2015 First Quarter Budget Review,
Kokopo Village Resort,
East New Britain Province
PRESENTED BY:
Gibson Ali Holemba
Provincial Works Manager
New Ireland Province
 New Ireland Province has a Total Land Area of
9560km2
 Total Sea Area within the Exclusive Economic Zone is
230,000km2.
 Total estimated Population in New Ireland Province is
about 260, 000 people.
 The average population density is at 1 person per
0.04km2.
 National Roads in New Ireland Province has a total
length of 571.42 km
Background
Map of New Ireland Province
West Coast Road
(ND4703)
Kaut Road
(ND4701)
Lelet Road
(ND4702)
Boluminsky Highway
(NM4701)
Poropop
Fangalawa
Lamusmus
BoKaru
Crossing
Lambuso
Crossing
 28km of Boluminsky Highway Resealed (TSSP)
 13km of Boluminsky Highway upgraded to Sealed Road
(GoPNG)
 Taskul Health Centre and Six Staff Houses improved to good
condition
 Taskul Police Station and Six (6) Staff Houses improved to
good condition
 Lakurumau Police Station and Three (3) Staff Houses improved
to good condition
 Epakasa Health Centre and Four (4) Staff Houses improved to
good condition
 Purchased 65KVA standby Genset
Notable Achievements
Summary of Funding
Funding Agency Total CFC
Allocation (K)
Total
Expenditure
(K)
Total
Committed (K)
Balance (K)
GoPNG
(Development)
20,422,466.74 16,313,494.95 16,313,494.95 - (4,108,971.79)
DFAT
(TSSP)
2, 346, 745.00 1, 018, 883.00 1, 018, 883.00 1, 327, 862.00
NIPG
DSIP (KVG)
281, 875.00 12, 739.00 12, 739.00 268, 386.00
Total (K) 23,051,086.74 17,345,116.95 17,345,116.95 - (2,512,723.79)
Activity Summary
Funding Agency
Total Funding
Expenditure
(PGK)
Total Improved
Road Length
(KM)
Total Improved
Cross Drainage
Structure
(No.)
Total of Improved
Buildings
(No.)
Sealed Unsealed New Existing New Existing
GoPNG
(DEVELOPMENT)
16,313,494.95 13 67.42 8 0 0 0
TSSP (DFAT) 2, 346, 745.00 66 90.5 12 41 0 0
NIPG/DSIP 281, 875.00 0 0 0 0 0 28
Total 18,942,114.95 79 157.92 20 41 0 28
Project Status Reports
Contract No. 42 – AT – 24BD 42 – AT – 24BT SC42 – SB – 08AW SC42 – NR – 14DM
Length (km) 38 28 13 10
Location Boluminsky Highway,
New Ireland Province
Ch135.5km to
Ch162.8km, Boluminsky
Highway, NIP
Boluminsky Highway, NIP Boluminsky Highway, NIP
Funding Agency DFAT (AusAID) DFAT (AusAID) GovPNG GovPNG
Contractor Dekenai Construction
Ltd
Dekenai Construction Ltd Dekenai Construction Ltd Green Field Contractor Ltd
Contract Amount K8, 240, 363.74 K7, 459, 733.85 K9, 955, 280.34 K9, 955, 280.34
Start Date 22 January 2013 29 April 2014 18th October 2013 15th August 2014
Duration 28 Weeks 26 Weeks 52 Weeks 32 Weeks
Completion Date 3rd September 2013 28th October 2014 14th November 2014 14th April 2015
Approved EOT 28 Days Nil Nil Nil
Revised Contract
Amount
K8, 285, 018.32
K7, 459, 733.85
K9, 955, 280.34 K9, 834, 682.00
Physical Progress 100% 99% 99% 78%
Financial Progress K8, 240, 363.74 K7, 374, 523.02 PGK 9,805,950.55 K5, 875, 040.00
Issues and Constraints Fully Completed Under Defects Period Under Defects Period In slow progress and require EoT
Project Status Reports
Contract No. Contractor Funding
Agency
Description of Works Proforma
Amount (PGK)
Claim paid
to-date (K)
Physical
Progress
(%)
Remarks
Road Maintenance Works Carry-over from 2014
AA-47ND03-14-04
Lims Construction Ltd DFAT/TSSP Patrol Grading from Kalili Plantation to
Marakalang River 292,098.40
226, 264.40
0
Works in progress after bad
weather
AA-47ND03-14-06
