Hydraulics and hydrology of hydropower
Hydropower Engineering I
Contents
1. Hydraulic Theory
2. Hydrologic analysis for hydropower
3. Flow Duration Analysis
4. Other Hydrologic Considerations
2.1 Hydraulic theory
 Energy-work approach:
 Work (W) = Force x Distance in the direction of force
 Work = weight of water x the distance it falls
gh
V
W w
w


• Where: ρw is density of water; g- acceleration
due to gravity; Vw- volume of water falling; h- the
vertical distance the water falls.
• It is conventional in hydropower computations to
treat h as the effective head that is utilized in
producing power.
 The h has been purposely designated as slightly below
the headwater or forebay level. Hence, in the Figure, the
losses of head in the water moving through the penstock
to the entrance of the turbine have been accounted for in
positioning the elemental cube.
• Effective head (h) is
the difference between
energy head at the
entrance to the turbine
and the energy head at
the exit of the draft
tube.
 Power (P) = Work / time
t
V
Q
Note
Qgh
t
gh
V
t
W
P
w
w
w
w



 

• Where Q is discharge.
• P is in watt. To compare kilowatts and
horsepower remember that:
hp
kw P
P 746
.
0

 Energy Equation Approach
 Mathematical development in terms of energy grade
lines and hydraulic grade lines, using the Energy
Equation.
.
2
2
2
2
2
2
1
1
2
1
Cons
h
z
p
g
v
z
p
g
v
f 








• where V1 = water velocity at
point 1
• p1 = pressure at point 1
• γ = ρg = specific weight of
water
• Z1 = potential head at point 1
referenced to the datum
• V2 =water velocity at point 2
• p2 =pressure at point 2
• Z2 =potential head at point 2
• hf = head loss in flow passage
between points 1 and 2
 Referring to the
Figure, the Energy
equation for a
hydropower
installation is first
written between point
1 at the surface of the
forebay and point 2 at
the entrance to the
turbine as
)
1
(
...
2
2
2
2
2
2
1
1
2
1
f
h
z
p
g
v
z
p
g
v








 Then the Energy equation is written between points
2 and 3, the surface of the water at the exit to the
draft tube:
 Where h is effective head on the turbine
 Recognizing that for practical purposes V1, p1, and
p3 are equal to zero, then solving for p2/γ in Eq. 1,
the result is:
)
2
(
...
2
2
3
3
2
3
2
2
2
2
h
z
p
g
v
z
p
g
v








)
3
(
...
2
2
2
2
1
2
f
h
z
g
v
z
p





)
4
...(
2
2
2
2
2
2
2
3
3
1
3
2
3
2
2
2
2
1
2
2
3
2
3
2
2
2
2
g
v
h
z
z
h
z
g
v
z
h
z
g
v
z
g
v
z
g
v
z
p
g
v
h
f
f


























