Introduction
It doesn’t seem to matter what happens, whether it be in the oil sector
(a memorial garden for Piper Alpha in 1988), aviation, maritime or
construction, we all embark on "relentless pursuit of delivering incident free
operations" but focus only on the behaviours of the operators where clearly
the operator has often been set up to fail through poor plant design or
unworkable procedures. We often say, “some good came from these
accidents”, but do we really learn the lessons of experience? Do we really
spend money wisely to stop it happening again? The truth is that many
organizations are still not at a level of safety performance that they should
be and this, in part, can be put down to not applying HFE design principles
early in a project.
The Real Costs of “Human Factors”
Many organisations do not understand the true cost of accidents and other
events with the potential for loss. (Adapted from Shorrock and Hughes
2001) Worse still, such loss-producing events are often simply accepted as
the inevitable consequence of doing business in an imperfect world. The
costs are sometimes seen in terms of fines or action from regulators and
compensation, or the knock-on effects on insurance premiums. In high-
hazard industries, the potential for loss of life is also clear.
But many of these same problems are also creating other losses associated
with reduced production and availability, falling profits, loss of goodwill
and reputation, legal expenses, cost of emergency equipment and
supplies, returned goods and other quality problems, repair and replace-
ment of damaged equipment, and so on.
© Monaco Engineering Solutions
THE CRITICALITY OF
HUMAN FACTORS ENGINEERING
INTEGRATION
Tim Southam
Principal Human Factors Engineer
Memorial Garden for Piper Alpha
It is now widely accepted that the human contribution to accidents and loss-producing events is enormous. Figures of 80
to 90% are often quoted as being “due to” or associated with human failure, but these figures have no meaning, since
they fail to answer some basic questions such as:
© Monaco Engineering Solutions
“When do the problems occur in the system lifecycle?”
“How and why do they occur?”
“How can they be prevented, reduced and mitigated?”
© Monaco Engineering Solutions
Human Factors (HF) are all those things that enhance or improve human performance in the
workplace. As a discipline, human factors is concerned with understanding interactions between people and other
elements of complex systems. Human factors applies scientific knowledge and principles as well as lessons learned
from previous incidents and operational experience to optimise human wellbeing, overall system performance and
reliability.
The discipline contributes to the design and evaluation of organisations, tasks, jobs and equipment, environments,
products and systems. It focuses on the inherent characteristics, needs, abilities and limitations of people and the
development of sustainable and safe working cultures.
Human Factors Engineering (HFE) focuses on the application of human factors knowledge to the
design and construction of technical systems. The objective is to ensure systems are designed in a way that
optimises the human contribution to production, sometimes called usability, and minimises potential for design-
induced risks to health, personal or process safety or environmental performance.
The major oil companies recognise that Human Factors Engineering has an important contribution to make to
ensure the quality, safety and fitness for purpose of equipment and facilities used in the industry. But rarely
integrate the processes well and this leads to fragmented results.
The IOGP 454 – HFE in projects, adopts a practical, cost-effective and balanced approach to applying HFE on oil and
gas projects. It recognises that many HFE issues can be controlled simply by ensuring compliance with existing
technical standards. However, there are times where there is a gap between what can be specialised in technical
standards and the design features needed to support efficient, reliable and safe human interventions to achieve
maximum performance.
This involves three elements for controlling HFE related risk:
1. Compliance with relevant technical specifications.
2. HFE specific design analysis and design validation.
3. Organisational competence to deliver appropriate stand-
ards of HFE quality control.
Compliance will normally satisfy the requirements from national
regulators for evidence that HFE has been adequately considered
in design. Despite recent Improvement Notices for lack of HFE in
Safety Case submissions, the process allows projects to
demonstrate that consideration has been given to reducing the
HFE risks and the potential for human failure to a level that can
be shown to be As Low As Reasonably Practicable (ALARP)
through engineering and design.
Major capital projects in the oil sector are only possible with
support from third-party engineering contractors. At one extreme
are global companies whom in partnership or consortia take on
the role of principal engineering contractor, sometimes from
Front End Engineering Design (FEED) through to Construction and
Commissioning.
At the other extreme are the very many consultancies and
vendors providing specialist services or equipment across the
industry. An important aim of HFE Integration is to help
engineering contractors and suppliers deliver a higher standard of
support by providing consistency in terms of:
 Understanding of the scope of HFE and how it relates to
other engineering disciplines;
 The value that investment in HFE is expected to deliver;
 The key activities and expected deliverables;
 The competence – in terms of professional training and
experience – expected of individuals assigned responsibility
for managing, conducting or supporting HFE activities; and
 The type of organisational arrangements likely to be
required within a project team.
© Monaco Engineering Solutions
The integration of HFE is based around the following principles:
 It recognises the relative lack of maturity of HFE as a professional discipline in the oil and gas sector. It therefore
defines a number of levels of HFE competence balancing the need to allow maximum re-use of the existing skills
and experience of the more traditional discipline engineers against the need for HFE professionals.
 It only recommends activities or controls that are not a normal part of oil and gas projects where experience has
shown that there is a compelling need to introduce them in order to provide adequate quality control.
 The competence, activities, deliverables and level of verification required are customised to the assessed
complexity, in HFE terms, of individual projects.
 A decision on how to implement HFE on any project is left to the discretion of the project management (many of
which do not really understand the subject). Someone must assess the project for HFE risk with the competence
and experience to make an informed judgement.
Call to Action
If we really mean these things and put into practice the sentiments that are always felt after a disaster, then let us make
the overriding statement “no harm to people, plant and environment” a reality, then we need to start walking the talk
and ensure that HFE is integrated into all projects. It is an opportunity to minimise the potential for human failure by
making our projects user centric from the start and reduce the often tragic events that leaves loved ones serving a life
sentence for actions left undone.
© Monaco Engineering Solutions
MINIMISING RISK
MAXIMISING PERFORMANCE
Monaco Engineering Solutions
Americas ● Europe ● Middle East ● Africa ● Asia Pacific
mes.info@mes-international.com