Maynips Ltd DFAT/TSSP Culvert Repair Works from Katu Creek to
Konogogo Junction 190,041.23
85, 516.00
10
Works in progress after bad
weather
AA-47ND03-14-08
DJ Civil Construction DFAT/TSSP Culvert Repair Works from Labur Bridge to
Katu Creek 279,203.32
134, 959.00
50
Works in progress after bad
weather
AA-47ND03-14-09
ET Contractors DFAT/TSSP Culvert Repair Works from Kontumut Creek
No.2 to Katedan River 263,298.72
100, 262.90
10
Works in progress after bad
weather
DoW/NRM – 47ND03-14-05
GMan Construction Ltd GoPNG/NRM Team & Patrol Grading from Usil to
Marakalang 337,990.40 337,990.40 50
Works in progress after bad
weather
DoW/NRM-47ND02-14-01 Lasbon Enterprise Ltd GoPNG/NRM Patrol Grading along Lelet Road
294,514.00 294,514.00 70
Works in progress after bad
weather
Building Maintenance Works Carry-over from 2014
PWC-KVG DIST/DOW 47-02-
10/2013
Rainbow Trading Kavieng
Dist/DSIP
Maintenance & Rehabilitation Works to
Taskul Rural Police Patrol Post (Lot. 2) in
Lavongai LLG
231,613.02 231,613.02 100
Fully completed
PWC-KVGJDP/DOW 47-02/2013
Jamans Building
Contractors
Kavieng
Dist/DSIP
Maintenance & Rehabilitation Works to
Taskul Rural Health Center (Lot. 2) in
Lavongai LLG
125,000.00 125,000.00 100
Fully completed
PWC-KVGJDP/DOW 47-03/2013
AW Engineering Kavieng
Dist/DSIP
Maintenance & Rehabilitation Works to
Taskul Rural Health Center (Lot. 3) in
Lovongai LLG
116,994.70 57,781.50 49
Contractor yet to complete
works
PWC-KVG DIST/DOW 47-01&03 -
10/2013
Genesis da Bilda Kavieng
Dist/DSIP
Maintenance & Rehabilitation Works to
Taskul Rural Police Patrol Post (Lot. 01 &
03) in Lavongai LLG
390,430.20 369,027.72 95
Works on halt due to bad
weather
PWC-KVG DIST/DOW 47-10-
04/2013
Island Contractors Ltd Kavieng
Dist/DSIP
Maintenance & Rehabilitation of Lakurumau
Rural Police Patrol Post (Lot.04) in Tikana
LLG
220,903.28 148,852.53 67
Contractor quit work without
approval. To be terminated.
PWC-KVGJDP/DOW 47-04/2013
Maiah Builders & Wood
Products
Kavieng
Dist/DSIP
Maintenance & Rehabilitation of Epakasi
Rural Health Center (Lot. 4) in Murat LLG. 300, 000.00 224,686.57 75
Works on halt due to bad
weather
Project Highlights
 Upgrading and sealing of Boluminsky Highway from Penamun to Soalaba
Bridge (DFAT)
 Reconstruction of Gogo & Lavatburra Bridge (DFAT)
 Resealing from Kimadan to Penamun along Boluminsky Highway (DFAT)
 Resealing from Tandis to Kabil Bridge along Boluminsky Highway (DFAT)
 Rehabilitation of Kavieng General Hospital funded by DFAT/MRA.
Architectural Design and Documentation for 4 x two (2) Bedroom
Apartment for Nurses has been submitted to the Kavieng Hospital Board.
 Architectural Design, Documentation and Supervision for Fisowa
Technical Institute
 Architectural Design and Documentation for Simberi Island Busness
Center has been submitted to New Provincial Government for review and
funding.
 Construction of 4 x new Permanent Bridges along West Coast Road
(ND4703) funded my Natalius Minerals under the Solowara 1 Project
(undersea bed mining).
New Planned Projects
 Require additional 2 x Project Engineers & Supervisors
 Require key Building Manpower to implement building
projects in the province
 NIPG has created New Ireland Works Ltd
 Low Contractor Capacity and require additional Class A
plants to undertake works on Day Labor
 K79, 000.00 for Lakurumau Police Station (DSIP) to be
re-voted.
Issues & Constraints
End of Presentation
na
Ino Rong Yet!

