Saudi Aramco: Company General Use
Risk Based Inspection or RBI
1
Ganesh Smart
Ganesh.smart@outlook.com
Australia
Saudi Aramco: Company General Use
2
AGENDA
 Introduction of RBI
 Workflow
 Data Analysis
 Assessments
 Reporting
RISK BASED INSPECTION
Saudi Aramco: Company General Use
3
WHY DO WE NEED RBI?
 Many codes/standards based on LOF, not COF
 Reduce risk of high consequence failures
 Cost effective inspection and maintenance resources
 Shifts resources from lower to higher risk equipment
 Measure and understand the risks
 Measure risk reduction as a result of inspection practices
Saudi Aramco: Company General Use
4
OBJECTIVES
 Determine the purpose of RBI
 Appreciate the benefits of RBI
 Understand the workflow and process
 Manage and execute an RBI program
 Analyze, interpret and report results
 Create inspection/equipment plans
 Influence maintenance and turnarounds
Saudi Aramco: Company General Use
5
TEAM OBJECTIVES
•Tailor to plant operations
•RBI (Risk Based Inspection) of Pressure
Equipment to Avoid
 Failure of Plant
 Endangering personnel
 Environmental damage
 Business interruption losses
 Property damage
Saudi Aramco: Company General Use
6
WHAT IS RBI?
•Risk Based Inspection (API RP 580)
• A risk assessment and management process that is focused on loss of
containment of pressurized equipment in processing facilities, due to material
deterioration. These risks are managed primarily through equipment
inspection.
•Other Definitions:
 Strategic process for lowering risk and costs
 Manages equipment integrity
 Establishes risk levels for equipment
 Addresses life cycle value of equipment
 Time based to condition based inspection
 Optimizes inspection/maintenance
Saudi Aramco: Company General Use
7
RISK BASED INSPECTIONS
IDENTIFY AND QUANTIFY THE RISK:
Risks considered are:
* Safety
* Environmental
* Business
The inspection is planned to reduce the risk based on
the factors creating the risk.
LIKELIHOOD
OF EVENT
X CONSEQUENCE = RISK
Saudi Aramco: Company General Use
How RBI Works
• The LOF assessment indicates the damage mechanism, typical
locations and rate of development. The damage mechanism indicates
what inspection techniques should be used.
8
Saudi Aramco: Company General Use
RBI Deliverable
9
Being risk based, the method requires consideration of both the probability of failure as well
as the consequences associated with failure. The methodology can be applied to process
equipment, structures and pipelines.
The main deliverable of an RBI study is an “ Inspection Programme” describing:
Saudi Aramco: Company General Use
RBI Planning Process
10
Saudi Aramco: Company General Use
11
INDUSTRY TRENDS TROUBLING
 Capacity creep in most process facilities
 Operating older plants without major replacements.
 Major losses are now dominated by mechanical (also
includes corrosion) failures.
 Move towards legislation based on risk criteria.
Saudi Aramco: Company General Use
12
RBI Motivator
 A large percent of the total
unit risk is concentrated in a
small percent of the
equipment items.
Saudi Aramco: Company General Use
13
STEPS
 Screen operating units to identify critical areas
 Estimate risk value for each equipment
 Prioritize equipment based on risk
 Create useful equipment inspection plans.
 Design an optimum inspection program
 Manage risk of equipment failures
 Reduce likelihood of failures
 Review consequences of failures
 Demonstrate cost benefit to the plants
 RBI Ever greening
Saudi Aramco: Company General Use
14
WHAT IS RISK?
 Dictionaries define risk as the chance of a loss. This portrays risk as a
probability.
 Chronic risk is ongoing, long term, low level doses of a potentially
hazardous substance.
 Acute risk is short term, high intensity events that can cause severe
consequences.
 RBI focuses on acute risk.
•API 580 defines:
Risk: Combination of the probability of an event and its consequence. In
