Dated:28.12.2016
SHEL-ASSIGNIA (JV)
Engineering, Procurement, and Construction of Rehabilitation and Upgrading to 2 lanes
/ 2 lane with Paved Shoulders Configuration and Strengthening of Bankura- Purulia
Road Section (km 0.00 to km 84.00) of NH-60A in the State of West Bengal (Package No.
NHIIP- -60A-6 (2nd Call) under Phase-I of National Highways Inter-connectivity
Improvement Projects (NHIIP)".
(JV)
LOCATION MAP
HEALTH SAFETY ENVIRONMENT
(JV)
PROJECT SUMMERY
Contract No :
NHIIP-WB-60A (2nd Call) under Phase-I of National Highways Inter
Connectivity Improvement Projects (NHIIP)
Description :
Rehabilitation and Upgrading to 2 Lane with Paved Shoulders of Bankura-Purulia
Road (Km: 0+000 to 84+000)
Employer : MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT. OF INDIA
EPC Contractor : M/S SHEL-ASSIGNIA (JV)
Authority Engineer : LEA ASSOCIATES SOUTH ASIA PRIVATE LIMITED
Total Length (KM) : 83.562 Kms
Contract Value : 322 (Rupees Three Hundred and Twenty Two Crores Only)
Commencement Date : 4th September-2015
Project Completion Date : 2nd March 2018 (910 days from Appointed Date)
SHEL-ASSIGNIA (JV)
Status of Schedule – F
(Required Applicable Permits)
1. Regulatory Permission & Clearances
SL. NO. Activities
Statutory
Authority
Location Status Remarks
1 Camp Layout Plan AE
23.750RHS Complete
1. Lease of Land with Owner
2. NOC from Panchayat dt. 18/11/2015
3. Approved by AE dt. 22/11/2015
56.630LHS Complete
1. Lease of Land with Owner
2. NOC from Panchayat dt. 05/09/2016
3. Recomendation given on layout plan by AE
2
Consent for Establishment
(CTE)for HMP, Batching &
WMM Plant
WBPCB
23.750RHS Complete
1. Memo No. 691-5/WPBD-NOC(6667)/16
dt.15/04/2016, obtained from WBPCB
56.630LHS Complete 1. Obtained From WBPCB
3
Consent for Operate
(CTO)for HMP, Batching &
WMM Plant
WBPCB
23.750RHS Complete
1. Memo No. 1093-7/WPBD-CONSENT(7061)/16
dt.08/06/2016, obtained from WBPCB
56.630LHS In Progress Application under process
4
Consent for Establishment
(CTE) & Consent for
Operate (CTO) for Crusher
WBPCB
23.750RHS Applied to WBPCB 1. NOC from Panchayat for land dt.18/11/2015
56.630LHS In Progress 1. Applied
5
Storage, Handling, and
Transport of Hazardous
Waste
WBPCB
23.750RHS In Progress 1. NOC from Panchayat dt. 18/11/2015
56.630LHS Applied to WBPCB 1. Applied to WBPCB
Status of Schedule – F
(Required Applicable Permits)
6
Permission for Withdrawal of
Ground Water for construction
CGWB/DC
23.750RHS Complete
Permit No. P0105270000240000001 TSE for 03 borewells. Obtained
from SWID on 01/07/2016
56.630LHS
Applied & Duties
Deposited
1. Applied to DC
7 Installation of Generators Electricity Board/DC
23.750RHS Complete
1.Memo No. DC/DED/390, Obtained from DED on 02/06/2016, and
all DG sets are of less than 1MVA for which CTE/CTO WBPCB is not
required.
56.630LHS In Progress
1. Applied to DC
2. All DG sets are of less than 1MVA for which CTE/CTO WBPCB is
not required.
8
License/Permission for storing
fuel, oil, lubricants, diesel etc.
at construction camp
Jt. Chief Cntroller of
Explosives
23.750RHS Complete 1. Ref. No. A/P/EC/WB/15/158 (p371936) DT. 07/01/2016
56.630LHS
Complete
1. Ref. No. A/P/EC/WB/15/204 (P390333) DT. 17/11/2016
9 Registration of all Vehicles
Motor Vehicle
Department
Project Vehicle Complete Various Dates
10 PUC of all vehicles
Motor Vehicle
Department
Project Vehicle Complete Various Dates
11 Labour License
Labour Comm'r
Purulia/Bankura
Project Workers Complete
1. License No. 935/LL/ALC/BNK dt. O8/12/2015, Valid upto
31/12/2016
2. License No. WB/PRL/CL L-68/2015 dt. 23/12/2015, Valid upto
31/12/2016
12
Mining of Sand,Aggregates and
