PROJECT EXPERIENCE
Cenovus Energy
Development of Reliability Work Diagrams for a SAGD Operating Plant, as well as Supervising the Failure
Mode Analysis – FMA for Critical Equipment, for supporting the implementation of a Downtime
Reporting program.
Methanex Inc.
Definition of the Asset Taxonomy for a Methanol Plant aligned with Standard ISO 14225. The process
and methodology for delivering the work includes analysis of Process Flow Diagrams, Piping and
Instrumentation Diagram and Control Narrative as well as the preparation of data loading files for
Maximo EAM.
EP PETROECUADOR
Consulting Service for the standardization and improvement of the spare parts catalog, related to
information description, physical inventory and valuation of the materials in the warehouses of the EP
Petroecuador. Data gathering, physical verification and improvement of the code descriptions of items
in the material warehouses of EP PETROECUADOR.
ATCO-I-TEK
Establish the Holistic Asset Management Consulting practice for Atco I-Tek, following accepted best
practices and aligned with Asset Management System as established in the PAS-55 and the ISO-55000
Standards.
PETROAMAZONAS EP
Responsible for the definition of the Maintenance Strategy based on the Reliability Centered
Maintenance methodology, for the equipment in the plants and stations of the Catatumbo-Orinoco
Superintendence of Ecopetrol SA; including Asset registry, equipment standard jobs, spares parts
cataloguing, bill of materials and Maintenance Strategy setup in the EAM System Ellipse”.
Responsible for the Data gathering, physical verification and improvement of the code descriptions of
items in the material warehouses of Petroamazonas EP, including the taxonomy definition and
taxonomy manual.
Development of a business case for an Enterprise Asset Management system in support of Work
Management and Reliability Engineering practices, and the development of a 3-year Roadmap for
reaching increased maturity levels in all areas of Maintenance and Reliability in preparation for steep
growth in production.
OLEODUCTO DE LOS LLANOS ORIENTALES – ODL
Asset Registry and Maintenance Strategy definition for the equipment of expansion project in the
operational infrastructure, including the Maintenance Strategy setup in the ERP-SAP.
CANADIAN NATURAL RESOURCES – CNRL
The Bitumen Production Plant at Horizon Project - CNRL, required the selection and implementation of a
Reliability Modelling Software Tool able to perform scenario analysis using Montecarlo Simulation.
Activities performed included: Software Selection, Implementation and Configuration according to Client
needs. Downtime data analysis and design of the Reliability Models for the Bitumen Production, Ore
Preparation, Extraction and Froth Treatment Plants.
The Bitumen Production Plant at Horizon Project - CNRL, required the facilitation of several activities to
review and update the Preventative Maintenance Strategy, as part of the continuous improvement
process lead by the Reliability Engineering team. Activities performed included: Failure Mode and
Effect Analysis – FMEA; PM Setup in JD Edwards – E1
CEPCOLSA
The Colombian Entity from the Spanish Petroleum Company – CEPCOLSA, was in the process of
implementing SAP and required the definition and codification of the good and services catalogue
according to the UNSPSC standard from United Nations.
ECOPETROL
The Project Direction Unit at the Colombian Petroleum Company – ECOPETROL, was in the process of
improving the Project Management Activities to ensure effectiveness on the implementation of the
Capital Project´s Portfolio. The analysis of the Project Management Work Flows and the Data Mapping
was performed to define a proposal for the optimization of the information flows.
CANADIAL NATURAL RESOURCES – CNRL
The Upgrading Plant at Horizon Project - CNRL, required the facilitation of RCM Studies to define the
Maintenance Strategy, as part of the Operational Readiness activities. Team of 2 Facilitators and 4
Specialists.
CANADIAL NATURAL RESOURCES – CNRL
The Horizon Project at CNRL requires defining the Maintenance Strategy for the different Business Units,
as part of the Operational Readiness activities. A Reliability Centered Maintenance Process is required
to ensure consistency on the Maintenance Approach for the Horizon´s Operative Infrastructure.
ECOPETROL
The Colombian Petroleum Company – ECOPETROL, was in the process to improve the Supply and
Procurement Processes. As part of this initiative it was necessary to redesign the Good & Services
Catalogue to make it compliant with international standards and to provide it with e-commerce
capabilities.
PROJECT MANAGEMENT
Participation and project Management of several initiatives with Colombian clients:
• Reliability Modeling and Maintenance Strategy Definition for Critical System Units at the
Production Oil Fiel Apiay- ECOPETROL. Jan 03 – Jul 03
• Reliability modelling and Maintenance strategy simulation for the Power Generation plant
Termocoa located in Colombia. Dec 05 – Mar 05
• Consulting and Technical advice for exploring technical and financial alternatives to modernize and
improve reliability of the facilities and off sites for the Refinery located at the Complejo Industrial de
Barrancabeja – Colombia. Jul 06 – Feb 07
• Reliability Modeling Simulation for the System: “Line 10” Galan Bucaramanga” at the Transport
Vicepresidency – VIT of ECOPETROL. Jun 08 – Oct 08
ECOPETROL
Strategic Planning - Master Professional. 1999 – 2000
Planning, Scheduling & Controlling the Strategic Plan of Telematics (IT and Telecommunications), for the
Transport Vice-presidency – Ecopetrol, using Methodologies like Prospective, Strategic Planning, Cost-
Benefit Analysis. Creation of Strategic plan for five, ten and fifteen years.
Project Manager - Transport Vice-presidency. 1992 – 1998
Implementing the ERP MIMS 3.13.L software for materials, maintenance and AP and GL, with ten (10)
data interfaces to other corporate information systems and 4,200 users, 15 Implementations.
Head Engineer Maintenance Area 1994 - 1998
Responsible for the Maintenance Business Process Re-engineering applied to Production, Refinery and
Pipelines at 15 different locations over the country. Participation at the Maintenance Steering
Committee of ECOPETROL from 1994 to 1998, creating Maintenance’s Policies for Production, Refinery
and Pipelines.
Corporate System for Managing Maintenance, Materials and Accounts Payable. One of the biggest IT
Projects in ECOPETROL’s history, 15 installations located all over the country encompassing a variety of
businesses (i.e., refinery, exploration, production, transportation, Oil Industry R&D Centre). Cost:
US$14 m, Team staff: 42 people.
SINDEMAN Pipeline District Maintenance Information System with broad geographic coverage for 150
Maintenance Department users.
ECOPETROL’s National Pipeline Network Scheduler —PROPOLID
Scheduling System for, based on linear programming, developed in Turbo-Pascal for microcomputer
environment. Employee Recognition Aware from Pipeline District.
Pipeline Construction. Apiay-Araguaney: 227 Km-10"/14", 63 bridges and 15 Km underwater river
crossings. USD$30m Sebastopol-San Jose del Nus: 60 Km of 12” pipeline, USD$8m

