DEFINITION
• EARNEST MONEY IS THE AMOUNT PAID BY A BIDDER IN REQUIRED
FORM AS A SECURITY FOR NOT BACKING OUT FROM HIS/HER
TENDER BEFORE ITS ACCEPTANCE OR REFUSING TO EXECUTE THE
WORK AFTER IT HAS BEEN AWARDED TO HIM/HER.
• EARNEST MONEY IS A DEPOSIT MADE BY THE PROMISOR THAT
REPRESENTS HIS FAITH TO ABIDE BY HIS PROMISE.
• EARNEST MONEY IS THE DEPOSIT MADE BY THE APPLICANT TO
SHOW HIS SERIOUSNESS AND WILLING TO DEMONSTRATE AN
EARNEST OF GOOD FAITH OF COMPLETING THE TRANSACTION.
• MONEY PAID TO CONFIRM A CONTRACT.
• EARNEST MONEY IS A MONETARY GUARANTEE INTENDED TO
DISSUADE BIDDERS FROM WITHDRAWING THEIR BIDS BEFORE
THE END OF THE BID VALIDITY PERIOD BECAUSE THEY WOULD
OTHERWISE FORFEIT THE BID SECURITY AMOUNT TO THE
PROCURING ENTITY.
DEFINITION
• EARNEST MONEY IS A MONETARY
GUARANTEE PAID BY THE TENDERER/BIDDER
INTENDED TO SHOW HIS SERIOUSNESS AND
WILLINGNESS TO DEMONSTRATE AN
EARNEST OF GOOD FAITH OF COMPLETING
HIS PROMISE WITHIN PRESCRIBED PERIOD.
EARNEST MONEY
• EARNEST MONEY IS ALSO KNOWN AS BID
SECURITY OR EARNEST PAYMENT
AMOUNT
• GENERALLY 2% OF THE ESTIMATED COST OF
WORK
• IN LARGE PROJECTS, IT MAY EVEN BE 1% OF
THE ESTIMATED COST OR LESS
• IN LARGER PROJECTS, THERE MAY BE A CAP
OF MAXIMUM AMOUNT
HOW DOES IT AFFECT
• FOR SMALL WORKS, IF AMOUNT OF EARNEST MONEY IS
LOW, BIDDER’S SERIOUSNESS WILL NOT BE THERE HENCE
OBJECTIVE OF EARNEST MONEY WILL BE LOST. HENCE,
FOR SMALLER WORKS, RATE OF EARNEST MONEY IS
HIGHER
• FOR LARGE WORKS, AMOUNT OF EARNEST MONEY GETS
BLOCKED FOR LONGER PERIOD AND THE CONTRACTOR
ULTIMATELY LOADS IT IN THE CONTRACT HENCE IT IS NOT
ADVISABLE TO BLOCK THE FINANCIAL RESOURCES HENCE
SMALLER RATE IS PRESCRIBED IN CASE OF LARGE WORKS
• CPWD SPECIFIES 2% EARNEST MONEY FOR THE WORKS
COSTING RS 10 CRORES AND 20 LAKHS + 1% OF
ESTIMATED COST FOR WORKS COSTING ABOVE 10 CRORES
FORMS OF EARNEST MONEY
• CASH
• BANK DRAFT/BANKER’S CHEQUE
• CHEQUE
• DEPOSIT AT CALL RECEIPT
• TERM DEPOSIT/FIXED DEPOSIT
• BANK GUARANTEE
FORMS OF EARNEST MONEY
• EARNEST MONEY HAS TO BE IN THE NAME OF
AUTHORITY PRESCRIBED BY TENDER INVITING
AUTHORITY SUCH AS EMPLOYER, ENGINEER IN
CHARGE
• ALL INSTRUMENTS INCLUDING BANK
GUARANTEE MUST BE VALID, ENFORCEABLE,
AND OF REQUIRED AMOUNT HAVING VALIDITY
TILL REQUIRED PERIOD
• THE INSTRUMENTS SHOULD BE GOT VERIFIED
FROM THE CONCERNED BANK
REFUND OF EARNEST MONEY
• SHOULD BE MADE AS EARLY AS POSSIBLE
• AS IN GOVERNMENT, ONLY LOWEST BID CAN
BE ACCEPTED, EARNEST MONEY OF BIDDERS
OTHER THAN THE LOWEST BIDDER SHOULD
BE REFUNDED ON THE SAME DAY WHEN BIDS