Soil from Quarry
Mining Dept./DL &
LRO
Darakeswar River,
Bankura
Complete Stock Available from previous valid permits
Saltora, Bankura. Complete Stock Available from previous valid permits
14.200RHS Complete 1. Royalty paid
21.500LHS Complete 1. Royalty paid
13
EC for Sand, Aggregates and
Soil Quarries
SEIAA/DEIAA
Darakeswar River,
Bankura New Notification
Vide S.O 141
(E)dt.15/01/2016
In progressSaltora, Bankura.
14.200RHS
21.500LHS
14 Debris Disposal Site Gram Panchayat
4.600RHS,
54.150LHS,
Complete
Contractor is also stacking its dismantleddebris in camp-1 & camp-2
for which permission from panchayat is available
HSE STATISTICS
(JV)
Sl. No. Description Cumulative Status
1 Safe Man-hours 894304
2 Safe Man days 111788
3 First Aid Case 23
4 Lost Time Injury NIL
4 Near miss Case ......
5 Medical Treatment Case NIL
6 HIPO Incident NIL
7 Environmental Issue NIL
8 Others Incident NIL
9 Fire Incident NIL
10 Fatal Incident NIL
11 Others NIL
S. No. Training Details Date of Training Training Location
Total
Attendee
Type of Participant
1 HSE Induction Training 03.12.2015 HSE Induction Hall 18 Workers
2 HSE Induction Training 09.12.2015 HSE Induction Hall 21 Worker and Staff
3 HSE Induction Training 10.12.2015 HSE Induction Hall 61 Security, Staff, and Cook
4 National Road Safety week Celebration
11.1.16 to
17.1.16
Camp-1, 23+750LHS 110+ All Employees & Guest
5 Road Traffic Safety Training 12.1.2016 HSE Induction Hall 12 Worker, Staff
6 Fire fighting & Emergency Response 15.1.2016 Camp-1, 23+750LHS 70 All Employees & Guest
7 Defensive Driving Training 16.1.2016 HSE Induction Hall 24 Drivers & Operators
8
Relation with dust and mechanical
Error
13.02.2016 HSE Induction Hall 18 All Mechanical Persons
9 Work with Heavy Earth Movers 07.02.2016 Workshop, Camp-1 11 Drivers & Operators
10 Description of Fuel, Oil & Lubricant 20.02.2016 Workshop, Camp-1 26 All Mechanical Persons
11 Genaral Safety Awareness Program 31.05.2016 Camp-1, 23+750LHS 100+ All Employees & Guest
12 AIDS & HIV Awareness Program 11.07.2016 Camp-1, 23+750LHS 125+ All Employees & Guest
13 AIDS & HIV Awareness Program 12.07.2016 Laxmanpur Market 60+ Villagers
14
Road Safety Awareness Program for
Studends & Road Users with Road Sow
12.07.2016
Hutmura High School &
Road Side
400+
Students, Teacher,
Police, Villagers
15
Road Safety Awareness Program for
Road Users
13.07.2016 Gosala More, Purulia. 100+ Villagers
16
Road Safety Awareness Program for
Studends and Road Users
15.07.2016 Vibekananda High School 500+
Students, Teacher &
BVEPL Staff
17 Republic Day 26.01.2016 Camp-1, 23+750LHS 70+ All Employees & Guest
18 National Safety Day 04.03.2016 Camp-1, 23+750LHS 200+ All Employees & Guest
19 World Environment Day 05.06.2016 Camp-1, 23+750LHS 65+ All Employees
Summery of Training & Programs
(JV)
Training and AwarenessTraining and Awareness
ProgramProgram
(JV)
Bhumi Puja
Our Journey Start from Here
Health Safety Environment
(JV)
HSE Induction Program
HSE Induction Training for
Employees
Health Safety Environment
(JV)
Health Safety Environment
World Bank
Visit
World Bank Visit
(JV)
Health Safety Environment
World Bank Visit
World Bank Visit
(JV)
Health Safety Environment
Ministry Site Visit
Environmental
Monitoring is Going on
(JV)
Health Safety Environment
Mock Drill on Fire Fighting
(JV)
Health Safety Environment
Mock Drill on Fire Fighting
Mock Drill on Fire Fighting
(JV)
Health Safety Environment
Republic Day Celebration
45th
National Safety Day
Celebration
(JV)
Health Safety Environment
45th
National Safety Day
Celebration
45th
National Safety Day
Celebration
(JV)