some situations, risk is a deviation from the expected. When
probability and consequence are expressed numerically, risk is the
product.
Saudi Aramco: Company General Use
15
WHERE RBI / INSPECTION HELPS
Mechanical
Failure
41%
Process Upset
8%
Sabotage/Arson
3%
Unknown
18%Operational
Error
20%
Design Error
4%
Natural Hazard
6%
About half of the
containment
losses in a
typical
petrrochemical
process plant
can be
influenced by
inspection
activities
Saudi Aramco: Company General Use
16
RISK MEASUREMENT
Eg. For Quantitative
Saudi Aramco: Company General Use
17
RISK ACCEPTABILITY
 ACCEPTABLE – No requirement for additional activities based on current
inspection strategy.
 ACCEPTABLE WITH CONTROLS – Although risk is acceptable, additional/more
effective controls may be required.
 UNDESIRABLE – Additional controls must be implemented and their effect on
reducing risk evaluated.
 UNACCEPTABLE – Additional and more effective controls must be
implemented at the earliest opportunity.
Saudi Aramco: Company General Use
18
RISK MEASURE Eg. of Quantitative
L
i
k
e
l
i
h
o
o
d
Consequence
10-5
10-3
10-1
10-7
103 104 105
10 102
Risk = 10
Risk = 1
Saudi Aramco: Company General Use
19
RISK MATRIX
High Risk
Medium Risk
5
4
3
2
1
LIKELIHOOD
CATEGORY
A B C D E
CONSEQUENCE CATEGORY
Low Risk
Medium Risk
Medium High Risk
High RiskMedium high Risk
Saudi Aramco: Company General Use
Risk Assessment Tasks
20
Saudi Aramco: Company General Use
Risk Assessment Tasks
21
Saudi Aramco: Company General Use
Risk Assessment Tasks
22
Saudi Aramco: Company General Use
23
RISK MANAGEMENT
RISKLEVEL
AMOUNT OF INSPECTION
Uninspectable risk
Risk with typical inspection program
Risk using RBI
Saudi Aramco: Company General Use
24
RISK CONTROLS
Losses($)Exp.
Quantify annual expenditure spent to avoid losses
 Inspection
 Maintenance
 Training
 Procedure
 Insurance
Saudi Aramco: Company General Use
25
REDUCE RISKS
Losses($)
Exp.
Optimise expenses to reduce loss
Saudi Aramco: Company General Use
26
RISK AND INSPECTION
 Inspection modifies risk by control
 Inspection optimization requires cost/risk analysis
 Risk evaluates value of information
 New technologies allow practical application of risk analysis
 Probabilistic modeling
 Computer simulation
 Computerized databases
Saudi Aramco: Company General Use
27
INSPECTION COSTS & RISKS
 Equipment risk is a major factor contributing to operational risk, and the maintenance strategy adopted.
 Increase in inspection or maintenance intervals generally imply lower maintenance costs, but increased
“failure cost” because of higher associated probability of failure.
Optimum inspection interval defined as the having the lowest sum of maintenance and failure costs.
Saudi Aramco: Company General Use
28
UNINSPECTABLE RISKS
 Human error
 Natural disasters
 External events like collisions
 Secondary effects from nearby units
 Deliberate acts like sabotage
 Hazardous materials handling
 Inspection method detectability
Saudi Aramco: Company General Use
29
API 580 RBI COVERS
 Reactors
 Pressure Vessels
 Piping
 Furnaces
 Pumps
 Compressors
 Heat Exchangers
 Storage Tanks
Saudi Aramco: Company General Use
30
API 580 RBI DOES NOT COVER
 Individual Components
 Instrument systems
 Control systems
 Electrical gear
 Machinery components
 Non-pressurized equipment
Saudi Aramco: Company General Use
31
RBI Methodologies
 DNV-API 580, 581
 Shell RBI
 TWI – RISKWISE software
 AEA Technology – Operational Critical Assessment (OCA) software
 Aptech Engineering –Risk Directed Mechanical Integrity Program
(RDMIP) software
 WGIM – Nexus Integrity Centre
 GL Noble Denton Galiom software
 Meridium APM (Asset Performance Management) Software
 API RBI
 BV RBeye
Saudi Aramco: Company General Use
32
RBI ISSUES
 Resistance to Change
 Inadequate Records
 Lack of Resources
 Risk Acceptance
 KPI data
 Internal versus Contractor
 RBI Validation
Saudi Aramco: Company General Use
How do we measure Risk?
Acceptable Risk