ARE OPENED. BLOCKADE OF MONEY IS NOT
IN THE INTEREST OF WORK OR ECONOMY.
REFUND/ADJUSTMENT OF EM
• EARNEST MONEY IS ONLY FOR EARNESTNESS
OF TENDER HENCE TO BE REFUNDED ONCE
CONTRACT IS FORMED
• FEW ORGANISATIONS REFUND IT ON
GETTING PERFORMANCE GUARANTEE
• FEW ORGANISATIONS GET IT ADJUSTED
AGAINST SECURITY DEPOSIT OR
PERFORMANCE GUARANTEE i.e. AGAINST
OTHER SECURITIES
EARNEST MONEY NOT PART OF CONTRACT
• PLEASE REMEMBER, EARNEST MONEY IS NOT
PART OF CONTRACT HENCE NOT PART OF
CONDITIONS OF CONTRACT
• ONCE CONTRACT IS FORMED AND
AGREEMENT COMES INTO FORCE, PURPOSE
OF EARNEST MONEY GETS COMPLETED
TREATMENT OF EM UNDER CERTAIN
CONDITIONS
1. IF A BIDDER WITHDRAWS OR MODIFIES THE
BID BEFORE ACCEPTANCE BUT WITHIN
VALIDITY PERIOD: LIABLE FOR FORFEITURE OF
50% EM PROVIDED SUCH CONDITION
AVAILABLE IN BID DOCUMENTS
2. IF A BIDDER WITHDRAWS OR MODIFIES THE
BID AFTER ACCEPTANCE OF HIS BID BUT
WITHIN VALIDITY PERIOD: LIABLE FOR
FORFEITURE OF 100% EM PROVIDED SUCH
CONDITION AVAILABLE IN BID DOCUMENTS
ACCEPTANCE OF BID/TENDER
• ACCEPTANCE OF BID/TENDER MEANS WHEN
THE EMPLOYER/TENDER INVITING
AUTHORITY/ENGINEER IN CHARGE MAKES
WRITTEN COMMUNICATION OF ACCEPTANCE
TO THE BIDDER AND i.e. PUTS INTO THE
POST.
TREATMENT OF EM
• BIDDER WITHDRAWS THE BID BEFORE LETTER OF
ACCEPTANCE IS RECEIVED BY HIM AND ACCEPTANCE IS
WITHIN VAILIDITY PERIOD : FORFEITURE OF 100% EM
• BIDDER WITHDRAWS THE BID AFTER BID VALIDITY PERIOD
HAS BEEN EXTENDED: CASES WILL BE DEALT AS
DISCUSSED EARLIER CONSIDERING REVISED VALIDITY
PERIOD AS VALIDITY PERIOD MENTIONED IN EARLIER
EXAMPLES
• BIDDER DOES NOT EXTEND VALIDITY PERIOD BUT HIS BID
IS ACCEPTED AFTER BID VALIDITY PERIOD IS OVER:
ACCEPTING AUTHORITY HAS NO RIGHT TO FORFEIT
EARNEST MONEY AS BID DOES NOT REMAIN VALID AFTER
BID VALIDITY PERIOD IS OVER
TREATMENT OF EM
• BIDDER WITHDRAWS THE BID BEFORE LETTER OF
ACCEPTANCE IS RECEIVED BY HIM AND ACCEPTANCE IS
WITHIN VAILIDITY PERIOD : FORFEITURE OF 100% EM
• BIDDER WITHDRAWS THE BID AFTER BID VALIDITY PERIOD
HAS BEEN EXTENDED: CASES WILL BE DEALT AS
DISCUSSED EARLIER CONSIDERING REVISED VALIDITY
PERIOD AS VALIDITY PERIOD MENTIONED IN EARLIER
EXAMPLES
• BIDDER DOES NOT EXTEND VALIDITY PERIOD BUT HIS BID
IS ACCEPTED AFTER BID VALIDITY PERIOD IS OVER:
ACCEPTING AUTHORITY HAS NO RIGHT TO FORFEIT
EARNEST MONEY AS BID DOES NOT REMAIN VALID AFTER
BID VALIDITY PERIOD IS OVER
Thanks for attending
Dr K M Soni, ADG (Retd.), CPWD, New Delhi
Also available on Youtube: KRISHNA MURARI Soni at
https://www.youtube.com/channel/UC_pPYxk0jI1ayqA5rO6fBOw