More Related Content

Viewers also liked

"Case Study: Sustainable Business Practise At Scott Wilson" - Gary Foster, Sc...
"Case Study: Sustainable Business Practise At Scott Wilson" - Gary Foster, Sc..."Case Study: Sustainable Business Practise At Scott Wilson" - Gary Foster, Sc...
"Case Study: Sustainable Business Practise At Scott Wilson" - Gary Foster, Sc...Sustainable Business Partnership
 
Tax discussion paper
Tax discussion paperTax discussion paper
Tax discussion paperSasha Grebe
 
Basic of accountings
Basic of accountingsBasic of accountings
Basic of accountingsRavish Vaidya
 
The Truth About The Super Tax Myths And Facts
The Truth About The Super Tax Myths And FactsThe Truth About The Super Tax Myths And Facts
The Truth About The Super Tax Myths And Factsjustinmannolini
 
Flood Resistant Bridge Design in PNG rev0117 draft
Flood Resistant Bridge Design in PNG rev0117 draftFlood Resistant Bridge Design in PNG rev0117 draft
Flood Resistant Bridge Design in PNG rev0117 draftGibson Ali Holemba
 
General Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design GuidelinesGeneral Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design GuidelinesGibson Ali Holemba
 
Developing and Sustaining Hydro Integrated Renewable Energy Power System (Hyd...
Developing and Sustaining Hydro Integrated Renewable Energy Power System (Hyd...Developing and Sustaining Hydro Integrated Renewable Energy Power System (Hyd...
Developing and Sustaining Hydro Integrated Renewable Energy Power System (Hyd...Sammy S. Aiau
 
Planning and registering your business in png keynote presentation
Planning and registering your business in png keynote presentationPlanning and registering your business in png keynote presentation
Planning and registering your business in png keynote presentationMazars Qld (Formerly Hanrick Curran)
 
GREEN COMPUTING
GREEN COMPUTINGGREEN COMPUTING
GREEN COMPUTINGveera
 
Basic accounting explained
Basic accounting explained Basic accounting explained
Basic accounting explained MaMaMoore
 
Accounting Terminology PowerPoint Presentation
Accounting Terminology PowerPoint PresentationAccounting Terminology PowerPoint Presentation
Accounting Terminology PowerPoint PresentationAndrew Schwartz
 
Income Tax Introduction
Income Tax IntroductionIncome Tax Introduction
Income Tax Introductionneelima kogta
 
Basic accounting principles
Basic accounting principlesBasic accounting principles
Basic accounting principlesUmar Gul
 
International Taxation - To begin with
International Taxation - To begin withInternational Taxation - To begin with
International Taxation - To begin withsreenivasanfca
 

Viewers also liked (20)

"Case Study: Sustainable Business Practise At Scott Wilson" - Gary Foster, Sc...
"Case Study: Sustainable Business Practise At Scott Wilson" - Gary Foster, Sc..."Case Study: Sustainable Business Practise At Scott Wilson" - Gary Foster, Sc...
"Case Study: Sustainable Business Practise At Scott Wilson" - Gary Foster, Sc...
 
