Man and Machine Interface
5
“Workers Lives Matter”
Man and Machine Interface
•Every Year a significant number of people
get injured and killed by accidents involving
vehicles in the workplace
6
“Workers Lives Matter”
Common causes of accidents and
incidents
Rocks or material
falling from the bucket
Being run over by
moving machinery
Being struck by bucket or
counterweight
Being struck by debris
from material face
Slipping, tripping and falling
over material lying around
Construction Plant and Equipment
7
“Workers Lives Matter”
Man and Machine Interface
• Your EMPLOYER has a responsibility to ensure that any vehicle /
equipment that comes onto site is operated safely and with reduced
risk.
This is achieved by:
 Traffic Plans
 Segregated traffic routes
 Reduced speed
 Site Maps and Signage
 Inductions
 Competent Drivers and site operatives
 Maintained plant and Equipment
 Banksmen
8
“Workers Lives Matter”
Man and Machine Interface
• Traffic Plans have
One Way Systems where possible
Reduced speed requirements
Measures to reduce the need for reversing & Turning
Segregated Pedestrians from Vehicles
Loading and off-loading areas and lay down areas indicated
Applicable signage
9
“Workers Lives Matter”
Man and Machine Interface
• Reduced Speed and Signage
10
“Workers Lives Matter”
Man and Machine Interface
• PPE
Signage
11
“Workers Lives Matter”
Man and Machine Interface
• Reduced Speed and Signage
12
“Workers Lives Matter”
• Segregated traffic routes and Emergency Plan
13
“Workers Lives Matter”
Who is a Banksman
He/She is a:
1. Trained person who controls the movements of most construction
equipment by signaling the operator.
2. Assists operator to safely manure the equipment in congested areas
where people are working.
3. Controls the movement of people while the equipment is in
operation.
4. Erects necessary barricades to control access of vehicles and
persons clear from the equipment.
5. Coordinates the work with other banksmen if more than one
equipment is in use in the same area.
6. Banksman is the eyes and ears of the operator of the machine where
he can not see (blind spots).
14
“Workers Lives Matter”
Banksman duties?
• Check vehicle maintenance and driver are trained and
competent.
• Ensure effective traffic movements & flow
• Monitor traffic & pedestrians routes as per traffic &
strategy.
• Monitor condition of traffic and pedestrian routes
• Manage loading and off-loading activities
• Control visiting delivery drivers & provide
information
15
“Workers Lives Matter”
Banksman duties?
• Ensure effective lighting at night
• MUST stay alert and prevent others becoming unsafe
• MUST never themselves in a blind spot
• MUST be seen by driver at all times
• MUST take a safe position at all times
• Stop any construction work, activity or process when unsafe
16
“Workers Lives Matter”
Banksmen must make sure that:
• All Entrances and Exits Shall be Clearly Defined.
• Access to Work Area Will be Restricted by use of Barriers,
Warning Signs and Close Supervision.
• Banksman to Control all Vehicles within Work Area.
• All Escape Routes Shall be Kept Clear at All Times.
• Follow Good Housekeeping Procedures.
Check Digging
Grounds for Electric,
Water or Gas Lines.
17
“Workers Lives Matter”
What is required?
• Only one person shall be designated as a Banksman.
• Should be able to observe the load and other workmen at all
times.
• Must be always be in plain view of the crane operator and all
lifting trucks.
• Never assume anything.
• Make sure both workers and operators understand exactly what
is expected to safely move the loads.
All Banksmen are to Conduct Daily Toolbox Talks
18
“Workers Lives Matter”
During Operations
• Stand in proper location
As a Banksman, stand where you can
see the load and can be seen by the
operator.
19
“Workers Lives Matter”
Unattended Machinery
Do NOT
leave the controls of any
machine unattended when
a work is being suspended
20
“Workers Lives Matter”
Moving Machinery
• Remain attentive
NEVER
Stand or pass in front of a
moving vehicle or a
Machinery at anytime
21
“Workers Lives Matter”
He/She has to:
• To Inspect all equipments / trucks prior to Use.
• Report Defects to the Supervisor.
• Follow Company Policies and Procedures such as PTWs and
PPE … etc.
Moving Machinery
22
“Workers Lives Matter”
• Dumper Trucks
• Cranes
• Excavators
• Compressors
• Fork Lift Trucks
• Concrete Mixers
• Compactors
• Shovels
• Excavators
CONTRUCTION PLANT AND EQUIPMENTS
INSPECTIONS
23
“Workers Lives Matter”
DUMPER TRUCKS
If “DUMPER” trucks are being used,
check:
 Load carried are within the capacity of
the dumper truck?
 Speed limits are not exceeded when
being driven?
 No passengers to ride on the dumper
when being driven?
 No traveling over steep embankments
and rough terrains?
 No sharp turning to avoid overturning of
dumper?
 Tyres are at the correct inflated
pressure?
 Operators are trained and competent?
24
“Workers Lives Matter”
Dumper / Trucks Tipping Hazards / Control Measures
• Loading
• Dumping
• Hazard control
Maintenance
Stability
25
“Workers Lives Matter”
EXCAVATORS
If “EXCAVATORS” are being used, check:
• Operators to be trained and competent?
• No passengers to ride on the excavators?
• Speed limits are not exceeded when
carrying loads?
• No travelling near to edge of excavations?
• All warning signals are operating?
• A banksman to be used during operations?
26
“Workers Lives Matter”
FORK LIFT TRUCKS
If “FORK LIFT TRUCKS” are being used,
check:
• Operators to be trained and competent?
• No passengers to ride on fork lift trucks?
• Speed limits are not exceeded when
carrying loads?
• No traveling at speed around corners?
• All warning signals are operating?
• Gas powered fork lift trucks not to be used in
enclosed spaces?
• Warning signs of Fork Lift Truck in Operation
to be posted?
27
“Workers Lives Matter”
If “CONCRETE MIXERS” are being used
check:
• All moving parts are secured when in
Transport?
• The truck is “locked off” before cleaning
the drums?
• Trucks not parked too close to excavation
edge?
• Observation of safe work practices and
exclusion zones?
• Correct personal protective equipment's is
being worn eg. Safety Halmet, safety
boots, gloves and hearing protectors,
safety Jacket?
• Observation of safe disposal of excess
concrete?
CONCRETE MIXERS
28
“Workers Lives Matter”
Driver and Operator’s PPE: Non – Compliance
(Serious, repetitive, widespread and cultural
For some unknown and inexplicable reason, and despite all the Arabtec rules and regulations on
PPE, all ATC projects are continuing to permit drivers and machine operatives on to their sites
(“Safety Starts Here – No – PPE – No Work”) who are:
 wearing sandals, flip-flops, trainers instead of SAFETY BOOTS.
 wearing casual clothes or national costume (generally loose, baggy and light clothing)
instead of industrial PROTECTIVE CLOTHING.
 wearing dark jumpers or other top clothing instead of HIGH VISIBILITY VESTS