More Related Content

What's hot

Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender NoticeSakshi Kirar
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in WorksDr K M SONI
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil EngineeringKailash Chander
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Arbitration Of Construction Disputes
Arbitration Of Construction DisputesArbitration Of Construction Disputes
Arbitration Of Construction Disputeslouchang
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of RatesRaj Shah
 

What's hot (20)

contract procedure
contract procedurecontract procedure
contract procedure
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Valuation(1)
Valuation(1)Valuation(1)
Valuation(1)
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Tender
TenderTender
Tender
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil Engineering
 
Construction process
Construction processConstruction process
Construction process
 
Arbitration Of Construction Disputes
Arbitration Of Construction DisputesArbitration Of Construction Disputes
Arbitration Of Construction Disputes
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Valuation
ValuationValuation
Valuation
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 

Similar to Earnest Money

Contract Management
Contract Management Contract Management
Contract Management Dr K M SONI
 
Presentation%20letter%20of%20cerdit%20pijat
Presentation%20letter%20of%20cerdit%20pijatPresentation%20letter%20of%20cerdit%20pijat
Presentation%20letter%20of%20cerdit%20pijatHafizah Makhatar
 
Negotiableinstrumentsact1881 121012020742-phpapp02 (1)
Negotiableinstrumentsact1881 121012020742-phpapp02 (1)Negotiableinstrumentsact1881 121012020742-phpapp02 (1)
Negotiableinstrumentsact1881 121012020742-phpapp02 (1)Ravi Kainth
 
Negotiable instruments act 1881
Negotiable instruments act 1881Negotiable instruments act 1881
Negotiable instruments act 1881Gyan Prakash
 
Negotiableinstrumentsact1881 121012020742-phpapp02
Negotiableinstrumentsact1881 121012020742-phpapp02Negotiableinstrumentsact1881 121012020742-phpapp02
Negotiableinstrumentsact1881 121012020742-phpapp02Manu John
 
Modes of payment in export business
Modes of payment in export businessModes of payment in export business
Modes of payment in export businessKaran Sharma
 
House Bill 09 1276 2
House Bill 09 1276 2House Bill 09 1276 2
House Bill 09 1276 2DivofHousing
 
Legal aspects of trade finance
Legal aspects of trade financeLegal aspects of trade finance
Legal aspects of trade financeKusum901
 
Working capital financing
Working capital financingWorking capital financing
Working capital financingSandeep Yadav
 
Operations of Letter of Credit
Operations of Letter of CreditOperations of Letter of Credit
Operations of Letter of CreditNazmul H. Palash
 
Bank and Customer.pptx
Bank and Customer.pptxBank and Customer.pptx
Bank and Customer.pptxShivaniSati5
 
MODERN BANKING - The Negotiable Instruments Act
MODERN BANKING - The Negotiable Instruments ActMODERN BANKING - The Negotiable Instruments Act
MODERN BANKING - The Negotiable Instruments Act24x7kannadanews
 
Negotiable instruments
Negotiable instrumentsNegotiable instruments
Negotiable instrumentsJithin Abraham
 

Similar to Earnest Money (20)

P C banker.pdf
P C banker.pdfP C banker.pdf
P C banker.pdf
 
P&C banker
P&C bankerP&C banker
P&C banker
 
Contract Management
Contract Management Contract Management
Contract Management
 
Presentation%20letter%20of%20cerdit%20pijat
Presentation%20letter%20of%20cerdit%20pijatPresentation%20letter%20of%20cerdit%20pijat
Presentation%20letter%20of%20cerdit%20pijat
 
Negotiableinstrumentsact1881 121012020742-phpapp02 (1)
Negotiableinstrumentsact1881 121012020742-phpapp02 (1)Negotiableinstrumentsact1881 121012020742-phpapp02 (1)
Negotiableinstrumentsact1881 121012020742-phpapp02 (1)
 
Welcome
WelcomeWelcome
Welcome
 
WELCOME
WELCOMEWELCOME
WELCOME
 
Letter of credit
Letter of creditLetter of credit
Letter of credit
 
Letter of credit
Letter of creditLetter of credit
Letter of credit
 
Negotiable instruments act 1881
Negotiable instruments act 1881Negotiable instruments act 1881
Negotiable instruments act 1881
 
Negotiableinstrumentsact1881 121012020742-phpapp02
Negotiableinstrumentsact1881 121012020742-phpapp02Negotiableinstrumentsact1881 121012020742-phpapp02
Negotiableinstrumentsact1881 121012020742-phpapp02
 
