SlideShare a Scribd company logo
1 of 7
RESUME
IMRAN ASLAM JAWRE [Piping/Mechanical Eng.(PDS DESIGNER)]
K.M KAZI BUILDING [43/6],
BOMBILBAZAR,
KALYAN [W] .
PIN CODE : [ 421301 ] .
CONTACT NO : [Saudi :+966 568306523, India : 9870481228].
E-mail ID : imranjawre@gmail.com
CAREER OBJECTIVE
TO WORK IN A COMPETITIVE & CHALLENGING ENVIRONMENT,TO CONTRIBUTE
WITH THE BEST OF MY ABILITY TOWARDS THE GROWTH OF AN ORGANISATION.
T E C H N I C A L E X P E R I E N C E
I am a qualified Diploma in Mechanical Engineer with over 12 years of Work
experience as a “Piping Designer" in various types of Oil, Gas & Petrochemical
Projects in India & Middle East. I have also done Advanced Diploma in Piping
Engineering.
TOTAL 7yrs EXPERIENCE AS A “PDS DESIGNER”.
TOTAL 5yrs EXPERIENCE AS A “PIPING DESIGNER”.
E D U C A T I O N A L Q U A L I F I C A T I O N
 Passed “ADVANCED DIPLOMA IN PIPING ENGINEERING” from “SUVIDYA
INSTITUTE OF TECHNOLOGY”- Mumbai.
 Passed “DIPLOMA IN MECHANICAL ENGINEERING” with Second Class from
“SHIVAJIRAO JONDHALE POLYTECHNIC”- MSBTE.
Note: My “DIPLOMA IN MECHANICAL ENGINEERING” Certificate is Attested By
SAUDI CULTURAL & SAUDI EMBASSY.
 Passed “COMPUTER AIDED DRAFTING” AutoCad with A Grade from “INDUSTRIAL
TRAINING INSTITUTE”- Ambernath.
 Passed “SECONDARY SCHOOL CERTIFICATE” with First Class from “LOURDES
HIGH SCHOOL”- Mumbai Board.
S O F T W A R E K N O W L E D G E
 PLANT DESIGN SYSTEM [PDS].
 MICROSTATION.
 RASTERMANAGER.
 AUTOCAD.
 SMART PLANT REVIEW [SPR], NAVISWORKS.
W O R K E X P E R I E N C E
1) Organization : JACOBSZATE SAUDI AL KHOBAR OFFICE .
Designation : Working as a “PIPING DESIGNER”.
Project : INCREASE CRUDE OIL CAPACITY EAST/WEST
PIPELINES.
Owner : SAUDI ARAMCO.
Start/End Date : Dec 2015 to Till Date.
Responsibilities :
 EQUIPMENT NOZZLE ORIENTATION DRAWING.
 PREPARATIONOF DEMOLITIONDRAWINGS.
 PIPINGLAYOUTS USINGMICROSTATION.
 CONDUCTINGSITE VISIT TO CHECK THE FEASIBILITY OF NEW PIPE ROUTING&
PROPOSED CIVIL PLATFORMS.
 GIVING STRUCTURE,PLATFORMS,SUPPORTS INPUT TO CIVIL DEPARTMENT.
 ISOMETRICS MAKINGAS PER NEW PIPING LAYOUTS.
 DEVELOPINGTIE-IN INDEXDRAWINGS.
 SUPPORT CODINGAS PER SUPPORT STANDARD.
 SUPPORT DRAWINGMAKING.
Project : REPLACEMENT OF PRESSURE VESSELS,
SOUTH GHAWAR, KSA.
Owner : SAUDI ARAMCO.
Start/End Date : May 2015 to Nov 2015.
Responsibilities : Replacement of HPTT – [459-D-3].
 EQUIPMENT NOZZLE ORIENTATION DRAWING.
 PREPARATIONOF DEMOLITIONDRAWINGS.
 PIPINGLAYOUTS USINGMICROSTATION.
 CONDUCTINGSITE VISIT TO CHECK THE FEASIBILITY OF NEW PIPE ROUTING&
PROPOSED CIVIL PLATFORMS.
 GIVING STRUCTURE,PLATFORMS,SUPPORTS INPUT TO CIVIL DEPARTMENT.
 ISOMETRICS MAKINGAS PER NEW PIPINGLAYOUTS.
 DEVELOPINGTIE-IN INDEXDRAWINGS.
 SUPPORT CODINGAS PER SUPPORT STANDARD.
 SUPPORT DRAWINGMAKING.
Project : EWO#14S133 - As-built Inspection Isometric [SAG15086]
Owner : SAUDI ARAMCO.
Start/End Date : Feb 2015 to April 2015.
Responsibilities :
 GENERATINGSITE MARKUP.
 MAKING AS-BUILT INSPECTION ISOMETRICS.
Project : REPLACEMENT OF PRESSURE VESSELS,
SOUTH GHAWAR, KSA.
Owner : SAUDI ARAMCO.
Start/End Date : Oct 2015 to Feb 2015.
Responsibilities : Replacement of HPPT – [459-D-1].
 EQUIPMENT NOZZLE ORIENTATION DRAWING.
 PREPARATIONOF DEMOLITIONDRAWINGS.
 PIPINGLAYOUTS USINGMICROSTATION.
 CONDUCTINGSITE VISIT TO CHECK THE FEASIBILITY OF NEW PIPE ROUTING&
PROPOSED CIVIL PLATFORMS.
 GIVING STRUCTURE,PLATFORMS,SUPPORTS INPUT TO CIVIL DEPARTMENT.
 ISOMETRICS MAKINGAS PER NEW PIPINGLAYOUTS.
 DEVELOPINGTIE-IN INDEXDRAWINGS.
 SUPPORT CODINGAS PER SUPPORT STANDARD.