 not wearing eye protection (in open vehicles) initial of SAFETY GOGGLES
 no nose and mouth protection (in open vehicles) initial of FACE MASKS
 wearing caps, cloths or nothing on their heads instead of SAFETY HELMETS
 not wearing (unbuckled) SEAT BELTS (which is a key PPE item for drivers)
There are NO EXCEPTIONS in the Arabtec or legal safety requirements in the wearing of PPE.
The other serious issue which concerns our Management, Construction, Plant and HSE teams, is
that we Do Walk By, do not check, and do not stop and the practice, which legally is condoning
the practice which do not discipline (= termination) which puts your project and Arabtec in legal
jeopardy.
ACT IMMEDIATELY AND DAILY TO ERADICATE THIS LEGACY AND HABITUAL CULTURE BY
DRIVERS, AND OUR FAILURE TO CONTROL.3
29
“Workers Lives Matter”
Tyre Safety
Tyre related accidents cause around 5% of the UAE traffic fatalities. All vehicle tyres must be procured, fitted and maintained properly,
considering the climate of the UAE. Proper tyre maintenance is an important safety function often neglected. Maintaining proper tyre
pressure, observing tyre and vehicle load limits and inspecting tyres for cuts, slashes and other irregularities are important to avoid tyre
failure such as tread separation or blowout and flat tyres. Remember, tyres are the only contact between your vehicles and the road and
poor tyre Maintenance could result in serious accidents.
Under-inflation/Over-inflation
Lower tyre pressure can create overload on tyres and overheat the tyres resulting in tyre damage. Over inflation causes increased stress to
internal materials which can result in premature failure, poor traction and change in vehicle handling/stability.
Check the tyre pressures at least once per month using a reliable or calibrated gauge. The recommended pressures are quoted in the
vehicle owner’s manual or on a sticker usually attached to a door frame or fuel cover. Make sure that the pressures are checked when the
tyres are “cold”, i.e. driven less than 3 km before the check.
Tyre Wear-Visual Check:
Check for obvious signs of wear such as wear of the treads, cuts, cracks or other visual damage.
The legal minimum level for tyre tread depth is 2mm. Once a tyre reaches this point it will have
lost 90 per cent of its performance. The RTA recommends replacing tyres no later than 5 years.
Also, regularly check the age, condition and air pressure of spare wheel to avoid having a spare
tyre unfit for use when needed.
30
“Workers Lives Matter”
Tyre Safety
Tyre Rotation and wheel alignment:
Tyre rotation reduces irregular wear. For maximum mileage, rotate tyres every 10,000
km. A wheel balance and alignment check at this time will help the potential life of the
tyre
Other Precautions:
 Use only reputable branded and certified tyres. Avoid fitting tyres which may be
substandard and therefore potentially unsafe.
 Use the correct tyre type and dimension for your vehicle. Refer to the vehicle
owner’s manual or ask for expert advice if not sure.
 Inflating tyres with Nitrogen instead of air can help to maintain pressure stability
for longer periods
 It is highly recommended that all four tyres be replaced at the same time
 Respect the load and speed capabilities of the tyres fitted to the vehicle by not
exceeding them
 Use the correct size of tyres as recommended by the vehicle manufacturer.
31
“Workers Lives Matter”
Mobile Elevated Work Platforms (MEWPs)
Mobile Elevated Work Platforms (MEWPs) must be certified by an approved third
party as per the applicable regulations and valid inspection and testing certificates
must be displayed. Everyone working on MEWPS shall wear a full body safety harness
fitted with double lanyards attached at all times to a fixed anchorage point.
The following must be ensured when MEWPs are being used:
 A written pre-operational checklist for the MEWP must be completed and signed off by the
supervisor.
 Risk Assessment must be conducted and a Permit To Work must be obtained before use.
 Ensure tool box talks and pre-start briefings on MEWPs are site specific and a safe system of
work is in place.
 MEWPs should be operated on level ground surfaces which are stable and will not compress
under the weight of the MEWP, operatives and/ or material.
 Prior to operation of MEWP, the weather conditions need to be assessed and MEWPs must not
be operated in adverse weather.
 The area around the MEWP must be barricaded and warning signs must be placed.
 A minimum of three trained, experienced, competent and certified operatives (two at the
platform and one at the ground) must be available for every MEWP being used. This will
ensure that in case of an emergency, the operative at the ground can take control the MEWP.
 The platform must be fully lowered when the MEWP is being moved and the flagman to guide
the movement.
 Strictly manage other equipment which is in close proximity (for example, other MEWPs,
cranes, teleporters) and ensure it is under competent supervision.
 Have the SWL displayed In a prominent location.
 Be equipped with flashing warning lights, audible warning device, fire extinguisher and a first
aid box.
Ensure maintenance records are kept up to date and documented
32
“Workers Lives Matter”
What is required?
Eyes on the Machine
Whistle Ready to Blow
Red Vest
33
“Workers Lives Matter”
Safety observations
No barricade provided before
the start of the job.
A group is busy in discussion near
the excavator and generator
34
“Workers Lives Matter”
Safety observations
35
“Workers Lives Matter”
Safety observations
36
“Workers Lives Matter”
Managing Heavy Vehicles
• Where the driver can see with his
mirrors.
• Observe Traffic signs
• Do not allow reversing operations
unless it is controlled and safe to do
so
37
“Workers Lives Matter”
you cannot see traffic on your left and right until it
gets very close
what you see with
rear view mirror
only
gives you good
information about
the traffic behind
you
BUT
CLEAR
VIEW
YOUR REAR VIEW (INSIDE) MIRROR
IS NOT ENOUGH
38
“Workers Lives Matter”
NORMAL SIDE MIRROR POSITION –
(YOU CAN SEE THE SIDE OF YOUR CAR)
CLEAR
VIEW
other traffic stays in your view for longer
using your side
mirrors plus rear
view mirror
the blind zones
are smaller
AND
39
“Workers Lives Matter”
NEW SIDE MIRROR POSITION –
(YOU LOOK ALONG THE ROAD, NOT THE SIDE OF YOUR
CAR)
CLEAR
VIEW
clear
view clear
view
you can see other traffic sooner and for longer
turn your mirrors out
- make sure you see
the road, not the side
of your car
you get only 4 small
blind zones
40
“Workers Lives Matter”
Fatal Incident Involving Reversing PMV
Reversing into
the trench
Location of fatally
injured person
On 18th May, 2019, approx. 9:13 am, while working in a trench, an Infrastructure
Subcontractor worker was struck and fatally injured by a reversing mechanical Shovel
which was working in the same area, on a different work task. Emergency Services
