SlideShare a Scribd company logo
1 of 2
Ephraim Issac Das (Electrical Engineer)
PERSONAL INFORMATION & CONTACTS:
FATHER’s NAME: Donald Das.
DATE OF BIRTH: 14_01_1984.
NIC NO: 54400-0503094-5.
Address: House #4, Noor Masjid Road, Bani Gala,Islamabad.
Phone No:051_4939229.
Cell No: 03337806184.
E-mail Address:ephraimissac@gmail.com
.
PROFESSIONAL EXPERIENCE:
Working in National Power Control Center,National Transmission and Dispatch Company from Apr-2008 till
date.
National Power Control Center:
The NPCC (National Power Control Center) WAPDA/NTDC Islamabad ensure continuous supply of Electric
Energy to all its consumers at all points at a frequency and voltage levels within the permissible limits through
SCADA System (Supervisory Control and Data Acquisition). NPCC is responsible for generation of electric
energy as economically as possible by coordinating hydro-thermal power plants to meet with the load demand
of the consumers from time to time. The network constraints are also given due consideration while dispatching
and transmitting the power in order to keep the system stability intact to the possible extent.
Job Responsibilitiesat National Power Control Centre:
Shift Engineer (Network Operations & CONTROL):
 Continuous monitoring of Frequency level in Power transmission network.
 Maintaining balance between supply and demand.
 Economic Load dispatching using hydro thermal coordination with different type of generators installed
in the system (HYDEL,DG- Sets, GT’s, Steam Turbines, Nuclear and Wind plants).
 Execution of merit order for economic dispatch and unit commitment.
 Study and implementation of Private Power Agreements, and SOP’s with different stake
holders (KESC, IPP’s).
 To study and arrange planned and emergent shut down of Power Generating Plants and Network
equipments.
 Generation Control of Generating Units through Automatic Generator Control (AGC) or manually w.r.t
variations in Frequency (50 Hz).
 Preparing and implementing generating schedule & observe the spinning reserve criteria.
 Study & implement load management schemes in pre- arranged methods in case of generation shortage
or other system contingency.
 Monitoring, Control and Operation of 500kV, 220kV and 132kV electrical substations and transmission
lines through SCADA.
 Keeping system parameters like voltage, frequency, loading of circuits and transformers within
allowable range as defined in “NEPRA Grid Code”, for reliable and secure system operation
 Performing normal switching operations for routine shutdowns of high voltage transmission lines
 Performing operations and issuing instructions to substation staff in case of emergency tripping events.
 Taking remedial measures to restore normal state of the system in case of any disturbance. .
 Preparing reports related to operation of Power Delivery System.
 Preparing short term contingency plans.
TECHNICAL SKILLS:
 Performing Steady State Load Flow Analysis using PSSE and ALSTOM EMS system.
 Preparation of Energy generation data on daily basis on MS Excel.
 Cost estimation of energy generated from different energy sources on daily basis.
 Preparing Energy plan to provide guidelines for economically utilizing the available energy over the
period of 8 hours
 Good understanding of P&I drawing
 Proficient in use of MS Office 2007 and 2010.
 Excellent communication and organization skills.
ACHIEVEMENTS:
 Member of restoration team during 12-Dec-2014 blackout.
 Member of restoration team during 08-Jan-2015 blackout.
 Member of restoration team during 24-Jan-2015 blackout.
 Restoration of Partial Blackout in GEPCO Region due to tripping of 1100MW Mangla Power House.
 Restoration of Baluchistan and upper Sind region in minimum time after outage of 2000MW generation
and 9 no of 220kV substation.
 Restoration of Partial Blackout in MEPCO Region due to tripping of 220 kVNGPS, and New
MultanGrid Station.
ACADEMIC RECORD:
 B.Sc. Electrical Engineering (Balochistan UET Khuzdar) 84 %.
 F.Sc. Pre-Engineering (PAF Intermediate College Quetta)61%.
 Matric (St. Marys Boys High School Quetta) 63%.
Training & Certifications:
Training/Certification Duration Venue
PSSE Training 06-04-2015 to 18-04-2015 Islamabad.

