1. Consultant’s Profile
Gary Liou
Project List:
Solution Reviews for Customers:
Tire Manufacturer – Nashville, TN, Order Processing Gap Analysis – Focused primarily on
addressing issues with special requirements in backorder processing/rescheduling (2 months)
Aerospace/Defense Contractor – Hartford, CT, Solution Review – Analysis of pre-go-live
issues with rescheduling and delivery interfaces (1 month)
Imaging Supplier – Greenville, SC, Value SAP Analysis – Reviewed their current
implementation with team to develop recommendations to increase value of their
implementation through the use of reporting elements in SIS/LIS (2 months)
Apparel Manufacturer – Martinsville, VA, SD Review – Reviewed ATP/Rescheduling design to
improve performance of their rescheduling (1 month)
Full Implementations:
Global Consumer Products Manufacturer – Atlanta, GA, ECC 5.0 – Senior Architect for design
of order to cash processes. Responsible for configuration and development specifications for
two North American roll-outs.
Global Paper Manufacturer – Memphis, TN, CRM 4.0 – Collaborated with Senior CRM
consultant to gather and validate requirements and implement CRM ISA. Strong SD
background leveraged to design solid integration between CRM and R/3 (8 months)
Domestic Paper Manufacturer – Atlanta, GA, 4.6C R/3 Implementation – Gathered requirements
for merged business processes to convert from JDE ERP to R/3 platform. Adjusted current
processes to accommodate merger. (10 months)
Domestic Paper Manufacturer – Atlanta, GA, 4.6C R/3 Upgrade – Conducted delta
requirements gathering between 3.1H and 4.6C. Educated client team on any new or changed
functionality. Executed test scripts and performed configuration. (6 months)
Global Paper Manufacturer – Atlanta, GA, 4.6C Roll-out – Designed and executed test scripts
for four new plants on their implementation path. Test Scripts primarily focused on the test of
interfaces between legacy systems and R/3. (6 months)
Domestic Home Builder – Atlanta, GA, 4.6C Homebuilding Solution – Fully cycle ASAP
implementation. Executed and documented all blueprint, baseline configuration, final
configuration, testing and training. Documented and implmented specialized customizations
including, portal and sales agent front-ends. (11 months)
SAP Inspire – Palo Alto, CA, EBay R/3 Interface – Provided SD knowledge for the design of
interface. Conducted requirements gathering for asset management and plant maintenance in
order to evaluate requirements as a re-seller tool. Configured R/3 prototype for interface
modeling. (2 months)
2. Consultant’s Profile
Mid-Size Industrial Products Company – Tuscaloosa, AL, 4.6B IS- Mill Products
Implementation. Gathered requirements and configured order, delivery, and billing processes.
Responsible for testing activities and all SD issue resolution. (5 months)
Global Tire Manufacturer – Nashville, TN, 4.5B R/3 Implementation – Provided specialized
knowledge and advice to partner consulting firm on the direction to address requirements. All
SD/LES development specifications were reviewed by our team to insure that they adhered to
SAP best business practice and optimized for performance.
Mid-Size Software Company – Ft. Lauderdale, FL, 4.6C R/3 Implementation. Responsible for
all testing and issue resolution in delivery processing (2 months)
Global Chemical Company – Richmond, VA, 4.0B R/3 Implementation. Responsible for user-
exit development and configuration. Focused in areas of batch management and pricing
routines. (2 months)
Mid-Size Carpet Retailer – Atlanta, GA, 4.0B R/3 Retail Implementation. Responsible for full
cycle ASAP implementation. Responsible for all areas of configuration. Implemented ground
breaking internet front-end using Trademart solution. (11 months)
Mid-Size Consumer Products Company – Atlanta, GA, 3.1H R/3 Canadian Roll-out. Involved
with the addition of the Canadian sales division; completed all configuration and issue resolution
involved with adding sales organization and company code. Responsible for all testing. (4
months)
Global PC Company – Raleigh, NC, 3.1H IS-SW Implementation. Provided client management
support to facilitate the transition between 3.0F and 3.1H. Provided major issue resolution
support. Managed OSS issues. (Spot for 12 months)
Mid-Size Electronics Company – Detroit, MI, 3.1H R/3 Implementation. Full-cycle ASAP
implementation or all SD functionality. Responsible for all blueprinting, configuration, testing,
training, and post-production support. (9 months)
Global Computer Peripheral Company – Huntsville, AL, 3.0F R/3 Implementation. Full
implementation for order, delivery, and billing processing. Responsible for configuration and
testing. (2 months)
Global Chemical Company – Greensboro, NC, 3.0F R/3 Upgrade. Responsible for full SAP
upgrade from 2.2D to 3.0F. Managed project team for testing and training. (3 months)
Global Paper Company – Memphis, TN, 3.0B and 3.0E R/3 Implementation. Provided
configuration support in SD processes for order, delivery, and billing processing. Provided OSS
support. (9 months)
Mid-Size Global Materials Company – Atlanta, GA, 3.0B R/3 Implementation. Configured and
created all SD and MM SAP Script documents. (3 months)
Mid-Size Global Telecommunications Company – Atlanta, GA, 2.2D R/3 Implementation.
Configured selective SD functionality. (3 months)
Page 2 of 2