SlideShare a Scribd company logo
1 of 41
Introduction to Estimation
TAPI DIPLOMA ENGINEERING COLLEGE
ESTIMATION
Estimation or estimating is the process of calculating the
quantitiesof various itemsof works involved in theproject.
Costing : It is the process of
determining the probable cost
of the project after Knowing
the quantities of various items
and their unit rate is called
costing
ESTIMATION
Estimation or estimating is the process of calculating the
quantities of various items of works involved in the project.
ESTIMATE
Estimate is a process of calculating the quantities and costs of the
variousitemsrequired inconnectionwiththework.
Quantity Surveying :
It is the process of calculating
the quantities of various
items of work for any
construction work.
NECESSITY OF ESTIMATES
To knowabout theapproximatecostof the
building construction.
Tocalculate the tax of thebuilding
Tofix the rent of building
The know about the various items of works
involved in the building construction andarrange
the available materials of theconstruction.
Toarrange the laboursof theconstructionworks.
Take theapproval forthegovernment projects.
Tohaving the loan from thebank.
1) DRAWINGS
If the drawings are not clear and without complete dimensions the
preparation of estimation become very difficult. So, it is very essential
before preparing an estimate.
2) SPECIFICATIONS
a) General Specifications:
This gives the nature, quality of work and materials in general terms to be
used in various parts of wok. It helps to form a general idea of building.
b) Detailed Specifications:
This gives the detailed description of the various items of work laying down
the Quantities and qualities of materials, their proportions, the method of
preparation workmanship and execution of work.
DATA REQUIRED TO PREPARE AN ESTIMATE
3) RATES
For preparing the estimate the unit rates of each item of work are
required.
1. For arriving at the unit rates of each item.
2. The rates of various materials to be used in the construction.
3. The cost of transport materials.
4. The wages of labor, skilled or unskilled of masons, carpenters,
Amador, etc.,
LUMPSUM:
While preparing an estimate, it is not possible to work out in detail
in case of petty items. Items other than civil engineering such items
are called lump sum items or simply L.S.Items.
DATA REQUIRED TO PREPARE AN ESTIMATE
DATA REQUIRED TO PREPARE AN ESTIMATE
QUALITIES OF QUANTITY SURVEYOR/ESTIMATOR
Thequantitysurveyor must bewell versed with the
drawing of work.
He should be able toread thedrawing correctlyand
bill the quantitiesaccurately.
Heshould have the knowledgeof theconstruction
procedure
He should be able towrite thedescriptionof different
works.
He should able toprepare the scheduleof the project
Heshould beable tovalueall variations underthe
contract.
To Prepare an estimate
To prepare specifications
To carry out survey of buildings and land.
To carry out rate analysis
To finalise the final accounts.
To supervise engineering structure during execution.
To prepare work execution schedule
To work as arbitrator
To carry out valuations of the property
To advise the architect and the local authorities about
the estimated cost of the project and construction of the
structure.
DUTIES OF A QUANTITY SURVEYOR OR ESTIMATOR
The estimates may be divided in to the following categories:-
(1) Preliminary or Approximate estimate.
(2) Detailed estimate.
(3) Quantity estimate
(4) Revised estimate
(5) Supplementary estimate.
(6) Supplementary & Revised estimate
(7) Annual repair & maintenance estimate.
TYPES OF ESTIMATE
Preliminary Estimate is prepared by various ways for different
structures as mentioned below :
 Buildings
Per Unit Basis – Per student for schools and hostels, per class
room for schools, per bed for hospitals, per seat for cinema
and theatre halls, per tenement for residential buildings.
Plinth area basis
Cubic content basis
Appx. Quantity method
 Roads and Highways – Per km basis depending upon nature of
road, width and thickness of metalling.
 Irrigation Channels
Per km basis
Per hectare basis (Area of land commanded)
PRELIMINARY ESTIMATE
 Bridges and Culverts – Per running meter of span depending
upon type of structure, type and depth of foundation.
 Sewerage and Water Supply Project
Per head of population served
Per hectare basis (Area covered)
 Over Head water Tank – Per liter or per gallon of tank
depending upon type of structure and height of tank.
PRELIMINARY ESTIMATE (Ctd.)
 It is the accurate estimate prepared by working out quantities of
each items of work.
 It is prepared in two stages –
 Details of measurements and calculation of quantities.
 Abstract of estimated cost – 3% to 5% of estimated cost is added to
cover miscellaneous expenditure
 Detailed estimate is prepared work-wise.
 Detailed estimate consists of –
 Report
 General Specifications
 Detailed specifications
 Drawings
 Calculation and designs
 Analysis of rates
 Detailed estimate is prepared for technical sanction, for
arranging contract and for execution of project.
DETAILED ESTIMATE
QUANTITY ESTIMATE
This is a complete estimate or list of quantities for all items of
work required to complete the concerned project.
The quantity of each individual item of work is worked out from
respective dimensions on the drawing of the structure.
To find the cost of an item its quantity is multiplied by the rate