 Because the Energy equation defines terms in
units of Kilogram –meter per Kilogram of water
flowing through the system, it should be
recognized that the Kilograms of water flowing
through the turbine per unit of time by definition is
ρgq.
 Now recognizing that energy per unit of time is
power, it is simple to calculate by multiplying Eq.
(4) and ρgq or γq to obtain the theoretical power
delivered by the water to the turbine as γqh which
is the theoretical power
2.2 Hydrology of hydropower
 Hydrology is the study of the occurrence,
movement and distribution of water on, above,
and within the earth's surface.
 Parameters necessary in making hydropower
studies are water discharge (Q) and hydraulic
head (h). The measurement and analyses of
these parameters are primarily hydrologic
problems.
 Determination of the head for a proposed
hydropower plant is a surveying problem that
identifies elevations of water surfaces as they are
expected to exist during operation of the
hydropower plant.
2.2 ctd.
 In some reconnaissance studies, good contour
maps may be sufficient to determine the value for
the hydraulic head.
 Because the headwater elevation and tailwater
elevations of the impoundment can vary with
stream flow, it is frequently necessary to develop
headwater and tailwater curves that show
variation with time, river discharge, or operational
features of the hydropower project.
2.3 Flow duration analysis
 Flow Duration Curves: is a
plot of flow versus the
percent of time a particular
flow can be expected to be
exceeded.
 A flow duration curve merely
reorders the flows in order of
magnitude instead of the true
time ordering of flows in a
flow versus time plot.
 Two methods
 The rank ordered technique
and
 The class-interval technique.
0
20
40
60
80
100
120
140
0 20 40 60 80 100
Discharge
in
m3/s Exceedence in %
2.3 ctd.
 The rank-ordered technique: considers a total time
series of flows that represent equal increments of time for
each measurement value, such as mean daily, weekly, or
monthly flows, and ranks the flows according to
magnitude.
 The rank-ordered values are assigned individual order
numbers, the largest beginning with order 1. The order
numbers are then divided by the total number in the
record and multiplied by 100 to obtain the percent of time
that the mean flow has been equaled or exceeded during
the period of record being considered.
 The flow value is then plotted versus the respective
computed exceedance percentage.
 Naturally, the longer the record, the more statistically
2.3 ctd.
 The class-interval technique: is slightly different in
that the time series of flow values are categorized
into class intervals. The classes range from the
highest flow value to the lowest value in the time
series. A tally is made of the number of flows in
each, and by summation the number of values
greater than a given upper limit of the class can be
determined.
 The number of flows greater than the upper limit of a
class interval can be divided by the total number of
flow values in the data series to obtain the
exceedance percentage.
Extrapolation of Flow Duration Data
to Un-gauged Sites
 Method 1 (Gladwell, et
al. 1978): Useful in
regions where stream
flow does not vary
directly with the area of
the contributing
drainage.
 The procedure is to
make plots of flow
duration curves for all
gauged streams within a
drainage basin, as
shown in the Fig.A.
Figure A
 Develop a family of
parametric duration
curves in which flow (Q) is
plotted against the
average annual runoff (R),
at the respective gauges
for several exceedance
percentages. A separate
curve is developed for
each exceedance interval
used.
 A correlation analysis is
then performed to obtain
the best-fitting curve for
the data taken from the
measured records of
stream flow. The result is
a parametric flow duration
Figure B
 Method 2, (Heitz, 1978): The values of flow for each
flow duration for a given exceedance point are
divided by the average annual discharge, Q, to give
a dimensionless flow term. These are then plotted
against the particular exceedance interval on
logarithmic probability paper as shown in the Figure
(next slide) to give a dimensionless flow duration
curve.
 Then a best-fitting curve is developed for a particular
area having homogeneous hydrology so that a single
curve results that relates a characteristic
dimensionless flow term to the exceedance
percentage.
 It is easy to recognize that at the limits of the curve
the reliability of the curve is questionable because
Figure C
Determination of Average Annual
Discharge
 To use the parametric flow duration curves
effectively, it is necessary to determine the
average annual discharge, Q, at the point or
location on the stream for which a hydropower
analysis is to be made.
 A procedure for making that determination
follows.
 First an accurate isohyetal map of normal annual
precipitation (NAP) of the river basin involved must
be obtained or developed. Isohyetal maps contain
lines representing equal precipitation for a
geographic region.
 Care should be taken that the map represents the
same period of record as the stream flow data for
which flow duration data are available and needed.
 Then, utilizing the records of average annual
precipitation input to the basins at measured
streams nearby or having similar hydrologic
characteristics, a runoff coefficient is estimated
for the drainage basin being studied. This value
can be rather subjective in determination and
thus represents a place for making a
considerable error.
 Much care should be exercised in estimating the
annual runoff coefficient. The product of this
coefficient and the computed normal annual
precipitation input to the basin and the basin area
can be used to calculate the average annual
discharge using the formula:
 Q = kPA,
 Where Q is average annual discharge
 k is annual runoff coefficient as a decimal value
 Given: A stream location on the Clearwater River in
Idaho has been identified for making a hydropower
analysis. The location is at a point where no stream
flow record is available. A parametric flow duration
curve has been developed for the streams in the river
basin being studied and is shown in Fig. B. A normal-
annual precipitation map showing the isohyetal lines
is presented in Fig. D. The planimetering of the
respective areas between isohyetal lines for the map
areas of Fig. B is indicated in Table Below and an
annual runoff coefficient based on the work of Emmert
(1979) has been estimated to be 0.73.
Designatio
n
P b/n Isohytal lines
(in)
Planimeterd area on map
(in2)
% of total
area
A 60 0.46 1.24
B 60 8.16 22.01
C 55 27.41 73.92
D 50 1.05 2.83
Total 37.08 100
 Required:
Determine the
average annual
discharge at the
marked location
and develop
ordinate values for
a flow duration
curve at the site
designated.
Figure D: Normal-annual-precipitation
A
B
C
D
B
B
C
C
 Analysis and solution: First, determine average annual
precipitation input to basin using data from the above table.
 Convert this to volume units of runoff per year R. The map
used had a scale of 1: 250,000, so
 Because the parametric flow duration curve was developed
on the basis of average annual runoff expressed in
(ft3/sec)(day) units, it is necessary to convert to
R(ft3/sec)(day) which is done by multiplying by 365 (the
number of days in year), so: 1739 x 365 = 643.7
 Entering the parametric flow duration curve of Fig. C or using
the regression equation for each specified exceedance
percentage, it is possible to arrive at the following values for
the ordinates of a specific flow duration curve for flow at the
outflow station designated on Fig. D:
in
A
A
A
A
A
P
A
P
A
P
A
P
P
D
C
B
A
D
D
C
C
B
B
A
A
02
.
56