 SUPPORT DRAWINGMAKING.
Designation : Working as a “PDS/PIPING DESIGNER”.
Project : DRAGADOS – DETAIL DESIGN ASPHALT LOADING &
STORAGE FACILITY, PROJECT NO- SA207700.
Owner : RAS TANURA, SAUDI ARABIAN OIL COMPANY.
Start/End Date : Sep 2014 to Oct 2015.
Responsibilities :
 EQUIPMENT & PIPINGMODELLINGUSINGPDS SOFTWARE.
 ISOMETRICS EXTRACTION.
 ISOMETRICS & PIPINGLAYOUTS CHECKING.
 SUPPORT MODELLING.
2) Organization : TECHNIP FRANCE ABUDHABI .
Designation : Worked as a “PDS DESIGNER” on Contract Basis.
Project : AL DABBIYA PHASE 3 FIELD DEVELOPMENT .
PROJECT NO-09447U.
Owner : ABU DHABI COMPANY FOR ONSHORE OIL OPERATIONS
[ADCO].
Start/End Date : Sep 2013 to Jan 2014.
Responsibilities :
 EQUIPMENT MODELLINGUSINGPDS SOFTWARE.
 PIPINGMODELLINGUSINGPDS SOFTWARE.
 ISOMETRICS EXTRACTION.
3) Organization : “JACOBS ENGINEERING ”–[MAHAPE OFFICE].
Designation : Worked as a “PDS DESIGNER”
Project : KIRBY NORTH PHASE 1, KIRBY NORTH PLANT .
CANADIAN NATURAL [CANADA], PROJECT NO-CE4160.
Owner : CANADIAN NATURAL RESOURCES (CNRL) .
Start/End Date : July 2012 to Sep 2013.
Responsibilities :
 EQUIPMENT MODELLINGUSINGPDS SOFTWARE.
 PIPINGMODELLINGUSINGPDS SOFTWARE.
 ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.
 SUPPORT MODELLINGAS PER STRESS ANALYSIS.
4) Organization : “AKER SOLUTIONS Pvt Ltd.”–[KANJURMARG(E)].
Designation : Worked as a “PDS DESIGNER”
Project : PTA PROJECT AT DMD .
DAHEJ MANUFACTURING DIVISION. BHARUCH [GUJARAT].
Owner : RELIANCE INDUSTRIES PVT LTD .
Start/End Date : Nov 2011 to June 2012.
Responsibilities :
 EQUIPMENT MODELLINGUSINGPDS SOFTWARE.
 PIPINGMODELLINGUSINGPDS SOFTWARE.
 ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.
 SUPPORT MODELLINGAS PER STRESS ANALYSIS.
5) Organization: “GOLLA ENGG. Pvt Ltd.”–[CBD-BELAPUR].
Designation : Worked as a “PDS DESIGNER”
Project : RESIDUE UPGRADATION & MS/HSD QUALITY
IMPROVEMENT PROJECT.
EPCC -4 ISOM & NSU UNIT.[PENEX UNIT]
Owner : INDIAN OIL CORPORATION LTD.VADODARA – [GUJARAT]
Pmc : TOYO ENGINEERING INDIA LTD.MUMBAI-INDIA.
Start/End Date : Mar 2008 to June 2011.
Responsibilities :
 TENTATIVE LINE ROUTING AS PER PFD [MANUALLY].
 BULK MTO TAKE OFF AS PER P&ID [MANUALLY].
 LINE ROUTINGIN GAD AS PER P&ID.
 EQUIPMENT MODELLINGUSINGPDS SOFTWARE.
 PIPINGMODELLINGUSINGPDS SOFTWARE (7.1 Version].
 ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.
 SUPPORT CODINGAS PER TECHNIP SUPPORT STANDARD.
 ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.
 EQUIPMENT CHECKINGAS PER VENDOR DRAWING
 ISOMETRICS CHECKINGAS PER PPL & P&ID.
 GIVING STRUCTURE,PLATFORMS,SUPPORTS INPUT TO CIVIL DEPARTMENT.
 PIPINGAND EQUIPMENT CLASH CHECKINGUSINGSPR.
Project : FRE – REVAMP [GREEN FUEL EMISSION CONTROL PROJECT]
[FRE-APS/VPS REVAMP] – [UNIT – 31/32].
Owner : HINDUSTAN PETROLEUM CORPORATION LIMITED
[Mumbai Refinery].
Responsibilities :
 AS BUILT MARK UP FROM SITE UPDATION IN GADS.
 LINE ROUTINGIN GAD AS PER NEW P&ID.
 ISOMETRICS MAKING,CHECKING& MTO UPDATION AS PER P&ID.
 SUPPORT CODINGAS PER EIL STANDARD.
 SPECIAL SUPPORT DESIGNINGAS PER REQUIREMENT.
 VESSEL CLIP DESIGNING.
 APS STACK AS BUILT DRAWINGMAKING.
 DUCTINGFABRICATION DRAWINGCHECKING.
 MODIFICATION OF EXISTINGDUCT AS PER REQUIREMENT.
Project : [ HIGEE SYSTEM IN FG AMINE ABSORPTION UNIT. ]
Owner : [ HINDUSTAN PETROLEUM CORPORATION LIMITED][VISAKH].
Responsibilities :
 EQUIPMENT MODELLING USINGPDS SOFTWARE.
 PIPINGMODELLINGUSINGPDS SOFTWARE
 ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.
Project : [ ISRL - SBR PLANT. ]
Responsibilities :