Fiscal Policy Responses Pacific
Fiscal Policy Responses PacificFiscal Policy Responses Pacific
Fiscal Policy Responses Pacific
 
Tax discussion paper
Tax discussion paperTax discussion paper
Tax discussion paper
 
Basic of accountings
Basic of accountingsBasic of accountings
Basic of accountings
 
The Truth About The Super Tax Myths And Facts
The Truth About The Super Tax Myths And FactsThe Truth About The Super Tax Myths And Facts
The Truth About The Super Tax Myths And Facts
 
Flood Resistant Bridge Design in PNG rev0117 draft
Flood Resistant Bridge Design in PNG rev0117 draftFlood Resistant Bridge Design in PNG rev0117 draft
Flood Resistant Bridge Design in PNG rev0117 draft
 
General Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design GuidelinesGeneral Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design Guidelines
 
Ocala/Marion County Chamber Green & Sustainable Workgroup
Ocala/Marion County Chamber Green & Sustainable WorkgroupOcala/Marion County Chamber Green & Sustainable Workgroup
Ocala/Marion County Chamber Green & Sustainable Workgroup
 
Papua New Guinea
Papua New GuineaPapua New Guinea
Papua New Guinea
 
Developing and Sustaining Hydro Integrated Renewable Energy Power System (Hyd...
Developing and Sustaining Hydro Integrated Renewable Energy Power System (Hyd...Developing and Sustaining Hydro Integrated Renewable Energy Power System (Hyd...
Developing and Sustaining Hydro Integrated Renewable Energy Power System (Hyd...
 
Planning and registering your business in png keynote presentation
Planning and registering your business in png keynote presentationPlanning and registering your business in png keynote presentation
Planning and registering your business in png keynote presentation
 
Ch03
Ch03Ch03
Ch03
 
GREEN COMPUTING
GREEN COMPUTINGGREEN COMPUTING
GREEN COMPUTING
 
Basic accounting explained
Basic accounting explained Basic accounting explained
Basic accounting explained
 
Principles of phil taxation
Principles of phil taxationPrinciples of phil taxation
Principles of phil taxation
 
Accounting Terminology PowerPoint Presentation
Accounting Terminology PowerPoint PresentationAccounting Terminology PowerPoint Presentation
Accounting Terminology PowerPoint Presentation
 
International Industrial Relations
International Industrial RelationsInternational Industrial Relations
International Industrial Relations
 
Income Tax Introduction
Income Tax IntroductionIncome Tax Introduction
Income Tax Introduction
 
Basic accounting principles
Basic accounting principlesBasic accounting principles
Basic accounting principles
 
International Taxation - To begin with
International Taxation - To begin withInternational Taxation - To begin with
International Taxation - To begin with
 

Similar to 2015 First Quarter Budget Review

#MP2013 Presentation of the MInister of Power
#MP2013  Presentation of the MInister of Power#MP2013  Presentation of the MInister of Power
#MP2013 Presentation of the MInister of PowerFMINigeria
 
A Presentaion from the Ministry of Power
A  Presentaion from the Ministry of PowerA  Presentaion from the Ministry of Power
A Presentaion from the Ministry of PowerNigeria Centenary
 
Ministry of Power
Ministry of PowerMinistry of Power
Ministry of PowerTransformNG
 
Webinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxWebinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxMohammedJazeel2549
 
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptxPkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptxVenkatesh Dontha
 
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana RoadsMinister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana RoadsKweku Zurek
 
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdfsantosobudipray
 
Yhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptxYhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptxKheljitSingh
 
Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport ReportTransformNG
 
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar #MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar FMINigeria
 
1_Geothermal_Development_in_Indonesia (2)
1_Geothermal_Development_in_Indonesia (2)1_Geothermal_Development_in_Indonesia (2)
1_Geothermal_Development_in_Indonesia (2)Frank Mercado
 
28.12.16, hse on project nh 60 a delhi world bank meeting
28.12.16, hse on project nh 60 a delhi world bank meeting28.12.16, hse on project nh 60 a delhi world bank meeting
28.12.16, hse on project nh 60 a delhi world bank meetingrupak kumar dey
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Kachinga-Wankunda Phiri
 