Health Safety Environment
45th
National Safety Day
Celebration
Best Safety Award 2015-16
(JV)
Health Safety Environment
Safety Awareness Program
Special Training Program for P & M Staff
(JV)
Health Safety Environment
World
Environment
Day Celebration
World
Environment Day
Celebration
(JV)
Health Safety Environment
Awareness Program for AIDS &
HIV
Awareness Program for AIDS &
HIV
(JV)
Health Safety Environment
Condom Distribution
Awareness Program for AIDS &
HIV
(JV)
Health Safety Environment
Road Safety
Awareness
Program for
Students And
Road Users with
the Support of
Police
(JV)
Health Safety Environment
Road Safety Awareness Program for Students
And Road Users with the Support of Police
(JV)
Health Safety Environment
Road Safety Awareness Program for Students And Road Users with the
Support of Police
(JV)
Health Safety Environment
Road Safety Awareness Program for Students And Road Users
(JV)
Health Safety Environment
Road Safety Awareness
Program for Students
And Road Users
Road Safety
Awareness Program
for Students And
Road Users
(JV)
Health Safety Environment
(JV)
Health Safety Environment
HSE Induction Hall
First Aid Centre
(JV)
Health Safety Environment
HSE Induction Hall,
Camp-2
The Place of God
at Camp-2
(JV)
Health Safety Environment
Emergency
Assembly Point
Smoking Zone
(JV)
Health Safety Environment
Accommodation
for Employees
Lavatory for
Office
Purpose
(JV)
Health Safety Environment
Septic Tank with Soak Pit As Per
Specification
Pest Control System
Developed
(JV)
Health Safety Environment
General Washing
Area
Recreation
Room
(JV)
Health Safety Environment
Tree Protection System Provided
Organic Waste Disposal
(JV)
Health Safety Environment
Sedimentation Tank For Batching
Plant
Oil Interceptor
(JV)
Health Safety Environment
World Bank Enhancement
Activity (Approach Road for
School)
World Bank Enhancement
Activity (Noise Barrier for School)
(JV)
Health Safety Environment
Earthing Pit Provided
with all Electrical
Equipment & Metal Body
Device
RCCB Test System Developed
(JV)
Health Safety Environment
Earthing Pit Provided with all
Electrical Equipment & Metal
Body Device & Shed at Camp-2
HSE Audit by Feedback Infra Ltd.
(JV)
Health Safety Environment
Mosquito Net Provided for all
Employees
Electrical Fan Provided for all
Employees
(JV)
Health Safety Environment
Proper Fire Fighting Equipment
Provided At Site
Waste & Used Oil Storage
(JV)
Health Safety Environment
Night View Of
Road Safety
Arrangement
Night View Of
Road Safety
Arrangement
(JV)
Health Safety Environment
Traffic Safety Sign
Board Installation
Traffic Safety
Sign Board
Installation
(JV)
Health Safety Environment
Traffic Safety Sign
Board Installation
Narrow Road
Marking
(JV)
Health Safety Environment
Security System
Implemented
Temple
Established At
Camp
(JV)
Health Safety Environment
Camp Lay Out Plan
Displayed at Camp
Awareness
Poster Placed at
Camp
(JV)
Health Safety Environment
AIDS & HIV Awareness
Poster at Camp
Emergency Exit
Marking
(JV)
Health Safety Environment
Awareness Poster
at Camp
Seepage Bitumen
Trap
(JV)
Health Safety Environment
Delineators Provided At Pond &
High Embankment Area
Borrow Area
(JV)
Health Safety Environment
We are Attended
World Bank
Seminar At
Bhubaneswar
Vehicle
Inspection Job
Going on
(JV)
Health Safety Environment
Mechanical
Maintenance job
for Dust and Noise
Control
Environment
Monitoring
Activity
(JV)
Health Safety Environment
Environment
Monitoring Activity
Environment
Monitoring
Activity
(JV)
Health Safety Environment
Waste Bitumen
Stacked at Camp
Construction
Waste
(JV)
SAFETY FOR ALL
ALL THE TIME
GO GREEN