 BULK MATERIAL TAKE OFF AS PER P&ID.
Project : FRE – REVAMP [GREEN FUEL EMISSION CONTROL PROJECT]
[FRE-APS/VPS REVAMP] – [UNIT – 31/32].
Owner : HINDUSTAN PETROLEUM CORPORATION LIMITED
[Mumbai Refinery].
Responsibilities :
 EQUIPMENT MODELLINGUSINGPDS SOFTWARE.
 PIPINGMODELLINGUSINGPDS SOFTWARE.
 ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.
Project : LAVAN REFINERY UPGRADING & REVAMPING
CONSTRUCTION OF LICENSED UNITS (EPC).
Owner : NATIONAL IRANIAN OIL REFINING & DISTRIBUTION CO.
LAVAN OIL REFINING COMPANY.
Pmc : BINA CONSULTING GROUP.
Responsibilities :
 PIPINGMODELLINGUSINGPDS SOFTWARE.
 SUPPORT MARKINGOF ALL COMPRESSOR LINES.
 HAVE INDEPENDENTLY DESIGNED & CHECKED ALL COMPRESSORS SUPPORT
DRAWINGS.
Project : INTER PLANT AND IN SHOP PIPE LINES FOR CRM-III
(PKG-099).
Owner : STEEL AUTHORITY OF INDIA LTD
[ BOKARO STEEL PLANT ].
Responsibilities :
 PIPINGMODELLINGOF STEAM LINES USINGPDS SOFTWARE.
 ISOMETRICS EXTRACTION AND ISO ERROR RESOLVING.
 ISOMETRICS CHECKINGAS PER GAD & P&ID.
 SUPPORT MODELLINGAS PER STRESS ANALYSIS.
 GIVING STRUCTURE,SUPPORTS INPUT TO CIVIL DEPARTMENT.
 PIPINGCLASH CHECKINGUSINGSPR.
6) Organization : “SHARP LINE ENGG. SERVICES” – [VIKROLI(W). ]
Designation : Worked as a “PIPING / PDS DESIGNER”.
Start/End Date : Oct 2006 to Feb 2008.
Responsibilities :
 ISOMETRICS DRAWINGWITH BILL OF MATERIAL.
 ISOMETRICS CHECKINGAS PER GAD,P&ID AND PMS.
 DESIGNING OF SPECIAL SUPPORT AS PER REQUIREMENT.
 BULK MATERIAL TAKE OFF AS PER P&ID.
 VESSEL CLIPS DESIGNING FOR ALL COLUMNS.
 LINE ROUTINGIN GAD , PIPINGSTUDY.
 EQUIPMENT MODELLINGUSINGPDS SOFTWARE.
 PIPINGMODELLINGUSINGPDS SOFTWARE.
 ISOMETRICS EXTRACTION.
7) Organization : “SNC-LAVALIN INDIA PRIVATE LIMITED”–[Sakinaka]
On subcontract with “SHARP LINE ENGG.SERVICES”.
Designation : Worked as a “PIPING DESIGNER”.
Project : “CONSITO”.
Start/End Date : Nov 2005 to Oct 2006.
Responsibilities :
 ISOMETRICS DRAWINGWITH BILL OF MATERIAL.
 ISOMETRICS CHECKING AS PER GAD,P&ID.
 DETAIL DRAWINGOF PUMP SUCTION & DISCHARGE LINES.
 PUMP LOCATION AS PER CLIENT REQUIREMENT.
 GAD LINE ELEVATION CHECKING.
 LINE ROUTINGON GAD AS PER P&ID .
 SUPPORTINGOF PUMP SUCTION & DISCHARGE LINES.
Project : SHELL [SINGAPORE]
NUMALIGARH REFINERY [GOLAGHAT DISTRICT ASSAM, INDIA].
Start/End Date : Sep 2004 to Oct 2005.
Responsibilities :
 ISOMETRICS DRAWINGWITH BILL OF MATERIAL.
 ISOMETRICS CHECKING AS PER P&ID.
Project : DEEPAK FERTILIZERS [NAVI MUMBAI, INDIA]
Start/End Date : Feb 2004 to Sep 2004.
Responsibilities :
 EQUIPMENT MODELLINGUSINGAUTOCAD.
 ISOMETRICS MAKINGAS PER GAD USING AUTOCAD.
College Project : HAVE PERSONALLY CONTRIBUTED IN MANUFACTURING
[T.Y M.E] FINAL YEAR PROJECT.
Project : “TILES POLISHING MACHINE AUTOMOBILE”
Extra Curricular Activities :
READINGBOOKS, TRYINGTO DO SOMETHINGCREATIVE.
Educational Highlights :
 Passed “ADVANCED DIPLOMA IN PIPING ENGINEERING” from “SUVIDYA
INSTITUTE OF TECHNOLOGY”- Mumbai.
 Passed “DIPLOMA IN MECHANICAL ENGINEERING” with Second Class from
“SHIVAJIRAO JONDHALE POLYTECHNIC”- MSBTE.
 Passed “COMPUTER AIDED DRAFTING” AutoCad with A Grade from “INDUSTRIAL
TRAINING INSTITUTE”- Ambernath.
 Passed “SECONDARY SCHOOL CERTIFICATE” with First Class from “LOURDES
HIGH SCHOOL”- Mumbai Board.
P E R S O N A L P R O F I L E
DATE OF BIRTH : 6- SEPTEMBER-1982
NATIONALITY : INDIAN
GENDER : MALE
MARTIAL STATUS : SINGLE
LANGUAGES KNOWN : ENGLISH, HINDI, MARATHI & URDU
CONTACT NO : [ Saudi : +966 568306523 , India : 9870481228].
E-mail ID : imranjawre@gmail.com
IMRAN ASLAM JAWRE.
DATE: 04-May-2016

