STORM SEWER PUMP
STATION SIZING
SPREADSHEET
Francis Mitchell, M.S., P.E.
F-MITCHELL@ATT.NET
Francis Mitchell, M.S., P.E. PAGE 1
STORM SEWER PUMP STATION SIZING SPREADSHEET
Abstract:
This spreadsheet is a tool to help the drainage engineer designs a storm sewer pump station by
performing a level pool analysis of the pumping system, and storage areas. The settings of the
pumps “on” and “off” points, flows, system storage, the storm hydrograph, rainfall depth, and
duration, are parameters that could be adjusted to optimize the size of a pump station.
This spreadsheet can be downloaded through the link below,
https://www.dropbox.com/sh/jf8vsmhhq013mdd/AACJfnUjpiiCieTCusBS0JxEa?dl=0
Francis Mitchell, M.S., P.E. PAGE 2
STORM SEWER PUMP STATION SIZING SPREADSHEET
Table of Contents Page
1.0 DESCRIPTION................................................................................................................................3
2.0 INPUT DATA WORKSHEETS..........................................................................................................4
3.0 OUTPUT DATA WORKSHEETS......................................................................................................8
4.0 CASE STUDY................................................................................................................................16
5.0 AUTHOR......................................................................................................................................33
6.0 REFERENCES...............................................................................................................................34
Francis Mitchell, M.S., P.E. PAGE 3
STORM SEWER PUMP STATION SIZING SPREADSHEET
1.0 DESCRIPTION
This spreadsheet was developed as a tool to perform the preliminary sizing of storm sewer pump
station and to complement the analysis performed by much advanced software which don’t have
the flexibility of quickly varying the input data. This spreadsheet could be used first to pre-size and
calibrate a pump station and then use the results for further analysis without having the burden of
performing countless trial and error analysis.
The analysis performed by this spreadsheet is a level pool flood routing of a pump station system
given its watershed area, the rainfall depth and duration, the unit hydrograph and peaking factor.
In addition the user can choose different storm hydrograph generating procedure. The pump
station is defined by its geometry, pumps capacities, “on” and “off” setting, and the storage
available in the storm sewer network.
This spreadsheet generates watershed inflow hydrograph output, outflow hydrograph output,
stage duration graph, and displays also the number of times a pump will turn “on” and “off”, as
well as the amount of working hours.
Francis Mitchell, M.S., P.E. PAGE 4
2.0 INPUT DATA WORKSHEETS
Francis Mitchell, M.S., P.E. PAGE 5
Design Unit
Design unit is either “Metric” or “English”.
Areas
Areas are entered as “Acres” or “Hectares”.
SCS CN
CN (curve number) depends on the type of land cover.
Time of Concentration
The time of concentration is entered in minutes.
Hydrologic Method
Three different hydrologic analysis method can be used.
 SCS – Santa Barbara Method
 SCS – Design Storm
 SCS – Flood Hydrograph
Rainfall Depth
Rainfall depth for the selected storm is entered in inches or millimeters.
Routing Time
This is the duration of the storm in hours.
Flood Routing Time Step
The time step increment for the routing analysis to be performed.
Print Display Time step
The time step for a result to be printed. This option is currently disabled.
Peaking Factor
The SCS peaking factor, and the length of the receding leg of the hydrograph. This variable
is dependent on the hydrologic method selected.
Francis Mitchell, M.S., P.E. PAGE 6
Francis Mitchell, M.S., P.E. PAGE 7
Top Elevation and Top Area
The pump station top elevation and top area are entered in feet, and square feet, or meter,
and square meter.
Critical Water Level
The stage at which the water level reached a critical value is entered in feet or meter. This
input data is only for graphical representation of the design constraint.
Starting Water Level
The starting water level is the level of the permanent pool of water inside the pump station.
This data is entered in feet or meter. The stage of the starting water level cannot be higher
than the lowest pump starting elevation.
Bottom Elevation and Bottom Area
The pump station bottom elevation and bottom area are entered in feet, and square feet,
or meter, and square meter.
Pumps Settings
The pumps “on” and “off” elevations are entered in feet or meter. The CUMULATIVE flow
for all the pumps are entered at each row. The unit is either cfs, or cubic meter per second.
Additional Storage
The storage within the drainage system is entered at each stage elevation. The unit is feet,
and cubic feet, or meter, and cubic meter.
Francis Mitchell, M.S., P.E. PAGE 8
3.0 OUTPUT DATA WORKSHEETS
Francis Mitchell, M.S., P.E. PAGE 9
Francis Mitchell, M.S., P.E. PAGE 10
Francis Mitchell, M.S., P.E. PAGE 11
Francis Mitchell, M.S., P.E. PAGE 12
Francis Mitchell, M.S., P.E. PAGE 13
Francis Mitchell, M.S., P.E. PAGE 14
Francis Mitchell, M.S., P.E. PAGE 15
Francis Mitchell, M.S., P.E. PAGE 16
4.0 CASE STUDY
Project:
The City of Miami Beach, and the Florida Department of Transportation District Six, have decided
to jointly fund the construction of a major storm sewer pump station facility to offer relief from
recurrent flooding events along Indian Creek Drive from 25th Street to 41st Street. These floodings
are mainly caused by the ever increasing high tides, and deficient gravity drainage systems that
were built in the 1940s.
Design Criteria:
 Design storm to satisfy FDOT critical storms duration as per Chapter 14-86.
 Minimum elevation of +3.70 for new pavement.
 Drainage for low lying side streets will need to be accommodated.
Design:
 Total tributary area A=36.81 acres
 SCS weighted curve number CN = 96
 Critical storm is FDOT 1 Hour hydrograph with rainfall depth of 3.60 inches
 Maximum watershed runoff flow is 132.23 cfs at 54.25 hours
 Trunk line length is 4,600 feet divided into a south and north reach.