were immediately called, and Ambulance & Police attended to the incident location
shortly after the incident.
1. There was no consideration for two separate teams of workers conducting
different tasks, one involving plant
2. There were no physical barriers between plant and manual works
3. There was no flagman, no charge hand, no supervisor/foreman, and no
engineer overseeing either tasks (Neither subcontractor nor Arabtec).
4. There was no PTW for the Shovel - (only one for an excavator which had just dug
the small shallow cross trench), the “All Clear Safe to Work” was a "Tick and
Flick” exercise with location, task and PTW number left blank.
5. No records of TBT or Pre-Start Briefing.
6. The reversing alarm on the shovel was not working.
7. The shovel operator had been allowed by all to operate in this area for 20 days
with all the same points 1 to 6.
NOTE: The incident could have been easily avoided by implementing the “Arabtec
Man -Machine-Task-Environment” risk assessment process, involving a physical pre-
start visual assessment.
41
“Workers Lives Matter”
Fatal Incident Involving Reversing PMV
Reversing into
the trench
Location of fatally
injured person
Lessons Learnt:
 Two concurrent work activities in the same area must never be allowed without
exclusion zone/physical hard barriers. Man-Machine overlap must never be
allowed. Re-schedule, or Segregate.
 Hard barriers or Jersey Barriers must be filled as per Manufacturer’s Instructions
and not left empty (as communicated via HSE Alert 56 Jersey Barriers). Empty
Jersey Barriers and/or ticker-tape are not barriers.
 Inspect and test all PMV before operation, including brakes, reversing alarms,
lights, and reversing mirrors.
 Ensure trained flagmen are assigned.
 Ensure works are supervised.
 Arabtec Construction team must never rely on subcontractors to fully self-manage
their own safety planning, controls, training or supervision.
 Important Notice (which is included in a new Arabtec Safety Standard # 40):
Reversing cameras are mandatory and must be installed on all PMV, including
those of subcontractors, to ensure 360 degree view.
42
“Workers Lives Matter”
Construction Plant and Equipment
Accident and Incident Photos
43
“Workers Lives Matter”
If there is a danger?
1. Banksman must stop operator by using whistle and hand
signal if there is any danger to people or other machine.
2. Banksman must check clearance around excavations, under
pipe racks, structure foundations or Scaffoldings before taking
his machine near or around such areas.
3. Banksman should remain alert to see any danger due to
machine’s operation and should stop the operation
immediately if a danger is occurring.
4. Always remain in operator’s view otherwise machine can be
dangerous to banksman as well as workers.
5. Lastly arrange to remove all signs, cones, barriers, and lamps
after finishing the work ?
44
“Workers Lives Matter”
Flagmen’s Safety
• Always face traffic
• Flagmen not facing oncoming
traffic
45
“Workers Lives Matter”
Flagmen’s Hazards
• Confusing signals
• Never walk ahead.
46
“Workers Lives Matter”
Man and Machine Interface
Person struck
by moving
plant
1. No person is permitted into the work area of
any moving plant unless the plant is stopped
and all drivers are aware of your presence
2. Any person found in the vicinity of moving
plant will be immediately released from the
project
3. The use of “banksmen” is NOT PERMITTED
to control vehicles during earthworks
operations
Lesson Learnt From Incidents!!!
47
“Workers Lives Matter”
X
Lesson Learnt From Incidents – Always Use your Commonsense & observe Safety Rules!!!
Incident Details: Recent examples of workers sleeping/resting under vehicles, plant, stockpiles
and other unsafe areas.
X
XX
X
X
X
X
Lesson Learnt From Incidents
Always Use your Commonsense & observe Safety Rules!!!
48
“Workers Lives Matter”
Lesson Learnt From Incidents – Always Use your Commonsense & observe Safety Rules!!!
Incident Details: Recent examples of workers sleeping/resting under vehicles, plant, stockpiles
and other unsafe areas.
X X
X X Good Practice
Lesson Learnt From Incidents
49
“Workers Lives Matter”
Man and Machine Interface
Construction vehicles used for filling and leveling have significant
mass, are slow to stop and often have visibility
restrictions to the driver (especially when reversing).
The consequences of being struck by a truck, grader or water truck
is very serious.
Separating people from this equipment either with distance or
barriers is important to preventing struck by
injuries.
Hazard: Person struck by Machine
Man & Machine Interface – Filling & Leveling
50
“Workers Lives Matter”
Man and Machine Interface
•Foreman/ worker shows the exact location of dumping,
• Foreman/worker must check the level and status of compaction
• Workers come behind the mobile equipment without any valid
reason (purely behavioral issue)
• Workers from other areas crossing the filling & leveling area
• Worker manually spraying water holding water hose standing
behind the water tank truck
Threat:
51
“Workers Lives Matter”
Man and Machine Interface
Key Safety Controls:
Foreman:
• Conducts effective STARRT
• Establishes exclusion zone by installing soft barricades around the
entire work area
• Deploys spotters at the boundary of the exclusion zone
• Provides, explains and demonstrates roles & responsibilities to
spotters and operators and verifies that spotters
and operators understand their responsibilities by asking questions
and watching them executing the tasks
• Establishes separate ‘Entry’ & ‘Exit’ for all the mobile equipments
inside the exclusion zone
• Installs warning signs
52
“Workers Lives Matter”
Man and Machine Interface
Operator:
• Stops driving/ operating equipment when notices personnel entry
inside the exclusion zone
• Follows the instruction of the foreman
• Parks mobile equipments at designated parking in reversed
direction
Spotter:
• Does not allow personnel entry inside the exclusion zone, while
mobile equipments are in operation
• Stops all equipments before allowing personnel to enter inside the
exclusion zone to check the level or
compaction or any other technical reason
• Follows the instruction of the foreman
53
“Workers Lives Matter”
Man and Machine Interface
Photo 1 – Typical Arrangements
54
“Workers Lives Matter”
Man and Machine Interface
Photo 2 - Visibility Restriction
55
“Workers Lives Matter”
Man and Machine Interface
A Fatal incident
Lack of supervision, training, failure identify hazard & non
availability of Banks men
56
“Workers Lives Matter”
Safety Slogan
Safety is our No1 Priority
Safety rules are your best tools
Worker Lives Matter
Safety a culture to live by; Communication Urge Leadership Teamwork
Understanding Recognition Empowerment
57
“Workers Lives Matter”
Man and Machine Interface
QUESTIONS?
58
“Workers Lives Matter”
Thank you for
attending.