Training Report on Barauni Thermal Power Station
Training Report on Barauni Thermal Power StationTraining Report on Barauni Thermal Power Station
Training Report on Barauni Thermal Power StationGulshan Singh
 
BPCL review meeting.pptx
BPCL review meeting.pptxBPCL review meeting.pptx
BPCL review meeting.pptxAyazkhan510262
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
Complete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectComplete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectEngr_Emad Khan
 

Similar to 2015 First Quarter Budget Review (20)

#MP2013 Presentation of the MInister of Power
#MP2013  Presentation of the MInister of Power#MP2013  Presentation of the MInister of Power
#MP2013 Presentation of the MInister of Power
 
A Presentaion from the Ministry of Power
A  Presentaion from the Ministry of PowerA  Presentaion from the Ministry of Power
A Presentaion from the Ministry of Power
 
Ministry of Power
Ministry of PowerMinistry of Power
Ministry of Power
 
Webinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxWebinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptx
 
SC ppt
SC pptSC ppt
SC ppt
 
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptxPkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
 
Tunnelling e brochure
Tunnelling e brochureTunnelling e brochure
Tunnelling e brochure
 
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana RoadsMinister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
 
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
 
Yhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptxYhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptx
 
Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport Report
 
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar #MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
 
1_Geothermal_Development_in_Indonesia (2)
1_Geothermal_Development_in_Indonesia (2)1_Geothermal_Development_in_Indonesia (2)
1_Geothermal_Development_in_Indonesia (2)
 
28.12.16, hse on project nh 60 a delhi world bank meeting
28.12.16, hse on project nh 60 a delhi world bank meeting28.12.16, hse on project nh 60 a delhi world bank meeting
28.12.16, hse on project nh 60 a delhi world bank meeting
 
Project report
Project reportProject report
Project report
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
 
Training Report on Barauni Thermal Power Station
Training Report on Barauni Thermal Power StationTraining Report on Barauni Thermal Power Station
Training Report on Barauni Thermal Power Station
 
BPCL review meeting.pptx
BPCL review meeting.pptxBPCL review meeting.pptx
BPCL review meeting.pptx
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
Complete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectComplete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric Project
 

More from Gibson Ali Holemba

Flood Loads on Bridges over River Crossings
Flood Loads on Bridges over River Crossings Flood Loads on Bridges over River Crossings
Flood Loads on Bridges over River Crossings Gibson Ali Holemba
 
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCDGibson Ali Holemba
 
Proforma Contract Bid Requirements
Proforma Contract Bid RequirementsProforma Contract Bid Requirements
Proforma Contract Bid RequirementsGibson Ali Holemba
 
Department of Works NIP - NIPA
Department of Works NIP - NIPADepartment of Works NIP - NIPA
Department of Works NIP - NIPAGibson Ali Holemba
 

More from Gibson Ali Holemba (6)

Sustainable Bridge Design
Sustainable Bridge DesignSustainable Bridge Design
Sustainable Bridge Design
 
Flood Loads on Bridges over River Crossings
Flood Loads on Bridges over River Crossings Flood Loads on Bridges over River Crossings
Flood Loads on Bridges over River Crossings
 
Decision Making
Decision MakingDecision Making
Decision Making
 
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
 
Proforma Contract Bid Requirements
Proforma Contract Bid RequirementsProforma Contract Bid Requirements
Proforma Contract Bid Requirements
 
Department of Works NIP - NIPA
Department of Works NIP - NIPADepartment of Works NIP - NIPA
Department of Works NIP - NIPA
 

