Lynée Russell - Previous Dry Utility Design & Coordination Projects:
 ATAPCO – Creekside Village: Site located in Glen Burnie, MD. Required new service design &
coordination for gas, electric and two telecoms. Site required gas regulation station design and
coordination. Property contained several phases which would provide new townhomes, single family lots
and apartment building complex to new residents. Coordinated payments/easements/contracts. Facilitated
& participated in marketing meetings to determine best telecom provider for new development. Required
General Contractor coordination and management assistance. (2012-2013, Bowman Consulting)
 Cityline PI Plan / Hanover Properties: Site located in Tyson’s Corner/McLean, VA area. Contained one
(1) city block of existing buildings (total of 6) to be demolished for new office/hotel/mixed-use residential
buildings. Required disconnects, abandonments, locates, new service and relocations design &
coordination efforts. Relocation of all existing wet and dry utilities within Westbranch Drive required
(roadway contained 10+ dry utilities, relocation of just Dominion VA Power would estimate to be one-
million in cost). Coordinated payments/easements/contracts. Monitored, tracked and scheduled dry utility
construction schedules. Required General Contractor coordination and management assistance.
(2011-2014, Bowman Consulting)
 Wal-Mart – Hampstead: Site located in Hampstead, MD. Required relocation of poles and signals in two
(2) different locations; underground line relocation due to conflicts from Wal-Mart construction impacting
existing Carroll County Water Tower on adjacent property; new service coordination; relocation of BGE:
Electric, Comcast, Carroll County Cable and Verizon on multiple street poles and across the street due to
intersection and roadway reconfigurations. Coordination with Wal-Mart Rollout and Energy Divisions
regarding on-site construction schedules). Coordinated payments/easements/contracts. Monitored,
tracked and scheduled dry utility construction schedules. Required General Contractor coordination and
management assistance. (2010-2011, Bowman Consulting)
 TD Bank – Wisconsin Ave: Site located in Washington DC. Coordinated asbestos/rodent removal,
camera line work to determine if DC WASA could reuse their existing facilities for new service.
Coordinated Pepco underground line and pole relocation. Washington Gas relocation/new service, Sprint
and Verizon relocation and new service. Managed the relocation of Sprint's existing cell tower Pepco
service on-site, from existing position to temporary position running power, then into new service location.
Assisted General Contractor, TD Bank Construction Manager (Michael Powell), Bohler Civils,
MEP/Architect and Sprint with utility designs, relocations, installation, activation.. Coordinated
payments/easements/contracts. Monitored, tracked and scheduled dry utility construction schedules.
(2009, Bohler Engineering)
 Wal-Mart – Newport News & Jefferson Ave: Sites located in Newport News, VA. Wal-Mart
Construction Manager, Lance Ogden required assistance with these Kimley-Horn projects and contacted
Lynée Russell. Both projects required General Contractor coordination and management assistance.
Coordination with all dry utilities regarding their construction/installation/activation schedules was needed
for each site. Coordination efforts required due to Hurricane Sandy impacting site, outage coordination
with Dominion VA Power required due to impacts with local farmers market for the Jefferson Ave site.
Coordination efforts required with Wal-Mart Rollout and Energy Divisions required for both sites.
(2012, Bowman Consulting)
 Wal-Mart – Warrenton: Site located in Warrenton, VA. Wal-Mart Construction Manager, Lance Ogden
required assistance with this Bohler Engineering project and contacted Lynée Russell. This project
required General Contractor coordination and management assistance. Coordination efforts with
Dominion VA Power were needed due to lack of correspondence response from Dominion regarding
construction/installation/activation schedules. (2011, Bowman Consulting)
Additional projects include (not limited to):
o PNC Bank VA & MD sites (Bohler)
o TD Bank – DC,MD,VA sites (Bohler)
o Safeway – McLean, VA (Bohler)
o ExxonMobil – Ashburn, VA (Bohler)
o Brookside Development – Warrenton (Bohler/DFM)
o Chick-fil-A – VA & MD sites (Bohler)
o Elysian Heights – Leesburg, VA (Bowman)
o ATAPCO – Creekside Village, MD (Bowman)
o Lennar Homes (Bowman/DFM)
o Bowman Consulting Survey Group (DFM)
o FedEx (DFM)
o Wal-Mart: Baltimore County (DFM)
o A&R Development (Bowman/DFM)