More Related Content

What's hot

Eyad Sallam International IFSEC and OSH Arabia conference presentation
Eyad Sallam International IFSEC and OSH Arabia conference presentationEyad Sallam International IFSEC and OSH Arabia conference presentation
Eyad Sallam International IFSEC and OSH Arabia conference presentationEyad Sallam
 
MasterCommanderMay15Final copy
MasterCommanderMay15Final copyMasterCommanderMay15Final copy
MasterCommanderMay15Final copyMichael Timpane
 
Human Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk GovernanceHuman Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk GovernanceThe Windsdor Consulting Group, Inc.
 
IRJET- Risk Management in Residential Project by Primavera Software
IRJET- Risk Management in Residential Project by Primavera SoftwareIRJET- Risk Management in Residential Project by Primavera Software
IRJET- Risk Management in Residential Project by Primavera SoftwareIRJET Journal
 
Business continuity and recovery planning for manufacturing
Business continuity and recovery planning for manufacturingBusiness continuity and recovery planning for manufacturing
Business continuity and recovery planning for manufacturingARC Advisory Group
 
Integrated Risk Informed Decision Making
Integrated Risk Informed Decision MakingIntegrated Risk Informed Decision Making
Integrated Risk Informed Decision MakingLeonam Guimarães
 
Organizational Failure (LSCITS EngD 2012)
Organizational Failure (LSCITS EngD 2012)Organizational Failure (LSCITS EngD 2012)
Organizational Failure (LSCITS EngD 2012)Ian Sommerville
 
12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)Glen Alleman
 
Bridging Hazard Recognition Knowledge and Competency for Process and Occupati...
Bridging Hazard Recognition Knowledge and Competency for Process and Occupati...Bridging Hazard Recognition Knowledge and Competency for Process and Occupati...
Bridging Hazard Recognition Knowledge and Competency for Process and Occupati...Decision Point Associates
 