More Related Content

What's hot

What's hot (20)

Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
Rotating Equipment Engineer
Rotating Equipment  EngineerRotating Equipment  Engineer
Rotating Equipment Engineer
 
cv
cvcv
cv
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineer
 
Sunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical ResumeSunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical Resume
 
MUBIN_CV
MUBIN_CVMUBIN_CV
MUBIN_CV
 
CV RANJITH
CV RANJITHCV RANJITH
CV RANJITH
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
 
Nitin kr jain
Nitin kr jainNitin kr jain
Nitin kr jain
 
Resume_Sanket Dalvi
Resume_Sanket DalviResume_Sanket Dalvi
Resume_Sanket Dalvi
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
 
Aathikesavan CV
Aathikesavan CVAathikesavan CV
Aathikesavan CV
 
Sunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical ResumeSunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical Resume
 
GRIDSCAN PROFILE 2017
GRIDSCAN PROFILE 2017GRIDSCAN PROFILE 2017
GRIDSCAN PROFILE 2017
 
DRS
DRSDRS
DRS
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical Engineer
 
Sandeep Suryavanshi CoverLetter and Resume
Sandeep Suryavanshi  CoverLetter and ResumeSandeep Suryavanshi  CoverLetter and Resume
Sandeep Suryavanshi CoverLetter and Resume
 
satish_dhiman_-_resume
satish_dhiman_-_resumesatish_dhiman_-_resume
satish_dhiman_-_resume
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 

Viewers also liked

Why is Active and Compelling Content Important to Connections
Why is Active and Compelling Content Important to ConnectionsWhy is Active and Compelling Content Important to Connections
Why is Active and Compelling Content Important to ConnectionsLetsConnect
 
Web 2.0 un guide
Web 2.0 un guideWeb 2.0 un guide
Web 2.0 un guidelucieaud
 
Bhajagovindam by Adi Sankara Kannada Transliteration
Bhajagovindam by Adi Sankara Kannada TransliterationBhajagovindam by Adi Sankara Kannada Transliteration
Bhajagovindam by Adi Sankara Kannada TransliterationRavi Ramakrishnan
 
Dr. Selman Reference Letter
Dr. Selman Reference LetterDr. Selman Reference Letter
Dr. Selman Reference LetterErica Cleveland
 
Nito Sudomo TP Temp of the Month
Nito Sudomo TP Temp of the  MonthNito Sudomo TP Temp of the  Month
Nito Sudomo TP Temp of the MonthNito Sudomo
 
Responsive web design new14
Responsive web design new14Responsive web design new14
Responsive web design new14FullSIX Group
 
Priority SEO Land powerpoint (1)
Priority SEO Land powerpoint (1)Priority SEO Land powerpoint (1)
Priority SEO Land powerpoint (1)Jacob Gabai
 
Mainframe modernization powered by AI
Mainframe modernization powered by AIMainframe modernization powered by AI
Mainframe modernization powered by AIInfosys
 

Viewers also liked (14)

Why is Active and Compelling Content Important to Connections
Why is Active and Compelling Content Important to ConnectionsWhy is Active and Compelling Content Important to Connections
Why is Active and Compelling Content Important to Connections
 