More Related Content

What's hot

Newington Road Pedestrian Bridge Replacement Project June 2014
Newington Road Pedestrian Bridge Replacement Project June 2014Newington Road Pedestrian Bridge Replacement Project June 2014
Newington Road Pedestrian Bridge Replacement Project June 2014Fairfax County
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayToronto Public Consultation Unit
 
Replace as+gg booklet
Replace as+gg bookletReplace as+gg booklet
Replace as+gg bookletGardinerEast
 
2011 Ports-to-Plains Alliance Report Card
2011 Ports-to-Plains Alliance Report Card2011 Ports-to-Plains Alliance Report Card
2011 Ports-to-Plains Alliance Report CardPorts-To-Plains Blog
 
MLK Boulevard Plan
MLK Boulevard PlanMLK Boulevard Plan
MLK Boulevard PlanJames May
 
A short history of a big idea
A short history of a big ideaA short history of a big idea
A short history of a big ideaGrowSmart Maine
 
Replace west8+dtah+cbagu booklet
Replace west8+dtah+cbagu bookletReplace west8+dtah+cbagu booklet
Replace west8+dtah+cbagu bookletGardinerEast
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display BoardsGardinerEast
 
Covington streetscape
Covington streetscapeCovington streetscape
Covington streetscapeJ03Van
 
City Council April 5, 2011 Planning Presentation
City Council April 5, 2011 Planning PresentationCity Council April 5, 2011 Planning Presentation
City Council April 5, 2011 Planning PresentationCity of San Angelo Texas
 
Improve kpmb+big booklet
Improve kpmb+big bookletImprove kpmb+big booklet
Improve kpmb+big bookletGardinerEast
 
Berwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant ApplicationBerwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant ApplicationBerwyn Residents
 
Le Blanc - Andrews Handout
Le Blanc - Andrews HandoutLe Blanc - Andrews Handout
Le Blanc - Andrews HandoutHayley Pallister
 
Improve kpmb+big boards
Improve kpmb+big boardsImprove kpmb+big boards
Improve kpmb+big boardsGardinerEast
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardinerEast
 
Mosman Parks & Bushland Association objection to Sydney Harbour Trust privati...
Mosman Parks & Bushland Association objection to Sydney Harbour Trust privati...Mosman Parks & Bushland Association objection to Sydney Harbour Trust privati...
Mosman Parks & Bushland Association objection to Sydney Harbour Trust privati...savemiddlehead
 

What's hot (20)

Newington Road Pedestrian Bridge Replacement Project June 2014
Newington Road Pedestrian Bridge Replacement Project June 2014Newington Road Pedestrian Bridge Replacement Project June 2014
Newington Road Pedestrian Bridge Replacement Project June 2014
 
Item #3 PPT 320 Alta
Item #3  PPT 320 AltaItem #3  PPT 320 Alta
Item #3 PPT 320 Alta
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner Expressway
 
AM undertaken projects
AM undertaken projectsAM undertaken projects
AM undertaken projects
 
Replace as+gg booklet
Replace as+gg bookletReplace as+gg booklet
Replace as+gg booklet
 
2011 Ports-to-Plains Alliance Report Card
2011 Ports-to-Plains Alliance Report Card2011 Ports-to-Plains Alliance Report Card
2011 Ports-to-Plains Alliance Report Card
 
MLK Boulevard Plan
MLK Boulevard PlanMLK Boulevard Plan
MLK Boulevard Plan
 
A short history of a big idea
A short history of a big ideaA short history of a big idea
A short history of a big idea
 
City of Rochester, Main Street Makeover
City of Rochester, Main Street MakeoverCity of Rochester, Main Street Makeover
City of Rochester, Main Street Makeover
 
Replace west8+dtah+cbagu booklet
Replace west8+dtah+cbagu bookletReplace west8+dtah+cbagu booklet
Replace west8+dtah+cbagu booklet
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display Boards
 
Covington streetscape
Covington streetscapeCovington streetscape
Covington streetscape
 