More Related Content

What's hot

Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011tbshaver
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResumeRyan Moyer PE
 
Tom Lewter Resume-2016-04-19
Tom Lewter Resume-2016-04-19Tom Lewter Resume-2016-04-19
Tom Lewter Resume-2016-04-19Tom Lewter
 
Nitin Patwardhan - Catalyst for As is to To Be
Nitin Patwardhan - Catalyst for As is to To BeNitin Patwardhan - Catalyst for As is to To Be
Nitin Patwardhan - Catalyst for As is to To BeNitin Patwardhan
 
01-Ahmed El Wazzan-Resume(Autosaved)
01-Ahmed El Wazzan-Resume(Autosaved)01-Ahmed El Wazzan-Resume(Autosaved)
01-Ahmed El Wazzan-Resume(Autosaved)Ahmed El Wazzan
 
Fuel Cell Electric Buses in California Fuel Cell Seminar 2013
Fuel Cell Electric Buses in California Fuel Cell Seminar 2013Fuel Cell Electric Buses in California Fuel Cell Seminar 2013
Fuel Cell Electric Buses in California Fuel Cell Seminar 2013Chris White
 
Gary Hall CV 2015
Gary Hall  CV 2015Gary Hall  CV 2015
Gary Hall CV 2015Gary Hall
 
Skills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industrySkills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industryAdvisian
 
John D Holbrook 2010v D
John D Holbrook 2010v DJohn D Holbrook 2010v D
John D Holbrook 2010v DJohnHolbrook
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayARC Advisory Group
 
Equipment sizing and costing using Petro-SIM
Equipment sizing and costing using Petro-SIMEquipment sizing and costing using Petro-SIM
Equipment sizing and costing using Petro-SIMKBC (A Yokogawa Company)
 
MPalm Project Profiles
MPalm Project ProfilesMPalm Project Profiles
MPalm Project ProfilesMike Palm
 

What's hot (20)

Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011
 
MOHANNAD CV
MOHANNAD  CVMOHANNAD  CV
MOHANNAD CV
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResume
 
Tom Lewter Resume-2016-04-19
Tom Lewter Resume-2016-04-19Tom Lewter Resume-2016-04-19
Tom Lewter Resume-2016-04-19
 