IJMS radiology
IJMS radiologyIJMS radiology
IJMS radiology
 
GDM and Pregnancy
GDM and PregnancyGDM and Pregnancy
GDM and Pregnancy
 
RaedCV
RaedCVRaedCV
RaedCV
 
Web 2.0 un guide
Web 2.0 un guideWeb 2.0 un guide
Web 2.0 un guide
 
Tj2
Tj2Tj2
Tj2
 
Maestra hercy (1)
Maestra hercy (1)Maestra hercy (1)
Maestra hercy (1)
 
Bhajagovindam by Adi Sankara Kannada Transliteration
Bhajagovindam by Adi Sankara Kannada TransliterationBhajagovindam by Adi Sankara Kannada Transliteration
Bhajagovindam by Adi Sankara Kannada Transliteration
 
GraduateResume
GraduateResumeGraduateResume
GraduateResume
 
Dr. Selman Reference Letter
Dr. Selman Reference LetterDr. Selman Reference Letter
Dr. Selman Reference Letter
 
Nito Sudomo TP Temp of the Month
Nito Sudomo TP Temp of the  MonthNito Sudomo TP Temp of the  Month
Nito Sudomo TP Temp of the Month
 
Responsive web design new14
Responsive web design new14Responsive web design new14
Responsive web design new14
 
Priority SEO Land powerpoint (1)
Priority SEO Land powerpoint (1)Priority SEO Land powerpoint (1)
Priority SEO Land powerpoint (1)
 
Mainframe modernization powered by AI
Mainframe modernization powered by AIMainframe modernization powered by AI
Mainframe modernization powered by AI
 

Similar to Imran Aslam Jawre CV.

Similar to Imran Aslam Jawre CV. (20)

Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
CONSTRUCTION ENGINEER
CONSTRUCTION ENGINEERCONSTRUCTION ENGINEER
CONSTRUCTION ENGINEER
 
Sharad_Jagtap_Resume
Sharad_Jagtap_ResumeSharad_Jagtap_Resume
Sharad_Jagtap_Resume
 
Instrumentation design engineer
Instrumentation design engineerInstrumentation design engineer
Instrumentation design engineer
 
Resume_VPrabu
Resume_VPrabuResume_VPrabu
Resume_VPrabu
 
Dinkar
DinkarDinkar
Dinkar
 
TECHNOLOGY SEMINAR - EPCPROMAN
TECHNOLOGY SEMINAR - EPCPROMANTECHNOLOGY SEMINAR - EPCPROMAN
TECHNOLOGY SEMINAR - EPCPROMAN
 
Resume Nagesh update
Resume  Nagesh updateResume  Nagesh update
Resume Nagesh update
 
Preetish Daniel PDS Piping
Preetish Daniel PDS PipingPreetish Daniel PDS Piping
Preetish Daniel PDS Piping
 
Resume-Manoj Yadav B.E. mechanical (Project Coordinator)
Resume-Manoj Yadav  B.E. mechanical (Project Coordinator)Resume-Manoj Yadav  B.E. mechanical (Project Coordinator)
Resume-Manoj Yadav B.E. mechanical (Project Coordinator)
 
Husam CV
Husam CVHusam CV
Husam CV
 
Husam cv
Husam cvHusam cv
Husam cv
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cv
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
 
ram resume
ram resumeram resume
ram resume
 
CV-Anto-2016
CV-Anto-2016CV-Anto-2016
CV-Anto-2016
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain Ali
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 

Imran Aslam Jawre CV.