s
ft
yr
ft
R
3
3
10
2
1739
10
485
.
5
73
.
0
12
144
250000
08
.
37
02
.
56








2.4 Other hydrologic
considerations
 Tailwater Relationships:
As releases of water over
spillways and any other
releases into the stream
immediately below a
hydropower plant are
made, the tailwater
elevation below the outlet to
the turbines will fluctuate.
Therefore, it is important to
develop a tailwater
elevation versus river
discharge curve over the
0 20 40 60 80 100
Elevation
(m
amsl)
Discharge m3/s
2.4 Ctd.
 Area capacity curves: Most
hydropower developments
involve an impoundment
behind a dam. As the water
in storage in the
impoundment is released the
headwater elevation changes
and this will influence the
design of the plant and the
pattern of operation.
Therefore, it is necessary to
have a storage volume
versus impoundment surface
elevation curve.
Area-Capacity curve
2.4 ctd.
 Reservoir Rule Curves: When releases from
reservoirs are made, the schedule of releases is
often dictated by considerations other than just
meeting the flow demands for power production.
The needs for municipal water supply, for flood
control, and for downstream use dictate certain
restraints. The restraints are conventionally taken
care of by developing reservoir operation rule
curves that can guide operating personnel in
making necessary changes in reservoir water
releases.
2.4 ctd.
 Evaporation Loss Evaluation: Where there is an
impoundment involved in a hydropower development
there is need to assess the effect of evaporation loss
from the reservoir surface.
 Spillway Design Flood Analysis: Many hydropower
developments require a dam or a diversion that
blocks the normal river flow. This then requires that
provisions be made for passing flood flows. Spillway
design flood analysis treats a unique type of
hydrology that concerns the occurrence of rare events
of extreme flooding. It is customary on larger dams
and dams where failure might cause a major disaster
to design the spillway to pass the probable maximum
flood. For small dams, spillways are designed to pass
a standard project flood.
Mini projects
 Generation of hydropower from heads as law as 1.0
m:
 Discus the hydraulic theory,
 Application, concerns and prospects in using such
ultra low head hydropower in Ethiopia.
 Pumped-hydro power development:
 Discuss the hydraulic theory
 Application, concerns, and prospects in Ethiopia
 House-hold level hydropower generation:
 Application, concerns, and prospects in Ethiopia
Quiz
1. Write the basic parameters to be obtained in
deciding the hydropower potential of a site.
2. Load factor is defined as the ratio of average
load to peak load, if the load factor of a certain
project is 0.33, what does this value mean in
practical application, discuss practical measures
taken to increase the load factor.
3. Flow duration curve is associated with
hydropower development that involves:
4. What about mass flow curve is association:
5. Write the hydrologic considerations in
hydropower development:
6. What are you going to do?
 Consider the load
curve and the
plant capacity.
 What are you
going to do?
Time
Load
6 12 18
24
Deficit
Surplus
Supply
Demand

More Related Content

What's hot

Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13World University of Bangladesh
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Latif Hyder Wadho
 