Modes of payment in export business
Modes of payment in export businessModes of payment in export business
Modes of payment in export business
 
House Bill 09 1276 2
House Bill 09 1276 2House Bill 09 1276 2
House Bill 09 1276 2
 
Legal aspects of trade finance
Legal aspects of trade financeLegal aspects of trade finance
Legal aspects of trade finance
 
Working capital financing
Working capital financingWorking capital financing
Working capital financing
 
Operations of Letter of Credit
Operations of Letter of CreditOperations of Letter of Credit
Operations of Letter of Credit
 
Bank and Customer.pptx
Bank and Customer.pptxBank and Customer.pptx
Bank and Customer.pptx
 
MODERN BANKING - The Negotiable Instruments Act
MODERN BANKING - The Negotiable Instruments ActMODERN BANKING - The Negotiable Instruments Act
MODERN BANKING - The Negotiable Instruments Act
 
Debentures part 1
Debentures part 1Debentures part 1
Debentures part 1
 
Negotiable instruments
Negotiable instrumentsNegotiable instruments
Negotiable instruments
 

More from Dr K M SONI

Heritage Conservation
Heritage ConservationHeritage Conservation
Heritage ConservationDr K M SONI
 
Project Management
Project ManagementProject Management
Project ManagementDr K M SONI
 
You are also a leader
You are also a leaderYou are also a leader
You are also a leaderDr K M SONI
 
Contract and agreements
Contract and agreementsContract and agreements
Contract and agreementsDr K M SONI
 
Price variation in works contracts
Price variation in works contractsPrice variation in works contracts
Price variation in works contractsDr K M SONI
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contractsDr K M SONI
 
Contract Conditions
Contract ConditionsContract Conditions
Contract ConditionsDr K M SONI
 
Anchors in civil engineering works
Anchors in civil engineering worksAnchors in civil engineering works
Anchors in civil engineering worksDr K M SONI
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy buildingDr K M SONI
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste ManagementDr K M SONI
 
EPC and other types of contracts
EPC and other types of contractsEPC and other types of contracts
EPC and other types of contractsDr K M SONI
 
Contract Management
Contract Management Contract Management
Contract Management Dr K M SONI
 
EPS Geofoam Blocks
EPS Geofoam BlocksEPS Geofoam Blocks
EPS Geofoam BlocksDr K M SONI
 
Aesthetics and Functionality through Glass
Aesthetics and Functionality through GlassAesthetics and Functionality through Glass
Aesthetics and Functionality through GlassDr K M SONI
 
Maintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural PlanningMaintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural PlanningDr K M SONI
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public WorksDr K M SONI
 
About me i.e. Dr. K M Soni
About me i.e. Dr. K M SoniAbout me i.e. Dr. K M Soni
About me i.e. Dr. K M SoniDr K M SONI
 

More from Dr K M SONI (20)

Heritage Conservation
Heritage ConservationHeritage Conservation
Heritage Conservation
 
Project Management
Project ManagementProject Management
Project Management
 
You are also a leader
You are also a leaderYou are also a leader
You are also a leader
 
Contract and agreements
Contract and agreementsContract and agreements
Contract and agreements
 
Price variation in works contracts
Price variation in works contractsPrice variation in works contracts
Price variation in works contracts
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contracts
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
 
Anchors in civil engineering works
Anchors in civil engineering worksAnchors in civil engineering works
Anchors in civil engineering works
 
Deconstruction
DeconstructionDeconstruction
Deconstruction
 
Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy building
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste Management
 
EPC and other types of contracts
EPC and other types of contractsEPC and other types of contracts
EPC and other types of contracts
 
Contract Management
Contract Management Contract Management
Contract Management
 
EPS Geofoam Blocks
EPS Geofoam BlocksEPS Geofoam Blocks
EPS Geofoam Blocks
 
Aesthetics and Functionality through Glass
Aesthetics and Functionality through GlassAesthetics and Functionality through Glass
Aesthetics and Functionality through Glass
 
EPC Contracts
EPC Contracts EPC Contracts
EPC Contracts
 
Maintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural PlanningMaintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural Planning
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public Works
 
About me i.e. Dr. K M Soni
About me i.e. Dr. K M SoniAbout me i.e. Dr. K M Soni
About me i.e. Dr. K M Soni
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 