More Related Content

What's hot

Control of parallel dc dc converters in a dc microgrid
Control of parallel dc dc converters in a dc microgridControl of parallel dc dc converters in a dc microgrid
Control of parallel dc dc converters in a dc microgridSushil Aggarwal
 
Power blackouts with special reference to july 2013 copy
Power blackouts with special reference to july 2013   copyPower blackouts with special reference to july 2013   copy
Power blackouts with special reference to july 2013 copyNIT MEGHALAYA
 
Control and Implementation of a Standalone DG-SPV-BES micro-grid System using...
Control and Implementation of a Standalone DG-SPV-BES micro-grid System using...Control and Implementation of a Standalone DG-SPV-BES micro-grid System using...
Control and Implementation of a Standalone DG-SPV-BES micro-grid System using...IRJET Journal
 
Data acquisition system to monitor electricity supply
Data acquisition system to monitor electricity supplyData acquisition system to monitor electricity supply
Data acquisition system to monitor electricity supplyPushkar Limaye
 
anti islanding technology(passive)
anti islanding technology(passive)anti islanding technology(passive)
anti islanding technology(passive)minu Yacob
 
Distributed generation b 3
Distributed generation b 3Distributed generation b 3
Distributed generation b 3Naresh Thakur
 
Control for Grid-Connected and Intentional Islanding Operations of Distribute...
Control for Grid-Connected and Intentional Islanding Operations of Distribute...Control for Grid-Connected and Intentional Islanding Operations of Distribute...
Control for Grid-Connected and Intentional Islanding Operations of Distribute...Asoka Technologies
 
Impact of high level penetration of photovoltaics on Power system
Impact of high level penetration of photovoltaics on Power systemImpact of high level penetration of photovoltaics on Power system
Impact of high level penetration of photovoltaics on Power systemMuwaf_5
 
Island Detection and Control Techniques
Island Detection and Control Techniques Island Detection and Control Techniques
Island Detection and Control Techniques Tanveer Riaz
 
How HE Results In Cost Saving - an Eltek Case Study
How HE Results In Cost Saving - an Eltek Case StudyHow HE Results In Cost Saving - an Eltek Case Study
How HE Results In Cost Saving - an Eltek Case StudyEltek
 
Design & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemDesign & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemSulaman Muhammad
 
Three Phase Load Balancing
Three Phase Load Balancing                                Three Phase Load Balancing
Three Phase Load Balancing IRJET Journal
 
Power Electronic Interface
Power Electronic InterfacePower Electronic Interface
Power Electronic Interfaceijtsrd
 
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...smartXBrains
 
Micro Wind Power Generator with Battery Energy Storage for Critical Load
Micro Wind Power Generator with Battery Energy Storage for Critical LoadMicro Wind Power Generator with Battery Energy Storage for Critical Load
Micro Wind Power Generator with Battery Energy Storage for Critical LoadAsoka Technologies
 

What's hot (20)

Impacts of Photovoltaic Distributed Generation Location and Size on Distribut...
Impacts of Photovoltaic Distributed Generation Location and Size on Distribut...Impacts of Photovoltaic Distributed Generation Location and Size on Distribut...
Impacts of Photovoltaic Distributed Generation Location and Size on Distribut...
 
Control of parallel dc dc converters in a dc microgrid
Control of parallel dc dc converters in a dc microgridControl of parallel dc dc converters in a dc microgrid
Control of parallel dc dc converters in a dc microgrid
 
Power blackouts with special reference to july 2013 copy
Power blackouts with special reference to july 2013   copyPower blackouts with special reference to july 2013   copy
Power blackouts with special reference to july 2013 copy
 
Control and Implementation of a Standalone DG-SPV-BES micro-grid System using...
Control and Implementation of a Standalone DG-SPV-BES micro-grid System using...Control and Implementation of a Standalone DG-SPV-BES micro-grid System using...
Control and Implementation of a Standalone DG-SPV-BES micro-grid System using...
 
Data acquisition system to monitor electricity supply
Data acquisition system to monitor electricity supplyData acquisition system to monitor electricity supply
Data acquisition system to monitor electricity supply
 
anti islanding technology(passive)
anti islanding technology(passive)anti islanding technology(passive)
anti islanding technology(passive)
 
BPU Product Description
BPU Product DescriptionBPU Product Description
BPU Product Description
 
IJET-V3I2P17
IJET-V3I2P17IJET-V3I2P17
IJET-V3I2P17
 
18 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_16051018 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_160510
 
Distributed generation b 3
Distributed generation b 3Distributed generation b 3
Distributed generation b 3
 
Control for Grid-Connected and Intentional Islanding Operations of Distribute...
Control for Grid-Connected and Intentional Islanding Operations of Distribute...Control for Grid-Connected and Intentional Islanding Operations of Distribute...
Control for Grid-Connected and Intentional Islanding Operations of Distribute...
 