Hydrology and hydraulics for design design
Hydrology and hydraulics for design designHydrology and hydraulics for design design
Hydrology and hydraulics for design designavirup naskar
 
Gravity dam stability analysis
Gravity dam stability analysisGravity dam stability analysis
Gravity dam stability analysisDivya Vishnoi
 
Seminar on Hydrological modelling
Seminar on Hydrological modellingSeminar on Hydrological modelling
Seminar on Hydrological modellingvishvam Pancholi
 
Flood forecasting presentation final
Flood forecasting presentation finalFlood forecasting presentation final
Flood forecasting presentation finalAbir Mohammad
 
Watermill to microhydropower ethiopia
Watermill to microhydropower ethiopiaWatermill to microhydropower ethiopia
Watermill to microhydropower ethiopiaFrezerSeid
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth damssaibabu48
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrographSatish Taji
 
RESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONRESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONLaxmanBhoyewar
 
Parshall Flume and Discharge Measurement Accessories
Parshall Flume and Discharge Measurement AccessoriesParshall Flume and Discharge Measurement Accessories
Parshall Flume and Discharge Measurement AccessoriesPratap Bikram Shahi
 
Factors affecting runoff
Factors affecting runoffFactors affecting runoff
Factors affecting runoffdheeraj byrapu
 
hydropower water conveyance system
hydropower water conveyance systemhydropower water conveyance system
hydropower water conveyance systemmarif tahayy
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic StructuresDamalla Rams
 
Chapter 7:Non Uniform G.V.F
Chapter 7:Non Uniform G.V.FChapter 7:Non Uniform G.V.F
Chapter 7:Non Uniform G.V.FBinu Khadka
 

What's hot (20)

Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)
 
Hydrology and hydraulics for design design
Hydrology and hydraulics for design designHydrology and hydraulics for design design
Hydrology and hydraulics for design design
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Gravity dam stability analysis
Gravity dam stability analysisGravity dam stability analysis
Gravity dam stability analysis
 
Stream Gauging
Stream GaugingStream Gauging
Stream Gauging
 
Seminar on Hydrological modelling
Seminar on Hydrological modellingSeminar on Hydrological modelling
Seminar on Hydrological modelling
 
Flood forecasting presentation final
Flood forecasting presentation finalFlood forecasting presentation final
Flood forecasting presentation final
 
DAMS AND ITS TYPES
DAMS AND ITS TYPESDAMS AND ITS TYPES
DAMS AND ITS TYPES
 
Watermill to microhydropower ethiopia
Watermill to microhydropower ethiopiaWatermill to microhydropower ethiopia
Watermill to microhydropower ethiopia
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
 
Hydrology
HydrologyHydrology
Hydrology
 
RESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONRESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATION
 
Parshall Flume and Discharge Measurement Accessories
Parshall Flume and Discharge Measurement AccessoriesParshall Flume and Discharge Measurement Accessories
Parshall Flume and Discharge Measurement Accessories
 
Factors affecting runoff
Factors affecting runoffFactors affecting runoff
Factors affecting runoff
 
hydropower water conveyance system
hydropower water conveyance systemhydropower water conveyance system
hydropower water conveyance system
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Chapter 7:Non Uniform G.V.F
Chapter 7:Non Uniform G.V.FChapter 7:Non Uniform G.V.F
Chapter 7:Non Uniform G.V.F
 

Similar to CH2 Hydraulics and hydrology of HP.pptx

CH3 Energy&power.pptx
CH3 Energy&power.pptxCH3 Energy&power.pptx
CH3 Energy&power.pptxDawit Girma
 
Determining The Coefficient Of Tr, Α And River Length (L) Of Flood Runoff Mod...
Determining The Coefficient Of Tr, Α And River Length (L) Of Flood Runoff Mod...Determining The Coefficient Of Tr, Α And River Length (L) Of Flood Runoff Mod...
Determining The Coefficient Of Tr, Α And River Length (L) Of Flood Runoff Mod...iosrjce
 
Flow measurement basics
Flow measurement basicsFlow measurement basics
Flow measurement basicsSalman1011
 
An algorithm for design of brick lining for irrigation channels
An algorithm for design of brick lining for irrigation channelsAn algorithm for design of brick lining for irrigation channels
An algorithm for design of brick lining for irrigation channelseSAT Publishing House
 