City Council April 5, 2011 Planning Presentation
City Council April 5, 2011 Planning PresentationCity Council April 5, 2011 Planning Presentation
City Council April 5, 2011 Planning Presentation
 
Improve kpmb+big booklet
Improve kpmb+big bookletImprove kpmb+big booklet
Improve kpmb+big booklet
 
Berwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant ApplicationBerwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant Application
 
Le Blanc - Andrews Handout
Le Blanc - Andrews HandoutLe Blanc - Andrews Handout
Le Blanc - Andrews Handout
 
Improve kpmb+big boards
Improve kpmb+big boardsImprove kpmb+big boards
Improve kpmb+big boards
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 Panels
 
Working Group Recommendations
Working Group RecommendationsWorking Group Recommendations
Working Group Recommendations
 
Mosman Parks & Bushland Association objection to Sydney Harbour Trust privati...
Mosman Parks & Bushland Association objection to Sydney Harbour Trust privati...Mosman Parks & Bushland Association objection to Sydney Harbour Trust privati...
Mosman Parks & Bushland Association objection to Sydney Harbour Trust privati...
 

Similar to Lynée Russell - Previous DUDC Projects

Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017Fairfax County
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16David Beverly
 
ROBERT J BOSCO 2014
ROBERT J BOSCO 2014ROBERT J BOSCO 2014
ROBERT J BOSCO 2014Bob Bosco
 
Erik D resume for Project Manager position
Erik D resume for Project Manager positionErik D resume for Project Manager position
Erik D resume for Project Manager positionErik Slaughter
 
Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021Fairfax County
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copydon rawson
 
Michael Craig company resume
Michael Craig company resume Michael Craig company resume
Michael Craig company resume Michael Craig
 
Municipalization process 11 12 12
Municipalization process 11 12 12Municipalization process 11 12 12
Municipalization process 11 12 12Brad Feld
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & ResumeRichard Rask
 
DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20Heritage Wind
 
Item # 5 - Water Main Installation HDD
Item # 5 - Water Main Installation HDDItem # 5 - Water Main Installation HDD
Item # 5 - Water Main Installation HDDahcitycouncil
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard
 
My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016Michael Duffy
 
Item # 5 - Ogden Pipe Bursting Change Order
Item # 5 - Ogden Pipe Bursting Change Order Item # 5 - Ogden Pipe Bursting Change Order
Item # 5 - Ogden Pipe Bursting Change Order ahcitycouncil
 

Similar to Lynée Russell - Previous DUDC Projects (20)

Resume.Brian Murphree
Resume.Brian MurphreeResume.Brian Murphree
Resume.Brian Murphree
 
Frank Del 0215
Frank Del 0215Frank Del 0215
Frank Del 0215
 
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16
 
ROBERT J BOSCO 2014
ROBERT J BOSCO 2014ROBERT J BOSCO 2014
ROBERT J BOSCO 2014
 
Erik D resume for Project Manager position
Erik D resume for Project Manager positionErik D resume for Project Manager position
Erik D resume for Project Manager position
 
Scott_Molstad 8
Scott_Molstad 8Scott_Molstad 8
Scott_Molstad 8
 
Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
Michael Craig company resume
Michael Craig company resume Michael Craig company resume
Michael Craig company resume
 
Municipalization process 11 12 12
Municipalization process 11 12 12Municipalization process 11 12 12
Municipalization process 11 12 12
 
2016 Projects
2016 Projects2016 Projects
2016 Projects
 
Lou Houlemarde
Lou HoulemardeLou Houlemarde
Lou Houlemarde
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20
 
FNK rev 06.08.15
FNK rev 06.08.15FNK rev 06.08.15
FNK rev 06.08.15
 
Item # 5 - Water Main Installation HDD
Item # 5 - Water Main Installation HDDItem # 5 - Water Main Installation HDD
Item # 5 - Water Main Installation HDD
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
 
My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016
 
Item # 5 - Ogden Pipe Bursting Change Order
Item # 5 - Ogden Pipe Bursting Change Order Item # 5 - Ogden Pipe Bursting Change Order
Item # 5 - Ogden Pipe Bursting Change Order
 