2015 First Quarter Budget Review

  • 1. 2015 First Quarter Budget Review, Kokopo Village Resort, East New Britain Province PRESENTED BY: Gibson Ali Holemba Provincial Works Manager New Ireland Province
  • 2.  New Ireland Province has a Total Land Area of 9560km2  Total Sea Area within the Exclusive Economic Zone is 230,000km2.  Total estimated Population in New Ireland Province is about 260, 000 people.  The average population density is at 1 person per 0.04km2.  National Roads in New Ireland Province has a total length of 571.42 km Background
  • 3. Map of New Ireland Province West Coast Road (ND4703) Kaut Road (ND4701) Lelet Road (ND4702) Boluminsky Highway (NM4701) Poropop Fangalawa Lamusmus BoKaru Crossing Lambuso Crossing
  • 4.  28km of Boluminsky Highway Resealed (TSSP)  13km of Boluminsky Highway upgraded to Sealed Road (GoPNG)  Taskul Health Centre and Six Staff Houses improved to good condition  Taskul Police Station and Six (6) Staff Houses improved to good condition  Lakurumau Police Station and Three (3) Staff Houses improved to good condition  Epakasa Health Centre and Four (4) Staff Houses improved to good condition  Purchased 65KVA standby Genset Notable Achievements
  • 5. Summary of Funding Funding Agency Total CFC Allocation (K) Total Expenditure (K) Total Committed (K) Balance (K) GoPNG (Development) 20,422,466.74 16,313,494.95 16,313,494.95 - (4,108,971.79) DFAT (TSSP) 2, 346, 745.00 1, 018, 883.00 1, 018, 883.00 1, 327, 862.00 NIPG DSIP (KVG) 281, 875.00 12, 739.00 12, 739.00 268, 386.00 Total (K) 23,051,086.74 17,345,116.95 17,345,116.95 - (2,512,723.79)
  • 6. Activity Summary Funding Agency Total Funding Expenditure (PGK) Total Improved Road Length (KM) Total Improved Cross Drainage Structure (No.) Total of Improved Buildings (No.) Sealed Unsealed New Existing New Existing GoPNG (DEVELOPMENT) 16,313,494.95 13 67.42 8 0 0 0 TSSP (DFAT) 2, 346, 745.00 66 90.5 12 41 0 0 NIPG/DSIP 281, 875.00 0 0 0 0 0 28 Total 18,942,114.95 79 157.92 20 41 0 28
  • 7. Project Status Reports Contract No. 42 – AT – 24BD 42 – AT – 24BT SC42 – SB – 08AW SC42 – NR – 14DM Length (km) 38 28 13 10 Location Boluminsky Highway, New Ireland Province Ch135.5km to Ch162.8km, Boluminsky Highway, NIP Boluminsky Highway, NIP Boluminsky Highway, NIP Funding Agency DFAT (AusAID) DFAT (AusAID) GovPNG GovPNG Contractor Dekenai Construction Ltd Dekenai Construction Ltd Dekenai Construction Ltd Green Field Contractor Ltd Contract Amount K8, 240, 363.74 K7, 459, 733.85 K9, 955, 280.34 K9, 955, 280.34 Start Date 22 January 2013 29 April 2014 18th October 2013 15th August 2014 Duration 28 Weeks 26 Weeks 52 Weeks 32 Weeks Completion Date 3rd September 2013 28th October 2014 14th November 2014 14th April 2015 Approved EOT 28 Days Nil Nil Nil Revised Contract Amount K8, 285, 018.32 K7, 459, 733.85 K9, 955, 280.34 K9, 834, 682.00 Physical Progress 100% 99% 99% 78% Financial Progress K8, 240, 363.74 K7, 374, 523.02 PGK 9,805,950.55 K5, 875, 040.00 Issues and Constraints Fully Completed Under Defects Period Under Defects Period In slow progress and require EoT