An algorithm for design of brick lining for irrigation channels
An algorithm for design of brick lining for irrigation channelsAn algorithm for design of brick lining for irrigation channels
An algorithm for design of brick lining for irrigation channelseSAT Journals
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
reservoir detail description Lecture 13,14.pdf
reservoir detail description Lecture 13,14.pdfreservoir detail description Lecture 13,14.pdf
reservoir detail description Lecture 13,14.pdfNazmulHossainSifat
 
Open channel flow equation
Open channel flow equationOpen channel flow equation
Open channel flow equationMrinmoy Majumder
 
Analysis of river flow data to develop stage discharge relationship
Analysis of river flow data to develop stage discharge relationshipAnalysis of river flow data to develop stage discharge relationship
Analysis of river flow data to develop stage discharge relationshipeSAT Journals
 
Analysis of river flow data to develop stage discharge relationship
Analysis of river flow data to develop stage discharge relationshipAnalysis of river flow data to develop stage discharge relationship
Analysis of river flow data to develop stage discharge relationshipeSAT Publishing House
 
Critical flow through an Open channel
Critical flow through an Open channelCritical flow through an Open channel
Critical flow through an Open channelAjoy Kumar Saha
 
Water measurement
Water measurementWater measurement
Water measurementHina Bhatu
 
IRJET- A Review of Synthetic Hydrograph Methods for Design Storm
IRJET-  	  A Review of Synthetic Hydrograph Methods for Design StormIRJET-  	  A Review of Synthetic Hydrograph Methods for Design Storm
IRJET- A Review of Synthetic Hydrograph Methods for Design StormIRJET Journal
 
Calibration of venturi and orifice meters
Calibration of venturi and orifice metersCalibration of venturi and orifice meters
Calibration of venturi and orifice metersHirizza Junko Yamamoto
 
Deck drainage design
Deck drainage designDeck drainage design
Deck drainage designSarita Joshi
 

Similar to CH2 Hydraulics and hydrology of HP.pptx (20)

Poster
PosterPoster
Poster
 
CH3 Energy&power.pptx
CH3 Energy&power.pptxCH3 Energy&power.pptx
CH3 Energy&power.pptx
 
E012662431
E012662431E012662431
E012662431
 
Determining The Coefficient Of Tr, Α And River Length (L) Of Flood Runoff Mod...
Determining The Coefficient Of Tr, Α And River Length (L) Of Flood Runoff Mod...Determining The Coefficient Of Tr, Α And River Length (L) Of Flood Runoff Mod...
Determining The Coefficient Of Tr, Α And River Length (L) Of Flood Runoff Mod...
 
Flow measurement basics
Flow measurement basicsFlow measurement basics
Flow measurement basics
 
An algorithm for design of brick lining for irrigation channels
An algorithm for design of brick lining for irrigation channelsAn algorithm for design of brick lining for irrigation channels
An algorithm for design of brick lining for irrigation channels
 
An algorithm for design of brick lining for irrigation channels
An algorithm for design of brick lining for irrigation channelsAn algorithm for design of brick lining for irrigation channels
An algorithm for design of brick lining for irrigation channels
 
E1072850
E1072850E1072850
E1072850
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
reservoir detail description Lecture 13,14.pdf
reservoir detail description Lecture 13,14.pdfreservoir detail description Lecture 13,14.pdf
reservoir detail description Lecture 13,14.pdf
 
Open channel flow equation
Open channel flow equationOpen channel flow equation
Open channel flow equation
 
Analysis of river flow data to develop stage discharge relationship
Analysis of river flow data to develop stage discharge relationshipAnalysis of river flow data to develop stage discharge relationship
Analysis of river flow data to develop stage discharge relationship
 
Analysis of river flow data to develop stage discharge relationship
Analysis of river flow data to develop stage discharge relationshipAnalysis of river flow data to develop stage discharge relationship
Analysis of river flow data to develop stage discharge relationship
 
Chapter 3.pdf
Chapter 3.pdfChapter 3.pdf
Chapter 3.pdf
 
Critical flow through an Open channel
Critical flow through an Open channelCritical flow through an Open channel
Critical flow through an Open channel
 