Lynée Russell - Previous DUDC Projects

  • 1. Lynée Russell - Previous Dry Utility Design & Coordination Projects:  ATAPCO – Creekside Village: Site located in Glen Burnie, MD. Required new service design & coordination for gas, electric and two telecoms. Site required gas regulation station design and coordination. Property contained several phases which would provide new townhomes, single family lots and apartment building complex to new residents. Coordinated payments/easements/contracts. Facilitated & participated in marketing meetings to determine best telecom provider for new development. Required General Contractor coordination and management assistance. (2012-2013, Bowman Consulting)  Cityline PI Plan / Hanover Properties: Site located in Tyson’s Corner/McLean, VA area. Contained one (1) city block of existing buildings (total of 6) to be demolished for new office/hotel/mixed-use residential buildings. Required disconnects, abandonments, locates, new service and relocations design & coordination efforts. Relocation of all existing wet and dry utilities within Westbranch Drive required (roadway contained 10+ dry utilities, relocation of just Dominion VA Power would estimate to be one- million in cost). Coordinated payments/easements/contracts. Monitored, tracked and scheduled dry utility construction schedules. Required General Contractor coordination and management assistance. (2011-2014, Bowman Consulting)  Wal-Mart – Hampstead: Site located in Hampstead, MD. Required relocation of poles and signals in two (2) different locations; underground line relocation due to conflicts from Wal-Mart construction impacting existing Carroll County Water Tower on adjacent property; new service coordination; relocation of BGE: Electric, Comcast, Carroll County Cable and Verizon on multiple street poles and across the street due to intersection and roadway reconfigurations. Coordination with Wal-Mart Rollout and Energy Divisions regarding on-site construction schedules). Coordinated payments/easements/contracts. Monitored, tracked and scheduled dry utility construction schedules. Required General Contractor coordination and management assistance. (2010-2011, Bowman Consulting)  TD Bank – Wisconsin Ave: Site located in Washington DC. Coordinated asbestos/rodent removal, camera line work to determine if DC WASA could reuse their existing facilities for new service. Coordinated Pepco underground line and pole relocation. Washington Gas relocation/new service, Sprint and Verizon relocation and new service. Managed the relocation of Sprint's existing cell tower Pepco service on-site, from existing position to temporary position running power, then into new service location. Assisted General Contractor, TD Bank Construction Manager (Michael Powell), Bohler Civils, MEP/Architect and Sprint with utility designs, relocations, installation, activation.. Coordinated payments/easements/contracts. Monitored, tracked and scheduled dry utility construction schedules. (2009, Bohler Engineering)  Wal-Mart – Newport News & Jefferson Ave: Sites located in Newport News, VA. Wal-Mart Construction Manager, Lance Ogden required assistance with these Kimley-Horn projects and contacted Lynée Russell. Both projects required General Contractor coordination and management assistance. Coordination with all dry utilities regarding their construction/installation/activation schedules was needed for each site. Coordination efforts required due to Hurricane Sandy impacting site, outage coordination with Dominion VA Power required due to impacts with local farmers market for the Jefferson Ave site. Coordination efforts required with Wal-Mart Rollout and Energy Divisions required for both sites. (2012, Bowman Consulting)
  • 2.  Wal-Mart – Warrenton: Site located in Warrenton, VA. Wal-Mart Construction Manager, Lance Ogden required assistance with this Bohler Engineering project and contacted Lynée Russell. This project required General Contractor coordination and management assistance. Coordination efforts with Dominion VA Power were needed due to lack of correspondence response from Dominion regarding construction/installation/activation schedules. (2011, Bowman Consulting) Additional projects include (not limited to): o PNC Bank VA & MD sites (Bohler) o TD Bank – DC,MD,VA sites (Bohler) o Safeway – McLean, VA (Bohler) o ExxonMobil – Ashburn, VA (Bohler) o Brookside Development – Warrenton (Bohler/DFM) o Chick-fil-A – VA & MD sites (Bohler) o Elysian Heights – Leesburg, VA (Bowman) o ATAPCO – Creekside Village, MD (Bowman) o Lennar Homes (Bowman/DFM) o Bowman Consulting Survey Group (DFM) o FedEx (DFM) o Wal-Mart: Baltimore County (DFM) o A&R Development (Bowman/DFM)