SlideShare a Scribd company logo
1 of 3
Thomas L Lewis
785-221-3711 lewiskansas@sbcglobal.net
I am an experienced project manager with a combination of Technical, Design, and Problem
Solving experience, Current use of Viewpoint & HCSS Project Manager.
Career Summary
Major local Civil/Heavy Contractor April 2012 – Present
Project Manager
Duties Include: Scheduling, Pay Request, Change Orders, Budgeting, Coordination of Projects,
Railroads
Kanza Construction Inc.
2000 – 2012
Project Manager: Duties Included Estimating, Scheduling, Pay Request, Change Orders, Budgeting,
Coordination of Project, Railroads, Airport Authorities, State Department of Transportation,
and other municipalities. Key Projects Includes:
Tex-Mex Construction Project: $23.6M, 145 miles near Laredo, Texas
Victoria to Rosenberg Grading - $24.3M, 85 miles near Rosenberg, Texas
Hay’s Municipal Airport – Hay’s, Kansas $1.4M
Forbes Air Force Base - Topeka, Kansas $750,000
Kerrville Regional Airport – Kerrville, Texas $4.3M
Floydada Airport Improvements – Floydada, Texas $1.5M
Harrisonville Airport – Harrisonville, Missouri $1.7M
Eufaula Railroad Siding – Eufaula, Oklahoma $3.0M
Cross Over Track – Muskogee, Oklahoma $2.6M
BNSF Railroad Hump Yard – Tulsa, Oklahoma $4.4M
BNSF Railroad Steel Girder Bridge, Construction and Main Line Realignment
Harris County Flood Control – Houston, Texas $2.6M
Sims Bayou Realignment & Excavation – Houston, Texas 3.8M
North Point Marina & Breakwater – Winthrop Harbor, Illinois $21.2M
Rechanneled Rio Grande River – Bureau of Reclamation 1.8M
Waukegan Harbor Breakwater Construction – Waukegan, Illinois $6M
Drainage Improvements – Fort Carson, Colorado – Corps of Engineers $4.5M
Black Mountain Pipeline: 78” High Pressure Water Line – Bureau of Rec $13.8 M
State of Nebraska Highway Project: I-80 to South Bend, Nebraska $4.6M
Thomas L. Lewis (Page 1)
Twin Bridges for Arkansas DOR Highway 412 at Siloam Springs, Arkansas
Concrete Sewer Line & Highway Construction – Kansas City, Missouri
Phillips Grading and Construction
Project Manager 1994 – 2000
Duties Included Estimating, Scheduling, Surveying, Operating Equipment, Budgets
Midwest Construction
Superintendent 1976 – 1994
Duties Included Surveying, Operating Equipment
Railroad Projects (UPRR, BNSF, KCS, KCT, & CN)
• Construct Flood Control Levee: Excavation, Embankment, High Pressure Grout, and
Grade Adjustment on Siding (Iowa and Missouri).
• Reconstruction of Track Grades and Structures: Rosenberg to Victoria and Corpus
Christi to Laredo (Texas)
• Washington Street Bridge: Remove Existing Bridge and construct a new 240 foot multi-
plate railroad tunnel. (Mississippi)
• Construct RR Sidings & Turnouts: Embankment, bridges, drainage structures, sub ballast,
lime treatment, and road crossings. (Oklahoma, Arkansas, Missouri)
• Cross Over Tracks: Embankment, Sub Ballast, Lime Treatment, and Drainage Structures.
(Oklahoma & Kentucky)
• Construction of 7 Story Office & Condo Building – Topeka, Kansas $ 9.5M
Taxiway, Apron, RR Sidings, & Runway Reconstruction & Various State DOT’s
• All of the projects consisted of New Embankment, Bridges, Lime, Fly Ash, or
Cement Treatment of subgrade, placement of base materials, New Pavement
(asphalt & concrete), Runway Lighting, RR Signals, Retaining Wall, New Runway
Education
United States Army: Heavy Vehicle and Equipment Mechanic - 1973 - 1980
University Of Maryland: Auto Mechanics 1 & 2 – 1975 – 1976
Iowa Western Community College: Surveying – Field to Design - 1989
Longview Community College: 1999 - 2000
• Elementary Surveying
• Advanced Surveying
• Boundary Control Surveys and Legal Principals
• Land Surveying Procedures for Retracement & Relocation
Thomas L. Lewis (Page 2)
Skills
• Surveyor
• Estimator
• Equipment Operator
• Drilling & Explosives Handler
• Mechanic
Awards & Certifications
• Licensed Electrician & Explosives Technician (Oklahoma State Bureau of Mines)
• CA/QC for Contractors ( US Army Corps of Engineers )
• Advanced Open Water Scuba Diver (PADI)
• E-Railsafe, Contractors Orientation for Railroad Workers (FRA, BNSF, UP, KCS)
Thomas L. Lewis (Page 3)