Area
Very Low Risk
Area
High Risk
Medium-
High Risk
Medium
Risk
Low Risk
Probability
Consequence
Saudi Aramco: Company General Use
Sq. ft / year
 PoF is expressed in frequency of occurrence
 or
 PoF = Number of Possible event / total number of events
 or
 Gff of 3.06x10-5 = 1 in 306,000 per year
Definition:
 Extent to which an event is likely to occur within the time
frame under consideration.
Saudi Aramco: Company General Use
LOF or POF
 Introduction to Probability analysis
 Units of measure in POF analysis
• Definition:
 Extent to which an event is likely to occur within the time frame
under consideration.
 The chance that a given event will occur.
 Probability = Number of Possible event / total number of events
The probability of failure used in API RBI is computed as:
Pf (t)=gff. Df(t) .Fms
35
Saudi Aramco: Company General Use
LOF or POF
• Generic Failure Frequency: A probability of failure developed
for specific component types based on a large population
of component data that does not include the effects of
specific damage mechanisms.
• Damage Factor: is the equipment specific adjustment factor
• Management Systems Factor: Adjusts the generic failure
frequencies for differences in process safety management
systems. The factor is derived from the results of an
evaluation of a facility or operating unit’s management
systems that affect plant risk.
36
Saudi Aramco: Company General Use
Generic Failure Frequency
37
Saudi Aramco: Company General Use
Damage Factor
38
• Definition:
• An adjustment factor applied to the generic
failure frequency to account for damage
mechanisms that are active in a component.
• The damage factor is determined based on the
applicable damage mechanisms.
Saudi Aramco: Company General Use
Damage Factor
39
Saudi Aramco: Company General Use
Management System Factor
40
• The API RBI procedure includes an evaluation
tool to assess the portions of the facility’s
management system that most directly impact the
probability of failure of a component.
• This evaluation consists of a series of interviews
with plant management, operations, inspection,
maintenance, engineering, training, and safety
personnel.
• A listing of the subjects covered in the
management systems evaluation and the weight
given to each subject is presented in next slide.
Saudi Aramco: Company General Use
Probability Analysis
41
The Key Concepts of RBI
RISK = Probability of Failure X
Consequence of
Failure
GFF Item DFX
Age
Damage
type/rate
Insp.
effective.
Damage area
Item repair
Other repairs
Injury
Business int.
Env. clean up
The probability of failure used in API RBI is computed as:
Pf (t)=gff. Df(t) .Fms
Saudi Aramco: Company General Use
Inspection and POF
42
The probability of failure can be managed....
By recognizing the types of damage that
different environments cause.
AND
By using the right inspection method at the right
location and right frequency.
AND
Addressing the mechanism before failure.
Saudi Aramco: Company General Use
Probability Analysis
43
It should be noted that damage mechanisms are not the
only causes of loss of containment. Other causes of loss
of containment include but are not limited to:
seismic activity,
weather extremes,
overpressure due to pressure-relief device failure,
operator error,
inadvertent substitution of materials of
construction,
design error,
Sabotage.
Saudi Aramco: Company General Use
Units of measure in POF analysis
• POF is typically expressed in terms of frequency.
• The time frame is typically expressed as a fixed interval.
• The frequency is expressed as events per interval.
• For a quantitative analysis, the POF may be categorized as one
through five.
Saudi Aramco: Company General Use
Continuous Improvement in Asset
Operations
8
Developing Maintenance,
Inspection/ Monitoring
Program
Saudi Aramco: Company General Use
S-RBI Process Flow – Examples
46
Saudi Aramco: Company General Use
• Thank You
47