 The south reach controls the design with a length of 2,490 feet.
 The south reach has 30 manholes risers, and 1 terminal manhole.
 The north reach is 2,110 feet.
 The north reach has 25 manholes risers, and 1 terminal manhole.
 Minimum existing inlet elevation +2.20 NAVD
Step 1
Find pump station preliminary total flow estimated at 70% of the watershed flow.
Qtotal = 132.23 cfs x 70% of inflow = 92.56 cfs
A preliminary headloss – system curve analysis yields a pump station with three pumps
having a total capacity of 93.36 cfs. (refer to step 5)
Step 2
Find trunk line preliminary pipe diameter for a conveyance velocity of 3.0 ft/s to 3.5 ft/s
Diameter for 3.0 ft/s = (92.56 cfs x 4 / (3.0 ft/s x 3.14159))^.5 = 6.3 ft ( 6.0 feet = 72 inches)
Diameter for 3.5 ft/s = (92.56 cfs x 4 / (3.5 ft/s x 3.14159))^.5 = 5.8 ft ( 5.5 feet = 66 inches)
Step 3
Calculate head losses along trunk line
Francis Mitchell, M.S., P.E. PAGE 17
Head losses for 66 inches pipe – south branch
Ref: Hydraulic Calculator Software from HYDTRENCH
Manhole risers losses = 30 x 0.15 x ((3.93)^2 / 64.4) = 1.08 feet
Terminal manhole loss = 1 x 0.5 x ((3.93)^2 / 64.4) = 0.12 foot
Manhole 90 deg. Bend to pump station = 1 x 0.7 x ((3.93)^2 / 64.4) = 0.17 foot
Pipe exit losses to pump station = 1 x 1.0 x ((3.93)^2 / 64.4) = 0.24 foot
Losses along length of south pipe = 2,490 feet x 0.0659 / 100 = 1.64 feet
-------------
Total Losses 3.25 feet
Minimum crown elevation of pipe for HGL to be below existing inlet
+2.20 NAVD – 3.25 feet (head losses) = -1.05 NAVD
Francis Mitchell, M.S., P.E. PAGE 18
Head losses for 66 inches pipe – south branch
Ref: Hydraulic Calculator Software from HYDTRENCH
Manhole risers losses = 30 x 0.15 x ((3.30)^2 / 64.4) = 0.76 foot
Terminal manhole loss = 1 x 0.5 x ((3.30)^2 / 64.4) = 0.08 foot
Manhole 90 deg. Bend to pump station = 1 x 0.7 x ((3.30)^2 / 64.4) = 0.12 foot
Pipe exit losses to pump station = 1 x 1.0 x ((3.30)^2 / 64.4) = 0.17 foot
Losses along length of south pipe = 2,490 feet x 0.0414 / 100 = 1.03 feet
-------------
Total Losses 2.16 feet
Minimum crown elevation of pipe for HGL to be below existing inlet
+2.20 NAVD – 2.16 feet (head losses) = +0.04 NAVD
Francis Mitchell, M.S., P.E. PAGE 19
Step 4
Find crown elevation based on concrete manhole structures placed along new pavement
Frame and cover height 9.0 inches
Brick leveling (2 layers) 8.0 inches
Concrete slab thickness 8.0 inches
Minimum wall height above opening 6.0 inches
Minimum spaces around pipe 6.0 inches
Pipe thickness 7.0 inches
---------------
Total Cover 44 inches (3.67 feet)
Crown elevation based on structure type = 3.70 NAVD – 3.67 = +0.03 NAVD
In order to expedite construction the City has decided to use spiral reinforced HDPE pipe. This pipe
will be placed under water and requires a soil overburden atop the pipe to prevent floatation. The
minimum crown elevation needed to prevent uplift is -1.00 NAVD.
Although the 66 inches pipe is sufficient, the 72 inches pipe will be used with crown placed at -1.00
NAVD, invert set at -7.00 NAVD. The benefit of using the 72 inches instead of the 66 inches will be
less head loss (lower HGL), longer filling time which will translate into longer cycling time between
pumps start.
Francis Mitchell, M.S., P.E. PAGE 20
Typical project pump station layout
Drawing Sketch Credit: Ribbeck Engineering Inc.
The pumps used are “in tube” axial flow pump. This setting allows lower minimum
submergence depth. As a result the pump station needs not to be set very deep.
The spacing between pumps is also reduced.
Another requirement was to construct the station in a modular fashion. The modular
approach allowed the units to be pre-cast at the casting yard, and transported on
site for setting and installation.
Francis Mitchell, M.S., P.E. PAGE 21
Step 5 – Head loss at low water level
Pump flow at low water level (maximum head) is 29.57 cfs
Francis Mitchell, M.S., P.E. PAGE 22
Head loss at high water level
Pump flow at high water level (minimum head) is 32.67 cfs
Average of pump flow for high and low water level is (32.67 cfs + 29.57 cfs)/2 = 31.12 cfs
Francis Mitchell, M.S., P.E. PAGE 23
Watershed input data
Francis Mitchell, M.S., P.E. PAGE 24
Pump station input data
Francis Mitchell, M.S., P.E. PAGE 25
Inflow Hydrograph
Francis Mitchell, M.S., P.E. PAGE 26
Outflow hydrograph
Francis Mitchell, M.S., P.E. PAGE 27
Inflow – outflow hydrograph
Francis Mitchell, M.S., P.E. PAGE 28
Stage duration
Francis Mitchell, M.S., P.E. PAGE 29
Cumulative inflow – outflow volume
Francis Mitchell, M.S., P.E. PAGE 30
Pumps running time
Francis Mitchell, M.S., P.E. PAGE 31
Pumps capacity and “on” “off” setting rating curve
Francis Mitchell, M.S., P.E. PAGE 32
System storage capacity rating curve
Francis Mitchell, M.S., P.E. PAGE 33
5.0 AUTHOR
This spreadsheet can be ordered from the following address.
Francis Mitchell, M.S., P.E.
f-mitchell@att.net
Phone: (305) 979-6387
Or by accessing the link below,
https://www.dropbox.com/sh/jf8vsmhhq013mdd/AACJfnUjpiiCieTCusBS0JxEa?dl=0
Francis Mitchell, M.S., P.E. PAGE 34
6.0 REFERENCES
Federal Highway Administration, Highway Stormwater Pump Station Design Manual,
HEC-24, 2000. Formerly Highway Storm Water Pumping Stations, Volumes 1 and 2,
FHWA-IP-82-17.
Daugherty, Robert L., and Franzini, Joseph B.: “Fluid Mechanics with Engineering Applications,”
McGraw-Hill Book Co., New York, 1985.
Mc Cuen, Richard:”Hydrologic Analysis and Design”, Second Edition, Prentice Hall, New Jersey,
1998.
Reitz, and Jens:”Design of Urban Highway Drainage, the State of the Art”, FHWA-TS-79-225, Federal
Highway Administration, August 1979.
Shammas, Namir C.; “Mathematical Algorithms in Visual Basic for Scientists and Engineers,”
McGraw-Hill Book Co., New York, 1995.
Soil Conservation Service:”National Engineering Handbook Section 4-Hydrology, (Part 1 of 2, 2 of
2), Engineering Division Soil Conservation Service, USDA, Washington, March 1985.
South Florida Water Management District:”Management and Storage of Surface Waters-Permit
Information Manual Volume IV”.Streeter, Victor L., and Wylie, Benjamin E.: “Fluid Mechanics,”
McGraw-Hill Book Co., New York, 1979.
Mitchell, Francis : “HYDTRENCH, Exfiltration Trench manual”, Miami, 1999.

