28.12.16, hse on project nh 60 a delhi world bank meeting
1. Dated:28.12.2016
SHEL-ASSIGNIA (JV)
Engineering, Procurement, and Construction of Rehabilitation and Upgrading to 2 lanes
/ 2 lane with Paved Shoulders Configuration and Strengthening of Bankura- Purulia
Road Section (km 0.00 to km 84.00) of NH-60A in the State of West Bengal (Package No.
NHIIP- -60A-6 (2nd Call) under Phase-I of National Highways Inter-connectivity
Improvement Projects (NHIIP)".
3. HEALTH SAFETY ENVIRONMENT
(JV)
PROJECT SUMMERY
Contract No :
NHIIP-WB-60A (2nd Call) under Phase-I of National Highways Inter
Connectivity Improvement Projects (NHIIP)
Description :
Rehabilitation and Upgrading to 2 Lane with Paved Shoulders of Bankura-Purulia
Road (Km: 0+000 to 84+000)
Employer : MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT. OF INDIA
EPC Contractor : M/S SHEL-ASSIGNIA (JV)
Authority Engineer : LEA ASSOCIATES SOUTH ASIA PRIVATE LIMITED
Total Length (KM) : 83.562 Kms
Contract Value : 322 (Rupees Three Hundred and Twenty Two Crores Only)
Commencement Date : 4th September-2015
Project Completion Date : 2nd March 2018 (910 days from Appointed Date)
SHEL-ASSIGNIA (JV)
4. Status of Schedule – F
(Required Applicable Permits)
1. Regulatory Permission & Clearances
SL. NO. Activities
Statutory
Authority
Location Status Remarks
1 Camp Layout Plan AE
23.750RHS Complete
1. Lease of Land with Owner
2. NOC from Panchayat dt. 18/11/2015
3. Approved by AE dt. 22/11/2015
56.630LHS Complete
1. Lease of Land with Owner
2. NOC from Panchayat dt. 05/09/2016
3. Recomendation given on layout plan by AE
2
Consent for Establishment
(CTE)for HMP, Batching &
WMM Plant
WBPCB
23.750RHS Complete
1. Memo No. 691-5/WPBD-NOC(6667)/16
dt.15/04/2016, obtained from WBPCB
56.630LHS Complete 1. Obtained From WBPCB
3
Consent for Operate
(CTO)for HMP, Batching &
WMM Plant
WBPCB
23.750RHS Complete
1. Memo No. 1093-7/WPBD-CONSENT(7061)/16
dt.08/06/2016, obtained from WBPCB
56.630LHS In Progress Application under process
4
Consent for Establishment
(CTE) & Consent for
Operate (CTO) for Crusher
WBPCB
23.750RHS Applied to WBPCB 1. NOC from Panchayat for land dt.18/11/2015
56.630LHS In Progress 1. Applied
5
Storage, Handling, and
Transport of Hazardous
Waste
WBPCB
23.750RHS In Progress 1. NOC from Panchayat dt. 18/11/2015
56.630LHS Applied to WBPCB 1. Applied to WBPCB
5. Status of Schedule – F
(Required Applicable Permits)
6
Permission for Withdrawal of
Ground Water for construction
CGWB/DC
23.750RHS Complete
Permit No. P0105270000240000001 TSE for 03 borewells. Obtained
from SWID on 01/07/2016
56.630LHS
Applied & Duties
Deposited
1. Applied to DC
7 Installation of Generators Electricity Board/DC
23.750RHS Complete
1.Memo No. DC/DED/390, Obtained from DED on 02/06/2016, and
all DG sets are of less than 1MVA for which CTE/CTO WBPCB is not
required.
56.630LHS In Progress
1. Applied to DC
2. All DG sets are of less than 1MVA for which CTE/CTO WBPCB is
not required.