Aqarius design professional liability
Aqarius design professional liabilityAqarius design professional liability
Aqarius design professional liabilityACHASM
 
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...Project Controls Expo
 
AJ Buono Project 1 Risk Identification
AJ Buono Project 1 Risk IdentificationAJ Buono Project 1 Risk Identification
AJ Buono Project 1 Risk IdentificationAlexander J. Buono
 
Vladimir Ivensky. "Business Risks: What Happens when Leaders are Committed to...
Vladimir Ivensky. "Business Risks: What Happens when Leaders are Committed to...Vladimir Ivensky. "Business Risks: What Happens when Leaders are Committed to...
Vladimir Ivensky. "Business Risks: What Happens when Leaders are Committed to...Vladimir Ivensky, CIH, CSP
 

What's hot (20)

Construction Accident Risk Management
Construction Accident Risk ManagementConstruction Accident Risk Management
Construction Accident Risk Management
 
Eyad Sallam International IFSEC and OSH Arabia conference presentation
Eyad Sallam International IFSEC and OSH Arabia conference presentationEyad Sallam International IFSEC and OSH Arabia conference presentation
Eyad Sallam International IFSEC and OSH Arabia conference presentation
 
Fenwick SHP0412
Fenwick SHP0412Fenwick SHP0412
Fenwick SHP0412
 
MasterCommanderMay15Final copy
MasterCommanderMay15Final copyMasterCommanderMay15Final copy
MasterCommanderMay15Final copy
 
Human Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk GovernanceHuman Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk Governance
 
SHP0510Fenwick
SHP0510FenwickSHP0510Fenwick
SHP0510Fenwick
 
IRJET- Risk Management in Residential Project by Primavera Software
IRJET- Risk Management in Residential Project by Primavera SoftwareIRJET- Risk Management in Residential Project by Primavera Software
IRJET- Risk Management in Residential Project by Primavera Software
 
Business continuity and recovery planning for manufacturing
Business continuity and recovery planning for manufacturingBusiness continuity and recovery planning for manufacturing
Business continuity and recovery planning for manufacturing
 
Integrated Risk Informed Decision Making
Integrated Risk Informed Decision MakingIntegrated Risk Informed Decision Making
Integrated Risk Informed Decision Making
 
Organizational Failure (LSCITS EngD 2012)
Organizational Failure (LSCITS EngD 2012)Organizational Failure (LSCITS EngD 2012)
Organizational Failure (LSCITS EngD 2012)
 
12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)
 
Bridging Hazard Recognition Knowledge and Competency for Process and Occupati...
Bridging Hazard Recognition Knowledge and Competency for Process and Occupati...Bridging Hazard Recognition Knowledge and Competency for Process and Occupati...
Bridging Hazard Recognition Knowledge and Competency for Process and Occupati...
 
Aqarius design professional liability
Aqarius design professional liabilityAqarius design professional liability
Aqarius design professional liability
 
Ecm
EcmEcm
Ecm
 
Unknowns systemic risks and prioritization - David Hulett
Unknowns systemic risks and prioritization - David Hulett Unknowns systemic risks and prioritization - David Hulett
Unknowns systemic risks and prioritization - David Hulett
 
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
 
QRA for overall project risk - Dr David Hillson
QRA for overall project risk - Dr David HillsonQRA for overall project risk - Dr David Hillson
QRA for overall project risk - Dr David Hillson
 
AJ Buono Project 1 Risk Identification
AJ Buono Project 1 Risk IdentificationAJ Buono Project 1 Risk Identification
AJ Buono Project 1 Risk Identification
 
Vladimir Ivensky. "Business Risks: What Happens when Leaders are Committed to...
Vladimir Ivensky. "Business Risks: What Happens when Leaders are Committed to...Vladimir Ivensky. "Business Risks: What Happens when Leaders are Committed to...
Vladimir Ivensky. "Business Risks: What Happens when Leaders are Committed to...
 