per unit for that item.
The purpose of the bill of quantities is to provide a complete list
of quantities necessary for the completion of any engineering
project and when priced gives the estimated cost of the project.
 Revised estimate is prepared when original sanctioned
estimate is likely to exceed more than 5%.
 When expenditure on work is likely to exceed amount of
administrative sanction by more than 10%
 When there are material deviation from original proposal even
though cost may be met from sanctioned cost.
 It is accompanied by comparative statement showing
variations in each item of works and reason for the same.
REVISED ESTIMATE
 It is the fresh detailed estimate of the additional works in
addition to the original estimate.
 It is required when further development is required during the
progress of work.
 Abstract should show the amount of original estimate and
total amount including supplementary amount.
SUPPLEMENTARY ESTIMATE
 When a work is partially abandoned and estimated cost of
remaining work is less than 95% of original sanctioned
estimate.
 When there are material deviations and changes in the design
 If at any time before or during the execution of work, it is
found that original estimate is excessive then divisional
officer may sanction a revised estimate of reduced amount.
SUPPLEMENTARY AND REVISED
ESTIMATE
 It is prepared to maintain structure or work in proper order
and safe condition
 For buildings like white washing, painting, minor repairs etc.
 For road works A.R. estimate provides for patch repairing,
repairs of bridges and culverts etc.
ANNUAL REPAIR OR MAINTENANCE
ESTIMATE (A.R/A.M ESTIMATE)
1. Service unit method :
•The service unit indicates the most important, unit in a
structure. The entire structure is divided into number of
service units. For example, in a schoo1 building, the service
unit is a class room.
•The rate of service unit is decided from the information of
similar construction in the area. Then, approximate cost of a
structure = Number of service units in the structure x Cost of
service unit in a similar existing structure. The service units
for various structures are given in the table below:
METHODS OF PREPARING APPROXIMATE ESTIMATE
SERVICE UNIT METHOD
•Plinth area = Area of the building at the plinth level,
measured out to out of walls.
The estimates are prepared on the basis of plinth
areas of the various buildings proposed to be constructed.
The rates are being arrived at the dividing the total cost of
construction with its plinth area.
•The following documents are attached with the estimate.
(a)Line plan with brief specifications.
(b)Cost of various services added i.e. electric and water supply
etc.
(c)North line should be shown clearly on line plan.
PLINTH AREA METHOD
Floor Area Plinth Area
•Floor area = Plinth area - area of walls
•In the calculation of area of walls, the thickness of the wall
shall be inclusive of finishes and dado if the height of such
finish is more than 1 m from floor finish .
The following shall be included in the wall area
{i) Door and other openings in the wall.
(ii} Built in cupboard appearing within a height of 2.2 m
from floor.
(iii) Flues which are within the wall.
(iv) Intermediate columns.
FLOOR AREA METHOD
•The carpet area is the floor area less the area of the
following portions (as per IS : 3861)
(i) Verandah
(ii) Corridor, Passage .
(iii) Entrance hall and Porch
(iv) Stair case
(v) Bathroom and W.C.
(vi) Kitchen and pantry
(vii) Store, machine room for lift
(viii) Shaft for sanitary pipes, etc.
Estimated cost = Carpet area x Carpet area rate
CARPET AREA METHOD
•In this method the cost of water supply, drainage,
electrification, etc. ancillary works is estimated as some
percentage of the total construction cost of building.
Cost-Percentage Item of total cost
1. Water supply = 4%
2. drainage = 4%
3. Electrical installation = 5 to 8%.
PERCENTAGE METHOD
•In this method, the cost per m3 used as a base for finding
out approximate cost of the proposed building.
•Cubical content of the building = Plinth area x height
of building
•While calculating the height of building, the depth below
plinth is not considered. If the roof is sloping, average height
is taken. Normally, distance between floor level and slab top
level is taken as the height.
Approximate cost of proposed building= Total cubical
content of building x Cube rate
CUBICAL CONTENT METHOD
•This method is useful in case of buildings which have several
similar bays.
A bay is a space from centre to centre of two successive
columns. A typical interior bay is selected and its total cost is
worked out.
•Approximate cost of proposed building =Number of
bays *Cost of one bay .
Following points are to be noted :
(i) Necessary corrections should be made for end bays due
to end walls.
(ii) Sufficient allowance should be made to compensate for
the small things that are over-looked.
TYPICAL BAY METHOD
EMPIRICAL EQUATIONS OF CBRI
•The quantities of materials and labours required for a particular
residential building can be worked out with help of certain
empirical equations developed by CBRI (Central Building
Research Institute Roorkee).
•Following are such equations: A -=Plinth area of building in m2.
1. Cement in tonnes = 0.153 A + 0.57
2. Sand in cu m =0.47 A- 7
3. Aggregate (C.A.) in cu.m -=0.145 A + 1.5
4. Bricks in Nos. = 226 A + 6680