More Related Content

What's hot

Canal of design
Canal of designCanal of design
Canal of designPREMKUMAR
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply schemeAby Mundackal
 
flow through open channel
flow through open channelflow through open channel
flow through open channelmohitjain123
 
Simulation of water distribution networks the use of epanet
Simulation of water distribution networks the use of epanetSimulation of water distribution networks the use of epanet
Simulation of water distribution networks the use of epanetRiki Rahmadhan KS
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic StructuresDamalla Rams
 
Drainage in Irrigation Engineering
Drainage in Irrigation EngineeringDrainage in Irrigation Engineering
Drainage in Irrigation EngineeringJaptyesh Singh
 
Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalSyed Salman
 
Hidrología aplicada a las pequeñas obras hidráulicas
Hidrología aplicada a las pequeñas obras hidráulicasHidrología aplicada a las pequeñas obras hidráulicas
Hidrología aplicada a las pequeñas obras hidráulicasCOLPOS
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrographuzma shaikh
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLatif Hyder Wadho
 
4. Construction and design criteria Earthen Dams.pptx
4. Construction and design criteria Earthen Dams.pptx4. Construction and design criteria Earthen Dams.pptx
4. Construction and design criteria Earthen Dams.pptxAbhilashvishwakrama
 

What's hot (20)

Canal of design
Canal of designCanal of design
Canal of design
 
Designed CANAL
Designed CANALDesigned CANAL
Designed CANAL
 
River training method
River training methodRiver training method
River training method
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
 
1. reservoirs unit !
1. reservoirs   unit !1. reservoirs   unit !
1. reservoirs unit !
 
flow through open channel
flow through open channelflow through open channel
flow through open channel
 
Simulation of water distribution networks the use of epanet
Simulation of water distribution networks the use of epanetSimulation of water distribution networks the use of epanet
Simulation of water distribution networks the use of epanet
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Drainage in Irrigation Engineering
Drainage in Irrigation EngineeringDrainage in Irrigation Engineering
Drainage in Irrigation Engineering
 
Hydraulic structures
Hydraulic structuresHydraulic structures
Hydraulic structures
 
Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E final
 
Floods
FloodsFloods
Floods
 
Hidrología aplicada a las pequeñas obras hidráulicas
Hidrología aplicada a las pequeñas obras hidráulicasHidrología aplicada a las pequeñas obras hidráulicas
Hidrología aplicada a las pequeñas obras hidráulicas
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
 
Canal
CanalCanal
Canal
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
4. Construction and design criteria Earthen Dams.pptx
4. Construction and design criteria Earthen Dams.pptx4. Construction and design criteria Earthen Dams.pptx
4. Construction and design criteria Earthen Dams.pptx
 