JWP-2015
JWP-2015JWP-2015
JWP-2015
 
Nitin Patwardhan - Catalyst for As is to To Be
Nitin Patwardhan - Catalyst for As is to To BeNitin Patwardhan - Catalyst for As is to To Be
Nitin Patwardhan - Catalyst for As is to To Be
 
My_CV
My_CVMy_CV
My_CV
 
Viresh Jugali CV
Viresh Jugali CVViresh Jugali CV
Viresh Jugali CV
 
01-Ahmed El Wazzan-Resume(Autosaved)
01-Ahmed El Wazzan-Resume(Autosaved)01-Ahmed El Wazzan-Resume(Autosaved)
01-Ahmed El Wazzan-Resume(Autosaved)
 
Fuel Cell Electric Buses in California Fuel Cell Seminar 2013
Fuel Cell Electric Buses in California Fuel Cell Seminar 2013Fuel Cell Electric Buses in California Fuel Cell Seminar 2013
Fuel Cell Electric Buses in California Fuel Cell Seminar 2013
 
Stewartclyde4
Stewartclyde4Stewartclyde4
Stewartclyde4
 
Gary Hall CV 2015
Gary Hall  CV 2015Gary Hall  CV 2015
Gary Hall CV 2015
 
Skills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industrySkills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industry
 
John D Holbrook 2010v D
John D Holbrook 2010v DJohn D Holbrook 2010v D
John D Holbrook 2010v D
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
 
Equipment sizing and costing using Petro-SIM
Equipment sizing and costing using Petro-SIMEquipment sizing and costing using Petro-SIM
Equipment sizing and costing using Petro-SIM
 
MPalm Project Profiles
MPalm Project ProfilesMPalm Project Profiles
MPalm Project Profiles
 
Ernesto Paz
Ernesto PazErnesto Paz
Ernesto Paz
 
Gecl casestudy
Gecl casestudyGecl casestudy
Gecl casestudy
 
Marcus Mansour CV
Marcus Mansour CVMarcus Mansour CV
Marcus Mansour CV
 

Viewers also liked

Rpt kssr tahun 6 pendidikan jasmani (rekreasi)
Rpt kssr tahun 6   pendidikan jasmani (rekreasi)Rpt kssr tahun 6   pendidikan jasmani (rekreasi)
Rpt kssr tahun 6 pendidikan jasmani (rekreasi)lindalinlin
 
Coping With Colds & Flu
Coping With Colds & FluCoping With Colds & Flu
Coping With Colds & FluCAS Hire
 
Manusia Purba Pithecanthropus
Manusia Purba PithecanthropusManusia Purba Pithecanthropus
Manusia Purba PithecanthropusNailul_Hisyam
 
Rpt kssr tahun 6 pendidikan jasmani (rekreasi)
Rpt kssr tahun 6   pendidikan jasmani (rekreasi)Rpt kssr tahun 6   pendidikan jasmani (rekreasi)
Rpt kssr tahun 6 pendidikan jasmani (rekreasi)lindalinlin
 
About Bitcoin, Blockchain, and the DLT Chimera
About Bitcoin, Blockchain, and the DLT ChimeraAbout Bitcoin, Blockchain, and the DLT Chimera
About Bitcoin, Blockchain, and the DLT ChimeraFerdinando Maria Ametrano
 

Viewers also liked (9)

CEDIA
CEDIACEDIA
CEDIA
 
DPR-AR15-English-LR
DPR-AR15-English-LRDPR-AR15-English-LR
DPR-AR15-English-LR
 
Trabajo de investigacion
Trabajo de investigacionTrabajo de investigacion
Trabajo de investigacion
 
Rpt kssr tahun 6 pendidikan jasmani (rekreasi)
Rpt kssr tahun 6   pendidikan jasmani (rekreasi)Rpt kssr tahun 6   pendidikan jasmani (rekreasi)
Rpt kssr tahun 6 pendidikan jasmani (rekreasi)
 
Coping With Colds & Flu
Coping With Colds & FluCoping With Colds & Flu
Coping With Colds & Flu
 
Manusia Purba Pithecanthropus
Manusia Purba PithecanthropusManusia Purba Pithecanthropus
Manusia Purba Pithecanthropus
 
Rpt kssr tahun 6 pendidikan jasmani (rekreasi)
Rpt kssr tahun 6   pendidikan jasmani (rekreasi)Rpt kssr tahun 6   pendidikan jasmani (rekreasi)
Rpt kssr tahun 6 pendidikan jasmani (rekreasi)
 