More Related Content

What's hot

07 AASHTO Bridge Committee Awards Presentation
07 AASHTO Bridge Committee Awards Presentation07 AASHTO Bridge Committee Awards Presentation
07 AASHTO Bridge Committee Awards PresentationAISC/NSBA
 
Ce 4710 presentation 2
Ce 4710 presentation 2Ce 4710 presentation 2
Ce 4710 presentation 2Matthew White
 
Caltrain/HSR Jan 2016 Local Policy Maker meeting agenda
Caltrain/HSR Jan 2016 Local Policy Maker meeting agendaCaltrain/HSR Jan 2016 Local Policy Maker meeting agenda
Caltrain/HSR Jan 2016 Local Policy Maker meeting agendaAdina Levin
 
Bridges by the Numbers
Bridges by the NumbersBridges by the Numbers
Bridges by the NumbersSkanska USA
 
Kosinski, Andy - CV
Kosinski, Andy - CVKosinski, Andy - CV
Kosinski, Andy - CVakosinski
 
Public Sector Design Services
Public Sector Design ServicesPublic Sector Design Services
Public Sector Design ServicesTrafficPD
 
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...Virtual ULI
 
Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati∴
 
Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Kristy Plummer
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
Newby Resume 2015
Newby Resume 2015Newby Resume 2015
Newby Resume 2015Steve Newby
 
El camino real fact sheet
El camino real fact sheet El camino real fact sheet
El camino real fact sheet Adina Levin
 
Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Mark Shaw
 
Mexico's Energy Reform and the Potential Impact on Texas' Transportation System
Mexico's Energy Reform and the Potential Impact on Texas' Transportation SystemMexico's Energy Reform and the Potential Impact on Texas' Transportation System
Mexico's Energy Reform and the Potential Impact on Texas' Transportation SystemTexas A&M Transportation Institute
 
My New Resume 2016
My New Resume 2016My New Resume 2016
My New Resume 2016Boyce Burns
 

What's hot (20)

07 AASHTO Bridge Committee Awards Presentation
07 AASHTO Bridge Committee Awards Presentation07 AASHTO Bridge Committee Awards Presentation
07 AASHTO Bridge Committee Awards Presentation
 
Ce 4710 presentation 2
Ce 4710 presentation 2Ce 4710 presentation 2
Ce 4710 presentation 2
 
Caltrain/HSR Jan 2016 Local Policy Maker meeting agenda
Caltrain/HSR Jan 2016 Local Policy Maker meeting agendaCaltrain/HSR Jan 2016 Local Policy Maker meeting agenda
Caltrain/HSR Jan 2016 Local Policy Maker meeting agenda
 
Arshad Jan CV
Arshad Jan CVArshad Jan CV
Arshad Jan CV
 
PM tools and techniques
PM tools and techniquesPM tools and techniques
PM tools and techniques
 
Bridges by the Numbers
Bridges by the NumbersBridges by the Numbers
Bridges by the Numbers
 
Kosinski, Andy - CV
Kosinski, Andy - CVKosinski, Andy - CV
Kosinski, Andy - CV
 
Antoine's Resume
Antoine's ResumeAntoine's Resume
Antoine's Resume
 
Public Sector Design Services
Public Sector Design ServicesPublic Sector Design Services
Public Sector Design Services
 
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
 
Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016
 
Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16
 
Soq
SoqSoq
Soq
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
Newby Resume 2015
Newby Resume 2015Newby Resume 2015
Newby Resume 2015
 