More Related Content

What's hot

10 Forklift Safety Rules - A Review
10 Forklift Safety Rules - A Review10 Forklift Safety Rules - A Review
10 Forklift Safety Rules - A ReviewCreative Safety Supply
 
Mewp training
Mewp training Mewp training
Mewp training simonslater16
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.pptIrfanAwan25
 
Working at-height
Working at-height Working at-height
Working at-height Reliance
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentationJulianElbu
 
Safety during construction
Safety during construction Safety during construction
Safety during construction BHAGWAN PRASAD
 
Work At Height
Work At HeightWork At Height
Work At HeightJames McCann
 
Forklift safety
Forklift safetyForklift safety
Forklift safetyshree
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Liftinghafiz abdul majid
 
Ladder Safety- Safety First!
Ladder Safety- Safety First!Ladder Safety- Safety First!
Ladder Safety- Safety First!davidhongwei
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safetyFroyd Dias
 
Forklift training
Forklift trainingForklift training
Forklift trainingPRAN-RFL Group
 
Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022Syed Neyaz Ahmad
 
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docxFULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docxDwarika Bhushan Sharma
 

What's hot (20)

10 Forklift Safety Rules - A Review
10 Forklift Safety Rules - A Review10 Forklift Safety Rules - A Review
10 Forklift Safety Rules - A Review
 
Mewp training
Mewp training Mewp training
Mewp training
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
Working at-height
Working at-height Working at-height
Working at-height
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentation
 
Safety during construction
Safety during construction Safety during construction
Safety during construction
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Forklift safety
Forklift safetyForklift safety
Forklift safety
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Ladder Safety- Safety First!
Ladder Safety- Safety First!Ladder Safety- Safety First!
Ladder Safety- Safety First!
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 
Forklift training
Forklift trainingForklift training
Forklift training
 
Haad height aware - eng
Haad   height aware - engHaad   height aware - eng
Haad height aware - eng
 
MOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETYMOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETY
 
Sample risk assessment roadhaulage
Sample risk assessment   roadhaulageSample risk assessment   roadhaulage
Sample risk assessment roadhaulage
 
Forklift safety
Forklift safetyForklift safety
Forklift safety
 
Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022
 
Lifting & Rigging by NEIS
Lifting & Rigging by NEISLifting & Rigging by NEIS
Lifting & Rigging by NEIS
 
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docxFULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
 

Similar to Arabtec safety man and machine presentation june 2019 rev-1

1Ascon Banksman and flagman Presentation-RO.ppt
1Ascon Banksman and flagman Presentation-RO.ppt1Ascon Banksman and flagman Presentation-RO.ppt
1Ascon Banksman and flagman Presentation-RO.pptFarhanMalik434232
 
fy11_sh-22248-11_8_Landscapers_Machinery_Vehicular.ppt
fy11_sh-22248-11_8_Landscapers_Machinery_Vehicular.pptfy11_sh-22248-11_8_Landscapers_Machinery_Vehicular.ppt
fy11_sh-22248-11_8_Landscapers_Machinery_Vehicular.pptJavurb
 
Traffic management safety six key issues
Traffic management safety   six key issuesTraffic management safety   six key issues
Traffic management safety six key issuesKailyn Lee
 
Traffic management safety six key issues (presentaion 1)
Traffic management safety   six key issues (presentaion 1)Traffic management safety   six key issues (presentaion 1)
Traffic management safety six key issues (presentaion 1)Shze Hwa Lee
 
www.ventracaus.com.au
www.ventracaus.com.auwww.ventracaus.com.au
www.ventracaus.com.auGhazanfar Ali
 
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
5 Forklift Hazardsto Eliminate from the Workplace - By RandstadForklift Trucks in Minnesota
 
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdffy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdfAlexSandroBorgesPere
 
Operation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrOperation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrSidhanath Singh
 
Road safety ppt
Road safety pptRoad safety ppt
Road safety pptAjeet Kumar
 
Mobile_Equipment_1.ppt
Mobile_Equipment_1.pptMobile_Equipment_1.ppt
Mobile_Equipment_1.pptImran Khan
 
Safety Awareness.pptx
Safety Awareness.pptxSafety Awareness.pptx
Safety Awareness.pptxzoredatta1
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdffujsekmdidjd3e
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdff8uejkkdmdm8u
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf8dskeddmdd
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdffujskmd9dokk
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfdujdkksmdm
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfufjjksemd8id9i
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdffujjekdmdmd
 

Similar to Arabtec safety man and machine presentation june 2019 rev-1 (20)

1Ascon Banksman and flagman Presentation-RO.ppt
1Ascon Banksman and flagman Presentation-RO.ppt1Ascon Banksman and flagman Presentation-RO.ppt
1Ascon Banksman and flagman Presentation-RO.ppt
 
fy11_sh-22248-11_8_Landscapers_Machinery_Vehicular.ppt
fy11_sh-22248-11_8_Landscapers_Machinery_Vehicular.pptfy11_sh-22248-11_8_Landscapers_Machinery_Vehicular.ppt
fy11_sh-22248-11_8_Landscapers_Machinery_Vehicular.ppt
 
Traffic management safety six key issues
Traffic management safety   six key issuesTraffic management safety   six key issues
Traffic management safety six key issues
 
Traffic management safety six key issues (presentaion 1)
Traffic management safety   six key issues (presentaion 1)Traffic management safety   six key issues (presentaion 1)
Traffic management safety six key issues (presentaion 1)
 
www.ventracaus.com.au
www.ventracaus.com.auwww.ventracaus.com.au
www.ventracaus.com.au
 
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
5 Forklift Hazardsto Eliminate from the Workplace - By Randstad
 
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdffy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
 
Fork Lift Truck Association Safety 4MOST
Fork Lift Truck Association  Safety 4MOSTFork Lift Truck Association  Safety 4MOST
Fork Lift Truck Association Safety 4MOST
 