More Related Content

Similar to 28.12.16, hse on project nh 60 a delhi world bank meeting

Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Probir Bidhan
 
Resume Anuj Dixit
Resume Anuj DixitResume Anuj Dixit
Resume Anuj DixitAnuj Dixit
 
Government Peatland Knowledge Platform, Sharing of Indonesia’s experience in...
 Government Peatland Knowledge Platform, Sharing of Indonesia’s experience in... Government Peatland Knowledge Platform, Sharing of Indonesia’s experience in...
Government Peatland Knowledge Platform, Sharing of Indonesia’s experience in...International Tropical Peatlands Center
 
3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
 3 BHK & 4 BHK Flats in Bandra | Flats in Bandra 3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
3 BHK & 4 BHK Flats in Bandra | Flats in Bandrashikhadesai1990
 
EIA Report Analysis of Rampal Power Plant
EIA Report Analysis of Rampal Power PlantEIA Report Analysis of Rampal Power Plant
EIA Report Analysis of Rampal Power Plantsaifulalamsuahag
 
Establishment of mobile soil and water testing unit
Establishment of mobile soil and water testing unitEstablishment of mobile soil and water testing unit
Establishment of mobile soil and water testing unitRahul Chandera
 
Update Safeguard Status 06 oktober 2022- Final.pptx
Update Safeguard Status 06 oktober 2022- Final.pptxUpdate Safeguard Status 06 oktober 2022- Final.pptx
Update Safeguard Status 06 oktober 2022- Final.pptxsttluass1
 
EstateInfrastructureDevelopmentwaterMinisty.pptx
EstateInfrastructureDevelopmentwaterMinisty.pptxEstateInfrastructureDevelopmentwaterMinisty.pptx
EstateInfrastructureDevelopmentwaterMinisty.pptxmenujapathirana1234
 
Curricular_Vitae-_aditya_eia_1new__1___2_ (2)
Curricular_Vitae-_aditya_eia_1new__1___2_ (2)Curricular_Vitae-_aditya_eia_1new__1___2_ (2)
Curricular_Vitae-_aditya_eia_1new__1___2_ (2)Aditya patwardhan
 
Lok adalath ppt 1 to 20
Lok adalath ppt   1 to 20Lok adalath ppt   1 to 20
Lok adalath ppt 1 to 20prakash_dcpa
 
24082021lkmnz2tiu2k89025662pptMellbro45TPH1 - Repaired.pptx
24082021lkmnz2tiu2k89025662pptMellbro45TPH1  -  Repaired.pptx24082021lkmnz2tiu2k89025662pptMellbro45TPH1  -  Repaired.pptx
24082021lkmnz2tiu2k89025662pptMellbro45TPH1 - Repaired.pptxManjeGowdaHS2
 
EIA - SEWAGE WATER TREATMENT PLANT FFC MIRPUR MATHELO
EIA - SEWAGE WATER TREATMENT PLANT FFC MIRPUR MATHELOEIA - SEWAGE WATER TREATMENT PLANT FFC MIRPUR MATHELO
EIA - SEWAGE WATER TREATMENT PLANT FFC MIRPUR MATHELOzubeditufail
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshLokesh Saini
 
2015 First Quarter Budget Review
2015 First Quarter Budget Review2015 First Quarter Budget Review
2015 First Quarter Budget ReviewGibson Ali Holemba
 

Similar to 28.12.16, hse on project nh 60 a delhi world bank meeting (20)

Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
 
Resume Anuj Dixit
Resume Anuj DixitResume Anuj Dixit
Resume Anuj Dixit
 
Government Peatland Knowledge Platform, Sharing of Indonesia’s experience in...
 Government Peatland Knowledge Platform, Sharing of Indonesia’s experience in... Government Peatland Knowledge Platform, Sharing of Indonesia’s experience in...
Government Peatland Knowledge Platform, Sharing of Indonesia’s experience in...
 
