PROFESSIONAL SUMMERY:-
I am having 7+ years of experience in Detail and Design Engineering in Electrical for various Projects
like Commercial Complexes, Apartments, Residential Buildings and Stadiums. I am conversant with International
and National codes like BS, IS, NEC or NFPA, CIBSE, IESNA, LEED Basic Concepts etc.
Academic Qualification:-
Bachelor of Technology (B.Tech) in Electrical & Electronics Engg. from Godavari Institute of Engineering &
Technology (GIET), affiliated to JNT University, Rajahmundry in (2008).
Intermediate from Siddhartha Jr. College at Rajahmundry in 2002.
S.S.C. from N.K.V. High School in Danavaipet at Rajahmundry in 2000.
EXPERIENCE:-
Working in Raychem RPG Pvt.Ltd, Mumbai, Since May’ 2014. As a Sr. Executive in Electrical Designing with
application in Conceptual design for Residential Buildings and Industrial Plants.
Worked in Dar-Al Handasah Consulatants (INDIA) Pvt.Ltd, Pune, From Jan’ 2012 to May 2014. As a Electrical
Design Engineer with application in Conceptual design for Residential Buildings and Commercial Complexes.
Worked in Hyderabad Consulting Engineers. From Dec’ 2008 to Dec’ 2011. As a Electrical Design Engineer with
application in conceptual design for Defence manufacturing factories (M/s.SEC Industries), Steel plant (M/s.JSW),
and Plastic manufacturing factories (M/s.Tupperware India Pvt. Ltd).
Worked in MC Consulting Engineers (P) Ltd. From April’ 2008 to Dec’ 2008, as a Electrical Design Engineer with
application in Conceptual System Design.
ELECTRICAL SOFTWARE:-
These below Calculations are done by related BS Codes
• DiaLux4.11 : For Lighting Lux level calculations.
• Furse : Lightning Protection and Risk Assessment.
• Elevate 8 : Traffic Analysis and Elevator Selection.
• Ulysse V2.3 : For Road Lighting Calculation.
DESIGN SOFTWARE:
• AutoCAD 2008-2012.
• Revit MEP 2012.
2. PROJECTS HANDLED: RAYCHEM RPG PVT. LTD., MUMBAI.
Al FORSAN GLOBAL INDUSTRIAL COMPLEX, SAUDI ARABIA .
This project was submitted by 3 different Packages
Package 1: Industrial Plants - 3 no’s.
Package 2: Residential Apartments, Canteen, Tennis Court..
Package 3: Ware Houses.
Reference Standards: Qatar Standard : Kahra MAA Regulations.
Role: -
Study the Technical Specifications and requirements of the Project and Soil Resistivity Report, then start the Risk
Assessment Calculation, Fully design of Lightning Protection Design to the complete structure, Protect the Internal
Equipment’s / Distribution Systems against Induced Over Voltage/Current or Surge Protection Device (SPD). Earthing
System was applied for System Earthing and Equipment Earthing. Providing Equi-potential bonding for External and
Extraneous Conductors. Providing detailed typical Installation details. Typical Earthing Schematic Layout. Surge
Protection Schematic Device (SPD) Layout. Co-ordination with Clients and Contractors. Preparation of Power point
presentation on the Lightning Protection System. Follow-up with Draftsman.
LAKSMANA CONDOMINIUM PROJECT, MALAYSIA.
This project was submitted by 2 different Packages.
Package A: Tower 1, 2 (Residential Building) With 3 basements
Package B: Tower 3 (Service Apartment + Office Tower) with 3 Basements.
Reference Standards: Malaysian Standard : MS 1979:2007.
Role: -
Study the Technical Specifications and requirements of the Project and Soil Resistivity Report, then start the risk
Assessment Calculation, Fully design of Lightning Protection Design to the complete structure, Protect the Internal
Equipment’s / Distribution Systems against Induced Over Voltage/Current or Surge Protection Device (SPD). Providing
Detail Swimming Pool Earthing. Earthing System was applied for System Earthing and Equipment Earthing. Providing
Equi-potential bonding for External and Extraneous Conductors. Providing detailed typical Installation details. Typical
Earthing Schematic Layout. Surge Protection Schematic Device (SPD) Layout.Co-ordination with Clients and
Contractors. Preparation of Power point presentation on the Lightning Protection System. Follow-up with Draftsman.
PIT BUILDING PROJECT, JOHOR, MALAYSIA.