Operation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrOperation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel Rr
 
warehouse.pdf
warehouse.pdfwarehouse.pdf
warehouse.pdf
 
Road safety ppt
Road safety pptRoad safety ppt
Road safety ppt
 
Mobile_Equipment_1.ppt
Mobile_Equipment_1.pptMobile_Equipment_1.ppt
Mobile_Equipment_1.ppt
 
Safety Awareness.pptx
Safety Awareness.pptxSafety Awareness.pptx
Safety Awareness.pptx
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
 
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdfFiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
Fiat Kobelco SL30B Skid Steer Loader Service Repair Manual.pdf
 

More from Dwarika Bhushan Sharma

4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdfDwarika Bhushan Sharma
 
5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf
5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf
5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdfDwarika Bhushan Sharma
 
3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf
3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf
3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdfDwarika Bhushan Sharma
 
2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf
2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf
2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdfDwarika Bhushan Sharma
 
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docxPRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docxDwarika Bhushan Sharma
 
FIRE PREVENTION REQUIREMENTS Form # HSEQ - Rev 2.docx
FIRE PREVENTION REQUIREMENTS Form # HSEQ -  Rev 2.docxFIRE PREVENTION REQUIREMENTS Form # HSEQ -  Rev 2.docx
FIRE PREVENTION REQUIREMENTS Form # HSEQ - Rev 2.docxDwarika Bhushan Sharma
 
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docxSUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docxDwarika Bhushan Sharma
 
STORE INSPECTION Form # HSEQ - Form 2 Rev 2.docx
STORE INSPECTION Form # HSEQ - Form 2 Rev 2.docxSTORE INSPECTION Form # HSEQ - Form 2 Rev 2.docx
STORE INSPECTION Form # HSEQ - Form 2 Rev 2.docxDwarika Bhushan Sharma
 
PROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docx
PROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docxPROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docx
PROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docxDwarika Bhushan Sharma
 
HSE FORMS (COVER PAGE)2 Form # HSEQ - Rev 2.docx
HSE FORMS (COVER PAGE)2 Form # HSEQ -  Rev 2.docxHSE FORMS (COVER PAGE)2 Form # HSEQ -  Rev 2.docx
HSE FORMS (COVER PAGE)2 Form # HSEQ - Rev 2.docxDwarika Bhushan Sharma
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxDwarika Bhushan Sharma
 
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docxLIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docxDwarika Bhushan Sharma
 
MOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docx
MOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docxMOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docx
MOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docxDwarika Bhushan Sharma
 
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docxLABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docxDwarika Bhushan Sharma
 
INCIDENT INVESTIGATION REPORT Form # HSEQ - IIR Rev 9 -.docx
INCIDENT INVESTIGATION REPORT  Form # HSEQ - IIR Rev 9 -.docxINCIDENT INVESTIGATION REPORT  Form # HSEQ - IIR Rev 9 -.docx
INCIDENT INVESTIGATION REPORT Form # HSEQ - IIR Rev 9 -.docxDwarika Bhushan Sharma
 
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.docHSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.docDwarika Bhushan Sharma
 
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docHSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docDwarika Bhushan Sharma
 
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxOFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxDwarika Bhushan Sharma
 

More from Dwarika Bhushan Sharma (20)

4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
 
5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf
5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf
5 - CLOWNS BELONG IN THE CIRCUS & NOT ON THE JOB.pdf
 
3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf
3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf
3-STOP FALLS, CLEAN UP, PICK UP, WIPE UP.pdf
 
2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf
2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf
2-THERE'S A SAFE WAY TO DO EVERY JOB, OF YOU DON'T KNOW ASK.pdf
 
1-HAZARDOUS CHEMICALS.pdf
1-HAZARDOUS CHEMICALS.pdf1-HAZARDOUS CHEMICALS.pdf
1-HAZARDOUS CHEMICALS.pdf
 
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docxPRE-START BRIEFING Form # HSEQ - PSB  Rev 2 -.docx
PRE-START BRIEFING Form # HSEQ - PSB Rev 2 -.docx
 
FIRE PREVENTION REQUIREMENTS Form # HSEQ - Rev 2.docx
FIRE PREVENTION REQUIREMENTS Form # HSEQ -  Rev 2.docxFIRE PREVENTION REQUIREMENTS Form # HSEQ -  Rev 2.docx
FIRE PREVENTION REQUIREMENTS Form # HSEQ - Rev 2.docx
 
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docxSUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
SUB CONTRACTORS HSE CHECKLIST Form # HSEQ - SPSC Rev 2 -.docx
 
STORE INSPECTION Form # HSEQ - Form 2 Rev 2.docx
STORE INSPECTION Form # HSEQ - Form 2 Rev 2.docxSTORE INSPECTION Form # HSEQ - Form 2 Rev 2.docx
STORE INSPECTION Form # HSEQ - Form 2 Rev 2.docx
 
WITNESS STATEMENT FORM.docx
WITNESS STATEMENT FORM.docxWITNESS STATEMENT FORM.docx
WITNESS STATEMENT FORM.docx
 
PROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docx
PROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docxPROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docx
PROJECT LEADER INCIDENT BRIEFING Form # HSEQ - PLIB Rev 2 -.docx
 
HSE FORMS (COVER PAGE)2 Form # HSEQ - Rev 2.docx
HSE FORMS (COVER PAGE)2 Form # HSEQ -  Rev 2.docxHSE FORMS (COVER PAGE)2 Form # HSEQ -  Rev 2.docx
HSE FORMS (COVER PAGE)2 Form # HSEQ - Rev 2.docx
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
 
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docxLIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
LIVE ELECTRICAL WORK PERMIT Form # HSEQ - LEP Rev 2.docx
 
MOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docx
MOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docxMOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docx
MOBILE PLANT REGISTER Form # HSEQ - MPR Rev 3.docx
 
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docxLABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
LABOR ACCOMMODATION CHECKLIST Form # HSEQ - LAC Rev 2.docx
 
INCIDENT INVESTIGATION REPORT Form # HSEQ - IIR Rev 9 -.docx
INCIDENT INVESTIGATION REPORT  Form # HSEQ - IIR Rev 9 -.docxINCIDENT INVESTIGATION REPORT  Form # HSEQ - IIR Rev 9 -.docx
INCIDENT INVESTIGATION REPORT Form # HSEQ - IIR Rev 9 -.docx
 
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.docHSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
HSE INDUCTION Form # HSEQ - HSEI Rev 2 -.doc
 
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docHSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
 
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docxOFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
OFFICE PORTA CABIN INSPECTION Form # HSEQ - OPC Rev 2.docx
 