3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
 3 BHK & 4 BHK Flats in Bandra | Flats in Bandra 3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
 
EIA Report Analysis of Rampal Power Plant
EIA Report Analysis of Rampal Power PlantEIA Report Analysis of Rampal Power Plant
EIA Report Analysis of Rampal Power Plant
 
Establishment of mobile soil and water testing unit
Establishment of mobile soil and water testing unitEstablishment of mobile soil and water testing unit
Establishment of mobile soil and water testing unit
 
Update Safeguard Status 06 oktober 2022- Final.pptx
Update Safeguard Status 06 oktober 2022- Final.pptxUpdate Safeguard Status 06 oktober 2022- Final.pptx
Update Safeguard Status 06 oktober 2022- Final.pptx
 
EstateInfrastructureDevelopmentwaterMinisty.pptx
EstateInfrastructureDevelopmentwaterMinisty.pptxEstateInfrastructureDevelopmentwaterMinisty.pptx
EstateInfrastructureDevelopmentwaterMinisty.pptx
 
EIA Report of Orange Line Train
EIA Report of Orange Line TrainEIA Report of Orange Line Train
EIA Report of Orange Line Train
 
Annexure-III.PDF
Annexure-III.PDFAnnexure-III.PDF
Annexure-III.PDF
 
CV-1
CV-1CV-1
CV-1
 
Curricular_Vitae-_aditya_eia_1new__1___2_ (2)
Curricular_Vitae-_aditya_eia_1new__1___2_ (2)Curricular_Vitae-_aditya_eia_1new__1___2_ (2)
Curricular_Vitae-_aditya_eia_1new__1___2_ (2)
 
Lok adalath ppt 1 to 20
Lok adalath ppt   1 to 20Lok adalath ppt   1 to 20
Lok adalath ppt 1 to 20
 
24082021lkmnz2tiu2k89025662pptMellbro45TPH1 - Repaired.pptx
24082021lkmnz2tiu2k89025662pptMellbro45TPH1  -  Repaired.pptx24082021lkmnz2tiu2k89025662pptMellbro45TPH1  -  Repaired.pptx
24082021lkmnz2tiu2k89025662pptMellbro45TPH1 - Repaired.pptx
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
41946 ind-seia
41946 ind-seia41946 ind-seia
41946 ind-seia
 
EIA - SEWAGE WATER TREATMENT PLANT FFC MIRPUR MATHELO
EIA - SEWAGE WATER TREATMENT PLANT FFC MIRPUR MATHELOEIA - SEWAGE WATER TREATMENT PLANT FFC MIRPUR MATHELO
EIA - SEWAGE WATER TREATMENT PLANT FFC MIRPUR MATHELO
 
Eiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakeshEiarfd2015 pce5271lokeshrakesh
Eiarfd2015 pce5271lokeshrakesh
 
2015 First Quarter Budget Review
2015 First Quarter Budget Review2015 First Quarter Budget Review
2015 First Quarter Budget Review
 
CV of JC Saha for Power Plant 290516
CV of JC Saha for Power Plant 290516CV of JC Saha for Power Plant 290516
CV of JC Saha for Power Plant 290516
 

Recently uploaded

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...Call girls in Ahmedabad High profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 

Recently uploaded (20)