5. Steel in quintal = 0.213 A - 3.14
6. Mason in Nos. = 1.335 A + 28
7. Mazdoor in Nos. = 4.766 A - 32
APPROXIMATE QUANTITIES METHOD
•In this method, various quantities are worked out with the help
of many short cuts. For instance, the wall foundations are
measured in linear measurements i.e. in running metres.
•The approximate quantities of items such as excavation,
foundation PCC, brick masonry up to plinth, D.P.C. are
computed per running length and with the help of rates of
these items, a fairly accurate price per running metre is
obtained.. This price when multiplied by the total running
measurements gives the approximate cost of the building up to
plinth level.
COST COMPARISON METHOD
•This method is suitable for the estimate of prototype
structures. For example when prototype staff quarters or
railway stations etc, are required to be estimated
approximately then the estimate for such prototype works are
prepared by comparing the previous cost with the present
market rates, normally be increasing the past cost on a
percentage basis.
IMPORTANT TERMINOLOGY
 Provisional Sum
Prime Cost
Provisional Quantities
Spot Items
Day Work
Contingencies
Work Charged Establishment
Charges
Water Charges
Over Head Charges
•Provisional sum is the amount provided in the estimate and bill
of quantities for some specialised work to be carried out by a
specialist firm; whose details not known at the time of preparing
estimate.
•e.g. installation of lift installation of air conditioners shifting of
water lines, sewer lines electrical fittings, etc. For such items, a
reasonable amount is provided in the estimate and in the bill of
quantities, known as provisional sum.
PROVISIONAL SUM
•When quantities of various items are being worked out, it is not
always possible to define everything necessary for the completion
of the proposed building. Certain items such as, water supply
fittings Sanitary fittings door and window fittings, etc. are to be
decided by the architect in consultation with his client at some
future date.
•Hence, the details of such items are not worked out at the time of
inviting tenders, but for the execution of such items, a lumpsum
amount is put up in the bill of quantities. This amount is Some
known as Prime cost.
PRIME COST
• When the quantities of a particular item are not certain,
provisional quantities are provided separately for such items. For
this purpose, measurements of the item are taken usual but kept
separately in the bill of quantities and marked as “Provisional”
•For a building if the nature of soil is uncertain, and if it is
thought that extra depth of foundation, will be required then
normal quantities of earthwork, foundation concrete and brick
work will be calculated from the dimensions given in the drawing
and the additional quantities of earthwork, foundation concrete
and brickwork due to the probable extra depth are worked out
separately and these additional quantities are marked as
Provisional quantities.
PROVISIONAL QUANTITIES
• There are certain items for which it is not possible for the
estimator to fix an amount without seeing and studying them in
detail. Such items are known as “spot items”.
•The estimate of such items can be prepared only after inspection
and taking detailed measurements at site.
•Some of the spot items are as follows
demolishing existing structures.
Constructing openings in the existing wall
Clearing the site
Connecting an old building to a new building
SPOT ITEMS
• The term day work' is used to denote a procedure of costing or
valuing an item of work on the basis of the materials used, the
actual time taken by the labourers and the equipment employed.
•The day work is adopted for certain complicated items of work
which can not be measured as
1.Design in the plaster work
2 .Front architectural finish of a building
3 .Work under water Ornamental door, etc.
are valued and paid by day work.
DAY WORK
• For drinking purpose of the workers and for the work,
arrangement of water either by sinking tube well or municipality
becomes necessary.
• In order to meet up the expense an amount of 1 to 1.5% of the
total cost of materials and labour has been provided in the
analysis of rate.
WATER CHARGES
OVERHEAD CHARGES
Overhead charges include general office expenses, rents, taxes,
salaries of office staff, and other costs which are indirect expenses and not
productive expenses on the job.
The overhead charges may be under thee two heads :
• Establishment (office staff)
• Stationary, Printing
• Postage
• Travelling expenses
• Telephone
• Rent
• Taxes
• Electrical bills, etc.
a. General overheads :
b. Job overheads:
• Salary of engineers
• Supervisors Handling of materials
• It Indicates incidental expenses of miscellaneous character
which cannot be classified under any distinct item. (3% to 5%
of the estimated cost is provided to allow for contingencies)
CONTINGENCIES
WORK-CHARGED ESTABLISHMENT
•During the construction of a project considerable number of
skilled supervisors, work assistance, watch men etc., are employed
on temporary basis. The salaries of these persons are drawn from
the L.S. amount allotted towards the work charged establishment.
•Work charged establishment charge is charged directly to work a
Lump -Sum amount of 1.5 to 2% of the estimated cost is provided
towards the work charged establishment.
THANKING YOU