El camino real fact sheet
El camino real fact sheet El camino real fact sheet
El camino real fact sheet
 
Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614
 
Resume_Stantec_2016_10
Resume_Stantec_2016_10Resume_Stantec_2016_10
Resume_Stantec_2016_10
 
Mexico's Energy Reform and the Potential Impact on Texas' Transportation System
Mexico's Energy Reform and the Potential Impact on Texas' Transportation SystemMexico's Energy Reform and the Potential Impact on Texas' Transportation System
Mexico's Energy Reform and the Potential Impact on Texas' Transportation System
 
My New Resume 2016
My New Resume 2016My New Resume 2016
My New Resume 2016
 

Viewers also liked

Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1Ron Sliwoski
 
Concept map
Concept map Concept map
Concept map sh1615
 
Short film script
Short film scriptShort film script
Short film scriptconnor2598
 
9. ulceras por presión
9. ulceras por presión9. ulceras por presión
9. ulceras por presiónCAEDTBE
 
11. tratamiento upp
11. tratamiento upp11. tratamiento upp
11. tratamiento uppCAEDTBE
 

Viewers also liked (10)

Prueba2bim1
Prueba2bim1Prueba2bim1
Prueba2bim1
 
Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1
 
Seni pra
Seni praSeni pra
Seni pra
 
Concept map
Concept map Concept map
Concept map
 
Short film script
Short film scriptShort film script
Short film script
 
Hidayah
HidayahHidayah
Hidayah
 
9. ulceras por presión
9. ulceras por presión9. ulceras por presión
9. ulceras por presión
 
Nuevo plan Agua New
Nuevo plan Agua NewNuevo plan Agua New
Nuevo plan Agua New
 
11. tratamiento upp
11. tratamiento upp11. tratamiento upp
11. tratamiento upp
 
Posiciones de enfermería.
Posiciones de enfermería.Posiciones de enfermería.
Posiciones de enfermería.
 

Similar to tlewisresumetopekarev (1)

Similar to tlewisresumetopekarev (1) (20)

FNK rev 06.08.15
FNK rev 06.08.15FNK rev 06.08.15
FNK rev 06.08.15
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
Epw Cv 2009
Epw Cv 2009Epw Cv 2009
Epw Cv 2009
 
Additional Work Experience
Additional Work ExperienceAdditional Work Experience
Additional Work Experience
 
Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 general
 
Quander Road Outfall and Stream Restoration
Quander Road Outfall and Stream RestorationQuander Road Outfall and Stream Restoration
Quander Road Outfall and Stream Restoration
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
 
170117 Liam Kimble Resume
170117 Liam Kimble Resume170117 Liam Kimble Resume
170117 Liam Kimble Resume
 
Culanag, Desideria
Culanag, DesideriaCulanag, Desideria
Culanag, Desideria
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12
 
Celestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceCelestain Jr Alfred_Refernce
Celestain Jr Alfred_Refernce
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
Frank Del 0215
Frank Del 0215Frank Del 0215
Frank Del 0215
 
resume 2017
resume 2017resume 2017
resume 2017
 
Resume.Brian Murphree
Resume.Brian MurphreeResume.Brian Murphree
Resume.Brian Murphree
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
Transportation Technical Group (TTG) January 2015 - High Speed Rail
Transportation Technical Group (TTG) January 2015 - High Speed RailTransportation Technical Group (TTG) January 2015 - High Speed Rail
Transportation Technical Group (TTG) January 2015 - High Speed Rail
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)
 

tlewisresumetopekarev (1)