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 

28.12.16, hse on project nh 60 a delhi world bank meeting

  • 1. Dated:28.12.2016 SHEL-ASSIGNIA (JV) Engineering, Procurement, and Construction of Rehabilitation and Upgrading to 2 lanes / 2 lane with Paved Shoulders Configuration and Strengthening of Bankura- Purulia Road Section (km 0.00 to km 84.00) of NH-60A in the State of West Bengal (Package No. NHIIP- -60A-6 (2nd Call) under Phase-I of National Highways Inter-connectivity Improvement Projects (NHIIP)".
  • 3. HEALTH SAFETY ENVIRONMENT (JV) PROJECT SUMMERY Contract No : NHIIP-WB-60A (2nd Call) under Phase-I of National Highways Inter Connectivity Improvement Projects (NHIIP) Description : Rehabilitation and Upgrading to 2 Lane with Paved Shoulders of Bankura-Purulia Road (Km: 0+000 to 84+000) Employer : MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT. OF INDIA EPC Contractor : M/S SHEL-ASSIGNIA (JV) Authority Engineer : LEA ASSOCIATES SOUTH ASIA PRIVATE LIMITED Total Length (KM) : 83.562 Kms Contract Value : 322 (Rupees Three Hundred and Twenty Two Crores Only) Commencement Date : 4th September-2015 Project Completion Date : 2nd March 2018 (910 days from Appointed Date) SHEL-ASSIGNIA (JV)
  • 4. Status of Schedule – F (Required Applicable Permits) 1. Regulatory Permission & Clearances SL. NO. Activities Statutory Authority Location Status Remarks 1 Camp Layout Plan AE 23.750RHS Complete 1. Lease of Land with Owner 2. NOC from Panchayat dt. 18/11/2015 3. Approved by AE dt. 22/11/2015 56.630LHS Complete 1. Lease of Land with Owner 2. NOC from Panchayat dt. 05/09/2016 3. Recomendation given on layout plan by AE 2 Consent for Establishment (CTE)for HMP, Batching & WMM Plant WBPCB 23.750RHS Complete 1. Memo No. 691-5/WPBD-NOC(6667)/16 dt.15/04/2016, obtained from WBPCB 56.630LHS Complete 1. Obtained From WBPCB 3 Consent for Operate (CTO)for HMP, Batching & WMM Plant WBPCB 23.750RHS Complete 1. Memo No. 1093-7/WPBD-CONSENT(7061)/16 dt.08/06/2016, obtained from WBPCB 56.630LHS In Progress Application under process 4 Consent for Establishment (CTE) & Consent for Operate (CTO) for Crusher WBPCB 23.750RHS Applied to WBPCB 1. NOC from Panchayat for land dt.18/11/2015 56.630LHS In Progress 1. Applied 5 Storage, Handling, and Transport of Hazardous Waste WBPCB 23.750RHS In Progress 1. NOC from Panchayat dt. 18/11/2015 56.630LHS Applied to WBPCB 1. Applied to WBPCB
  • 5. Status of Schedule – F (Required Applicable Permits) 6 Permission for Withdrawal of Ground Water for construction CGWB/DC 23.750RHS Complete Permit No. P0105270000240000001 TSE for 03 borewells. Obtained from SWID on 01/07/2016 56.630LHS Applied & Duties Deposited 1. Applied to DC 7 Installation of Generators Electricity Board/DC 23.750RHS Complete 1.Memo No. DC/DED/390, Obtained from DED on 02/06/2016, and all DG sets are of less than 1MVA for which CTE/CTO WBPCB is not required. 56.630LHS In Progress 1. Applied to DC 2. All DG sets are of less than 1MVA for which CTE/CTO WBPCB is not required. 8 License/Permission for storing fuel, oil, lubricants, diesel etc. at construction camp Jt. Chief Cntroller of Explosives 23.750RHS Complete 1. Ref. No. A/P/EC/WB/15/158 (p371936) DT. 07/01/2016 56.630LHS Complete 1. Ref. No. A/P/EC/WB/15/204 (P390333) DT. 17/11/2016 9 Registration of all Vehicles Motor Vehicle Department Project Vehicle Complete Various Dates 10 PUC of all vehicles Motor Vehicle Department Project Vehicle Complete Various Dates 11 Labour License Labour Comm'r Purulia/Bankura Project Workers Complete 1. License No. 935/LL/ALC/BNK dt. O8/12/2015, Valid upto 31/12/2016 2. License No. WB/PRL/CL L-68/2015 dt. 23/12/2015, Valid upto 31/12/2016 12 Mining of Sand,Aggregates and Soil from Quarry Mining Dept./DL & LRO Darakeswar River, Bankura Complete Stock Available from previous valid permits Saltora, Bankura. Complete Stock Available from previous valid permits 14.200RHS Complete 1. Royalty paid 21.500LHS Complete 1. Royalty paid 13 EC for Sand, Aggregates and Soil Quarries SEIAA/DEIAA Darakeswar River, Bankura New Notification Vide S.O 141 (E)dt.15/01/2016 In progressSaltora, Bankura. 