  • 1. RESUME IMRAN ASLAM JAWRE [Piping/Mechanical Eng.(PDS DESIGNER)] K.M KAZI BUILDING [43/6], BOMBILBAZAR, KALYAN [W] . PIN CODE : [ 421301 ] . CONTACT NO : [Saudi :+966 568306523, India : 9870481228]. E-mail ID : imranjawre@gmail.com CAREER OBJECTIVE TO WORK IN A COMPETITIVE & CHALLENGING ENVIRONMENT,TO CONTRIBUTE WITH THE BEST OF MY ABILITY TOWARDS THE GROWTH OF AN ORGANISATION. T E C H N I C A L E X P E R I E N C E I am a qualified Diploma in Mechanical Engineer with over 12 years of Work experience as a “Piping Designer" in various types of Oil, Gas & Petrochemical Projects in India & Middle East. I have also done Advanced Diploma in Piping Engineering. TOTAL 7yrs EXPERIENCE AS A “PDS DESIGNER”. TOTAL 5yrs EXPERIENCE AS A “PIPING DESIGNER”. E D U C A T I O N A L Q U A L I F I C A T I O N  Passed “ADVANCED DIPLOMA IN PIPING ENGINEERING” from “SUVIDYA INSTITUTE OF TECHNOLOGY”- Mumbai.  Passed “DIPLOMA IN MECHANICAL ENGINEERING” with Second Class from “SHIVAJIRAO JONDHALE POLYTECHNIC”- MSBTE. Note: My “DIPLOMA IN MECHANICAL ENGINEERING” Certificate is Attested By SAUDI CULTURAL & SAUDI EMBASSY.  Passed “COMPUTER AIDED DRAFTING” AutoCad with A Grade from “INDUSTRIAL TRAINING INSTITUTE”- Ambernath.  Passed “SECONDARY SCHOOL CERTIFICATE” with First Class from “LOURDES HIGH SCHOOL”- Mumbai Board. S O F T W A R E K N O W L E D G E  PLANT DESIGN SYSTEM [PDS].  MICROSTATION.  RASTERMANAGER.  AUTOCAD.  SMART PLANT REVIEW [SPR], NAVISWORKS.
  • 2. W O R K E X P E R I E N C E 1) Organization : JACOBSZATE SAUDI AL KHOBAR OFFICE . Designation : Working as a “PIPING DESIGNER”. Project : INCREASE CRUDE OIL CAPACITY EAST/WEST PIPELINES. Owner : SAUDI ARAMCO. Start/End Date : Dec 2015 to Till Date. Responsibilities :  EQUIPMENT NOZZLE ORIENTATION DRAWING.  PREPARATIONOF DEMOLITIONDRAWINGS.  PIPINGLAYOUTS USINGMICROSTATION.  CONDUCTINGSITE VISIT TO CHECK THE FEASIBILITY OF NEW PIPE ROUTING& PROPOSED CIVIL PLATFORMS.  GIVING STRUCTURE,PLATFORMS,SUPPORTS INPUT TO CIVIL DEPARTMENT.  ISOMETRICS MAKINGAS PER NEW PIPING LAYOUTS.  DEVELOPINGTIE-IN INDEXDRAWINGS.  SUPPORT CODINGAS PER SUPPORT STANDARD.  SUPPORT DRAWINGMAKING. Project : REPLACEMENT OF PRESSURE VESSELS, SOUTH GHAWAR, KSA. Owner : SAUDI ARAMCO. Start/End Date : May 2015 to Nov 2015. Responsibilities : Replacement of HPTT – [459-D-3].  EQUIPMENT NOZZLE ORIENTATION DRAWING.  PREPARATIONOF DEMOLITIONDRAWINGS.  PIPINGLAYOUTS USINGMICROSTATION.  CONDUCTINGSITE VISIT TO CHECK THE FEASIBILITY OF NEW PIPE ROUTING& PROPOSED CIVIL PLATFORMS.  GIVING STRUCTURE,PLATFORMS,SUPPORTS INPUT TO CIVIL DEPARTMENT.  ISOMETRICS MAKINGAS PER NEW PIPINGLAYOUTS.  DEVELOPINGTIE-IN INDEXDRAWINGS.  SUPPORT CODINGAS PER SUPPORT STANDARD.  SUPPORT DRAWINGMAKING. Project : EWO#14S133 - As-built Inspection Isometric [SAG15086] Owner : SAUDI ARAMCO. Start/End Date : Feb 2015 to April 2015. Responsibilities :  GENERATINGSITE MARKUP.  MAKING AS-BUILT INSPECTION ISOMETRICS. Project : REPLACEMENT OF PRESSURE VESSELS, SOUTH GHAWAR, KSA. Owner : SAUDI ARAMCO. Start/End Date : Oct 2015 to Feb 2015.