Intro to ERM
Intro to ERMIntro to ERM
Intro to ERM
 

Viewers also liked

Raport z monitoringu polityki senioralnej w Będzinie
Raport z monitoringu polityki senioralnej w BędzinieRaport z monitoringu polityki senioralnej w Będzinie
Raport z monitoringu polityki senioralnej w BędzinieStowarzyszenie Bona Fides
 
Raport z monitoringu realizacji Konińskiego Budżetu Obywatelskiego 2016
Raport z monitoringu realizacji Konińskiego Budżetu Obywatelskiego 2016Raport z monitoringu realizacji Konińskiego Budżetu Obywatelskiego 2016
Raport z monitoringu realizacji Konińskiego Budżetu Obywatelskiego 2016Waldemar Duczmal
 
사업계획서 동화나라 초대장
사업계획서   동화나라 초대장사업계획서   동화나라 초대장
사업계획서 동화나라 초대장KIMSONGCHOI
 
마당발 빅데이터 최주호 사업계획서(2016스마트창작터-3차)
마당발 빅데이터 최주호 사업계획서(2016스마트창작터-3차)마당발 빅데이터 최주호 사업계획서(2016스마트창작터-3차)
마당발 빅데이터 최주호 사업계획서(2016스마트창작터-3차)주호 최
 
Wzór umowy użyczenia woes
Wzór umowy użyczenia woesWzór umowy użyczenia woes
Wzór umowy użyczenia woesWaldemar Duczmal
 
Propozycja współpracy WOES
Propozycja współpracy WOESPropozycja współpracy WOES
Propozycja współpracy WOESWaldemar Duczmal
 
스마트창작터사업계획서
스마트창작터사업계획서스마트창작터사업계획서
스마트창작터사업계획서herrsong
 

Viewers also liked (10)

Raport z monitoringu polityki senioralnej w Będzinie
Raport z monitoringu polityki senioralnej w BędzinieRaport z monitoringu polityki senioralnej w Będzinie
Raport z monitoringu polityki senioralnej w Będzinie
 
통일만두
통일만두통일만두
통일만두
 
Raport z monitoringu realizacji Konińskiego Budżetu Obywatelskiego 2016
Raport z monitoringu realizacji Konińskiego Budżetu Obywatelskiego 2016Raport z monitoringu realizacji Konińskiego Budżetu Obywatelskiego 2016
Raport z monitoringu realizacji Konińskiego Budżetu Obywatelskiego 2016
 
사업계획서 동화나라 초대장
사업계획서   동화나라 초대장사업계획서   동화나라 초대장
사업계획서 동화나라 초대장
 
Madera evs 2015
Madera evs 2015Madera evs 2015
Madera evs 2015
 
마당발 빅데이터 최주호 사업계획서(2016스마트창작터-3차)
마당발 빅데이터 최주호 사업계획서(2016스마트창작터-3차)마당발 빅데이터 최주호 사업계획서(2016스마트창작터-3차)
마당발 빅데이터 최주호 사업계획서(2016스마트창작터-3차)
 
Wzór umowy użyczenia woes
Wzór umowy użyczenia woesWzór umowy użyczenia woes
Wzór umowy użyczenia woes
 
Propozycja współpracy WOES
Propozycja współpracy WOESPropozycja współpracy WOES
Propozycja współpracy WOES
 
Escuela online arcoiris
Escuela online arcoirisEscuela online arcoiris
Escuela online arcoiris
 
스마트창작터사업계획서
스마트창작터사업계획서스마트창작터사업계획서
스마트창작터사업계획서
 

Similar to THE CRITICALITY OF HUMAN FACTORS ENGINEERING INTEGRATION

Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...
Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...
Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...EPC Group
 
Risk Management and Cost Overruns due to delays in Construction Project using...
Risk Management and Cost Overruns due to delays in Construction Project using...Risk Management and Cost Overruns due to delays in Construction Project using...
Risk Management and Cost Overruns due to delays in Construction Project using...IRJET Journal
 
Optimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations TrainingOptimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations TrainingKarl Kolmetz
 