This is a second Formula One-standard circuit being built in Malaysia. The planned 4.5-kilometre (2.8-mile) test track is
part of a $1.2 billion Motorsport City, Johor.
Reference Standards: Malaysian Standard : MS 1979:2007.
Role: -
Study the Technical Specifications and requirements of the Project and Soil Resistivity Report, then start the risk
Assessment Calculation, Fully design of Lightning Protection Design to the complete structure, Protect the Internal
Equipment’s / Distribution Systems against Induced Over Voltage/Current or Surge Protection Device (SPD). Earthing
System was applied for System Earthing and Equipment Earthing. Providing Equi-potential bonding for External and
Extraneous Conductors. Providing detailed typical Installation details. Typical Earthing Schematic Layout. Surge
3. Protection Schematic Device (SPD) Layout.Co-ordination with Clients and Contractors. Preparation of Power point
presentation on the Lightning Protection System. Follow-up with Draftsman.
PROJECTS HANDLED: DAR – AL HANDASAH CONSULTANTS (INDIA) PVT. LTD., PUNE.
EXTENSION OF INTERCONTINENTAL HOTEL DOHA, OFFSHORE RESTAURENT, CHALLETS &
APARTMENTS.
This project was submitted by 3 different Packages
Package 1: Residential Building, 19no’s Challets & Landscape Lighting Part– 1.
Package 2: Extension Hotel, Squash Court & Landscape Lighting Part– 2.
Package 3: Offshore Restaurant, Landscape Lighting Part– 3.
Role: - Fully design of Squash Court Lighting, Power and Distribution schedule, Landscape Lighting for 3 packages Co-
Ordination with Landscape Department, Feeder Pillar Schedule and Cable Sizing Calculation with considering the
derating factor and Voltage drop. LV Single Line Diagram, Fire Escape Routing (Exit Signs), Lighting and Small Power on
Back of House Areas in Hotel Extension, Panel Board Schedule. Follow up with the AutoCAD draughtsman.
MAKKAH HOTELS & COMMERCIAL COMPLEX, MAKKAH CITY, SAUDI.
The site gross land area is approximately 128,834 M2. This Project was submitted for LEED Green Building Certification.
This project was submitted in one package Residential Tower, Hotel Tower, Retail Mall, Mosque, 24 no’s. Villas and Staff
Residence.
Role: - Fully design of Staff Residence & MOSQUE Lighting Calculation as per ASHRAE LPD, Controlling the Lighting
Circuits with Occupancy Sensors, Fire Escape Routing (Exit Signs), Small Power, LV Single Line Diagram, Heat
Dissipation Calculation for A.C requirement in Technical Rooms, Kitchen Equipment Schedule and Implementation on
related drawings, Furse Calculation, Lightning Protection Layout, Earthing Schematic Layout. Preparing Lighting Relay
Panels (LRP), Master Selector Switch Panel Schedule (MSSP), Motor Control Centers (MCC’s). Co-ordinating with
HVAC, Plumbing, Architecture, departments for the related projects. Cable Routing, and Panel Board Schedule. Follow
up with the AutoCAD draughtsman. Preparing Bill of Quantities.
AL-KHOR STADIUM, DOHA.
This is a Doha International FIFA Stadium. The Site area is approximately 1,000,000 m2. Stadium Bowl the capacity of
70,000 spectators could be arranged in FIFA Mode. Stadium is designed ready to host FIFA World Cup 2022 games.
This project was submitted by 2 Package.
Package1: Exhibition, Retail Building, Landscape Lighting.
Package2: Main Stadium (Legacy Mode & FIFA Mode).
Role:-.Preparation of Lightning Protection Layout and Earthing for Complete Plant. Motor Control Centers (MCC’s). Co-
Ordinating with HVAC, Plumbing, Architecture, departments for the related projects. Fire Escape Routing (Exit Signs),
Kitchen Equipment Schedule and Implementation on related drawings. LV Single Line Diagram, Cable Sizing Calculation
with considering the derating factor and Voltage drop. Lighting Calculation and Small power for Mechanical Areas.
Preparing the installation Details for Lighting and Cable Tray. Follow up with the AutoCAD draughtsman.
MADHINA AL HAZZ CITY, SAUDI ARABIA (ON GOING).
The Project will be submitted by 3 Packages. The Site area is approximately 60 Lac. M2, This Project will be submit by
LEED Green Building Certification.