Recently uploaded

Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 

Arabtec safety man and machine presentation june 2019 rev-1

  • 1. 1 “Workers Lives Matter” Arabtec Safety Man and Machine Interface Rev. 1.0 June-2019
  • 5. 5 “Workers Lives Matter” Man and Machine Interface •Every Year a significant number of people get injured and killed by accidents involving vehicles in the workplace
  • 6. 6 “Workers Lives Matter” Common causes of accidents and incidents Rocks or material falling from the bucket Being run over by moving machinery Being struck by bucket or counterweight Being struck by debris from material face Slipping, tripping and falling over material lying around Construction Plant and Equipment
  • 7. 7 “Workers Lives Matter” Man and Machine Interface • Your EMPLOYER has a responsibility to ensure that any vehicle / equipment that comes onto site is operated safely and with reduced risk. This is achieved by:  Traffic Plans  Segregated traffic routes  Reduced speed  Site Maps and Signage  Inductions  Competent Drivers and site operatives  Maintained plant and Equipment  Banksmen
  • 8. 8 “Workers Lives Matter” Man and Machine Interface • Traffic Plans have One Way Systems where possible Reduced speed requirements Measures to reduce the need for reversing & Turning Segregated Pedestrians from Vehicles Loading and off-loading areas and lay down areas indicated Applicable signage
  • 9. 9 “Workers Lives Matter” Man and Machine Interface • Reduced Speed and Signage
  • 10. 10 “Workers Lives Matter” Man and Machine Interface • PPE Signage
  • 11. 11 “Workers Lives Matter” Man and Machine Interface • Reduced Speed and Signage
  • 12. 12 “Workers Lives Matter” • Segregated traffic routes and Emergency Plan
  • 13. 13 “Workers Lives Matter” Who is a Banksman He/She is a: 1. Trained person who controls the movements of most construction equipment by signaling the operator. 2. Assists operator to safely manure the equipment in congested areas where people are working. 3. Controls the movement of people while the equipment is in operation. 4. Erects necessary barricades to control access of vehicles and persons clear from the equipment. 5. Coordinates the work with other banksmen if more than one equipment is in use in the same area. 6. Banksman is the eyes and ears of the operator of the machine where he can not see (blind spots).
  • 14. 14 “Workers Lives Matter” Banksman duties? • Check vehicle maintenance and driver are trained and competent. • Ensure effective traffic movements & flow • Monitor traffic & pedestrians routes as per traffic & strategy. • Monitor condition of traffic and pedestrian routes • Manage loading and off-loading activities • Control visiting delivery drivers & provide information
  • 15. 15 “Workers Lives Matter” Banksman duties? • Ensure effective lighting at night • MUST stay alert and prevent others becoming unsafe • MUST never themselves in a blind spot • MUST be seen by driver at all times • MUST take a safe position at all times • Stop any construction work, activity or process when unsafe
  • 16. 16 “Workers Lives Matter” Banksmen must make sure that: • All Entrances and Exits Shall be Clearly Defined. • Access to Work Area Will be Restricted by use of Barriers, Warning Signs and Close Supervision. • Banksman to Control all Vehicles within Work Area. • All Escape Routes Shall be Kept Clear at All Times. • Follow Good Housekeeping Procedures. Check Digging Grounds for Electric, Water or Gas Lines.
  • 17. 17 “Workers Lives Matter” What is required? • Only one person shall be designated as a Banksman. • Should be able to observe the load and other workmen at all times. • Must be always be in plain view of the crane operator and all lifting trucks. • Never assume anything. • Make sure both workers and operators understand exactly what is expected to safely move the loads. All Banksmen are to Conduct Daily Toolbox Talks
  • 18. 18 “Workers Lives Matter” During Operations • Stand in proper location As a Banksman, stand where you can see the load and can be seen by the operator.
  • 19. 19 “Workers Lives Matter” Unattended Machinery Do NOT leave the controls of any machine unattended when a work is being suspended
  • 20. 20 “Workers Lives Matter” Moving Machinery • Remain attentive NEVER Stand or pass in front of a moving vehicle or a Machinery at anytime
  • 21. 21 “Workers Lives Matter” He/She has to: • To Inspect all equipments / trucks prior to Use. • Report Defects to the Supervisor. • Follow Company Policies and Procedures such as PTWs and PPE … etc. Moving Machinery
  • 22. 22 “Workers Lives Matter” • Dumper Trucks • Cranes • Excavators • Compressors • Fork Lift Trucks • Concrete Mixers • Compactors • Shovels • Excavators CONTRUCTION PLANT AND EQUIPMENTS INSPECTIONS
  • 23. 23 “Workers Lives Matter” DUMPER TRUCKS If “DUMPER” trucks are being used, check:  Load carried are within the capacity of the dumper truck?  Speed limits are not exceeded when being driven?  No passengers to ride on the dumper when being driven?  No traveling over steep embankments and rough terrains?  No sharp turning to avoid overturning of dumper?  Tyres are at the correct inflated pressure?  Operators are trained and competent?
  • 24. 24 “Workers Lives Matter” Dumper / Trucks Tipping Hazards / Control Measures • Loading • Dumping • Hazard control Maintenance Stability
  • 25. 25 “Workers Lives Matter” EXCAVATORS If “EXCAVATORS” are being used, check: • Operators to be trained and competent? • No passengers to ride on the excavators? • Speed limits are not exceeded when carrying loads? • No travelling near to edge of excavations? • All warning signals are operating? • A banksman to be used during operations?
  • 26. 26 “Workers Lives Matter” FORK LIFT TRUCKS If “FORK LIFT TRUCKS” are being used, check: • Operators to be trained and competent? • No passengers to ride on fork lift trucks? • Speed limits are not exceeded when carrying loads? • No traveling at speed around corners? • All warning signals are operating? • Gas powered fork lift trucks not to be used in enclosed spaces? • Warning signs of Fork Lift Truck in Operation to be posted?
  • 27. 27 “Workers Lives Matter” If “CONCRETE MIXERS” are being used check: • All moving parts are secured when in Transport? • The truck is “locked off” before cleaning the drums? • Trucks not parked too close to excavation edge? • Observation of safe work practices and exclusion zones? • Correct personal protective equipment's is being worn eg. Safety Halmet, safety boots, gloves and hearing protectors, safety Jacket? • Observation of safe disposal of excess concrete? CONCRETE MIXERS