  • 1. Thomas L Lewis 785-221-3711 lewiskansas@sbcglobal.net I am an experienced project manager with a combination of Technical, Design, and Problem Solving experience, Current use of Viewpoint & HCSS Project Manager. Career Summary Major local Civil/Heavy Contractor April 2012 – Present Project Manager Duties Include: Scheduling, Pay Request, Change Orders, Budgeting, Coordination of Projects, Railroads Kanza Construction Inc. 2000 – 2012 Project Manager: Duties Included Estimating, Scheduling, Pay Request, Change Orders, Budgeting, Coordination of Project, Railroads, Airport Authorities, State Department of Transportation, and other municipalities. Key Projects Includes: Tex-Mex Construction Project: $23.6M, 145 miles near Laredo, Texas Victoria to Rosenberg Grading - $24.3M, 85 miles near Rosenberg, Texas Hay’s Municipal Airport – Hay’s, Kansas $1.4M Forbes Air Force Base - Topeka, Kansas $750,000 Kerrville Regional Airport – Kerrville, Texas $4.3M Floydada Airport Improvements – Floydada, Texas $1.5M Harrisonville Airport – Harrisonville, Missouri $1.7M Eufaula Railroad Siding – Eufaula, Oklahoma $3.0M Cross Over Track – Muskogee, Oklahoma $2.6M BNSF Railroad Hump Yard – Tulsa, Oklahoma $4.4M BNSF Railroad Steel Girder Bridge, Construction and Main Line Realignment Harris County Flood Control – Houston, Texas $2.6M Sims Bayou Realignment & Excavation – Houston, Texas 3.8M North Point Marina & Breakwater – Winthrop Harbor, Illinois $21.2M Rechanneled Rio Grande River – Bureau of Reclamation 1.8M Waukegan Harbor Breakwater Construction – Waukegan, Illinois $6M Drainage Improvements – Fort Carson, Colorado – Corps of Engineers $4.5M Black Mountain Pipeline: 78” High Pressure Water Line – Bureau of Rec $13.8 M State of Nebraska Highway Project: I-80 to South Bend, Nebraska $4.6M Thomas L. Lewis (Page 1)
  • 2. Twin Bridges for Arkansas DOR Highway 412 at Siloam Springs, Arkansas Concrete Sewer Line & Highway Construction – Kansas City, Missouri Phillips Grading and Construction Project Manager 1994 – 2000 Duties Included Estimating, Scheduling, Surveying, Operating Equipment, Budgets Midwest Construction Superintendent 1976 – 1994 Duties Included Surveying, Operating Equipment Railroad Projects (UPRR, BNSF, KCS, KCT, & CN) • Construct Flood Control Levee: Excavation, Embankment, High Pressure Grout, and Grade Adjustment on Siding (Iowa and Missouri). • Reconstruction of Track Grades and Structures: Rosenberg to Victoria and Corpus Christi to Laredo (Texas) • Washington Street Bridge: Remove Existing Bridge and construct a new 240 foot multi- plate railroad tunnel. (Mississippi) • Construct RR Sidings & Turnouts: Embankment, bridges, drainage structures, sub ballast, lime treatment, and road crossings. (Oklahoma, Arkansas, Missouri) • Cross Over Tracks: Embankment, Sub Ballast, Lime Treatment, and Drainage Structures. (Oklahoma & Kentucky) • Construction of 7 Story Office & Condo Building – Topeka, Kansas $ 9.5M Taxiway, Apron, RR Sidings, & Runway Reconstruction & Various State DOT’s • All of the projects consisted of New Embankment, Bridges, Lime, Fly Ash, or Cement Treatment of subgrade, placement of base materials, New Pavement (asphalt & concrete), Runway Lighting, RR Signals, Retaining Wall, New Runway Education United States Army: Heavy Vehicle and Equipment Mechanic - 1973 - 1980 University Of Maryland: Auto Mechanics 1 & 2 – 1975 – 1976 Iowa Western Community College: Surveying – Field to Design - 1989 Longview Community College: 1999 - 2000 • Elementary Surveying • Advanced Surveying • Boundary Control Surveys and Legal Principals • Land Surveying Procedures for Retracement & Relocation Thomas L. Lewis (Page 2)
  • 3. Skills • Surveyor • Estimator • Equipment Operator • Drilling & Explosives Handler • Mechanic Awards & Certifications • Licensed Electrician & Explosives Technician (Oklahoma State Bureau of Mines) • CA/QC for Contractors ( US Army Corps of Engineers ) • Advanced Open Water Scuba Diver (PADI) • E-Railsafe, Contractors Orientation for Railroad Workers (FRA, BNSF, UP, KCS) Thomas L. Lewis (Page 3)