Package 1:- All Infrastructure,
Package2:- Small Mosque, Office Tower – 11 No’s, Hotel Tower – 6 No’s,
Package3:- Metro Station, Mall, Large Mosque.
4. Role: - This Project will be Submit on Revit. Preparation of Lightning Protection Layout and Earthing for all Towers and
Mosque. Design of Façade Lighting for Office Hotel and Mosque Co-ordination with Architecture. Motor Control Centers
(MCC’s) Co-Ordinating with HVAC, Plumbing, Architecture, departments for the related projects. Fire Escape Routing
(Exit Signs), LV Single Line Diagram, Cable Sizing Calculation with considering the derating factor and Voltage drop.
Preparing the installation Details for Lighting and Cable Tray. Follow up with the AutoCAD and Revit draughtsman.
PROJECTS HANDLED: HYDERABAD CONSULTING ENGINEERS, HYDERABAD.
M/s.SEC INDUSTRIES Pvt. Ltd., HYDERABAD.
This is a Defence Manufacturing Factory in Hyderabad. Proposed Production Plant at Hyderabad.
Role: - Worked on Fully design of Electrical Services like Lighting, Small Power and Cable Routing, LV Single Line
Diagram, Design on PCC’s and MCC’s Co-Ordinating with HVAC, Plumbing, Architecture Consultancies. Preparing
Lightning Protection Layout, Earthing Schematic Layout. Interacting with Client and Contractor. Supervision of Work
Execution at site etc., LT Panel Inspection at Vendor’s Factory. Preparation of Transformer Sizing Calculation and DG
Sizing Calculation, Preparation of Panel Board Schedule. Preparing Bill of Quantities.
M/s.JINDHAL STEEL WORKS (JSW), BELLARY, BANGALORE.
Jindhal Steel works propose a Pellet Plant in Bellary
Role: - Worked on Fully design of Electrical Services like Lighting, Small Power and Cable Routing for Electrical
Substation, Transformer Rooms and Entire Plant, Design on PCC’s and MCC’s Co-ordinating with HVAC, Plumbing,
Architecture Consultancies. Preparing Lightning Protection Layout, Earthing Schematic Layout. Preparation of Panel
Board Schedule. Preparing Bill of Quantities.
M/s.J.R.SEAMLESS Pvt. Ltd, MEDAK DISTRICT, HYDERABAD.
This is a Steel Manufacturing Factory in Hyderabad.
Role: - Worked on Fully design of Electrical Services like Lighting, Small Power and Cable Routing, LV Single Line
Diagram, Design on PCC’s and MCC’s Co-Ordinating with HVAC, Plumbing, Architecture Consultancies. Preparing
Lightning Protection Layout, Earthing Schematic Layout. Interacting with Client and Contractor. Supervision of Work
Execution at site etc., LT Panel Inspection at Vendor’s Factory. Preparation of Transformer Sizing Calculation and DG
Sizing Calculation, Preparation of Panel Board Schedule. Preparing Bill of Quantities.
M/s.TUPPERWARE INDIA Pvt. Ltd., GURGAON, HARYANA.
This is a Plastic Manufacturing Factory in Haryana.
Role: - Worked on Fully design of Electrical Services like Lighting, Small Power and Cable Routing, LV Single Line
Diagram, Design on PCC’s and MCC’s Co-Ordinating with HVAC, Plumbing, Architecture Consultancies. Preparing
Lightning Protection Layout, Earthing Schematic Layout. Preparation of Transformer Sizing Calculation and DG Sizing
Calculation, LT Panel Inspection at Vendor’s Factory. Preparation of Panel Board Schedule. Preparing Bill of Quantities.
M/s. PROPOSED HUMAN RESOURCES TRAINING INSTITUTE FOR ANDHRA BANK, NANAKRAMGUDA
HYDERABAD.
This is a training Institute for Andhra Bank Employes, Site Area is approximately 2,00,000 SQ.ft.
Role: - Worked on Fully design of Electrical Services like Lighting, Small Power and Cable Routing for LT side and HT
side, LV Single Line Diagram, Preparing Lightning Protection Layout, Earthing Schematic Layout. Interacting with Client
and Contractor. Preparation of Transformer Sizing Calculation and DG Sizing Calculation, Supervision of Work Execution
at site etc., LT Panel Inspection at Vendor’s Factory. Preparation of Panel Board Schedule. Preparing Bill of Quantities.