8
License/Permission for storing
fuel, oil, lubricants, diesel etc.
at construction camp
Jt. Chief Cntroller of
Explosives
23.750RHS Complete 1. Ref. No. A/P/EC/WB/15/158 (p371936) DT. 07/01/2016
56.630LHS
Complete
1. Ref. No. A/P/EC/WB/15/204 (P390333) DT. 17/11/2016
9 Registration of all Vehicles
Motor Vehicle
Department
Project Vehicle Complete Various Dates
10 PUC of all vehicles
Motor Vehicle
Department
Project Vehicle Complete Various Dates
11 Labour License
Labour Comm'r
Purulia/Bankura
Project Workers Complete
1. License No. 935/LL/ALC/BNK dt. O8/12/2015, Valid upto
31/12/2016
2. License No. WB/PRL/CL L-68/2015 dt. 23/12/2015, Valid upto
31/12/2016
12
Mining of Sand,Aggregates and
Soil from Quarry
Mining Dept./DL &
LRO
Darakeswar River,
Bankura
Complete Stock Available from previous valid permits
Saltora, Bankura. Complete Stock Available from previous valid permits
14.200RHS Complete 1. Royalty paid
21.500LHS Complete 1. Royalty paid
13
EC for Sand, Aggregates and
Soil Quarries
SEIAA/DEIAA
Darakeswar River,
Bankura New Notification
Vide S.O 141
(E)dt.15/01/2016
In progressSaltora, Bankura.
14.200RHS
21.500LHS
14 Debris Disposal Site Gram Panchayat
4.600RHS,
54.150LHS,
Complete
Contractor is also stacking its dismantleddebris in camp-1 & camp-2
for which permission from panchayat is available
6. HSE STATISTICS
(JV)
Sl. No. Description Cumulative Status
1 Safe Man-hours 894304
2 Safe Man days 111788
3 First Aid Case 23
4 Lost Time Injury NIL
4 Near miss Case ......
5 Medical Treatment Case NIL
6 HIPO Incident NIL
7 Environmental Issue NIL
8 Others Incident NIL
9 Fire Incident NIL
10 Fatal Incident NIL
11 Others NIL
7. S. No. Training Details Date of Training Training Location
Total
Attendee
Type of Participant
1 HSE Induction Training 03.12.2015 HSE Induction Hall 18 Workers
2 HSE Induction Training 09.12.2015 HSE Induction Hall 21 Worker and Staff
3 HSE Induction Training 10.12.2015 HSE Induction Hall 61 Security, Staff, and Cook
4 National Road Safety week Celebration
11.1.16 to
17.1.16
Camp-1, 23+750LHS 110+ All Employees & Guest
5 Road Traffic Safety Training 12.1.2016 HSE Induction Hall 12 Worker, Staff
6 Fire fighting & Emergency Response 15.1.2016 Camp-1, 23+750LHS 70 All Employees & Guest
7 Defensive Driving Training 16.1.2016 HSE Induction Hall 24 Drivers & Operators
8
Relation with dust and mechanical
Error
13.02.2016 HSE Induction Hall 18 All Mechanical Persons
9 Work with Heavy Earth Movers 07.02.2016 Workshop, Camp-1 11 Drivers & Operators
10 Description of Fuel, Oil & Lubricant 20.02.2016 Workshop, Camp-1 26 All Mechanical Persons
11 Genaral Safety Awareness Program 31.05.2016 Camp-1, 23+750LHS 100+ All Employees & Guest
12 AIDS & HIV Awareness Program 11.07.2016 Camp-1, 23+750LHS 125+ All Employees & Guest
13 AIDS & HIV Awareness Program 12.07.2016 Laxmanpur Market 60+ Villagers
14
Road Safety Awareness Program for
Studends & Road Users with Road Sow
12.07.2016
Hutmura High School &
Road Side
400+
Students, Teacher,
Police, Villagers
15
Road Safety Awareness Program for
Road Users
13.07.2016 Gosala More, Purulia. 100+ Villagers
16
Road Safety Awareness Program for
Studends and Road Users
15.07.2016 Vibekananda High School 500+
Students, Teacher &
BVEPL Staff
17 Republic Day 26.01.2016 Camp-1, 23+750LHS 70+ All Employees & Guest
18 National Safety Day 04.03.2016 Camp-1, 23+750LHS 200+ All Employees & Guest
19 World Environment Day 05.06.2016 Camp-1, 23+750LHS 65+ All Employees
Summery of Training & Programs
37. (JV)
Health Safety Environment
World Bank Enhancement
Activity (Approach Road for
School)
World Bank Enhancement
Activity (Noise Barrier for School)