  • 3. Responsibilities : Replacement of HPPT – [459-D-1].  EQUIPMENT NOZZLE ORIENTATION DRAWING.  PREPARATIONOF DEMOLITIONDRAWINGS.  PIPINGLAYOUTS USINGMICROSTATION.  CONDUCTINGSITE VISIT TO CHECK THE FEASIBILITY OF NEW PIPE ROUTING& PROPOSED CIVIL PLATFORMS.  GIVING STRUCTURE,PLATFORMS,SUPPORTS INPUT TO CIVIL DEPARTMENT.  ISOMETRICS MAKINGAS PER NEW PIPINGLAYOUTS.  DEVELOPINGTIE-IN INDEXDRAWINGS.  SUPPORT CODINGAS PER SUPPORT STANDARD.  SUPPORT DRAWINGMAKING. Designation : Working as a “PDS/PIPING DESIGNER”. Project : DRAGADOS – DETAIL DESIGN ASPHALT LOADING & STORAGE FACILITY, PROJECT NO- SA207700. Owner : RAS TANURA, SAUDI ARABIAN OIL COMPANY. Start/End Date : Sep 2014 to Oct 2015. Responsibilities :  EQUIPMENT & PIPINGMODELLINGUSINGPDS SOFTWARE.  ISOMETRICS EXTRACTION.  ISOMETRICS & PIPINGLAYOUTS CHECKING.  SUPPORT MODELLING. 2) Organization : TECHNIP FRANCE ABUDHABI . Designation : Worked as a “PDS DESIGNER” on Contract Basis. Project : AL DABBIYA PHASE 3 FIELD DEVELOPMENT . PROJECT NO-09447U. Owner : ABU DHABI COMPANY FOR ONSHORE OIL OPERATIONS [ADCO]. Start/End Date : Sep 2013 to Jan 2014. Responsibilities :  EQUIPMENT MODELLINGUSINGPDS SOFTWARE.  PIPINGMODELLINGUSINGPDS SOFTWARE.  ISOMETRICS EXTRACTION. 3) Organization : “JACOBS ENGINEERING ”–[MAHAPE OFFICE]. Designation : Worked as a “PDS DESIGNER” Project : KIRBY NORTH PHASE 1, KIRBY NORTH PLANT . CANADIAN NATURAL [CANADA], PROJECT NO-CE4160. Owner : CANADIAN NATURAL RESOURCES (CNRL) . Start/End Date : July 2012 to Sep 2013. Responsibilities :  EQUIPMENT MODELLINGUSINGPDS SOFTWARE.  PIPINGMODELLINGUSINGPDS SOFTWARE.  ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.  SUPPORT MODELLINGAS PER STRESS ANALYSIS.
  • 4. 4) Organization : “AKER SOLUTIONS Pvt Ltd.”–[KANJURMARG(E)]. Designation : Worked as a “PDS DESIGNER” Project : PTA PROJECT AT DMD . DAHEJ MANUFACTURING DIVISION. BHARUCH [GUJARAT]. Owner : RELIANCE INDUSTRIES PVT LTD . Start/End Date : Nov 2011 to June 2012. Responsibilities :  EQUIPMENT MODELLINGUSINGPDS SOFTWARE.  PIPINGMODELLINGUSINGPDS SOFTWARE.  ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.  SUPPORT MODELLINGAS PER STRESS ANALYSIS. 5) Organization: “GOLLA ENGG. Pvt Ltd.”–[CBD-BELAPUR]. Designation : Worked as a “PDS DESIGNER” Project : RESIDUE UPGRADATION & MS/HSD QUALITY IMPROVEMENT PROJECT. EPCC -4 ISOM & NSU UNIT.[PENEX UNIT] Owner : INDIAN OIL CORPORATION LTD.VADODARA – [GUJARAT] Pmc : TOYO ENGINEERING INDIA LTD.MUMBAI-INDIA. Start/End Date : Mar 2008 to June 2011. Responsibilities :  TENTATIVE LINE ROUTING AS PER PFD [MANUALLY].  BULK MTO TAKE OFF AS PER P&ID [MANUALLY].  LINE ROUTINGIN GAD AS PER P&ID.  EQUIPMENT MODELLINGUSINGPDS SOFTWARE.  PIPINGMODELLINGUSINGPDS SOFTWARE (7.1 Version].  ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.  SUPPORT CODINGAS PER TECHNIP SUPPORT STANDARD.  ISOMETRICS EXTRACTION & ISO ERROR RESOLVING.  EQUIPMENT CHECKINGAS PER VENDOR DRAWING  ISOMETRICS CHECKINGAS PER PPL & P&ID.  GIVING STRUCTURE,PLATFORMS,SUPPORTS INPUT TO CIVIL DEPARTMENT.  PIPINGAND EQUIPMENT CLASH CHECKINGUSINGSPR. Project : FRE – REVAMP [GREEN FUEL EMISSION CONTROL PROJECT] [FRE-APS/VPS REVAMP] – [UNIT – 31/32]. Owner : HINDUSTAN PETROLEUM CORPORATION LIMITED [Mumbai Refinery]. Responsibilities :  AS BUILT MARK UP FROM SITE UPDATION IN GADS.  LINE ROUTINGIN GAD AS PER NEW P&ID.  ISOMETRICS MAKING,CHECKING& MTO UPDATION AS PER P&ID.  SUPPORT CODINGAS PER EIL STANDARD.  SPECIAL SUPPORT DESIGNINGAS PER REQUIREMENT.  VESSEL CLIP DESIGNING.  APS STACK AS BUILT DRAWINGMAKING.  DUCTINGFABRICATION DRAWINGCHECKING.  MODIFICATION OF EXISTINGDUCT AS PER REQUIREMENT.