Water measurement
Water measurementWater measurement
Water measurement
 
IRJET- A Review of Synthetic Hydrograph Methods for Design Storm
IRJET-  	  A Review of Synthetic Hydrograph Methods for Design StormIRJET-  	  A Review of Synthetic Hydrograph Methods for Design Storm
IRJET- A Review of Synthetic Hydrograph Methods for Design Storm
 
Chapter 4.pdf
Chapter 4.pdfChapter 4.pdf
Chapter 4.pdf
 
Calibration of venturi and orifice meters
Calibration of venturi and orifice metersCalibration of venturi and orifice meters
Calibration of venturi and orifice meters
 
Deck drainage design
Deck drainage designDeck drainage design
Deck drainage design
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

CH2 Hydraulics and hydrology of HP.pptx

  • 1. Chapter 2 Hydraulics and hydrology of hydropower Hydropower Engineering I
  • 2. Contents 1. Hydraulic Theory 2. Hydrologic analysis for hydropower 3. Flow Duration Analysis 4. Other Hydrologic Considerations
  • 3. 2.1 Hydraulic theory  Energy-work approach:  Work (W) = Force x Distance in the direction of force  Work = weight of water x the distance it falls gh V W w w   • Where: ρw is density of water; g- acceleration due to gravity; Vw- volume of water falling; h- the vertical distance the water falls. • It is conventional in hydropower computations to treat h as the effective head that is utilized in producing power.
  • 4.  The h has been purposely designated as slightly below the headwater or forebay level. Hence, in the Figure, the losses of head in the water moving through the penstock to the entrance of the turbine have been accounted for in positioning the elemental cube. • Effective head (h) is the difference between energy head at the entrance to the turbine and the energy head at the exit of the draft tube.
  • 5.  Power (P) = Work / time t V Q Note Qgh t gh V t W P w w w w       • Where Q is discharge. • P is in watt. To compare kilowatts and horsepower remember that: hp kw P P 746 . 0 
  • 6.  Energy Equation Approach  Mathematical development in terms of energy grade lines and hydraulic grade lines, using the Energy Equation. . 2 2 2 2 2 2 1 1 2 1 Cons h z p g v z p g v f          • where V1 = water velocity at point 1 • p1 = pressure at point 1 • γ = ρg = specific weight of water • Z1 = potential head at point 1 referenced to the datum • V2 =water velocity at point 2 • p2 =pressure at point 2 • Z2 =potential head at point 2 • hf = head loss in flow passage between points 1 and 2
  • 7.  Referring to the Figure, the Energy equation for a hydropower installation is first written between point 1 at the surface of the forebay and point 2 at the entrance to the turbine as ) 1 ( ... 2 2 2 2 2 2 1 1 2 1 f h z p g v z p g v        
  • 8.  Then the Energy equation is written between points 2 and 3, the surface of the water at the exit to the draft tube:  Where h is effective head on the turbine  Recognizing that for practical purposes V1, p1, and p3 are equal to zero, then solving for p2/γ in Eq. 1, the result is: ) 2 ( ... 2 2 3 3 2 3 2 2 2 2 h z p g v z p g v         ) 3 ( ... 2 2 2 2 1 2 f h z g v z p      ) 4 ...( 2 2 2 2 2 2 2 3 3 1 3 2 3 2 2 2 2 1 2 2 3 2 3 2 2 2 2 g v h z z h z g v z h z g v z g v z g v z p g v h f f                          
  • 9.  Because the Energy equation defines terms in units of Kilogram –meter per Kilogram of water flowing through the system, it should be recognized that the Kilograms of water flowing through the turbine per unit of time by definition is ρgq.  Now recognizing that energy per unit of time is power, it is simple to calculate by multiplying Eq. (4) and ρgq or γq to obtain the theoretical power delivered by the water to the turbine as γqh which is the theoretical power
  • 10. 2.2 Hydrology of hydropower  Hydrology is the study of the occurrence, movement and distribution of water on, above, and within the earth's surface.  Parameters necessary in making hydropower studies are water discharge (Q) and hydraulic head (h). The measurement and analyses of these parameters are primarily hydrologic problems.  Determination of the head for a proposed hydropower plant is a surveying problem that identifies elevations of water surfaces as they are expected to exist during operation of the hydropower plant.
  • 11. 2.2 ctd.  In some reconnaissance studies, good contour maps may be sufficient to determine the value for the hydraulic head.  Because the headwater elevation and tailwater elevations of the impoundment can vary with stream flow, it is frequently necessary to develop headwater and tailwater curves that show variation with time, river discharge, or operational features of the hydropower project.