More Related Content

What's hot

Case study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal HaziraCase study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal HaziraAbhishant Baishya
 
Hazards in steel plant and their control, By B C das
Hazards in steel plant and their control, By B C dasHazards in steel plant and their control, By B C das
Hazards in steel plant and their control, By B C dasBimal Chandra Das
 
Bow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk ManagementBow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk ManagementArthurGroot
 
Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01Yaowaluk Yuangsoi
 
Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)TheSafetyGuru
 
62809773 h-s-checklist
62809773 h-s-checklist62809773 h-s-checklist
62809773 h-s-checklistimaduddin91
 
Process safety management in india
Process safety management in indiaProcess safety management in india
Process safety management in indiaPANNALAL SONI
 
Dust Explosion Prevention
Dust Explosion PreventionDust Explosion Prevention
Dust Explosion PreventionChetwinBrandon
 
Process Safety
Process SafetyProcess Safety
Process SafetyConsultivo
 
Introduction to Safety
Introduction to Safety Introduction to Safety
Introduction to Safety Mohannad Hany
 
Hazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsHazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsJohn Kingsley
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan genericfirstpick
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management systemgraha katiga
 

What's hot (20)

Case study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal HaziraCase study: Fire in IOC terminal Jaipur & IOC terminal Hazira
Case study: Fire in IOC terminal Jaipur & IOC terminal Hazira
 
Hazards in steel plant and their control, By B C das
Hazards in steel plant and their control, By B C dasHazards in steel plant and their control, By B C das
Hazards in steel plant and their control, By B C das
 
Bow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk ManagementBow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk Management
 
Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01
 
Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)Prestartup Safety Review (PSSR)
Prestartup Safety Review (PSSR)
 
62809773 h-s-checklist
62809773 h-s-checklist62809773 h-s-checklist
62809773 h-s-checklist
 
Oil Accounting
Oil AccountingOil Accounting
Oil Accounting
 
Fire Risk Assessment October 26 to 28 2015
Fire Risk Assessment October 26 to 28 2015Fire Risk Assessment October 26 to 28 2015
Fire Risk Assessment October 26 to 28 2015
 
14 Tips for Process Safety Management
14 Tips for Process Safety Management14 Tips for Process Safety Management
14 Tips for Process Safety Management
 
Material Safety Data Sheets
Material Safety Data SheetsMaterial Safety Data Sheets
Material Safety Data Sheets
 
Presentation hazop introduction
Presentation hazop introductionPresentation hazop introduction
Presentation hazop introduction
 
Process safety management in india
Process safety management in indiaProcess safety management in india
Process safety management in india
 
Dust Explosion Prevention
Dust Explosion PreventionDust Explosion Prevention
Dust Explosion Prevention
 
Process Safety
Process SafetyProcess Safety
Process Safety
 
Introduction to Safety
Introduction to Safety Introduction to Safety
Introduction to Safety
 
Oil and Gas Risk Analysis
Oil and Gas Risk AnalysisOil and Gas Risk Analysis
Oil and Gas Risk Analysis
 
Hazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsHazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluids
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management system
 
EHS
EHSEHS
EHS
 

Similar to Rbi masterclass fleming summit_ss

SGS API580 Risk based Inspection (RBI).pdf
SGS API580 Risk based Inspection (RBI).pdfSGS API580 Risk based Inspection (RBI).pdf
SGS API580 Risk based Inspection (RBI).pdfMuhammadNasirAbbas4
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceDibyendu De
 
RBI for Power Generation
RBI for Power GenerationRBI for Power Generation
RBI for Power GenerationNikhil Kumar
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdfaashir14
 
Risk Solutions for the Manager
Risk Solutions for the ManagerRisk Solutions for the Manager
Risk Solutions for the ManagerEdwin A Merrick
 
Risk based inspection_best_practice-the_technical_specification_ron_selva_pp_...
Risk based inspection_best_practice-the_technical_specification_ron_selva_pp_...Risk based inspection_best_practice-the_technical_specification_ron_selva_pp_...
Risk based inspection_best_practice-the_technical_specification_ron_selva_pp_...ADNAN MUNIR
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxSamuel Gher
 
cdoif-Learning-from-Buncefield.pdf
cdoif-Learning-from-Buncefield.pdfcdoif-Learning-from-Buncefield.pdf
cdoif-Learning-from-Buncefield.pdfEfari Bahcevan
 
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisAnas Momen
 
Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)Bouchaib Dolla
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]lcgg59
 
General Presentation On Augustus
General Presentation On AugustusGeneral Presentation On Augustus
General Presentation On AugustusEdwin A Merrick
 

Similar to Rbi masterclass fleming summit_ss (20)

Introduction.ppt
Introduction.pptIntroduction.ppt
Introduction.ppt
 
SGS API580 Risk based Inspection (RBI).pdf
SGS API580 Risk based Inspection (RBI).pdfSGS API580 Risk based Inspection (RBI).pdf
SGS API580 Risk based Inspection (RBI).pdf
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Maximo Overview
Maximo OverviewMaximo Overview
Maximo Overview
 
RBI for Power Generation
RBI for Power GenerationRBI for Power Generation
RBI for Power Generation
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdf
 
Risk Solutions for the Manager
Risk Solutions for the ManagerRisk Solutions for the Manager
Risk Solutions for the Manager
 
Risk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islamRisk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islam
 
Risk based inspection_best_practice-the_technical_specification_ron_selva_pp_...
Risk based inspection_best_practice-the_technical_specification_ron_selva_pp_...Risk based inspection_best_practice-the_technical_specification_ron_selva_pp_...
Risk based inspection_best_practice-the_technical_specification_ron_selva_pp_...
 
