops, accompanying facilities for the quarry, Installation precasт concrete factory ,overpass, bridge. . Direct supervision of 75 workmen and four groups contractors.
  • 6. 2011- “ Sipopo” Urbanisation exclusive diplomatic Village, Malabo, E. Guinea,value of the project - 80million EUR My responsibility: senior site superintendent My job: earthworks,preparation for 28 km streets asphalting, subbase and base, landscaping and buried networks (cable lines, pipeline, sewerlines ) fit-out, finishing. Direct supervision of 25 workmen and five groups contractors.
  • 7. 2012 -2013 - “Santa Maria” The urbanization part of town, Malabo, E. Guinea, value of the project - 21million EUR My responsibility: senior site superintendent My job: earthworks, excavation, subbase, base, pipeline, buried networks, curbs, sidewalks, fit- out, finishing. Direct supervision of 15 workmen and four groups contractors.
  • 8. 2013 - 2014 - “Streets reconstruction- Malabo”, E. Guinea, value of the project - 34million EUR My responsibility: senior site superintendent My job: demolition, cleaning, preparation for streets asphalting, subbase and base, cable lines, pipeline, sewerlines,fit-out, finishing. Direct supervision of 15 workmen and seven groups contractors.
  • 9. Jobs for “Besix”: (as a subcontractor within SOGECO) 2012 -management building Marathon- company, Malabo, value of the project- unknown My responsibility: senior site superintendent My job : Buildingparkinglot . (nopictures) 2016: Protection of the Punta Cristina Cliffs –Malabo value of the project-unknown My responsibility: senior site superintendent My job: earthworks, incorporation approximately 60 000 m3 of compacted material. Direct supervision of 6-8 heavy machinery operator and 15 truck driver All projects listed in the portfolio have been constructed successfully and according to all the r equirements ofinvestors and in within the stipulated timeframe. The truthfulness ofthe data in the portfolio and the quality of my work, you can check with:  Мr. Vlastimir Radovic CEO of"SOGECO-ECOCSA" Equatorial Guinea e- mail vlastimir.radovic@sogeco-ecocsa.com tel. +240 222 258505 and +240 222 555 267284  Mr. Predrag Milenkovic Deputy General Manager "SOGECO- ECOCSA" predrag.milenkovic@sogeco-ecocsa.com tel.+240 222 268922
  • 10. Please note: The photos are taken with the consent of the owner of the official archives SOGECO-ECOCSA and their purpose is only for this portfolio