  • 12. 2.3 Flow duration analysis  Flow Duration Curves: is a plot of flow versus the percent of time a particular flow can be expected to be exceeded.  A flow duration curve merely reorders the flows in order of magnitude instead of the true time ordering of flows in a flow versus time plot.  Two methods  The rank ordered technique and  The class-interval technique. 0 20 40 60 80 100 120 140 0 20 40 60 80 100 Discharge in m3/s Exceedence in %
  • 13. 2.3 ctd.  The rank-ordered technique: considers a total time series of flows that represent equal increments of time for each measurement value, such as mean daily, weekly, or monthly flows, and ranks the flows according to magnitude.  The rank-ordered values are assigned individual order numbers, the largest beginning with order 1. The order numbers are then divided by the total number in the record and multiplied by 100 to obtain the percent of time that the mean flow has been equaled or exceeded during the period of record being considered.  The flow value is then plotted versus the respective computed exceedance percentage.  Naturally, the longer the record, the more statistically
  • 14. 2.3 ctd.  The class-interval technique: is slightly different in that the time series of flow values are categorized into class intervals. The classes range from the highest flow value to the lowest value in the time series. A tally is made of the number of flows in each, and by summation the number of values greater than a given upper limit of the class can be determined.  The number of flows greater than the upper limit of a class interval can be divided by the total number of flow values in the data series to obtain the exceedance percentage.
  • 15. Extrapolation of Flow Duration Data to Un-gauged Sites  Method 1 (Gladwell, et al. 1978): Useful in regions where stream flow does not vary directly with the area of the contributing drainage.  The procedure is to make plots of flow duration curves for all gauged streams within a drainage basin, as shown in the Fig.A. Figure A
  • 16.  Develop a family of parametric duration curves in which flow (Q) is plotted against the average annual runoff (R), at the respective gauges for several exceedance percentages. A separate curve is developed for each exceedance interval used.  A correlation analysis is then performed to obtain the best-fitting curve for the data taken from the measured records of stream flow. The result is a parametric flow duration Figure B
  • 17.  Method 2, (Heitz, 1978): The values of flow for each flow duration for a given exceedance point are divided by the average annual discharge, Q, to give a dimensionless flow term. These are then plotted against the particular exceedance interval on logarithmic probability paper as shown in the Figure (next slide) to give a dimensionless flow duration curve.  Then a best-fitting curve is developed for a particular area having homogeneous hydrology so that a single curve results that relates a characteristic dimensionless flow term to the exceedance percentage.  It is easy to recognize that at the limits of the curve the reliability of the curve is questionable because
  • 19. Determination of Average Annual Discharge  To use the parametric flow duration curves effectively, it is necessary to determine the average annual discharge, Q, at the point or location on the stream for which a hydropower analysis is to be made.  A procedure for making that determination follows.  First an accurate isohyetal map of normal annual precipitation (NAP) of the river basin involved must be obtained or developed. Isohyetal maps contain lines representing equal precipitation for a geographic region.  Care should be taken that the map represents the same period of record as the stream flow data for which flow duration data are available and needed.
  • 20.  Then, utilizing the records of average annual precipitation input to the basins at measured streams nearby or having similar hydrologic characteristics, a runoff coefficient is estimated for the drainage basin being studied. This value can be rather subjective in determination and thus represents a place for making a considerable error.  Much care should be exercised in estimating the annual runoff coefficient. The product of this coefficient and the computed normal annual precipitation input to the basin and the basin area can be used to calculate the average annual discharge using the formula:  Q = kPA,  Where Q is average annual discharge  k is annual runoff coefficient as a decimal value