Earnest Money

  • 1. EARNEST MONEY Dr K M Soni, ADG(Retd.), CPWD, New Delhi
  • 2. DEFINITION • EARNEST MONEY IS THE AMOUNT PAID BY A BIDDER IN REQUIRED FORM AS A SECURITY FOR NOT BACKING OUT FROM HIS/HER TENDER BEFORE ITS ACCEPTANCE OR REFUSING TO EXECUTE THE WORK AFTER IT HAS BEEN AWARDED TO HIM/HER. • EARNEST MONEY IS A DEPOSIT MADE BY THE PROMISOR THAT REPRESENTS HIS FAITH TO ABIDE BY HIS PROMISE. • EARNEST MONEY IS THE DEPOSIT MADE BY THE APPLICANT TO SHOW HIS SERIOUSNESS AND WILLING TO DEMONSTRATE AN EARNEST OF GOOD FAITH OF COMPLETING THE TRANSACTION. • MONEY PAID TO CONFIRM A CONTRACT. • EARNEST MONEY IS A MONETARY GUARANTEE INTENDED TO DISSUADE BIDDERS FROM WITHDRAWING THEIR BIDS BEFORE THE END OF THE BID VALIDITY PERIOD BECAUSE THEY WOULD OTHERWISE FORFEIT THE BID SECURITY AMOUNT TO THE PROCURING ENTITY.
  • 3. DEFINITION • EARNEST MONEY IS A MONETARY GUARANTEE PAID BY THE TENDERER/BIDDER INTENDED TO SHOW HIS SERIOUSNESS AND WILLINGNESS TO DEMONSTRATE AN EARNEST OF GOOD FAITH OF COMPLETING HIS PROMISE WITHIN PRESCRIBED PERIOD.
  • 4. EARNEST MONEY • EARNEST MONEY IS ALSO KNOWN AS BID SECURITY OR EARNEST PAYMENT
  • 5. AMOUNT • GENERALLY 2% OF THE ESTIMATED COST OF WORK • IN LARGE PROJECTS, IT MAY EVEN BE 1% OF THE ESTIMATED COST OR LESS • IN LARGER PROJECTS, THERE MAY BE A CAP OF MAXIMUM AMOUNT
  • 6. HOW DOES IT AFFECT • FOR SMALL WORKS, IF AMOUNT OF EARNEST MONEY IS LOW, BIDDER’S SERIOUSNESS WILL NOT BE THERE HENCE OBJECTIVE OF EARNEST MONEY WILL BE LOST. HENCE, FOR SMALLER WORKS, RATE OF EARNEST MONEY IS HIGHER • FOR LARGE WORKS, AMOUNT OF EARNEST MONEY GETS BLOCKED FOR LONGER PERIOD AND THE CONTRACTOR ULTIMATELY LOADS IT IN THE CONTRACT HENCE IT IS NOT ADVISABLE TO BLOCK THE FINANCIAL RESOURCES HENCE SMALLER RATE IS PRESCRIBED IN CASE OF LARGE WORKS • CPWD SPECIFIES 2% EARNEST MONEY FOR THE WORKS COSTING RS 10 CRORES AND 20 LAKHS + 1% OF ESTIMATED COST FOR WORKS COSTING ABOVE 10 CRORES
  • 7. FORMS OF EARNEST MONEY • CASH • BANK DRAFT/BANKER’S CHEQUE • CHEQUE • DEPOSIT AT CALL RECEIPT • TERM DEPOSIT/FIXED DEPOSIT • BANK GUARANTEE
  • 8. FORMS OF EARNEST MONEY • EARNEST MONEY HAS TO BE IN THE NAME OF AUTHORITY PRESCRIBED BY TENDER INVITING AUTHORITY SUCH AS EMPLOYER, ENGINEER IN CHARGE • ALL INSTRUMENTS INCLUDING BANK GUARANTEE MUST BE VALID, ENFORCEABLE, AND OF REQUIRED AMOUNT HAVING VALIDITY TILL REQUIRED PERIOD • THE INSTRUMENTS SHOULD BE GOT VERIFIED FROM THE CONCERNED BANK
  • 9. REFUND OF EARNEST MONEY • SHOULD BE MADE AS EARLY AS POSSIBLE • AS IN GOVERNMENT, ONLY LOWEST BID CAN BE ACCEPTED, EARNEST MONEY OF BIDDERS OTHER THAN THE LOWEST BIDDER SHOULD BE REFUNDED ON THE SAME DAY WHEN BIDS ARE OPENED. BLOCKADE OF MONEY IS NOT IN THE INTEREST OF WORK OR ECONOMY.