Optimizing Petroleum Refining Unit Operations Training Course
Optimizing Petroleum Refining Unit Operations Training CourseOptimizing Petroleum Refining Unit Operations Training Course
Optimizing Petroleum Refining Unit Operations Training CourseKarl Kolmetz
 
Reliability Engineering and Terotechnology
Reliability Engineering and TerotechnologyReliability Engineering and Terotechnology
Reliability Engineering and TerotechnologyChristian Enoval
 
WCM KM Shutdowns_2013_Eng_4MB
WCM KM Shutdowns_2013_Eng_4MBWCM KM Shutdowns_2013_Eng_4MB
WCM KM Shutdowns_2013_Eng_4MBPaul Casteleijn
 
Information Technology Risk Management
Information Technology Risk ManagementInformation Technology Risk Management
Information Technology Risk ManagementGlen Alleman
 
Advanced Relief Valve and Process Flare Systems Training
Advanced Relief Valve and Process Flare Systems TrainingAdvanced Relief Valve and Process Flare Systems Training
Advanced Relief Valve and Process Flare Systems TrainingKarl Kolmetz
 
Advanced Training for Pressure Relieving and Flaring Systems
Advanced Training for Pressure Relieving and Flaring SystemsAdvanced Training for Pressure Relieving and Flaring Systems
Advanced Training for Pressure Relieving and Flaring SystemsKarl Kolmetz
 
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...Karl Kolmetz
 
A crux of oil & gas industry operations
A crux of  oil & gas  industry operationsA crux of  oil & gas  industry operations
A crux of oil & gas industry operationsGuires
 
Session W1 - Reliable Risk Quantification For Project Cost and Schedule
Session W1 - Reliable Risk Quantification For Project Cost and ScheduleSession W1 - Reliable Risk Quantification For Project Cost and Schedule
Session W1 - Reliable Risk Quantification For Project Cost and ScheduleProject Controls Expo
 
Bts whitepaper addressinglifesafetychallengesinindustrialsettings
Bts whitepaper  addressinglifesafetychallengesinindustrialsettingsBts whitepaper  addressinglifesafetychallengesinindustrialsettings
Bts whitepaper addressinglifesafetychallengesinindustrialsettingsJeremyGarcia46
 
vskills facility management expert sample material
vskills facility management expert sample materialvskills facility management expert sample material
vskills facility management expert sample materialVskills
 
Reliability - the missing leg of the stool final proof
Reliability - the missing leg of the stool final proofReliability - the missing leg of the stool final proof
Reliability - the missing leg of the stool final proofDonald Dunn
 
Comparing RCM and PMO2000
Comparing RCM and PMO2000Comparing RCM and PMO2000
Comparing RCM and PMO2000Steve Turner
 

Similar to THE CRITICALITY OF HUMAN FACTORS ENGINEERING INTEGRATION (20)

Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...
Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...
Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...
 
Risk Management and Cost Overruns due to delays in Construction Project using...
Risk Management and Cost Overruns due to delays in Construction Project using...Risk Management and Cost Overruns due to delays in Construction Project using...
Risk Management and Cost Overruns due to delays in Construction Project using...
 
Optimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations TrainingOptimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations Training
 
Optimizing Petroleum Refining Unit Operations Training Course
Optimizing Petroleum Refining Unit Operations Training CourseOptimizing Petroleum Refining Unit Operations Training Course
Optimizing Petroleum Refining Unit Operations Training Course
 
Reliability Engineering and Terotechnology
Reliability Engineering and TerotechnologyReliability Engineering and Terotechnology
Reliability Engineering and Terotechnology
 
WCM KM Shutdowns_2013_Eng_4MB
WCM KM Shutdowns_2013_Eng_4MBWCM KM Shutdowns_2013_Eng_4MB
WCM KM Shutdowns_2013_Eng_4MB
 
Information Technology Risk Management
Information Technology Risk ManagementInformation Technology Risk Management
Information Technology Risk Management
 
Practical reliability
Practical reliabilityPractical reliability
Practical reliability
 