  • 28. 28 “Workers Lives Matter” Driver and Operator’s PPE: Non – Compliance (Serious, repetitive, widespread and cultural For some unknown and inexplicable reason, and despite all the Arabtec rules and regulations on PPE, all ATC projects are continuing to permit drivers and machine operatives on to their sites (“Safety Starts Here – No – PPE – No Work”) who are:  wearing sandals, flip-flops, trainers instead of SAFETY BOOTS.  wearing casual clothes or national costume (generally loose, baggy and light clothing) instead of industrial PROTECTIVE CLOTHING.  wearing dark jumpers or other top clothing instead of HIGH VISIBILITY VESTS  not wearing eye protection (in open vehicles) initial of SAFETY GOGGLES  no nose and mouth protection (in open vehicles) initial of FACE MASKS  wearing caps, cloths or nothing on their heads instead of SAFETY HELMETS  not wearing (unbuckled) SEAT BELTS (which is a key PPE item for drivers) There are NO EXCEPTIONS in the Arabtec or legal safety requirements in the wearing of PPE. The other serious issue which concerns our Management, Construction, Plant and HSE teams, is that we Do Walk By, do not check, and do not stop and the practice, which legally is condoning the practice which do not discipline (= termination) which puts your project and Arabtec in legal jeopardy. ACT IMMEDIATELY AND DAILY TO ERADICATE THIS LEGACY AND HABITUAL CULTURE BY DRIVERS, AND OUR FAILURE TO CONTROL.3
  • 29. 29 “Workers Lives Matter” Tyre Safety Tyre related accidents cause around 5% of the UAE traffic fatalities. All vehicle tyres must be procured, fitted and maintained properly, considering the climate of the UAE. Proper tyre maintenance is an important safety function often neglected. Maintaining proper tyre pressure, observing tyre and vehicle load limits and inspecting tyres for cuts, slashes and other irregularities are important to avoid tyre failure such as tread separation or blowout and flat tyres. Remember, tyres are the only contact between your vehicles and the road and poor tyre Maintenance could result in serious accidents. Under-inflation/Over-inflation Lower tyre pressure can create overload on tyres and overheat the tyres resulting in tyre damage. Over inflation causes increased stress to internal materials which can result in premature failure, poor traction and change in vehicle handling/stability. Check the tyre pressures at least once per month using a reliable or calibrated gauge. The recommended pressures are quoted in the vehicle owner’s manual or on a sticker usually attached to a door frame or fuel cover. Make sure that the pressures are checked when the tyres are “cold”, i.e. driven less than 3 km before the check. Tyre Wear-Visual Check: Check for obvious signs of wear such as wear of the treads, cuts, cracks or other visual damage. The legal minimum level for tyre tread depth is 2mm. Once a tyre reaches this point it will have lost 90 per cent of its performance. The RTA recommends replacing tyres no later than 5 years. Also, regularly check the age, condition and air pressure of spare wheel to avoid having a spare tyre unfit for use when needed.
  • 30. 30 “Workers Lives Matter” Tyre Safety Tyre Rotation and wheel alignment: Tyre rotation reduces irregular wear. For maximum mileage, rotate tyres every 10,000 km. A wheel balance and alignment check at this time will help the potential life of the tyre Other Precautions:  Use only reputable branded and certified tyres. Avoid fitting tyres which may be substandard and therefore potentially unsafe.  Use the correct tyre type and dimension for your vehicle. Refer to the vehicle owner’s manual or ask for expert advice if not sure.  Inflating tyres with Nitrogen instead of air can help to maintain pressure stability for longer periods  It is highly recommended that all four tyres be replaced at the same time  Respect the load and speed capabilities of the tyres fitted to the vehicle by not exceeding them  Use the correct size of tyres as recommended by the vehicle manufacturer.
  • 31. 31 “Workers Lives Matter” Mobile Elevated Work Platforms (MEWPs) Mobile Elevated Work Platforms (MEWPs) must be certified by an approved third party as per the applicable regulations and valid inspection and testing certificates must be displayed. Everyone working on MEWPS shall wear a full body safety harness fitted with double lanyards attached at all times to a fixed anchorage point. The following must be ensured when MEWPs are being used:  A written pre-operational checklist for the MEWP must be completed and signed off by the supervisor.  Risk Assessment must be conducted and a Permit To Work must be obtained before use.  Ensure tool box talks and pre-start briefings on MEWPs are site specific and a safe system of work is in place.  MEWPs should be operated on level ground surfaces which are stable and will not compress under the weight of the MEWP, operatives and/ or material.  Prior to operation of MEWP, the weather conditions need to be assessed and MEWPs must not be operated in adverse weather.  The area around the MEWP must be barricaded and warning signs must be placed.  A minimum of three trained, experienced, competent and certified operatives (two at the platform and one at the ground) must be available for every MEWP being used. This will ensure that in case of an emergency, the operative at the ground can take control the MEWP.  The platform must be fully lowered when the MEWP is being moved and the flagman to guide the movement.  Strictly manage other equipment which is in close proximity (for example, other MEWPs, cranes, teleporters) and ensure it is under competent supervision.  Have the SWL displayed In a prominent location.  Be equipped with flashing warning lights, audible warning device, fire extinguisher and a first aid box. Ensure maintenance records are kept up to date and documented
  • 32. 32 “Workers Lives Matter” What is required? Eyes on the Machine Whistle Ready to Blow Red Vest
  • 33. 33 “Workers Lives Matter” Safety observations No barricade provided before the start of the job. A group is busy in discussion near the excavator and generator
  • 36. 36 “Workers Lives Matter” Managing Heavy Vehicles • Where the driver can see with his mirrors. • Observe Traffic signs • Do not allow reversing operations unless it is controlled and safe to do so
  • 37. 37 “Workers Lives Matter” you cannot see traffic on your left and right until it gets very close what you see with rear view mirror only gives you good information about the traffic behind you BUT CLEAR VIEW YOUR REAR VIEW (INSIDE) MIRROR IS NOT ENOUGH
  • 38. 38 “Workers Lives Matter” NORMAL SIDE MIRROR POSITION – (YOU CAN SEE THE SIDE OF YOUR CAR) CLEAR VIEW other traffic stays in your view for longer using your side mirrors plus rear view mirror the blind zones are smaller AND
  • 39. 39 “Workers Lives Matter” NEW SIDE MIRROR POSITION – (YOU LOOK ALONG THE ROAD, NOT THE SIDE OF YOUR CAR) CLEAR VIEW clear view clear view you can see other traffic sooner and for longer turn your mirrors out - make sure you see the road, not the side of your car you get only 4 small blind zones