Introduction to Blockchain
Introduction to BlockchainIntroduction to Blockchain
Introduction to Blockchain
 
About Bitcoin, Blockchain, and the DLT Chimera
About Bitcoin, Blockchain, and the DLT ChimeraAbout Bitcoin, Blockchain, and the DLT Chimera
About Bitcoin, Blockchain, and the DLT Chimera
 

Similar to Eduardo Neira - Project Experience

Similar to Eduardo Neira - Project Experience (20)

Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
Geraldine_Goh-CV
Geraldine_Goh-CVGeraldine_Goh-CV
Geraldine_Goh-CV
 
999saeed
999saeed999saeed
999saeed
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
Resume Leyla Clothier
Resume Leyla ClothierResume Leyla Clothier
Resume Leyla Clothier
 
RLPResume
RLPResumeRLPResume
RLPResume
 
Satish.S -Resume.
Satish.S -Resume.Satish.S -Resume.
Satish.S -Resume.
 
Faikcan Altiparmak_Resume
Faikcan Altiparmak_ResumeFaikcan Altiparmak_Resume
Faikcan Altiparmak_Resume
 
Hakkache mohamed 202111
Hakkache mohamed 202111Hakkache mohamed 202111
Hakkache mohamed 202111
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
 
resumenew_Atul Bhalla
resumenew_Atul Bhallaresumenew_Atul Bhalla
resumenew_Atul Bhalla
 
Reliability Engineer
Reliability EngineerReliability Engineer
Reliability Engineer
 
Vinay_Chandwalker[1]_25032015
Vinay_Chandwalker[1]_25032015Vinay_Chandwalker[1]_25032015
Vinay_Chandwalker[1]_25032015
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IE
 
PW cv1602 03
PW cv1602 03PW cv1602 03
PW cv1602 03
 
P66_AprilMay2014
P66_AprilMay2014P66_AprilMay2014
P66_AprilMay2014
 
Corporate-Profile
Corporate-ProfileCorporate-Profile
Corporate-Profile
 
Maintenance Planning & Scheduling
Maintenance Planning & SchedulingMaintenance Planning & Scheduling
Maintenance Planning & Scheduling
 