More Related Content

What's hot

Approximate estimate
Approximate estimateApproximate estimate
Approximate estimatePrasad Manerikar
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & managementManit Agarwal
 
Foundation types
Foundation typesFoundation types
Foundation typesAshwini Ingale
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2ArunRavi43
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)Waqas Aslam
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionAshwiniChaudhari13
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringAabid Ansar
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and CostingSakshi Kirar
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial buildinglckr117
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of RatesRaj Shah
 
Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costingJanak Mehta
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimateGanesh Tatikonda
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Detailed specifications
Detailed specificationsDetailed specifications
Detailed specificationsSimran Vats
 

What's hot (20)

Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Building Components
Building ComponentsBuilding Components
Building Components
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Foundation types
Foundation typesFoundation types
Foundation types
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 
Earthwork and excavation
Earthwork  and  excavationEarthwork  and  excavation
Earthwork and excavation
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and Costing
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costing
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Detailed specifications
Detailed specificationsDetailed specifications
Detailed specifications
 

Similar to Introduction to estimation

Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptTauheedKhan45
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).pptNaumanIjaz12
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Padmasinh Patil
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for buildingHimani762003
 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIALNat Rice
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing2cd
 
ESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdfESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdfsuchitamantry2002
 
Estimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptxEstimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptxcricketreview
 