  • 5. Project : [ HIGEE SYSTEM IN FG AMINE ABSORPTION UNIT. ] Owner : [ HINDUSTAN PETROLEUM CORPORATION LIMITED][VISAKH]. Responsibilities :  EQUIPMENT MODELLING USINGPDS SOFTWARE.  PIPINGMODELLINGUSINGPDS SOFTWARE  ISOMETRICS EXTRACTION & ISO ERROR RESOLVING. Project : [ ISRL - SBR PLANT. ] Responsibilities :  BULK MATERIAL TAKE OFF AS PER P&ID. Project : FRE – REVAMP [GREEN FUEL EMISSION CONTROL PROJECT] [FRE-APS/VPS REVAMP] – [UNIT – 31/32]. Owner : HINDUSTAN PETROLEUM CORPORATION LIMITED [Mumbai Refinery]. Responsibilities :  EQUIPMENT MODELLINGUSINGPDS SOFTWARE.  PIPINGMODELLINGUSINGPDS SOFTWARE.  ISOMETRICS EXTRACTION & ISO ERROR RESOLVING. Project : LAVAN REFINERY UPGRADING & REVAMPING CONSTRUCTION OF LICENSED UNITS (EPC). Owner : NATIONAL IRANIAN OIL REFINING & DISTRIBUTION CO. LAVAN OIL REFINING COMPANY. Pmc : BINA CONSULTING GROUP. Responsibilities :  PIPINGMODELLINGUSINGPDS SOFTWARE.  SUPPORT MARKINGOF ALL COMPRESSOR LINES.  HAVE INDEPENDENTLY DESIGNED & CHECKED ALL COMPRESSORS SUPPORT DRAWINGS. Project : INTER PLANT AND IN SHOP PIPE LINES FOR CRM-III (PKG-099). Owner : STEEL AUTHORITY OF INDIA LTD [ BOKARO STEEL PLANT ]. Responsibilities :  PIPINGMODELLINGOF STEAM LINES USINGPDS SOFTWARE.  ISOMETRICS EXTRACTION AND ISO ERROR RESOLVING.  ISOMETRICS CHECKINGAS PER GAD & P&ID.  SUPPORT MODELLINGAS PER STRESS ANALYSIS.  GIVING STRUCTURE,SUPPORTS INPUT TO CIVIL DEPARTMENT.  PIPINGCLASH CHECKINGUSINGSPR. 6) Organization : “SHARP LINE ENGG. SERVICES” – [VIKROLI(W). ] Designation : Worked as a “PIPING / PDS DESIGNER”. Start/End Date : Oct 2006 to Feb 2008. Responsibilities :
  • 6.  ISOMETRICS DRAWINGWITH BILL OF MATERIAL.  ISOMETRICS CHECKINGAS PER GAD,P&ID AND PMS.  DESIGNING OF SPECIAL SUPPORT AS PER REQUIREMENT.  BULK MATERIAL TAKE OFF AS PER P&ID.  VESSEL CLIPS DESIGNING FOR ALL COLUMNS.  LINE ROUTINGIN GAD , PIPINGSTUDY.  EQUIPMENT MODELLINGUSINGPDS SOFTWARE.  PIPINGMODELLINGUSINGPDS SOFTWARE.  ISOMETRICS EXTRACTION. 7) Organization : “SNC-LAVALIN INDIA PRIVATE LIMITED”–[Sakinaka] On subcontract with “SHARP LINE ENGG.SERVICES”. Designation : Worked as a “PIPING DESIGNER”. Project : “CONSITO”. Start/End Date : Nov 2005 to Oct 2006. Responsibilities :  ISOMETRICS DRAWINGWITH BILL OF MATERIAL.  ISOMETRICS CHECKING AS PER GAD,P&ID.  DETAIL DRAWINGOF PUMP SUCTION & DISCHARGE LINES.  PUMP LOCATION AS PER CLIENT REQUIREMENT.  GAD LINE ELEVATION CHECKING.  LINE ROUTINGON GAD AS PER P&ID .  SUPPORTINGOF PUMP SUCTION & DISCHARGE LINES. Project : SHELL [SINGAPORE] NUMALIGARH REFINERY [GOLAGHAT DISTRICT ASSAM, INDIA]. Start/End Date : Sep 2004 to Oct 2005. Responsibilities :  ISOMETRICS DRAWINGWITH BILL OF MATERIAL.  ISOMETRICS CHECKING AS PER P&ID. Project : DEEPAK FERTILIZERS [NAVI MUMBAI, INDIA] Start/End Date : Feb 2004 to Sep 2004. Responsibilities :  EQUIPMENT MODELLINGUSINGAUTOCAD.  ISOMETRICS MAKINGAS PER GAD USING AUTOCAD. College Project : HAVE PERSONALLY CONTRIBUTED IN MANUFACTURING [T.Y M.E] FINAL YEAR PROJECT. Project : “TILES POLISHING MACHINE AUTOMOBILE” Extra Curricular Activities : READINGBOOKS, TRYINGTO DO SOMETHINGCREATIVE. Educational Highlights :  Passed “ADVANCED DIPLOMA IN PIPING ENGINEERING” from “SUVIDYA INSTITUTE OF TECHNOLOGY”- Mumbai.  Passed “DIPLOMA IN MECHANICAL ENGINEERING” with Second Class from “SHIVAJIRAO JONDHALE POLYTECHNIC”- MSBTE.
  • 7.  Passed “COMPUTER AIDED DRAFTING” AutoCad with A Grade from “INDUSTRIAL TRAINING INSTITUTE”- Ambernath.  Passed “SECONDARY SCHOOL CERTIFICATE” with First Class from “LOURDES HIGH SCHOOL”- Mumbai Board. P E R S O N A L P R O F I L E DATE OF BIRTH : 6- SEPTEMBER-1982 NATIONALITY : INDIAN GENDER : MALE MARTIAL STATUS : SINGLE LANGUAGES KNOWN : ENGLISH, HINDI, MARATHI & URDU CONTACT NO : [ Saudi : +966 568306523 , India : 9870481228]. E-mail ID : imranjawre@gmail.com IMRAN ASLAM JAWRE. DATE: 04-May-2016