RCFA Pro Brochure ver1
RCFA Pro Brochure ver1RCFA Pro Brochure ver1
RCFA Pro Brochure ver1
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
 
RCM
RCMRCM
RCM
 
cdoif-Learning-from-Buncefield.pdf
cdoif-Learning-from-Buncefield.pdfcdoif-Learning-from-Buncefield.pdf
cdoif-Learning-from-Buncefield.pdf
 
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
 
Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]
 
General Presentation On Augustus
General Presentation On AugustusGeneral Presentation On Augustus
General Presentation On Augustus
 

Recently uploaded

APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 

Recently uploaded (20)

APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 

Rbi masterclass fleming summit_ss

  • 1. Saudi Aramco: Company General Use Risk Based Inspection or RBI 1 Ganesh Smart Ganesh.smart@outlook.com Australia
  • 2. Saudi Aramco: Company General Use 2 AGENDA  Introduction of RBI  Workflow  Data Analysis  Assessments  Reporting RISK BASED INSPECTION
  • 3. Saudi Aramco: Company General Use 3 WHY DO WE NEED RBI?  Many codes/standards based on LOF, not COF  Reduce risk of high consequence failures  Cost effective inspection and maintenance resources  Shifts resources from lower to higher risk equipment  Measure and understand the risks  Measure risk reduction as a result of inspection practices
  • 4. Saudi Aramco: Company General Use 4 OBJECTIVES  Determine the purpose of RBI  Appreciate the benefits of RBI  Understand the workflow and process  Manage and execute an RBI program  Analyze, interpret and report results  Create inspection/equipment plans  Influence maintenance and turnarounds
  • 5. Saudi Aramco: Company General Use 5 TEAM OBJECTIVES •Tailor to plant operations •RBI (Risk Based Inspection) of Pressure Equipment to Avoid  Failure of Plant  Endangering personnel  Environmental damage  Business interruption losses  Property damage
  • 6. Saudi Aramco: Company General Use 6 WHAT IS RBI? •Risk Based Inspection (API RP 580) • A risk assessment and management process that is focused on loss of containment of pressurized equipment in processing facilities, due to material deterioration. These risks are managed primarily through equipment inspection. •Other Definitions:  Strategic process for lowering risk and costs  Manages equipment integrity  Establishes risk levels for equipment  Addresses life cycle value of equipment  Time based to condition based inspection  Optimizes inspection/maintenance
  • 7. Saudi Aramco: Company General Use 7 RISK BASED INSPECTIONS IDENTIFY AND QUANTIFY THE RISK: Risks considered are: * Safety * Environmental * Business The inspection is planned to reduce the risk based on the factors creating the risk. LIKELIHOOD OF EVENT X CONSEQUENCE = RISK
  • 8. Saudi Aramco: Company General Use How RBI Works • The LOF assessment indicates the damage mechanism, typical locations and rate of development. The damage mechanism indicates what inspection techniques should be used. 8
  • 9. Saudi Aramco: Company General Use RBI Deliverable 9 Being risk based, the method requires consideration of both the probability of failure as well as the consequences associated with failure. The methodology can be applied to process equipment, structures and pipelines. The main deliverable of an RBI study is an “ Inspection Programme” describing:
  • 10. Saudi Aramco: Company General Use RBI Planning Process 10
  • 11. Saudi Aramco: Company General Use 11 INDUSTRY TRENDS TROUBLING  Capacity creep in most process facilities  Operating older plants without major replacements.  Major losses are now dominated by mechanical (also includes corrosion) failures.  Move towards legislation based on risk criteria.
  • 12. Saudi Aramco: Company General Use 12 RBI Motivator  A large percent of the total unit risk is concentrated in a small percent of the equipment items.
  • 13. Saudi Aramco: Company General Use 13 STEPS  Screen operating units to identify critical areas  Estimate risk value for each equipment  Prioritize equipment based on risk  Create useful equipment inspection plans.  Design an optimum inspection program  Manage risk of equipment failures  Reduce likelihood of failures  Review consequences of failures  Demonstrate cost benefit to the plants  RBI Ever greening