Quantity Survey and Estimation basic terms
Quantity Survey and Estimation basic termsQuantity Survey and Estimation basic terms
Quantity Survey and Estimation basic termsmeghajain275
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptBALAMURUGANR53
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptSOUMITRAMUDI
 
Introduction to Quantity Surveying .pptx
Introduction to Quantity Surveying .pptxIntroduction to Quantity Surveying .pptx
Introduction to Quantity Surveying .pptxNSHYAMANANDASINGH
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
EEEC pdf.pdf
EEEC pdf.pdfEEEC pdf.pdf
EEEC pdf.pdfBSuresh26
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a buildingswethasekhar5
 
Aiet e&c lecture_notes
Aiet  e&c lecture_notesAiet  e&c lecture_notes
Aiet e&c lecture_notesDr.K.Mohan Das
 

Similar to Introduction to estimation (20)

Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.ppt
 
Ecv
EcvEcv
Ecv
 
Lec05.pptx
Lec05.pptxLec05.pptx
Lec05.pptx
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).ppt
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing
 
ESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdfESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdf
 
Estimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptxEstimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptx
 
Quantity Survey and Estimation basic terms
Quantity Survey and Estimation basic termsQuantity Survey and Estimation basic terms
Quantity Survey and Estimation basic terms
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
Estimation_and_Costing.ppt
Estimation_and_Costing.pptEstimation_and_Costing.ppt
Estimation_and_Costing.ppt
 
Introduction to Quantity Surveying .pptx
Introduction to Quantity Surveying .pptxIntroduction to Quantity Surveying .pptx
Introduction to Quantity Surveying .pptx
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
EEEC pdf.pdf
EEEC pdf.pdfEEEC pdf.pdf
EEEC pdf.pdf
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a building
 
type of cost Estimation
type of cost Estimationtype of cost Estimation
type of cost Estimation
 
Aiet e&c lecture_notes
Aiet  e&c lecture_notesAiet  e&c lecture_notes
Aiet e&c lecture_notes
 