4 spillways
4 spillways4 spillways
4 spillways
 

Similar to Pump station design manual

Exfiltration Trench Design Manual
Exfiltration Trench Design ManualExfiltration Trench Design Manual
Exfiltration Trench Design ManualFrancis Mitchell
 
Anexo sobre-riego-por-aspersion
Anexo sobre-riego-por-aspersionAnexo sobre-riego-por-aspersion
Anexo sobre-riego-por-aspersionmartinatorafer
 
"Design Criteria of Lift Irrigation Scheme"
"Design Criteria of Lift Irrigation Scheme""Design Criteria of Lift Irrigation Scheme"
"Design Criteria of Lift Irrigation Scheme"IRJET Journal
 
Airport drainage
Airport drainageAirport drainage
Airport drainagejagadish108
 
Fao low cost pipe distribution syste,
Fao   low cost pipe distribution syste,Fao   low cost pipe distribution syste,
Fao low cost pipe distribution syste,TASFAA
 
2 SPRINKLER IRRIGATION SYSTEMS.pdf
2 SPRINKLER IRRIGATION SYSTEMS.pdf2 SPRINKLER IRRIGATION SYSTEMS.pdf
2 SPRINKLER IRRIGATION SYSTEMS.pdfMoisesJose12
 
Air flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake portAir flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake portTunAnh309
 
Hydraulic Calculator Manual
Hydraulic Calculator ManualHydraulic Calculator Manual
Hydraulic Calculator ManualFrancis Mitchell
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design reportMuhammad Magsi
 
Deck drainage design
Deck drainage designDeck drainage design
Deck drainage designSarita Joshi
 
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxNEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxASHISHGOUTAM6
 
Measuring and Conserving Irrigation Water
Measuring and Conserving Irrigation WaterMeasuring and Conserving Irrigation Water
Measuring and Conserving Irrigation WaterGardening
 
Irrigation Engg.(CE5G) Irrigation method.ppt
Irrigation Engg.(CE5G) Irrigation    method.pptIrrigation Engg.(CE5G) Irrigation    method.ppt
Irrigation Engg.(CE5G) Irrigation method.pptMounikaRangaraj
 
Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Suyog Khose
 

Similar to Pump station design manual (20)

Exfiltration Trench Design Manual
Exfiltration Trench Design ManualExfiltration Trench Design Manual
Exfiltration Trench Design Manual
 
Drainage design
Drainage designDrainage design
Drainage design
 
Anexo sobre-riego-por-aspersion
Anexo sobre-riego-por-aspersionAnexo sobre-riego-por-aspersion
Anexo sobre-riego-por-aspersion
 
"Design Criteria of Lift Irrigation Scheme"
"Design Criteria of Lift Irrigation Scheme""Design Criteria of Lift Irrigation Scheme"
"Design Criteria of Lift Irrigation Scheme"
 
Airport drainage
Airport drainageAirport drainage
Airport drainage
 
Airport drainage
Airport drainageAirport drainage
Airport drainage
 
Fao low cost pipe distribution syste,
Fao   low cost pipe distribution syste,Fao   low cost pipe distribution syste,
Fao low cost pipe distribution syste,
 
2 SPRINKLER IRRIGATION SYSTEMS.pdf
2 SPRINKLER IRRIGATION SYSTEMS.pdf2 SPRINKLER IRRIGATION SYSTEMS.pdf
2 SPRINKLER IRRIGATION SYSTEMS.pdf
 
Air flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake portAir flow and charge motion study of engine intake port
Air flow and charge motion study of engine intake port
 
11wiik
11wiik11wiik
11wiik
 
Hydraulic Calculator Manual
Hydraulic Calculator ManualHydraulic Calculator Manual
Hydraulic Calculator Manual
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design report
 
Deck drainage design
Deck drainage designDeck drainage design
Deck drainage design
 
RP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptxRP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptx
 
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxNEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
 
Measuring and Conserving Irrigation Water
Measuring and Conserving Irrigation WaterMeasuring and Conserving Irrigation Water
Measuring and Conserving Irrigation Water
 
Irrigation Engg.(CE5G) Irrigation method.ppt
Irrigation Engg.(CE5G) Irrigation    method.pptIrrigation Engg.(CE5G) Irrigation    method.ppt
Irrigation Engg.(CE5G) Irrigation method.ppt
 
8445806
84458068445806
8445806
 
Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System,
 
Pipe sizing guide
Pipe sizing guidePipe sizing guide
Pipe sizing guide
 

More from Francis Mitchell

Proyecto Binacional Peligre Dos Bocas .pdf
Proyecto Binacional Peligre Dos Bocas .pdfProyecto Binacional Peligre Dos Bocas .pdf
Proyecto Binacional Peligre Dos Bocas .pdfFrancis Mitchell
 
Peligre Dos Bocas Binational Project.pdf
Peligre Dos Bocas Binational Project.pdfPeligre Dos Bocas Binational Project.pdf
Peligre Dos Bocas Binational Project.pdfFrancis Mitchell
 
Projet Binational Peligre Dos Bocas.pdf
Projet Binational Peligre Dos Bocas.pdfProjet Binational Peligre Dos Bocas.pdf
Projet Binational Peligre Dos Bocas.pdfFrancis Mitchell
 
Haiti hydropower potential-Appendix-E - 3
Haiti hydropower potential-Appendix-E - 3Haiti hydropower potential-Appendix-E - 3
Haiti hydropower potential-Appendix-E - 3Francis Mitchell
 