dhmCareerHistory
dhmCareerHistorydhmCareerHistory
dhmCareerHistory
 
My Resume
My ResumeMy Resume
My Resume
 

Eduardo Neira - Project Experience

  • 1. PROJECT EXPERIENCE Cenovus Energy Development of Reliability Work Diagrams for a SAGD Operating Plant, as well as Supervising the Failure Mode Analysis – FMA for Critical Equipment, for supporting the implementation of a Downtime Reporting program. Methanex Inc. Definition of the Asset Taxonomy for a Methanol Plant aligned with Standard ISO 14225. The process and methodology for delivering the work includes analysis of Process Flow Diagrams, Piping and Instrumentation Diagram and Control Narrative as well as the preparation of data loading files for Maximo EAM. EP PETROECUADOR Consulting Service for the standardization and improvement of the spare parts catalog, related to information description, physical inventory and valuation of the materials in the warehouses of the EP Petroecuador. Data gathering, physical verification and improvement of the code descriptions of items in the material warehouses of EP PETROECUADOR. ATCO-I-TEK Establish the Holistic Asset Management Consulting practice for Atco I-Tek, following accepted best practices and aligned with Asset Management System as established in the PAS-55 and the ISO-55000 Standards. PETROAMAZONAS EP Responsible for the definition of the Maintenance Strategy based on the Reliability Centered Maintenance methodology, for the equipment in the plants and stations of the Catatumbo-Orinoco Superintendence of Ecopetrol SA; including Asset registry, equipment standard jobs, spares parts cataloguing, bill of materials and Maintenance Strategy setup in the EAM System Ellipse”. Responsible for the Data gathering, physical verification and improvement of the code descriptions of items in the material warehouses of Petroamazonas EP, including the taxonomy definition and taxonomy manual. Development of a business case for an Enterprise Asset Management system in support of Work Management and Reliability Engineering practices, and the development of a 3-year Roadmap for reaching increased maturity levels in all areas of Maintenance and Reliability in preparation for steep growth in production. OLEODUCTO DE LOS LLANOS ORIENTALES – ODL Asset Registry and Maintenance Strategy definition for the equipment of expansion project in the operational infrastructure, including the Maintenance Strategy setup in the ERP-SAP. CANADIAN NATURAL RESOURCES – CNRL The Bitumen Production Plant at Horizon Project - CNRL, required the selection and implementation of a Reliability Modelling Software Tool able to perform scenario analysis using Montecarlo Simulation. Activities performed included: Software Selection, Implementation and Configuration according to Client needs. Downtime data analysis and design of the Reliability Models for the Bitumen Production, Ore Preparation, Extraction and Froth Treatment Plants.
  • 2. The Bitumen Production Plant at Horizon Project - CNRL, required the facilitation of several activities to review and update the Preventative Maintenance Strategy, as part of the continuous improvement process lead by the Reliability Engineering team. Activities performed included: Failure Mode and Effect Analysis – FMEA; PM Setup in JD Edwards – E1 CEPCOLSA The Colombian Entity from the Spanish Petroleum Company – CEPCOLSA, was in the process of implementing SAP and required the definition and codification of the good and services catalogue according to the UNSPSC standard from United Nations. ECOPETROL The Project Direction Unit at the Colombian Petroleum Company – ECOPETROL, was in the process of improving the Project Management Activities to ensure effectiveness on the implementation of the Capital Project´s Portfolio. The analysis of the Project Management Work Flows and the Data Mapping was performed to define a proposal for the optimization of the information flows. CANADIAL NATURAL RESOURCES – CNRL The Upgrading Plant at Horizon Project - CNRL, required the facilitation of RCM Studies to define the Maintenance Strategy, as part of the Operational Readiness activities. Team of 2 Facilitators and 4 Specialists. CANADIAL NATURAL RESOURCES – CNRL The Horizon Project at CNRL requires defining the Maintenance Strategy for the different Business Units, as part of the Operational Readiness activities. A Reliability Centered Maintenance Process is required to ensure consistency on the Maintenance Approach for the Horizon´s Operative Infrastructure. ECOPETROL The Colombian Petroleum Company – ECOPETROL, was in the process to improve the Supply and Procurement Processes. As part of this initiative it was necessary to redesign the Good & Services Catalogue to make it compliant with international standards and to provide it with e-commerce capabilities. PROJECT MANAGEMENT Participation and project Management of several initiatives with Colombian clients: • Reliability Modeling and Maintenance Strategy Definition for Critical System Units at the Production Oil Fiel Apiay- ECOPETROL. Jan 03 – Jul 03 • Reliability modelling and Maintenance strategy simulation for the Power Generation plant Termocoa located in Colombia. Dec 05 – Mar 05 • Consulting and Technical advice for exploring technical and financial alternatives to modernize and improve reliability of the facilities and off sites for the Refinery located at the Complejo Industrial de Barrancabeja – Colombia. Jul 06 – Feb 07 • Reliability Modeling Simulation for the System: “Line 10” Galan Bucaramanga” at the Transport Vicepresidency – VIT of ECOPETROL. Jun 08 – Oct 08 ECOPETROL Strategic Planning - Master Professional. 1999 – 2000
  • 3. Planning, Scheduling & Controlling the Strategic Plan of Telematics (IT and Telecommunications), for the Transport Vice-presidency – Ecopetrol, using Methodologies like Prospective, Strategic Planning, Cost- Benefit Analysis. Creation of Strategic plan for five, ten and fifteen years. Project Manager - Transport Vice-presidency. 1992 – 1998 Implementing the ERP MIMS 3.13.L software for materials, maintenance and AP and GL, with ten (10) data interfaces to other corporate information systems and 4,200 users, 15 Implementations. Head Engineer Maintenance Area 1994 - 1998 Responsible for the Maintenance Business Process Re-engineering applied to Production, Refinery and Pipelines at 15 different locations over the country. Participation at the Maintenance Steering Committee of ECOPETROL from 1994 to 1998, creating Maintenance’s Policies for Production, Refinery and Pipelines. Corporate System for Managing Maintenance, Materials and Accounts Payable. One of the biggest IT Projects in ECOPETROL’s history, 15 installations located all over the country encompassing a variety of businesses (i.e., refinery, exploration, production, transportation, Oil Industry R&D Centre). Cost: US$14 m, Team staff: 42 people. SINDEMAN Pipeline District Maintenance Information System with broad geographic coverage for 150 Maintenance Department users. ECOPETROL’s National Pipeline Network Scheduler —PROPOLID Scheduling System for, based on linear programming, developed in Turbo-Pascal for microcomputer environment. Employee Recognition Aware from Pipeline District. Pipeline Construction. Apiay-Araguaney: 227 Km-10"/14", 63 bridges and 15 Km underwater river crossings. USD$30m Sebastopol-San Jose del Nus: 60 Km of 12” pipeline, USD$8m