Recently uploaded

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

Introduction to estimation

  • 1. Introduction to Estimation TAPI DIPLOMA ENGINEERING COLLEGE
  • 2. ESTIMATION Estimation or estimating is the process of calculating the quantitiesof various itemsof works involved in theproject. Costing : It is the process of determining the probable cost of the project after Knowing the quantities of various items and their unit rate is called costing ESTIMATION Estimation or estimating is the process of calculating the quantities of various items of works involved in the project.
  • 3. ESTIMATE Estimate is a process of calculating the quantities and costs of the variousitemsrequired inconnectionwiththework. Quantity Surveying : It is the process of calculating the quantities of various items of work for any construction work.
  • 4. NECESSITY OF ESTIMATES To knowabout theapproximatecostof the building construction. Tocalculate the tax of thebuilding Tofix the rent of building The know about the various items of works involved in the building construction andarrange the available materials of theconstruction. Toarrange the laboursof theconstructionworks. Take theapproval forthegovernment projects. Tohaving the loan from thebank.
  • 5. 1) DRAWINGS If the drawings are not clear and without complete dimensions the preparation of estimation become very difficult. So, it is very essential before preparing an estimate. 2) SPECIFICATIONS a) General Specifications: This gives the nature, quality of work and materials in general terms to be used in various parts of wok. It helps to form a general idea of building. b) Detailed Specifications: This gives the detailed description of the various items of work laying down the Quantities and qualities of materials, their proportions, the method of preparation workmanship and execution of work. DATA REQUIRED TO PREPARE AN ESTIMATE
  • 6. 3) RATES For preparing the estimate the unit rates of each item of work are required. 1. For arriving at the unit rates of each item. 2. The rates of various materials to be used in the construction. 3. The cost of transport materials. 4. The wages of labor, skilled or unskilled of masons, carpenters, Amador, etc., LUMPSUM: While preparing an estimate, it is not possible to work out in detail in case of petty items. Items other than civil engineering such items are called lump sum items or simply L.S.Items. DATA REQUIRED TO PREPARE AN ESTIMATE DATA REQUIRED TO PREPARE AN ESTIMATE
  • 7. QUALITIES OF QUANTITY SURVEYOR/ESTIMATOR Thequantitysurveyor must bewell versed with the drawing of work. He should be able toread thedrawing correctlyand bill the quantitiesaccurately. Heshould have the knowledgeof theconstruction procedure He should be able towrite thedescriptionof different works. He should able toprepare the scheduleof the project Heshould beable tovalueall variations underthe contract.
  • 8. To Prepare an estimate To prepare specifications To carry out survey of buildings and land. To carry out rate analysis To finalise the final accounts. To supervise engineering structure during execution. To prepare work execution schedule To work as arbitrator To carry out valuations of the property To advise the architect and the local authorities about the estimated cost of the project and construction of the structure. DUTIES OF A QUANTITY SURVEYOR OR ESTIMATOR
  • 9. The estimates may be divided in to the following categories:- (1) Preliminary or Approximate estimate. (2) Detailed estimate. (3) Quantity estimate (4) Revised estimate (5) Supplementary estimate. (6) Supplementary & Revised estimate (7) Annual repair & maintenance estimate. TYPES OF ESTIMATE
  • 10. Preliminary Estimate is prepared by various ways for different structures as mentioned below :  Buildings Per Unit Basis – Per student for schools and hostels, per class room for schools, per bed for hospitals, per seat for cinema and theatre halls, per tenement for residential buildings. Plinth area basis Cubic content basis Appx. Quantity method  Roads and Highways – Per km basis depending upon nature of road, width and thickness of metalling.  Irrigation Channels Per km basis Per hectare basis (Area of land commanded) PRELIMINARY ESTIMATE
  • 11.  Bridges and Culverts – Per running meter of span depending upon type of structure, type and depth of foundation.  Sewerage and Water Supply Project Per head of population served Per hectare basis (Area covered)  Over Head water Tank – Per liter or per gallon of tank depending upon type of structure and height of tank. PRELIMINARY ESTIMATE (Ctd.)
  • 12.  It is the accurate estimate prepared by working out quantities of each items of work.  It is prepared in two stages –  Details of measurements and calculation of quantities.  Abstract of estimated cost – 3% to 5% of estimated cost is added to cover miscellaneous expenditure  Detailed estimate is prepared work-wise.  Detailed estimate consists of –  Report  General Specifications  Detailed specifications  Drawings  Calculation and designs  Analysis of rates  Detailed estimate is prepared for technical sanction, for arranging contract and for execution of project. DETAILED ESTIMATE