  • 14. Saudi Aramco: Company General Use 14 WHAT IS RISK?  Dictionaries define risk as the chance of a loss. This portrays risk as a probability.  Chronic risk is ongoing, long term, low level doses of a potentially hazardous substance.  Acute risk is short term, high intensity events that can cause severe consequences.  RBI focuses on acute risk. •API 580 defines: Risk: Combination of the probability of an event and its consequence. In some situations, risk is a deviation from the expected. When probability and consequence are expressed numerically, risk is the product.
  • 15. Saudi Aramco: Company General Use 15 WHERE RBI / INSPECTION HELPS Mechanical Failure 41% Process Upset 8% Sabotage/Arson 3% Unknown 18%Operational Error 20% Design Error 4% Natural Hazard 6% About half of the containment losses in a typical petrrochemical process plant can be influenced by inspection activities
  • 16. Saudi Aramco: Company General Use 16 RISK MEASUREMENT Eg. For Quantitative
  • 17. Saudi Aramco: Company General Use 17 RISK ACCEPTABILITY  ACCEPTABLE – No requirement for additional activities based on current inspection strategy.  ACCEPTABLE WITH CONTROLS – Although risk is acceptable, additional/more effective controls may be required.  UNDESIRABLE – Additional controls must be implemented and their effect on reducing risk evaluated.  UNACCEPTABLE – Additional and more effective controls must be implemented at the earliest opportunity.
  • 18. Saudi Aramco: Company General Use 18 RISK MEASURE Eg. of Quantitative L i k e l i h o o d Consequence 10-5 10-3 10-1 10-7 103 104 105 10 102 Risk = 10 Risk = 1
  • 19. Saudi Aramco: Company General Use 19 RISK MATRIX High Risk Medium Risk 5 4 3 2 1 LIKELIHOOD CATEGORY A B C D E CONSEQUENCE CATEGORY Low Risk Medium Risk Medium High Risk High RiskMedium high Risk
  • 20. Saudi Aramco: Company General Use Risk Assessment Tasks 20
  • 21. Saudi Aramco: Company General Use Risk Assessment Tasks 21
  • 22. Saudi Aramco: Company General Use Risk Assessment Tasks 22
  • 23. Saudi Aramco: Company General Use 23 RISK MANAGEMENT RISKLEVEL AMOUNT OF INSPECTION Uninspectable risk Risk with typical inspection program Risk using RBI
  • 24. Saudi Aramco: Company General Use 24 RISK CONTROLS Losses($)Exp. Quantify annual expenditure spent to avoid losses  Inspection  Maintenance  Training  Procedure  Insurance
  • 25. Saudi Aramco: Company General Use 25 REDUCE RISKS Losses($) Exp. Optimise expenses to reduce loss
  • 26. Saudi Aramco: Company General Use 26 RISK AND INSPECTION  Inspection modifies risk by control  Inspection optimization requires cost/risk analysis  Risk evaluates value of information  New technologies allow practical application of risk analysis  Probabilistic modeling  Computer simulation  Computerized databases
  • 27. Saudi Aramco: Company General Use 27 INSPECTION COSTS & RISKS  Equipment risk is a major factor contributing to operational risk, and the maintenance strategy adopted.  Increase in inspection or maintenance intervals generally imply lower maintenance costs, but increased “failure cost” because of higher associated probability of failure. Optimum inspection interval defined as the having the lowest sum of maintenance and failure costs.
  • 28. Saudi Aramco: Company General Use 28 UNINSPECTABLE RISKS  Human error  Natural disasters  External events like collisions  Secondary effects from nearby units  Deliberate acts like sabotage  Hazardous materials handling  Inspection method detectability
  • 29. Saudi Aramco: Company General Use 29 API 580 RBI COVERS  Reactors  Pressure Vessels  Piping  Furnaces  Pumps  Compressors  Heat Exchangers  Storage Tanks
  • 30. Saudi Aramco: Company General Use 30 API 580 RBI DOES NOT COVER  Individual Components  Instrument systems  Control systems  Electrical gear  Machinery components  Non-pressurized equipment
  • 31. Saudi Aramco: Company General Use 31 RBI Methodologies  DNV-API 580, 581  Shell RBI  TWI – RISKWISE software  AEA Technology – Operational Critical Assessment (OCA) software  Aptech Engineering –Risk Directed Mechanical Integrity Program (RDMIP) software  WGIM – Nexus Integrity Centre  GL Noble Denton Galiom software  Meridium APM (Asset Performance Management) Software  API RBI  BV RBeye