Impact of high level penetration of photovoltaics on Power system
Impact of high level penetration of photovoltaics on Power systemImpact of high level penetration of photovoltaics on Power system
Impact of high level penetration of photovoltaics on Power system
 
04 key ieee p1547 update
04 key ieee p1547 update04 key ieee p1547 update
04 key ieee p1547 update
 
Island Detection and Control Techniques
Island Detection and Control Techniques Island Detection and Control Techniques
Island Detection and Control Techniques
 
How HE Results In Cost Saving - an Eltek Case Study
How HE Results In Cost Saving - an Eltek Case StudyHow HE Results In Cost Saving - an Eltek Case Study
How HE Results In Cost Saving - an Eltek Case Study
 
Design & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic SystemDesign & Analysis of Grid Connected Photovoltaic System
Design & Analysis of Grid Connected Photovoltaic System
 
Three Phase Load Balancing
Three Phase Load Balancing                                Three Phase Load Balancing
Three Phase Load Balancing
 
Power Electronic Interface
Power Electronic InterfacePower Electronic Interface
Power Electronic Interface
 
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
 
Micro Wind Power Generator with Battery Energy Storage for Critical Load
Micro Wind Power Generator with Battery Energy Storage for Critical LoadMicro Wind Power Generator with Battery Energy Storage for Critical Load
Micro Wind Power Generator with Battery Energy Storage for Critical Load
 

Similar to Ephraim Issac Das (CV)

Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
Presentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfPresentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfHASSAN527910
 
CV, Electrical Engr -
CV, Electrical Engr -CV, Electrical Engr -
CV, Electrical Engr -Mehboob Ahmad
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..Keshari Mishra
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companiesbala madhu
 
Hierarchical grid connection of Idia
Hierarchical grid connection of IdiaHierarchical grid connection of Idia
Hierarchical grid connection of IdiaMAYURSINH RATHOOD
 
Husam Sabbah CV2015
Husam Sabbah CV2015Husam Sabbah CV2015
Husam Sabbah CV2015Husam Sabbah
 
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...ijtsrd
 
Restoration after Blackout IME.pdf
Restoration after Blackout IME.pdfRestoration after Blackout IME.pdf
Restoration after Blackout IME.pdfIzharKhan472377
 
Eng nigah hussain_packages
Eng nigah hussain_packagesEng nigah hussain_packages
Eng nigah hussain_packagesNigah Hussain
 

Similar to Ephraim Issac Das (CV) (20)

Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
CV ENGLISH Feb2016 - Copy
CV ENGLISH Feb2016 - CopyCV ENGLISH Feb2016 - Copy
CV ENGLISH Feb2016 - Copy
 
EirGrid NATIONAL CONTROL CENTRE
EirGrid NATIONAL CONTROL CENTREEirGrid NATIONAL CONTROL CENTRE
EirGrid NATIONAL CONTROL CENTRE
 
Resume
ResumeResume
Resume
 
Presentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfPresentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdf
 
CV, Electrical Engr
CV, Electrical EngrCV, Electrical Engr
CV, Electrical Engr
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
lakhwinder_Singh_CV_
lakhwinder_Singh_CV_lakhwinder_Singh_CV_
lakhwinder_Singh_CV_
 
CV of PK Mishra_Update
CV of PK Mishra_UpdateCV of PK Mishra_Update
CV of PK Mishra_Update
 
CV, Electrical Engr -
CV, Electrical Engr -CV, Electrical Engr -
CV, Electrical Engr -
 
Resume
ResumeResume
Resume
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
Hierarchical grid connection of Idia
Hierarchical grid connection of IdiaHierarchical grid connection of Idia
Hierarchical grid connection of Idia
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Husam Sabbah CV2015
Husam Sabbah CV2015Husam Sabbah CV2015
Husam Sabbah CV2015
 