Haiti GIS-Based Hydropower Potential Mapping Atlas
Haiti GIS-Based Hydropower Potential Mapping AtlasHaiti GIS-Based Hydropower Potential Mapping Atlas
Haiti GIS-Based Hydropower Potential Mapping AtlasFrancis Mitchell
 
Haiti Hydroelectric Potential - Panel 7 of 7
Haiti Hydroelectric Potential - Panel 7 of 7Haiti Hydroelectric Potential - Panel 7 of 7
Haiti Hydroelectric Potential - Panel 7 of 7Francis Mitchell
 
Haiti Hydroelectric Potential - Panel 6 of 7
Haiti Hydroelectric Potential - Panel 6 of 7Haiti Hydroelectric Potential - Panel 6 of 7
Haiti Hydroelectric Potential - Panel 6 of 7Francis Mitchell
 
Haiti Hydroelectric Potential - Panel 5 of 7
Haiti Hydroelectric Potential - Panel 5 of 7Haiti Hydroelectric Potential - Panel 5 of 7
Haiti Hydroelectric Potential - Panel 5 of 7Francis Mitchell
 
Haiti Hydroelectric Potential - Panel 4 of 7
Haiti Hydroelectric Potential - Panel 4 of 7Haiti Hydroelectric Potential - Panel 4 of 7
Haiti Hydroelectric Potential - Panel 4 of 7Francis Mitchell
 
Haiti Hydroelectric Potential - Panel 3 of 7
Haiti Hydroelectric Potential - Panel 3 of 7Haiti Hydroelectric Potential - Panel 3 of 7
Haiti Hydroelectric Potential - Panel 3 of 7Francis Mitchell
 
Haiti Hydroelectric Potential - Panel 2 of 7
Haiti Hydroelectric Potential - Panel 2 of 7Haiti Hydroelectric Potential - Panel 2 of 7
Haiti Hydroelectric Potential - Panel 2 of 7Francis Mitchell
 
Haiti Hydroelectric Potential - Panel 1 of 7
Haiti Hydroelectric Potential - Panel 1 of 7Haiti Hydroelectric Potential - Panel 1 of 7
Haiti Hydroelectric Potential - Panel 1 of 7Francis Mitchell
 
Haiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-FHaiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-FFrancis Mitchell
 
Haiti hydropower potential-Appendix-E-5
Haiti hydropower potential-Appendix-E-5Haiti hydropower potential-Appendix-E-5
Haiti hydropower potential-Appendix-E-5Francis Mitchell
 
Haiti hydropower potential-Appendix-E-4
Haiti hydropower potential-Appendix-E-4Haiti hydropower potential-Appendix-E-4
Haiti hydropower potential-Appendix-E-4Francis Mitchell
 
Haiti hydropower potential-Appendix-E-2
Haiti hydropower potential-Appendix-E-2Haiti hydropower potential-Appendix-E-2
Haiti hydropower potential-Appendix-E-2Francis Mitchell
 
Haiti hydropower potential-Appendix-E-1
Haiti hydropower potential-Appendix-E-1Haiti hydropower potential-Appendix-E-1
Haiti hydropower potential-Appendix-E-1Francis Mitchell
 
Haiti hydropower potential-Appendix-D
Haiti hydropower potential-Appendix-DHaiti hydropower potential-Appendix-D
Haiti hydropower potential-Appendix-DFrancis Mitchell
 
Haiti hydropower potential-Appendix-C
Haiti hydropower potential-Appendix-CHaiti hydropower potential-Appendix-C
Haiti hydropower potential-Appendix-CFrancis Mitchell
 
Haiti hydropower potential-Appendix-B
Haiti hydropower potential-Appendix-BHaiti hydropower potential-Appendix-B
Haiti hydropower potential-Appendix-BFrancis Mitchell
 

More from Francis Mitchell (20)

Proyecto Binacional Peligre Dos Bocas .pdf
Proyecto Binacional Peligre Dos Bocas .pdfProyecto Binacional Peligre Dos Bocas .pdf
Proyecto Binacional Peligre Dos Bocas .pdf
 
Peligre Dos Bocas Binational Project.pdf
Peligre Dos Bocas Binational Project.pdfPeligre Dos Bocas Binational Project.pdf
Peligre Dos Bocas Binational Project.pdf
 
Projet Binational Peligre Dos Bocas.pdf
Projet Binational Peligre Dos Bocas.pdfProjet Binational Peligre Dos Bocas.pdf
Projet Binational Peligre Dos Bocas.pdf
 
Haiti hydropower potential-Appendix-E - 3
Haiti hydropower potential-Appendix-E - 3Haiti hydropower potential-Appendix-E - 3
Haiti hydropower potential-Appendix-E - 3
 
Haiti GIS-Based Hydropower Potential Mapping Atlas
Haiti GIS-Based Hydropower Potential Mapping AtlasHaiti GIS-Based Hydropower Potential Mapping Atlas
Haiti GIS-Based Hydropower Potential Mapping Atlas
 
Haiti Hydroelectric Potential - Panel 7 of 7
Haiti Hydroelectric Potential - Panel 7 of 7Haiti Hydroelectric Potential - Panel 7 of 7
Haiti Hydroelectric Potential - Panel 7 of 7
 
Haiti Hydroelectric Potential - Panel 6 of 7
Haiti Hydroelectric Potential - Panel 6 of 7Haiti Hydroelectric Potential - Panel 6 of 7
Haiti Hydroelectric Potential - Panel 6 of 7
 