14.200RHS 21.500LHS 14 Debris Disposal Site Gram Panchayat 4.600RHS, 54.150LHS, Complete Contractor is also stacking its dismantleddebris in camp-1 & camp-2 for which permission from panchayat is available
  • 6. HSE STATISTICS (JV) Sl. No. Description Cumulative Status 1 Safe Man-hours 894304 2 Safe Man days 111788 3 First Aid Case 23 4 Lost Time Injury NIL 4 Near miss Case ...... 5 Medical Treatment Case NIL 6 HIPO Incident NIL 7 Environmental Issue NIL 8 Others Incident NIL 9 Fire Incident NIL 10 Fatal Incident NIL 11 Others NIL
  • 7. S. No. Training Details Date of Training Training Location Total Attendee Type of Participant 1 HSE Induction Training 03.12.2015 HSE Induction Hall 18 Workers 2 HSE Induction Training 09.12.2015 HSE Induction Hall 21 Worker and Staff 3 HSE Induction Training 10.12.2015 HSE Induction Hall 61 Security, Staff, and Cook 4 National Road Safety week Celebration 11.1.16 to 17.1.16 Camp-1, 23+750LHS 110+ All Employees & Guest 5 Road Traffic Safety Training 12.1.2016 HSE Induction Hall 12 Worker, Staff 6 Fire fighting & Emergency Response 15.1.2016 Camp-1, 23+750LHS 70 All Employees & Guest 7 Defensive Driving Training 16.1.2016 HSE Induction Hall 24 Drivers & Operators 8 Relation with dust and mechanical Error 13.02.2016 HSE Induction Hall 18 All Mechanical Persons 9 Work with Heavy Earth Movers 07.02.2016 Workshop, Camp-1 11 Drivers & Operators 10 Description of Fuel, Oil & Lubricant 20.02.2016 Workshop, Camp-1 26 All Mechanical Persons 11 Genaral Safety Awareness Program 31.05.2016 Camp-1, 23+750LHS 100+ All Employees & Guest 12 AIDS & HIV Awareness Program 11.07.2016 Camp-1, 23+750LHS 125+ All Employees & Guest 13 AIDS & HIV Awareness Program 12.07.2016 Laxmanpur Market 60+ Villagers 14 Road Safety Awareness Program for Studends & Road Users with Road Sow 12.07.2016 Hutmura High School & Road Side 400+ Students, Teacher, Police, Villagers 15 Road Safety Awareness Program for Road Users 13.07.2016 Gosala More, Purulia. 100+ Villagers 16 Road Safety Awareness Program for Studends and Road Users 15.07.2016 Vibekananda High School 500+ Students, Teacher & BVEPL Staff 17 Republic Day 26.01.2016 Camp-1, 23+750LHS 70+ All Employees & Guest 18 National Safety Day 04.03.2016 Camp-1, 23+750LHS 200+ All Employees & Guest 19 World Environment Day 05.06.2016 Camp-1, 23+750LHS 65+ All Employees Summery of Training & Programs
  • 8. (JV) Training and AwarenessTraining and Awareness ProgramProgram
  • 9. (JV) Bhumi Puja Our Journey Start from Here Health Safety Environment
  • 10. (JV) HSE Induction Program HSE Induction Training for Employees Health Safety Environment
  • 11. (JV) Health Safety Environment World Bank Visit World Bank Visit
  • 12. (JV) Health Safety Environment World Bank Visit World Bank Visit
  • 13. (JV) Health Safety Environment Ministry Site Visit Environmental Monitoring is Going on
  • 14. (JV) Health Safety Environment Mock Drill on Fire Fighting
  • 15. (JV) Health Safety Environment Mock Drill on Fire Fighting Mock Drill on Fire Fighting
  • 16. (JV) Health Safety Environment Republic Day Celebration 45th National Safety Day Celebration
  • 17. (JV) Health Safety Environment 45th National Safety Day Celebration 45th National Safety Day Celebration