  • 21.  Given: A stream location on the Clearwater River in Idaho has been identified for making a hydropower analysis. The location is at a point where no stream flow record is available. A parametric flow duration curve has been developed for the streams in the river basin being studied and is shown in Fig. B. A normal- annual precipitation map showing the isohyetal lines is presented in Fig. D. The planimetering of the respective areas between isohyetal lines for the map areas of Fig. B is indicated in Table Below and an annual runoff coefficient based on the work of Emmert (1979) has been estimated to be 0.73. Designatio n P b/n Isohytal lines (in) Planimeterd area on map (in2) % of total area A 60 0.46 1.24 B 60 8.16 22.01 C 55 27.41 73.92 D 50 1.05 2.83 Total 37.08 100
  • 22.  Required: Determine the average annual discharge at the marked location and develop ordinate values for a flow duration curve at the site designated. Figure D: Normal-annual-precipitation A B C D B B C C
  • 23.  Analysis and solution: First, determine average annual precipitation input to basin using data from the above table.  Convert this to volume units of runoff per year R. The map used had a scale of 1: 250,000, so  Because the parametric flow duration curve was developed on the basis of average annual runoff expressed in (ft3/sec)(day) units, it is necessary to convert to R(ft3/sec)(day) which is done by multiplying by 365 (the number of days in year), so: 1739 x 365 = 643.7  Entering the parametric flow duration curve of Fig. C or using the regression equation for each specified exceedance percentage, it is possible to arrive at the following values for the ordinates of a specific flow duration curve for flow at the outflow station designated on Fig. D: in A A A A A P A P A P A P P D C B A D D C C B B A A 02 . 56         s ft yr ft R 3 3 10 2 1739 10 485 . 5 73 . 0 12 144 250000 08 . 37 02 . 56        
  • 24. 2.4 Other hydrologic considerations  Tailwater Relationships: As releases of water over spillways and any other releases into the stream immediately below a hydropower plant are made, the tailwater elevation below the outlet to the turbines will fluctuate. Therefore, it is important to develop a tailwater elevation versus river discharge curve over the 0 20 40 60 80 100 Elevation (m amsl) Discharge m3/s
  • 25. 2.4 Ctd.  Area capacity curves: Most hydropower developments involve an impoundment behind a dam. As the water in storage in the impoundment is released the headwater elevation changes and this will influence the design of the plant and the pattern of operation. Therefore, it is necessary to have a storage volume versus impoundment surface elevation curve.
  • 27. 2.4 ctd.  Reservoir Rule Curves: When releases from reservoirs are made, the schedule of releases is often dictated by considerations other than just meeting the flow demands for power production. The needs for municipal water supply, for flood control, and for downstream use dictate certain restraints. The restraints are conventionally taken care of by developing reservoir operation rule curves that can guide operating personnel in making necessary changes in reservoir water releases.
  • 28. 2.4 ctd.  Evaporation Loss Evaluation: Where there is an impoundment involved in a hydropower development there is need to assess the effect of evaporation loss from the reservoir surface.  Spillway Design Flood Analysis: Many hydropower developments require a dam or a diversion that blocks the normal river flow. This then requires that provisions be made for passing flood flows. Spillway design flood analysis treats a unique type of hydrology that concerns the occurrence of rare events of extreme flooding. It is customary on larger dams and dams where failure might cause a major disaster to design the spillway to pass the probable maximum flood. For small dams, spillways are designed to pass a standard project flood.
  • 29. Mini projects  Generation of hydropower from heads as law as 1.0 m:  Discus the hydraulic theory,  Application, concerns and prospects in using such ultra low head hydropower in Ethiopia.  Pumped-hydro power development:  Discuss the hydraulic theory  Application, concerns, and prospects in Ethiopia  House-hold level hydropower generation:  Application, concerns, and prospects in Ethiopia
  • 30. Quiz 1. Write the basic parameters to be obtained in deciding the hydropower potential of a site. 2. Load factor is defined as the ratio of average load to peak load, if the load factor of a certain project is 0.33, what does this value mean in practical application, discuss practical measures taken to increase the load factor. 3. Flow duration curve is associated with hydropower development that involves: 4. What about mass flow curve is association: 5. Write the hydrologic considerations in hydropower development:
  • 31. 6. What are you going to do?  Consider the load curve and the plant capacity.  What are you going to do? Time Load 6 12 18 24 Deficit Surplus Supply Demand

Editor's Notes

  1. Regulated Flow cosideration?