  • 8. Project Status Reports Contract No. Contractor Funding Agency Description of Works Proforma Amount (PGK) Claim paid to-date (K) Physical Progress (%) Remarks Road Maintenance Works Carry-over from 2014 AA-47ND03-14-04 Lims Construction Ltd DFAT/TSSP Patrol Grading from Kalili Plantation to Marakalang River 292,098.40 226, 264.40 0 Works in progress after bad weather AA-47ND03-14-06 Maynips Ltd DFAT/TSSP Culvert Repair Works from Katu Creek to Konogogo Junction 190,041.23 85, 516.00 10 Works in progress after bad weather AA-47ND03-14-08 DJ Civil Construction DFAT/TSSP Culvert Repair Works from Labur Bridge to Katu Creek 279,203.32 134, 959.00 50 Works in progress after bad weather AA-47ND03-14-09 ET Contractors DFAT/TSSP Culvert Repair Works from Kontumut Creek No.2 to Katedan River 263,298.72 100, 262.90 10 Works in progress after bad weather DoW/NRM – 47ND03-14-05 GMan Construction Ltd GoPNG/NRM Team & Patrol Grading from Usil to Marakalang 337,990.40 337,990.40 50 Works in progress after bad weather DoW/NRM-47ND02-14-01 Lasbon Enterprise Ltd GoPNG/NRM Patrol Grading along Lelet Road 294,514.00 294,514.00 70 Works in progress after bad weather Building Maintenance Works Carry-over from 2014 PWC-KVG DIST/DOW 47-02- 10/2013 Rainbow Trading Kavieng Dist/DSIP Maintenance & Rehabilitation Works to Taskul Rural Police Patrol Post (Lot. 2) in Lavongai LLG 231,613.02 231,613.02 100 Fully completed PWC-KVGJDP/DOW 47-02/2013 Jamans Building Contractors Kavieng Dist/DSIP Maintenance & Rehabilitation Works to Taskul Rural Health Center (Lot. 2) in Lavongai LLG 125,000.00 125,000.00 100 Fully completed PWC-KVGJDP/DOW 47-03/2013 AW Engineering Kavieng Dist/DSIP Maintenance & Rehabilitation Works to Taskul Rural Health Center (Lot. 3) in Lovongai LLG 116,994.70 57,781.50 49 Contractor yet to complete works PWC-KVG DIST/DOW 47-01&03 - 10/2013 Genesis da Bilda Kavieng Dist/DSIP Maintenance & Rehabilitation Works to Taskul Rural Police Patrol Post (Lot. 01 & 03) in Lavongai LLG 390,430.20 369,027.72 95 Works on halt due to bad weather PWC-KVG DIST/DOW 47-10- 04/2013 Island Contractors Ltd Kavieng Dist/DSIP Maintenance & Rehabilitation of Lakurumau Rural Police Patrol Post (Lot.04) in Tikana LLG 220,903.28 148,852.53 67 Contractor quit work without approval. To be terminated. PWC-KVGJDP/DOW 47-04/2013 Maiah Builders & Wood Products Kavieng Dist/DSIP Maintenance & Rehabilitation of Epakasi Rural Health Center (Lot. 4) in Murat LLG. 300, 000.00 224,686.57 75 Works on halt due to bad weather
  • 10.  Upgrading and sealing of Boluminsky Highway from Penamun to Soalaba Bridge (DFAT)  Reconstruction of Gogo & Lavatburra Bridge (DFAT)  Resealing from Kimadan to Penamun along Boluminsky Highway (DFAT)  Resealing from Tandis to Kabil Bridge along Boluminsky Highway (DFAT)  Rehabilitation of Kavieng General Hospital funded by DFAT/MRA. Architectural Design and Documentation for 4 x two (2) Bedroom Apartment for Nurses has been submitted to the Kavieng Hospital Board.  Architectural Design, Documentation and Supervision for Fisowa Technical Institute  Architectural Design and Documentation for Simberi Island Busness Center has been submitted to New Provincial Government for review and funding.  Construction of 4 x new Permanent Bridges along West Coast Road (ND4703) funded my Natalius Minerals under the Solowara 1 Project (undersea bed mining). New Planned Projects
  • 11.  Require additional 2 x Project Engineers & Supervisors  Require key Building Manpower to implement building projects in the province  NIPG has created New Ireland Works Ltd  Low Contractor Capacity and require additional Class A plants to undertake works on Day Labor  K79, 000.00 for Lakurumau Police Station (DSIP) to be re-voted. Issues & Constraints