M/s. A.P. POLLUTION CONTROL BOARD, SITAMMADHARA, VISAKHAPATANAM.
This is a Pollution Check up Centre for factories at Sitammadhara; Site Area is approximately 50,000 SQ.ft.
5. Role: - Worked on Fully design of Electrical Services like Lighting, Small Power and Cable Routing, LV Single Line
Diagram, Preparing Lightning Protection Layout, Earthing Schematic Layout. Interacting with Client and Contractor.
Preparation of Transformer Sizing Calculation and DG Sizing Calculation, Supervision of Work Execution at site etc.,
LT Panel Inspection at Vendor’s Factory. Preparation of Panel Board Schedule. Preparing Bill of Quantities.
PROJECTS HANDLED: MC CONSULTING ENGINEERS, HYDERABAD.
M/s. VISHNUNIVAS P.A.C. AT TIRUPATI.
Proposed PILGRIM’S AMMUNITY CENTRE AT TIRUPATI; Site Area is approximately 1,00,000 S.ft.
Role: - Worked on Fully design of Electrical Services like Lighting, Small Power, Cable Routing and UPS Layout, LV
Single Line Diagram, UPS Sizing, Earthing Schematic Layout. Preparation of Transformer Sizing Calculation and DG
Sizing Calculation, Preparation of Panel Board Schedule. Preparing Bill of Quantities.
M/s. GITAMS UNIVERSITY, RANGA REDDY DIST., HYDERABAD.
Proposed New Educational Building and Temporary Campus at Rudhraram; Site Area is approximately 50,000 S.ft.
Role: - Worked on Fully design of Electrical Services like Lighting, Small Power, Cable Routing and UPS Layout, LV
Single Line Diagram, UPS Sizing, Earthing Schematic Layout. Preparation of Transformer Sizing Calculation and DG
Sizing Calculation, Preparation of Panel Board Schedule. Preparing Bill of Quantities.
PERSOANL DETAILS:
PASSPORT:
Passport Number : G2916568
Date of Issue : 19/07/2007
Date of Expire : 18/07/2017
Permanent Address:
: P.V.D.SRINIVAS
: S/o. SATYANARAYANA.
: D.No:-1-3-6,
: Vinayaka Temple Street,
: Meraka Veedhi, Kovvur,
: West Godavari Dist.
: Andhra Pradesh-534350.
6. Role: - Worked on Fully design of Electrical Services like Lighting, Small Power and Cable Routing, LV Single Line
Diagram, Preparing Lightning Protection Layout, Earthing Schematic Layout. Interacting with Client and Contractor.
Preparation of Transformer Sizing Calculation and DG Sizing Calculation, Supervision of Work Execution at site etc.,
LT Panel Inspection at Vendor’s Factory. Preparation of Panel Board Schedule. Preparing Bill of Quantities.
PROJECTS HANDLED: MC CONSULTING ENGINEERS, HYDERABAD.
M/s. VISHNUNIVAS P.A.C. AT TIRUPATI.
Proposed PILGRIM’S AMMUNITY CENTRE AT TIRUPATI; Site Area is approximately 1,00,000 S.ft.
Role: - Worked on Fully design of Electrical Services like Lighting, Small Power, Cable Routing and UPS Layout, LV
Single Line Diagram, UPS Sizing, Earthing Schematic Layout. Preparation of Transformer Sizing Calculation and DG
Sizing Calculation, Preparation of Panel Board Schedule. Preparing Bill of Quantities.
M/s. GITAMS UNIVERSITY, RANGA REDDY DIST., HYDERABAD.
Proposed New Educational Building and Temporary Campus at Rudhraram; Site Area is approximately 50,000 S.ft.
Role: - Worked on Fully design of Electrical Services like Lighting, Small Power, Cable Routing and UPS Layout, LV
Single Line Diagram, UPS Sizing, Earthing Schematic Layout. Preparation of Transformer Sizing Calculation and DG
Sizing Calculation, Preparation of Panel Board Schedule. Preparing Bill of Quantities.
PERSOANL DETAILS:
PASSPORT:
Passport Number : G2916568
Date of Issue : 19/07/2007
Date of Expire : 18/07/2017
Permanent Address:
: P.V.D.SRINIVAS
: S/o. SATYANARAYANA.
: D.No:-1-3-6,
: Vinayaka Temple Street,
: Meraka Veedhi, Kovvur,
: West Godavari Dist.
: Andhra Pradesh-534350.