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
 
Restoration after Blackout IME.pdf
Restoration after Blackout IME.pdfRestoration after Blackout IME.pdf
Restoration after Blackout IME.pdf
 
Eng nigah hussain_packages
Eng nigah hussain_packagesEng nigah hussain_packages
Eng nigah hussain_packages
 

Ephraim Issac Das (CV)

  • 1. Ephraim Issac Das (Electrical Engineer) PERSONAL INFORMATION & CONTACTS: FATHER’s NAME: Donald Das. DATE OF BIRTH: 14_01_1984. NIC NO: 54400-0503094-5. Address: House #4, Noor Masjid Road, Bani Gala,Islamabad. Phone No:051_4939229. Cell No: 03337806184. E-mail Address:ephraimissac@gmail.com . PROFESSIONAL EXPERIENCE: Working in National Power Control Center,National Transmission and Dispatch Company from Apr-2008 till date. National Power Control Center: The NPCC (National Power Control Center) WAPDA/NTDC Islamabad ensure continuous supply of Electric Energy to all its consumers at all points at a frequency and voltage levels within the permissible limits through SCADA System (Supervisory Control and Data Acquisition). NPCC is responsible for generation of electric energy as economically as possible by coordinating hydro-thermal power plants to meet with the load demand of the consumers from time to time. The network constraints are also given due consideration while dispatching and transmitting the power in order to keep the system stability intact to the possible extent. Job Responsibilitiesat National Power Control Centre: Shift Engineer (Network Operations & CONTROL):  Continuous monitoring of Frequency level in Power transmission network.  Maintaining balance between supply and demand.  Economic Load dispatching using hydro thermal coordination with different type of generators installed in the system (HYDEL,DG- Sets, GT’s, Steam Turbines, Nuclear and Wind plants).  Execution of merit order for economic dispatch and unit commitment.  Study and implementation of Private Power Agreements, and SOP’s with different stake holders (KESC, IPP’s).  To study and arrange planned and emergent shut down of Power Generating Plants and Network equipments.  Generation Control of Generating Units through Automatic Generator Control (AGC) or manually w.r.t variations in Frequency (50 Hz).  Preparing and implementing generating schedule & observe the spinning reserve criteria.  Study & implement load management schemes in pre- arranged methods in case of generation shortage or other system contingency.  Monitoring, Control and Operation of 500kV, 220kV and 132kV electrical substations and transmission lines through SCADA.  Keeping system parameters like voltage, frequency, loading of circuits and transformers within allowable range as defined in “NEPRA Grid Code”, for reliable and secure system operation  Performing normal switching operations for routine shutdowns of high voltage transmission lines  Performing operations and issuing instructions to substation staff in case of emergency tripping events.
  • 2.  Taking remedial measures to restore normal state of the system in case of any disturbance. .  Preparing reports related to operation of Power Delivery System.  Preparing short term contingency plans. TECHNICAL SKILLS:  Performing Steady State Load Flow Analysis using PSSE and ALSTOM EMS system.  Preparation of Energy generation data on daily basis on MS Excel.  Cost estimation of energy generated from different energy sources on daily basis.  Preparing Energy plan to provide guidelines for economically utilizing the available energy over the period of 8 hours  Good understanding of P&I drawing  Proficient in use of MS Office 2007 and 2010.  Excellent communication and organization skills. ACHIEVEMENTS:  Member of restoration team during 12-Dec-2014 blackout.  Member of restoration team during 08-Jan-2015 blackout.  Member of restoration team during 24-Jan-2015 blackout.  Restoration of Partial Blackout in GEPCO Region due to tripping of 1100MW Mangla Power House.  Restoration of Baluchistan and upper Sind region in minimum time after outage of 2000MW generation and 9 no of 220kV substation.  Restoration of Partial Blackout in MEPCO Region due to tripping of 220 kVNGPS, and New MultanGrid Station. ACADEMIC RECORD:  B.Sc. Electrical Engineering (Balochistan UET Khuzdar) 84 %.  F.Sc. Pre-Engineering (PAF Intermediate College Quetta)61%.  Matric (St. Marys Boys High School Quetta) 63%. Training & Certifications: Training/Certification Duration Venue PSSE Training 06-04-2015 to 18-04-2015 Islamabad.