1. 3283cab0-2175-4ca4-a4f7-c9b97814c1f7-150126114332-
conversion-gate02
1
George J Bugaj
Appleby House, Flat 5, Derby Road, Caversham, Reading RG4 5EY
GJ.Bugaj@gmail.com 0118 9462732/0756 116 8848
With over 25 years’ experience within the petrochemical industry in Expediting/Material Control
and IT Logistics, George is highly motivated and conscientious and is able to work under pressure
to achieve customer’s requirements and deadlines. He has the ability to work on his own, but also
part of a team to meet challenges presented.
Early in his career George took a two year assignment to Norway, working as an Internal
Expeditor for the Statfjord C Project near Oslo.
Experience
1997 – PRESENT : AMEC FOSTER WHEELER ENERGY LTD, READING, BERKSHIRE
2000 - present Senior Service Analyst, Asset Management
ICT Department
Member of the ICT Service Support Team allocating hardware to Projects and
Departments andensuring installation in a timely manner andthat a quota of ready
built kit always in stock to meet demand, building CADs, PCs andLaptops. Role also
requires the updating the Asset Database to reflect movement andallocation of
hardware kit as well as monthly physical audits to ensure accuracy of database
Was also a member of the Windows 7 Migration team that successfully deliveredthe
migration of Windows 7 from XP to the UK operating unit. .
Also providedsupport to the Mobile Telecommunications department during holiday
absences, issuing mobile phones/blackberries anddata cards.
1997 - 1999 Supplier Co-ordinator
Procurement Department
Duties include:
Introducing new suppliers, via questionnaire, to Foster Wheeler’s supplier
database SMILE
Assisting buyers with sourcing suppliers appropriate to material requirements
1991 – 1996 : JOHN BROWN ENGINEERING
1994 - 1996 Archives Co Ordinator
Central Line Project – LUL Ltd
Responsible for the archiving of documentation andensuring all documentation was
easily accessible for future retrieval.
Internal & External Expeditor
QE2 Re-fit project
Responsible for expediting suppliers of materials andservices.
1994 Material Controller
Power Station Projects – Tetuan, Morocco Aramco, Saudi Arabia and Aylesford SCL
Secondedto John Brown Engineering Clydebank, responsible for the timely delivery
of materials anddocumentation successfully ensuring all deadlines were met, using
several computerisedsystems to monitor andrecordmovements.
2. Career Summary – cont.
George Bugaj
2
Earlier Career Highlights
1990 In-House Expeditor – Fluor Daniel
1989 – 1990 Desk FieldExpeditor – Wimpey Engineering Ltd, Fawley
1987 – 1989 Administration Officer – Intervention Boardfor Agricultural Products
1987 Sales Executive – Weston Records Management
1985 – 1986 Buyers Assistant – Shell Tern Project
1983 – 1985 Internal Expeditor – Alywn North Project for Foster Wheeler
1980 – 1983 Internal Expeditor (all packages) – StatfjordC Project, Oslo for Foster Wheeler
1978 – 1980 Internal Expeditor – BP Sullum Voe andShell Sarnia
Education and Qualifications
Education Polytechnic of South Bank
Qualifications HND Business Studies with French
“A” Level French
“O” Level Polish, English, French, Religious Studies & Mathematics.
Interests & Outside Activities
I am a Director of the Housing Management Companies which look after 10 flats, meeting once a month to
discuss relevant issues such as fire safety, upkeepandmaintenance, which are then communicatedto
residents. I have a keen interest in the history of World War II, watching many documentaries on the
subject andalso languages, particularly French andPolish
Other interests include music andplaying guitar andkeeping fit, I attendthe gym 3 times a week and
walk 25 miles a week.
1993 - 1994 Lead Expeditor (All packages)
Pickerill Gas Compression Project, Conoco
Responsible for the timely delivery of materials anddocumentation successfully
ensuring all deadlines were met, using JOBPROC/JOBVEND computer systems to
monitor andrecordall movements of POS andDOCS.
1991 - 1993 In-house & External Expeditor
Flue Gas Desulphurisation Project - Powergen
Expedited the movement of materials anddocuments using JOBPROC/JOBVEND
system for this £250m lumpsum turnkey project for Powergen’s 4x500 million Power
Station at Ratcliffe-on-Sea
1990 - 1991 In-house & External Expeditor
Bruce Gas Drilling Platform, BP
Responsible for the timely delivery of materials anddocumentation ensuring all
deadlines were successfully met using JOBEND/JOBVEND computer systems.