  • 32. Saudi Aramco: Company General Use 32 RBI ISSUES  Resistance to Change  Inadequate Records  Lack of Resources  Risk Acceptance  KPI data  Internal versus Contractor  RBI Validation
  • 33. Saudi Aramco: Company General Use How do we measure Risk? Acceptable Risk Area Very Low Risk Area High Risk Medium- High Risk Medium Risk Low Risk Probability Consequence
  • 34. Saudi Aramco: Company General Use Sq. ft / year  PoF is expressed in frequency of occurrence  or  PoF = Number of Possible event / total number of events  or  Gff of 3.06x10-5 = 1 in 306,000 per year Definition:  Extent to which an event is likely to occur within the time frame under consideration.
  • 35. Saudi Aramco: Company General Use LOF or POF  Introduction to Probability analysis  Units of measure in POF analysis • Definition:  Extent to which an event is likely to occur within the time frame under consideration.  The chance that a given event will occur.  Probability = Number of Possible event / total number of events The probability of failure used in API RBI is computed as: Pf (t)=gff. Df(t) .Fms 35
  • 36. Saudi Aramco: Company General Use LOF or POF • Generic Failure Frequency: A probability of failure developed for specific component types based on a large population of component data that does not include the effects of specific damage mechanisms. • Damage Factor: is the equipment specific adjustment factor • Management Systems Factor: Adjusts the generic failure frequencies for differences in process safety management systems. The factor is derived from the results of an evaluation of a facility or operating unit’s management systems that affect plant risk. 36
  • 37. Saudi Aramco: Company General Use Generic Failure Frequency 37
  • 38. Saudi Aramco: Company General Use Damage Factor 38 • Definition: • An adjustment factor applied to the generic failure frequency to account for damage mechanisms that are active in a component. • The damage factor is determined based on the applicable damage mechanisms.
  • 39. Saudi Aramco: Company General Use Damage Factor 39
  • 40. Saudi Aramco: Company General Use Management System Factor 40 • The API RBI procedure includes an evaluation tool to assess the portions of the facility’s management system that most directly impact the probability of failure of a component. • This evaluation consists of a series of interviews with plant management, operations, inspection, maintenance, engineering, training, and safety personnel. • A listing of the subjects covered in the management systems evaluation and the weight given to each subject is presented in next slide.
  • 41. Saudi Aramco: Company General Use Probability Analysis 41 The Key Concepts of RBI RISK = Probability of Failure X Consequence of Failure GFF Item DFX Age Damage type/rate Insp. effective. Damage area Item repair Other repairs Injury Business int. Env. clean up The probability of failure used in API RBI is computed as: Pf (t)=gff. Df(t) .Fms
  • 42. Saudi Aramco: Company General Use Inspection and POF 42 The probability of failure can be managed.... By recognizing the types of damage that different environments cause. AND By using the right inspection method at the right location and right frequency. AND Addressing the mechanism before failure.
  • 43. Saudi Aramco: Company General Use Probability Analysis 43 It should be noted that damage mechanisms are not the only causes of loss of containment. Other causes of loss of containment include but are not limited to: seismic activity, weather extremes, overpressure due to pressure-relief device failure, operator error, inadvertent substitution of materials of construction, design error, Sabotage.
  • 44. Saudi Aramco: Company General Use Units of measure in POF analysis • POF is typically expressed in terms of frequency. • The time frame is typically expressed as a fixed interval. • The frequency is expressed as events per interval. • For a quantitative analysis, the POF may be categorized as one through five.
  • 45. Saudi Aramco: Company General Use Continuous Improvement in Asset Operations 8 Developing Maintenance, Inspection/ Monitoring Program
  • 46. Saudi Aramco: Company General Use S-RBI Process Flow – Examples 46
  • 47. Saudi Aramco: Company General Use • Thank You 47