Advanced Relief Valve and Process Flare Systems Training
Advanced Relief Valve and Process Flare Systems TrainingAdvanced Relief Valve and Process Flare Systems Training
Advanced Relief Valve and Process Flare Systems Training
 
Advanced Training for Pressure Relieving and Flaring Systems
Advanced Training for Pressure Relieving and Flaring SystemsAdvanced Training for Pressure Relieving and Flaring Systems
Advanced Training for Pressure Relieving and Flaring Systems
 
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
 
A crux of oil & gas industry operations
A crux of  oil & gas  industry operationsA crux of  oil & gas  industry operations
A crux of oil & gas industry operations
 
Lean MRO Office AVM
Lean MRO Office AVMLean MRO Office AVM
Lean MRO Office AVM
 
Integrated risk management
Integrated risk managementIntegrated risk management
Integrated risk management
 
Session W1 - Reliable Risk Quantification For Project Cost and Schedule
Session W1 - Reliable Risk Quantification For Project Cost and ScheduleSession W1 - Reliable Risk Quantification For Project Cost and Schedule
Session W1 - Reliable Risk Quantification For Project Cost and Schedule
 
Bts whitepaper addressinglifesafetychallengesinindustrialsettings
Bts whitepaper  addressinglifesafetychallengesinindustrialsettingsBts whitepaper  addressinglifesafetychallengesinindustrialsettings
Bts whitepaper addressinglifesafetychallengesinindustrialsettings
 
vskills facility management expert sample material
vskills facility management expert sample materialvskills facility management expert sample material
vskills facility management expert sample material
 
Reliability - the missing leg of the stool final proof
Reliability - the missing leg of the stool final proofReliability - the missing leg of the stool final proof
Reliability - the missing leg of the stool final proof
 
Comparing RCM and PMO2000
Comparing RCM and PMO2000Comparing RCM and PMO2000
Comparing RCM and PMO2000
 
Effective Communications in Business Continuity Planning
Effective Communications in Business Continuity PlanningEffective Communications in Business Continuity Planning
Effective Communications in Business Continuity Planning
 

Recently uploaded

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Recently uploaded (20)