Haiti Hydroelectric Potential - Panel 5 of 7
Haiti Hydroelectric Potential - Panel 5 of 7Haiti Hydroelectric Potential - Panel 5 of 7
Haiti Hydroelectric Potential - Panel 5 of 7
 
Haiti Hydroelectric Potential - Panel 4 of 7
Haiti Hydroelectric Potential - Panel 4 of 7Haiti Hydroelectric Potential - Panel 4 of 7
Haiti Hydroelectric Potential - Panel 4 of 7
 
Haiti Hydroelectric Potential - Panel 3 of 7
Haiti Hydroelectric Potential - Panel 3 of 7Haiti Hydroelectric Potential - Panel 3 of 7
Haiti Hydroelectric Potential - Panel 3 of 7
 
Haiti Hydroelectric Potential - Panel 2 of 7
Haiti Hydroelectric Potential - Panel 2 of 7Haiti Hydroelectric Potential - Panel 2 of 7
Haiti Hydroelectric Potential - Panel 2 of 7
 
Haiti Hydroelectric Potential - Panel 1 of 7
Haiti Hydroelectric Potential - Panel 1 of 7Haiti Hydroelectric Potential - Panel 1 of 7
Haiti Hydroelectric Potential - Panel 1 of 7
 
Haiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-FHaiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-F
 
Haiti hydropower potential-Appendix-E-5
Haiti hydropower potential-Appendix-E-5Haiti hydropower potential-Appendix-E-5
Haiti hydropower potential-Appendix-E-5
 
Haiti hydropower potential-Appendix-E-4
Haiti hydropower potential-Appendix-E-4Haiti hydropower potential-Appendix-E-4
Haiti hydropower potential-Appendix-E-4
 
Haiti hydropower potential-Appendix-E-2
Haiti hydropower potential-Appendix-E-2Haiti hydropower potential-Appendix-E-2
Haiti hydropower potential-Appendix-E-2
 
Haiti hydropower potential-Appendix-E-1
Haiti hydropower potential-Appendix-E-1Haiti hydropower potential-Appendix-E-1
Haiti hydropower potential-Appendix-E-1
 
Haiti hydropower potential-Appendix-D
Haiti hydropower potential-Appendix-DHaiti hydropower potential-Appendix-D
Haiti hydropower potential-Appendix-D
 
Haiti hydropower potential-Appendix-C
Haiti hydropower potential-Appendix-CHaiti hydropower potential-Appendix-C
Haiti hydropower potential-Appendix-C
 
Haiti hydropower potential-Appendix-B
Haiti hydropower potential-Appendix-BHaiti hydropower potential-Appendix-B
Haiti hydropower potential-Appendix-B
 