  • 10. REFUND/ADJUSTMENT OF EM • EARNEST MONEY IS ONLY FOR EARNESTNESS OF TENDER HENCE TO BE REFUNDED ONCE CONTRACT IS FORMED • FEW ORGANISATIONS REFUND IT ON GETTING PERFORMANCE GUARANTEE • FEW ORGANISATIONS GET IT ADJUSTED AGAINST SECURITY DEPOSIT OR PERFORMANCE GUARANTEE i.e. AGAINST OTHER SECURITIES
  • 11. EARNEST MONEY NOT PART OF CONTRACT • PLEASE REMEMBER, EARNEST MONEY IS NOT PART OF CONTRACT HENCE NOT PART OF CONDITIONS OF CONTRACT • ONCE CONTRACT IS FORMED AND AGREEMENT COMES INTO FORCE, PURPOSE OF EARNEST MONEY GETS COMPLETED
  • 12. TREATMENT OF EM UNDER CERTAIN CONDITIONS 1. IF A BIDDER WITHDRAWS OR MODIFIES THE BID BEFORE ACCEPTANCE BUT WITHIN VALIDITY PERIOD: LIABLE FOR FORFEITURE OF 50% EM PROVIDED SUCH CONDITION AVAILABLE IN BID DOCUMENTS 2. IF A BIDDER WITHDRAWS OR MODIFIES THE BID AFTER ACCEPTANCE OF HIS BID BUT WITHIN VALIDITY PERIOD: LIABLE FOR FORFEITURE OF 100% EM PROVIDED SUCH CONDITION AVAILABLE IN BID DOCUMENTS
  • 13. ACCEPTANCE OF BID/TENDER • ACCEPTANCE OF BID/TENDER MEANS WHEN THE EMPLOYER/TENDER INVITING AUTHORITY/ENGINEER IN CHARGE MAKES WRITTEN COMMUNICATION OF ACCEPTANCE TO THE BIDDER AND i.e. PUTS INTO THE POST.
  • 14. TREATMENT OF EM • BIDDER WITHDRAWS THE BID BEFORE LETTER OF ACCEPTANCE IS RECEIVED BY HIM AND ACCEPTANCE IS WITHIN VAILIDITY PERIOD : FORFEITURE OF 100% EM • BIDDER WITHDRAWS THE BID AFTER BID VALIDITY PERIOD HAS BEEN EXTENDED: CASES WILL BE DEALT AS DISCUSSED EARLIER CONSIDERING REVISED VALIDITY PERIOD AS VALIDITY PERIOD MENTIONED IN EARLIER EXAMPLES • BIDDER DOES NOT EXTEND VALIDITY PERIOD BUT HIS BID IS ACCEPTED AFTER BID VALIDITY PERIOD IS OVER: ACCEPTING AUTHORITY HAS NO RIGHT TO FORFEIT EARNEST MONEY AS BID DOES NOT REMAIN VALID AFTER BID VALIDITY PERIOD IS OVER
  • 15. TREATMENT OF EM • BIDDER WITHDRAWS THE BID BEFORE LETTER OF ACCEPTANCE IS RECEIVED BY HIM AND ACCEPTANCE IS WITHIN VAILIDITY PERIOD : FORFEITURE OF 100% EM • BIDDER WITHDRAWS THE BID AFTER BID VALIDITY PERIOD HAS BEEN EXTENDED: CASES WILL BE DEALT AS DISCUSSED EARLIER CONSIDERING REVISED VALIDITY PERIOD AS VALIDITY PERIOD MENTIONED IN EARLIER EXAMPLES • BIDDER DOES NOT EXTEND VALIDITY PERIOD BUT HIS BID IS ACCEPTED AFTER BID VALIDITY PERIOD IS OVER: ACCEPTING AUTHORITY HAS NO RIGHT TO FORFEIT EARNEST MONEY AS BID DOES NOT REMAIN VALID AFTER BID VALIDITY PERIOD IS OVER
  • 16. Thanks for attending Dr K M Soni, ADG (Retd.), CPWD, New Delhi Also available on Youtube: KRISHNA MURARI Soni at https://www.youtube.com/channel/UC_pPYxk0jI1ayqA5rO6fBOw