  • 18. (JV) Health Safety Environment 45th National Safety Day Celebration Best Safety Award 2015-16
  • 19. (JV) Health Safety Environment Safety Awareness Program Special Training Program for P & M Staff
  • 20. (JV) Health Safety Environment World Environment Day Celebration World Environment Day Celebration
  • 21. (JV) Health Safety Environment Awareness Program for AIDS & HIV Awareness Program for AIDS & HIV
  • 22. (JV) Health Safety Environment Condom Distribution Awareness Program for AIDS & HIV
  • 23. (JV) Health Safety Environment Road Safety Awareness Program for Students And Road Users with the Support of Police
  • 24. (JV) Health Safety Environment Road Safety Awareness Program for Students And Road Users with the Support of Police
  • 25. (JV) Health Safety Environment Road Safety Awareness Program for Students And Road Users with the Support of Police
  • 26. (JV) Health Safety Environment Road Safety Awareness Program for Students And Road Users
  • 27. (JV) Health Safety Environment Road Safety Awareness Program for Students And Road Users Road Safety Awareness Program for Students And Road Users
  • 29. (JV) Health Safety Environment HSE Induction Hall First Aid Centre
  • 30. (JV) Health Safety Environment HSE Induction Hall, Camp-2 The Place of God at Camp-2
  • 32. (JV) Health Safety Environment Accommodation for Employees Lavatory for Office Purpose
  • 33. (JV) Health Safety Environment Septic Tank with Soak Pit As Per Specification Pest Control System Developed
  • 34. (JV) Health Safety Environment General Washing Area Recreation Room
  • 35. (JV) Health Safety Environment Tree Protection System Provided Organic Waste Disposal
  • 36. (JV) Health Safety Environment Sedimentation Tank For Batching Plant Oil Interceptor
  • 37. (JV) Health Safety Environment World Bank Enhancement Activity (Approach Road for School) World Bank Enhancement Activity (Noise Barrier for School)
  • 38. (JV) Health Safety Environment Earthing Pit Provided with all Electrical Equipment & Metal Body Device RCCB Test System Developed
  • 39. (JV) Health Safety Environment Earthing Pit Provided with all Electrical Equipment & Metal Body Device & Shed at Camp-2 HSE Audit by Feedback Infra Ltd.
  • 40. (JV) Health Safety Environment Mosquito Net Provided for all Employees Electrical Fan Provided for all Employees
  • 41. (JV) Health Safety Environment Proper Fire Fighting Equipment Provided At Site Waste & Used Oil Storage
  • 42. (JV) Health Safety Environment Night View Of Road Safety Arrangement Night View Of Road Safety Arrangement
  • 43. (JV) Health Safety Environment Traffic Safety Sign Board Installation Traffic Safety Sign Board Installation
  • 44. (JV) Health Safety Environment Traffic Safety Sign Board Installation Narrow Road Marking
  • 45. (JV) Health Safety Environment Security System Implemented Temple Established At Camp
  • 46. (JV) Health Safety Environment Camp Lay Out Plan Displayed at Camp Awareness Poster Placed at Camp
  • 47. (JV) Health Safety Environment AIDS & HIV Awareness Poster at Camp Emergency Exit Marking
  • 48. (JV) Health Safety Environment Awareness Poster at Camp Seepage Bitumen Trap
  • 49. (JV) Health Safety Environment Delineators Provided At Pond & High Embankment Area Borrow Area
  • 50. (JV) Health Safety Environment We are Attended World Bank Seminar At Bhubaneswar Vehicle Inspection Job Going on
  • 51. (JV) Health Safety Environment Mechanical Maintenance job for Dust and Noise Control Environment Monitoring Activity
  • 52. (JV) Health Safety Environment Environment Monitoring Activity Environment Monitoring Activity
  • 53. (JV) Health Safety Environment Waste Bitumen Stacked at Camp Construction Waste
  • 54. (JV) SAFETY FOR ALL ALL THE TIME GO GREEN