Recently uploaded

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 

Recently uploaded (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 

Pump station design manual

  • 1. STORM SEWER PUMP STATION SIZING SPREADSHEET Francis Mitchell, M.S., P.E. F-MITCHELL@ATT.NET
  • 2. Francis Mitchell, M.S., P.E. PAGE 1 STORM SEWER PUMP STATION SIZING SPREADSHEET Abstract: This spreadsheet is a tool to help the drainage engineer designs a storm sewer pump station by performing a level pool analysis of the pumping system, and storage areas. The settings of the pumps “on” and “off” points, flows, system storage, the storm hydrograph, rainfall depth, and duration, are parameters that could be adjusted to optimize the size of a pump station. This spreadsheet can be downloaded through the link below, https://www.dropbox.com/sh/jf8vsmhhq013mdd/AACJfnUjpiiCieTCusBS0JxEa?dl=0
  • 3. Francis Mitchell, M.S., P.E. PAGE 2 STORM SEWER PUMP STATION SIZING SPREADSHEET Table of Contents Page 1.0 DESCRIPTION................................................................................................................................3 2.0 INPUT DATA WORKSHEETS..........................................................................................................4 3.0 OUTPUT DATA WORKSHEETS......................................................................................................8 4.0 CASE STUDY................................................................................................................................16 5.0 AUTHOR......................................................................................................................................33 6.0 REFERENCES...............................................................................................................................34
  • 4. Francis Mitchell, M.S., P.E. PAGE 3 STORM SEWER PUMP STATION SIZING SPREADSHEET 1.0 DESCRIPTION This spreadsheet was developed as a tool to perform the preliminary sizing of storm sewer pump station and to complement the analysis performed by much advanced software which don’t have the flexibility of quickly varying the input data. This spreadsheet could be used first to pre-size and calibrate a pump station and then use the results for further analysis without having the burden of performing countless trial and error analysis. The analysis performed by this spreadsheet is a level pool flood routing of a pump station system given its watershed area, the rainfall depth and duration, the unit hydrograph and peaking factor. In addition the user can choose different storm hydrograph generating procedure. The pump station is defined by its geometry, pumps capacities, “on” and “off” setting, and the storage available in the storm sewer network. This spreadsheet generates watershed inflow hydrograph output, outflow hydrograph output, stage duration graph, and displays also the number of times a pump will turn “on” and “off”, as well as the amount of working hours.
  • 5. Francis Mitchell, M.S., P.E. PAGE 4 2.0 INPUT DATA WORKSHEETS
  • 6. Francis Mitchell, M.S., P.E. PAGE 5 Design Unit Design unit is either “Metric” or “English”. Areas Areas are entered as “Acres” or “Hectares”. SCS CN CN (curve number) depends on the type of land cover. Time of Concentration The time of concentration is entered in minutes. Hydrologic Method Three different hydrologic analysis method can be used.  SCS – Santa Barbara Method  SCS – Design Storm  SCS – Flood Hydrograph Rainfall Depth Rainfall depth for the selected storm is entered in inches or millimeters. Routing Time This is the duration of the storm in hours. Flood Routing Time Step The time step increment for the routing analysis to be performed. Print Display Time step The time step for a result to be printed. This option is currently disabled. Peaking Factor The SCS peaking factor, and the length of the receding leg of the hydrograph. This variable is dependent on the hydrologic method selected.
  • 8. Francis Mitchell, M.S., P.E. PAGE 7 Top Elevation and Top Area The pump station top elevation and top area are entered in feet, and square feet, or meter, and square meter. Critical Water Level The stage at which the water level reached a critical value is entered in feet or meter. This input data is only for graphical representation of the design constraint. Starting Water Level The starting water level is the level of the permanent pool of water inside the pump station. This data is entered in feet or meter. The stage of the starting water level cannot be higher than the lowest pump starting elevation. Bottom Elevation and Bottom Area The pump station bottom elevation and bottom area are entered in feet, and square feet, or meter, and square meter. Pumps Settings The pumps “on” and “off” elevations are entered in feet or meter. The CUMULATIVE flow for all the pumps are entered at each row. The unit is either cfs, or cubic meter per second. Additional Storage The storage within the drainage system is entered at each stage elevation. The unit is feet, and cubic feet, or meter, and cubic meter.
  • 9. Francis Mitchell, M.S., P.E. PAGE 8 3.0 OUTPUT DATA WORKSHEETS
  • 10. Francis Mitchell, M.S., P.E. PAGE 9
  • 11. Francis Mitchell, M.S., P.E. PAGE 10
  • 12. Francis Mitchell, M.S., P.E. PAGE 11
  • 13. Francis Mitchell, M.S., P.E. PAGE 12
  • 14. Francis Mitchell, M.S., P.E. PAGE 13
  • 15. Francis Mitchell, M.S., P.E. PAGE 14
  • 16. Francis Mitchell, M.S., P.E. PAGE 15
