2. Problem
Optical sensor assemblies have been shipped to
customers with defects. Screws without loctite
thread lock.
Loose screws were found in the shipping container
of some top assemblies.
All units have been deployed.
There have been no reported optical errors.
Estimate the potential axis alignment error to
establish a recall schedule.
8. Conclusion
The single missing screw will add to
the optical misalignment budget.
At the peak of the worst case load of
10G an additional alignment error of
.0044 inches is predicted.