  • 13. QUANTITY ESTIMATE This is a complete estimate or list of quantities for all items of work required to complete the concerned project. The quantity of each individual item of work is worked out from respective dimensions on the drawing of the structure. To find the cost of an item its quantity is multiplied by the rate per unit for that item. The purpose of the bill of quantities is to provide a complete list of quantities necessary for the completion of any engineering project and when priced gives the estimated cost of the project.
  • 14.  Revised estimate is prepared when original sanctioned estimate is likely to exceed more than 5%.  When expenditure on work is likely to exceed amount of administrative sanction by more than 10%  When there are material deviation from original proposal even though cost may be met from sanctioned cost.  It is accompanied by comparative statement showing variations in each item of works and reason for the same. REVISED ESTIMATE
  • 15.  It is the fresh detailed estimate of the additional works in addition to the original estimate.  It is required when further development is required during the progress of work.  Abstract should show the amount of original estimate and total amount including supplementary amount. SUPPLEMENTARY ESTIMATE
  • 16.  When a work is partially abandoned and estimated cost of remaining work is less than 95% of original sanctioned estimate.  When there are material deviations and changes in the design  If at any time before or during the execution of work, it is found that original estimate is excessive then divisional officer may sanction a revised estimate of reduced amount. SUPPLEMENTARY AND REVISED ESTIMATE
  • 17.  It is prepared to maintain structure or work in proper order and safe condition  For buildings like white washing, painting, minor repairs etc.  For road works A.R. estimate provides for patch repairing, repairs of bridges and culverts etc. ANNUAL REPAIR OR MAINTENANCE ESTIMATE (A.R/A.M ESTIMATE)
  • 18. 1. Service unit method : •The service unit indicates the most important, unit in a structure. The entire structure is divided into number of service units. For example, in a schoo1 building, the service unit is a class room. •The rate of service unit is decided from the information of similar construction in the area. Then, approximate cost of a structure = Number of service units in the structure x Cost of service unit in a similar existing structure. The service units for various structures are given in the table below: METHODS OF PREPARING APPROXIMATE ESTIMATE
  • 20. •Plinth area = Area of the building at the plinth level, measured out to out of walls. The estimates are prepared on the basis of plinth areas of the various buildings proposed to be constructed. The rates are being arrived at the dividing the total cost of construction with its plinth area. •The following documents are attached with the estimate. (a)Line plan with brief specifications. (b)Cost of various services added i.e. electric and water supply etc. (c)North line should be shown clearly on line plan. PLINTH AREA METHOD
  • 22. •Floor area = Plinth area - area of walls •In the calculation of area of walls, the thickness of the wall shall be inclusive of finishes and dado if the height of such finish is more than 1 m from floor finish . The following shall be included in the wall area {i) Door and other openings in the wall. (ii} Built in cupboard appearing within a height of 2.2 m from floor. (iii) Flues which are within the wall. (iv) Intermediate columns. FLOOR AREA METHOD
  • 23. •The carpet area is the floor area less the area of the following portions (as per IS : 3861) (i) Verandah (ii) Corridor, Passage . (iii) Entrance hall and Porch (iv) Stair case (v) Bathroom and W.C. (vi) Kitchen and pantry (vii) Store, machine room for lift (viii) Shaft for sanitary pipes, etc. Estimated cost = Carpet area x Carpet area rate CARPET AREA METHOD
  • 24. •In this method the cost of water supply, drainage, electrification, etc. ancillary works is estimated as some percentage of the total construction cost of building. Cost-Percentage Item of total cost 1. Water supply = 4% 2. drainage = 4% 3. Electrical installation = 5 to 8%. PERCENTAGE METHOD
  • 25. •In this method, the cost per m3 used as a base for finding out approximate cost of the proposed building. •Cubical content of the building = Plinth area x height of building •While calculating the height of building, the depth below plinth is not considered. If the roof is sloping, average height is taken. Normally, distance between floor level and slab top level is taken as the height. Approximate cost of proposed building= Total cubical content of building x Cube rate CUBICAL CONTENT METHOD
  • 26. •This method is useful in case of buildings which have several similar bays. A bay is a space from centre to centre of two successive columns. A typical interior bay is selected and its total cost is worked out. •Approximate cost of proposed building =Number of bays *Cost of one bay . Following points are to be noted : (i) Necessary corrections should be made for end bays due to end walls. (ii) Sufficient allowance should be made to compensate for the small things that are over-looked. TYPICAL BAY METHOD
  • 27. EMPIRICAL EQUATIONS OF CBRI •The quantities of materials and labours required for a particular residential building can be worked out with help of certain empirical equations developed by CBRI (Central Building Research Institute Roorkee). •Following are such equations: A -=Plinth area of building in m2. 1. Cement in tonnes = 0.153 A + 0.57 2. Sand in cu m =0.47 A- 7 3. Aggregate (C.A.) in cu.m -=0.145 A + 1.5 4. Bricks in Nos. = 226 A + 6680 5. Steel in quintal = 0.213 A - 3.14 6. Mason in Nos. = 1.335 A + 28 7. Mazdoor in Nos. = 4.766 A - 32