  • 17. Francis Mitchell, M.S., P.E. PAGE 16 4.0 CASE STUDY Project: The City of Miami Beach, and the Florida Department of Transportation District Six, have decided to jointly fund the construction of a major storm sewer pump station facility to offer relief from recurrent flooding events along Indian Creek Drive from 25th Street to 41st Street. These floodings are mainly caused by the ever increasing high tides, and deficient gravity drainage systems that were built in the 1940s. Design Criteria:  Design storm to satisfy FDOT critical storms duration as per Chapter 14-86.  Minimum elevation of +3.70 for new pavement.  Drainage for low lying side streets will need to be accommodated. Design:  Total tributary area A=36.81 acres  SCS weighted curve number CN = 96  Critical storm is FDOT 1 Hour hydrograph with rainfall depth of 3.60 inches  Maximum watershed runoff flow is 132.23 cfs at 54.25 hours  Trunk line length is 4,600 feet divided into a south and north reach.  The south reach controls the design with a length of 2,490 feet.  The south reach has 30 manholes risers, and 1 terminal manhole.  The north reach is 2,110 feet.  The north reach has 25 manholes risers, and 1 terminal manhole.  Minimum existing inlet elevation +2.20 NAVD Step 1 Find pump station preliminary total flow estimated at 70% of the watershed flow. Qtotal = 132.23 cfs x 70% of inflow = 92.56 cfs A preliminary headloss – system curve analysis yields a pump station with three pumps having a total capacity of 93.36 cfs. (refer to step 5) Step 2 Find trunk line preliminary pipe diameter for a conveyance velocity of 3.0 ft/s to 3.5 ft/s Diameter for 3.0 ft/s = (92.56 cfs x 4 / (3.0 ft/s x 3.14159))^.5 = 6.3 ft ( 6.0 feet = 72 inches) Diameter for 3.5 ft/s = (92.56 cfs x 4 / (3.5 ft/s x 3.14159))^.5 = 5.8 ft ( 5.5 feet = 66 inches) Step 3 Calculate head losses along trunk line
  • 18. Francis Mitchell, M.S., P.E. PAGE 17 Head losses for 66 inches pipe – south branch Ref: Hydraulic Calculator Software from HYDTRENCH Manhole risers losses = 30 x 0.15 x ((3.93)^2 / 64.4) = 1.08 feet Terminal manhole loss = 1 x 0.5 x ((3.93)^2 / 64.4) = 0.12 foot Manhole 90 deg. Bend to pump station = 1 x 0.7 x ((3.93)^2 / 64.4) = 0.17 foot Pipe exit losses to pump station = 1 x 1.0 x ((3.93)^2 / 64.4) = 0.24 foot Losses along length of south pipe = 2,490 feet x 0.0659 / 100 = 1.64 feet ------------- Total Losses 3.25 feet Minimum crown elevation of pipe for HGL to be below existing inlet +2.20 NAVD – 3.25 feet (head losses) = -1.05 NAVD
  • 19. Francis Mitchell, M.S., P.E. PAGE 18 Head losses for 66 inches pipe – south branch Ref: Hydraulic Calculator Software from HYDTRENCH Manhole risers losses = 30 x 0.15 x ((3.30)^2 / 64.4) = 0.76 foot Terminal manhole loss = 1 x 0.5 x ((3.30)^2 / 64.4) = 0.08 foot Manhole 90 deg. Bend to pump station = 1 x 0.7 x ((3.30)^2 / 64.4) = 0.12 foot Pipe exit losses to pump station = 1 x 1.0 x ((3.30)^2 / 64.4) = 0.17 foot Losses along length of south pipe = 2,490 feet x 0.0414 / 100 = 1.03 feet ------------- Total Losses 2.16 feet Minimum crown elevation of pipe for HGL to be below existing inlet +2.20 NAVD – 2.16 feet (head losses) = +0.04 NAVD
  • 20. Francis Mitchell, M.S., P.E. PAGE 19 Step 4 Find crown elevation based on concrete manhole structures placed along new pavement Frame and cover height 9.0 inches Brick leveling (2 layers) 8.0 inches Concrete slab thickness 8.0 inches Minimum wall height above opening 6.0 inches Minimum spaces around pipe 6.0 inches Pipe thickness 7.0 inches --------------- Total Cover 44 inches (3.67 feet) Crown elevation based on structure type = 3.70 NAVD – 3.67 = +0.03 NAVD In order to expedite construction the City has decided to use spiral reinforced HDPE pipe. This pipe will be placed under water and requires a soil overburden atop the pipe to prevent floatation. The minimum crown elevation needed to prevent uplift is -1.00 NAVD. Although the 66 inches pipe is sufficient, the 72 inches pipe will be used with crown placed at -1.00 NAVD, invert set at -7.00 NAVD. The benefit of using the 72 inches instead of the 66 inches will be less head loss (lower HGL), longer filling time which will translate into longer cycling time between pumps start.
  • 21. Francis Mitchell, M.S., P.E. PAGE 20 Typical project pump station layout Drawing Sketch Credit: Ribbeck Engineering Inc. The pumps used are “in tube” axial flow pump. This setting allows lower minimum submergence depth. As a result the pump station needs not to be set very deep. The spacing between pumps is also reduced. Another requirement was to construct the station in a modular fashion. The modular approach allowed the units to be pre-cast at the casting yard, and transported on site for setting and installation.
  • 22. Francis Mitchell, M.S., P.E. PAGE 21 Step 5 – Head loss at low water level Pump flow at low water level (maximum head) is 29.57 cfs
  • 23. Francis Mitchell, M.S., P.E. PAGE 22 Head loss at high water level Pump flow at high water level (minimum head) is 32.67 cfs Average of pump flow for high and low water level is (32.67 cfs + 29.57 cfs)/2 = 31.12 cfs
  • 24. Francis Mitchell, M.S., P.E. PAGE 23 Watershed input data
  • 25. Francis Mitchell, M.S., P.E. PAGE 24 Pump station input data
  • 26. Francis Mitchell, M.S., P.E. PAGE 25 Inflow Hydrograph
  • 27. Francis Mitchell, M.S., P.E. PAGE 26 Outflow hydrograph
  • 28. Francis Mitchell, M.S., P.E. PAGE 27 Inflow – outflow hydrograph
  • 29. Francis Mitchell, M.S., P.E. PAGE 28 Stage duration
  • 30. Francis Mitchell, M.S., P.E. PAGE 29 Cumulative inflow – outflow volume
  • 31. Francis Mitchell, M.S., P.E. PAGE 30 Pumps running time
  • 32. Francis Mitchell, M.S., P.E. PAGE 31 Pumps capacity and “on” “off” setting rating curve
  • 33. Francis Mitchell, M.S., P.E. PAGE 32 System storage capacity rating curve
  • 34. Francis Mitchell, M.S., P.E. PAGE 33 5.0 AUTHOR This spreadsheet can be ordered from the following address. Francis Mitchell, M.S., P.E. f-mitchell@att.net Phone: (305) 979-6387 Or by accessing the link below, https://www.dropbox.com/sh/jf8vsmhhq013mdd/AACJfnUjpiiCieTCusBS0JxEa?dl=0
  • 35. Francis Mitchell, M.S., P.E. PAGE 34 6.0 REFERENCES Federal Highway Administration, Highway Stormwater Pump Station Design Manual, HEC-24, 2000. Formerly Highway Storm Water Pumping Stations, Volumes 1 and 2, FHWA-IP-82-17. Daugherty, Robert L., and Franzini, Joseph B.: “Fluid Mechanics with Engineering Applications,” McGraw-Hill Book Co., New York, 1985. Mc Cuen, Richard:”Hydrologic Analysis and Design”, Second Edition, Prentice Hall, New Jersey, 1998. Reitz, and Jens:”Design of Urban Highway Drainage, the State of the Art”, FHWA-TS-79-225, Federal Highway Administration, August 1979. Shammas, Namir C.; “Mathematical Algorithms in Visual Basic for Scientists and Engineers,” McGraw-Hill Book Co., New York, 1995. Soil Conservation Service:”National Engineering Handbook Section 4-Hydrology, (Part 1 of 2, 2 of 2), Engineering Division Soil Conservation Service, USDA, Washington, March 1985. South Florida Water Management District:”Management and Storage of Surface Waters-Permit Information Manual Volume IV”.Streeter, Victor L., and Wylie, Benjamin E.: “Fluid Mechanics,” McGraw-Hill Book Co., New York, 1979. Mitchell, Francis : “HYDTRENCH, Exfiltration Trench manual”, Miami, 1999.