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

THE CRITICALITY OF HUMAN FACTORS ENGINEERING INTEGRATION

  • 1. Introduction It doesn’t seem to matter what happens, whether it be in the oil sector (a memorial garden for Piper Alpha in 1988), aviation, maritime or construction, we all embark on "relentless pursuit of delivering incident free operations" but focus only on the behaviours of the operators where clearly the operator has often been set up to fail through poor plant design or unworkable procedures. We often say, “some good came from these accidents”, but do we really learn the lessons of experience? Do we really spend money wisely to stop it happening again? The truth is that many organizations are still not at a level of safety performance that they should be and this, in part, can be put down to not applying HFE design principles early in a project. The Real Costs of “Human Factors” Many organisations do not understand the true cost of accidents and other events with the potential for loss. (Adapted from Shorrock and Hughes 2001) Worse still, such loss-producing events are often simply accepted as the inevitable consequence of doing business in an imperfect world. The costs are sometimes seen in terms of fines or action from regulators and compensation, or the knock-on effects on insurance premiums. In high- hazard industries, the potential for loss of life is also clear. But many of these same problems are also creating other losses associated with reduced production and availability, falling profits, loss of goodwill and reputation, legal expenses, cost of emergency equipment and supplies, returned goods and other quality problems, repair and replace- ment of damaged equipment, and so on. © Monaco Engineering Solutions THE CRITICALITY OF HUMAN FACTORS ENGINEERING INTEGRATION Tim Southam Principal Human Factors Engineer Memorial Garden for Piper Alpha
  • 2. It is now widely accepted that the human contribution to accidents and loss-producing events is enormous. Figures of 80 to 90% are often quoted as being “due to” or associated with human failure, but these figures have no meaning, since they fail to answer some basic questions such as: © Monaco Engineering Solutions “When do the problems occur in the system lifecycle?” “How and why do they occur?” “How can they be prevented, reduced and mitigated?”
  • 3. © Monaco Engineering Solutions Human Factors (HF) are all those things that enhance or improve human performance in the workplace. As a discipline, human factors is concerned with understanding interactions between people and other elements of complex systems. Human factors applies scientific knowledge and principles as well as lessons learned from previous incidents and operational experience to optimise human wellbeing, overall system performance and reliability. The discipline contributes to the design and evaluation of organisations, tasks, jobs and equipment, environments, products and systems. It focuses on the inherent characteristics, needs, abilities and limitations of people and the development of sustainable and safe working cultures. Human Factors Engineering (HFE) focuses on the application of human factors knowledge to the design and construction of technical systems. The objective is to ensure systems are designed in a way that optimises the human contribution to production, sometimes called usability, and minimises potential for design- induced risks to health, personal or process safety or environmental performance. The major oil companies recognise that Human Factors Engineering has an important contribution to make to ensure the quality, safety and fitness for purpose of equipment and facilities used in the industry. But rarely integrate the processes well and this leads to fragmented results. The IOGP 454 – HFE in projects, adopts a practical, cost-effective and balanced approach to applying HFE on oil and gas projects. It recognises that many HFE issues can be controlled simply by ensuring compliance with existing technical standards. However, there are times where there is a gap between what can be specialised in technical standards and the design features needed to support efficient, reliable and safe human interventions to achieve maximum performance.
  • 4. This involves three elements for controlling HFE related risk: 1. Compliance with relevant technical specifications. 2. HFE specific design analysis and design validation. 3. Organisational competence to deliver appropriate stand- ards of HFE quality control. Compliance will normally satisfy the requirements from national regulators for evidence that HFE has been adequately considered in design. Despite recent Improvement Notices for lack of HFE in Safety Case submissions, the process allows projects to demonstrate that consideration has been given to reducing the HFE risks and the potential for human failure to a level that can be shown to be As Low As Reasonably Practicable (ALARP) through engineering and design. Major capital projects in the oil sector are only possible with support from third-party engineering contractors. At one extreme are global companies whom in partnership or consortia take on the role of principal engineering contractor, sometimes from Front End Engineering Design (FEED) through to Construction and Commissioning. At the other extreme are the very many consultancies and vendors providing specialist services or equipment across the industry. An important aim of HFE Integration is to help engineering contractors and suppliers deliver a higher standard of support by providing consistency in terms of:  Understanding of the scope of HFE and how it relates to other engineering disciplines;  The value that investment in HFE is expected to deliver;  The key activities and expected deliverables;  The competence – in terms of professional training and experience – expected of individuals assigned responsibility for managing, conducting or supporting HFE activities; and  The type of organisational arrangements likely to be required within a project team. © Monaco Engineering Solutions
  • 5. The integration of HFE is based around the following principles:  It recognises the relative lack of maturity of HFE as a professional discipline in the oil and gas sector. It therefore defines a number of levels of HFE competence balancing the need to allow maximum re-use of the existing skills and experience of the more traditional discipline engineers against the need for HFE professionals.  It only recommends activities or controls that are not a normal part of oil and gas projects where experience has shown that there is a compelling need to introduce them in order to provide adequate quality control.  The competence, activities, deliverables and level of verification required are customised to the assessed complexity, in HFE terms, of individual projects.  A decision on how to implement HFE on any project is left to the discretion of the project management (many of which do not really understand the subject). Someone must assess the project for HFE risk with the competence and experience to make an informed judgement. Call to Action If we really mean these things and put into practice the sentiments that are always felt after a disaster, then let us make the overriding statement “no harm to people, plant and environment” a reality, then we need to start walking the talk and ensure that HFE is integrated into all projects. It is an opportunity to minimise the potential for human failure by making our projects user centric from the start and reduce the often tragic events that leaves loved ones serving a life sentence for actions left undone. © Monaco Engineering Solutions MINIMISING RISK MAXIMISING PERFORMANCE Monaco Engineering Solutions Americas ● Europe ● Middle East ● Africa ● Asia Pacific mes.info@mes-international.com