  • 40. 40 “Workers Lives Matter” Fatal Incident Involving Reversing PMV Reversing into the trench Location of fatally injured person On 18th May, 2019, approx. 9:13 am, while working in a trench, an Infrastructure Subcontractor worker was struck and fatally injured by a reversing mechanical Shovel which was working in the same area, on a different work task. Emergency Services were immediately called, and Ambulance & Police attended to the incident location shortly after the incident. 1. There was no consideration for two separate teams of workers conducting different tasks, one involving plant 2. There were no physical barriers between plant and manual works 3. There was no flagman, no charge hand, no supervisor/foreman, and no engineer overseeing either tasks (Neither subcontractor nor Arabtec). 4. There was no PTW for the Shovel - (only one for an excavator which had just dug the small shallow cross trench), the “All Clear Safe to Work” was a "Tick and Flick” exercise with location, task and PTW number left blank. 5. No records of TBT or Pre-Start Briefing. 6. The reversing alarm on the shovel was not working. 7. The shovel operator had been allowed by all to operate in this area for 20 days with all the same points 1 to 6. NOTE: The incident could have been easily avoided by implementing the “Arabtec Man -Machine-Task-Environment” risk assessment process, involving a physical pre- start visual assessment.
  • 41. 41 “Workers Lives Matter” Fatal Incident Involving Reversing PMV Reversing into the trench Location of fatally injured person Lessons Learnt:  Two concurrent work activities in the same area must never be allowed without exclusion zone/physical hard barriers. Man-Machine overlap must never be allowed. Re-schedule, or Segregate.  Hard barriers or Jersey Barriers must be filled as per Manufacturer’s Instructions and not left empty (as communicated via HSE Alert 56 Jersey Barriers). Empty Jersey Barriers and/or ticker-tape are not barriers.  Inspect and test all PMV before operation, including brakes, reversing alarms, lights, and reversing mirrors.  Ensure trained flagmen are assigned.  Ensure works are supervised.  Arabtec Construction team must never rely on subcontractors to fully self-manage their own safety planning, controls, training or supervision.  Important Notice (which is included in a new Arabtec Safety Standard # 40): Reversing cameras are mandatory and must be installed on all PMV, including those of subcontractors, to ensure 360 degree view.
  • 42. 42 “Workers Lives Matter” Construction Plant and Equipment Accident and Incident Photos
  • 43. 43 “Workers Lives Matter” If there is a danger? 1. Banksman must stop operator by using whistle and hand signal if there is any danger to people or other machine. 2. Banksman must check clearance around excavations, under pipe racks, structure foundations or Scaffoldings before taking his machine near or around such areas. 3. Banksman should remain alert to see any danger due to machine’s operation and should stop the operation immediately if a danger is occurring. 4. Always remain in operator’s view otherwise machine can be dangerous to banksman as well as workers. 5. Lastly arrange to remove all signs, cones, barriers, and lamps after finishing the work ?
  • 44. 44 “Workers Lives Matter” Flagmen’s Safety • Always face traffic • Flagmen not facing oncoming traffic
  • 45. 45 “Workers Lives Matter” Flagmen’s Hazards • Confusing signals • Never walk ahead.
  • 46. 46 “Workers Lives Matter” Man and Machine Interface Person struck by moving plant 1. No person is permitted into the work area of any moving plant unless the plant is stopped and all drivers are aware of your presence 2. Any person found in the vicinity of moving plant will be immediately released from the project 3. The use of “banksmen” is NOT PERMITTED to control vehicles during earthworks operations Lesson Learnt From Incidents!!!
  • 47. 47 “Workers Lives Matter” X Lesson Learnt From Incidents – Always Use your Commonsense & observe Safety Rules!!! Incident Details: Recent examples of workers sleeping/resting under vehicles, plant, stockpiles and other unsafe areas. X XX X X X X Lesson Learnt From Incidents Always Use your Commonsense & observe Safety Rules!!!
  • 48. 48 “Workers Lives Matter” Lesson Learnt From Incidents – Always Use your Commonsense & observe Safety Rules!!! Incident Details: Recent examples of workers sleeping/resting under vehicles, plant, stockpiles and other unsafe areas. X X X X Good Practice Lesson Learnt From Incidents
  • 49. 49 “Workers Lives Matter” Man and Machine Interface Construction vehicles used for filling and leveling have significant mass, are slow to stop and often have visibility restrictions to the driver (especially when reversing). The consequences of being struck by a truck, grader or water truck is very serious. Separating people from this equipment either with distance or barriers is important to preventing struck by injuries. Hazard: Person struck by Machine Man & Machine Interface – Filling & Leveling
  • 50. 50 “Workers Lives Matter” Man and Machine Interface •Foreman/ worker shows the exact location of dumping, • Foreman/worker must check the level and status of compaction • Workers come behind the mobile equipment without any valid reason (purely behavioral issue) • Workers from other areas crossing the filling & leveling area • Worker manually spraying water holding water hose standing behind the water tank truck Threat:
  • 51. 51 “Workers Lives Matter” Man and Machine Interface Key Safety Controls: Foreman: • Conducts effective STARRT • Establishes exclusion zone by installing soft barricades around the entire work area • Deploys spotters at the boundary of the exclusion zone • Provides, explains and demonstrates roles & responsibilities to spotters and operators and verifies that spotters and operators understand their responsibilities by asking questions and watching them executing the tasks • Establishes separate ‘Entry’ & ‘Exit’ for all the mobile equipments inside the exclusion zone • Installs warning signs
  • 52. 52 “Workers Lives Matter” Man and Machine Interface Operator: • Stops driving/ operating equipment when notices personnel entry inside the exclusion zone • Follows the instruction of the foreman • Parks mobile equipments at designated parking in reversed direction Spotter: • Does not allow personnel entry inside the exclusion zone, while mobile equipments are in operation • Stops all equipments before allowing personnel to enter inside the exclusion zone to check the level or compaction or any other technical reason • Follows the instruction of the foreman
  • 53. 53 “Workers Lives Matter” Man and Machine Interface Photo 1 – Typical Arrangements
  • 54. 54 “Workers Lives Matter” Man and Machine Interface Photo 2 - Visibility Restriction
  • 55. 55 “Workers Lives Matter” Man and Machine Interface A Fatal incident Lack of supervision, training, failure identify hazard & non availability of Banks men
  • 56. 56 “Workers Lives Matter” Safety Slogan Safety is our No1 Priority Safety rules are your best tools Worker Lives Matter Safety a culture to live by; Communication Urge Leadership Teamwork Understanding Recognition Empowerment
  • 57. 57 “Workers Lives Matter” Man and Machine Interface QUESTIONS?