  • 28. APPROXIMATE QUANTITIES METHOD •In this method, various quantities are worked out with the help of many short cuts. For instance, the wall foundations are measured in linear measurements i.e. in running metres. •The approximate quantities of items such as excavation, foundation PCC, brick masonry up to plinth, D.P.C. are computed per running length and with the help of rates of these items, a fairly accurate price per running metre is obtained.. This price when multiplied by the total running measurements gives the approximate cost of the building up to plinth level.
  • 29. COST COMPARISON METHOD •This method is suitable for the estimate of prototype structures. For example when prototype staff quarters or railway stations etc, are required to be estimated approximately then the estimate for such prototype works are prepared by comparing the previous cost with the present market rates, normally be increasing the past cost on a percentage basis.
  • 30.
  • 31. IMPORTANT TERMINOLOGY  Provisional Sum Prime Cost Provisional Quantities Spot Items Day Work Contingencies Work Charged Establishment Charges Water Charges Over Head Charges
  • 32. •Provisional sum is the amount provided in the estimate and bill of quantities for some specialised work to be carried out by a specialist firm; whose details not known at the time of preparing estimate. •e.g. installation of lift installation of air conditioners shifting of water lines, sewer lines electrical fittings, etc. For such items, a reasonable amount is provided in the estimate and in the bill of quantities, known as provisional sum. PROVISIONAL SUM
  • 33. •When quantities of various items are being worked out, it is not always possible to define everything necessary for the completion of the proposed building. Certain items such as, water supply fittings Sanitary fittings door and window fittings, etc. are to be decided by the architect in consultation with his client at some future date. •Hence, the details of such items are not worked out at the time of inviting tenders, but for the execution of such items, a lumpsum amount is put up in the bill of quantities. This amount is Some known as Prime cost. PRIME COST
  • 34. • When the quantities of a particular item are not certain, provisional quantities are provided separately for such items. For this purpose, measurements of the item are taken usual but kept separately in the bill of quantities and marked as “Provisional” •For a building if the nature of soil is uncertain, and if it is thought that extra depth of foundation, will be required then normal quantities of earthwork, foundation concrete and brick work will be calculated from the dimensions given in the drawing and the additional quantities of earthwork, foundation concrete and brickwork due to the probable extra depth are worked out separately and these additional quantities are marked as Provisional quantities. PROVISIONAL QUANTITIES
  • 35. • There are certain items for which it is not possible for the estimator to fix an amount without seeing and studying them in detail. Such items are known as “spot items”. •The estimate of such items can be prepared only after inspection and taking detailed measurements at site. •Some of the spot items are as follows demolishing existing structures. Constructing openings in the existing wall Clearing the site Connecting an old building to a new building SPOT ITEMS
  • 36. • The term day work' is used to denote a procedure of costing or valuing an item of work on the basis of the materials used, the actual time taken by the labourers and the equipment employed. •The day work is adopted for certain complicated items of work which can not be measured as 1.Design in the plaster work 2 .Front architectural finish of a building 3 .Work under water Ornamental door, etc. are valued and paid by day work. DAY WORK
  • 37. • For drinking purpose of the workers and for the work, arrangement of water either by sinking tube well or municipality becomes necessary. • In order to meet up the expense an amount of 1 to 1.5% of the total cost of materials and labour has been provided in the analysis of rate. WATER CHARGES
  • 38. OVERHEAD CHARGES Overhead charges include general office expenses, rents, taxes, salaries of office staff, and other costs which are indirect expenses and not productive expenses on the job. The overhead charges may be under thee two heads : • Establishment (office staff) • Stationary, Printing • Postage • Travelling expenses • Telephone • Rent • Taxes • Electrical bills, etc. a. General overheads : b. Job overheads: • Salary of engineers • Supervisors Handling of materials
  • 39. • It Indicates incidental expenses of miscellaneous character which cannot be classified under any distinct item. (3% to 5% of the estimated cost is provided to allow for contingencies) CONTINGENCIES
  • 40. WORK-CHARGED ESTABLISHMENT •During the construction of a project considerable number of skilled supervisors, work assistance, watch men etc., are employed on temporary basis. The salaries of these persons are drawn from the L.S. amount allotted towards the work charged establishment. •Work charged establishment charge is charged directly to work a Lump -Sum amount of 1.5 to 2% of the estimated cost is provided towards the work charged establishment.