Reservoir
TECHNIQUES FOR COMPUTING STORAGE CAPACITY
Whatever be the size or use of a reservoir , the main function of a reservoir is to
store water and thus to stabilize the flow of water. Therefore, the most important
Physical characteristic of a reservoir is nothing but its STORGE CAPACITY.
The capacity of reservoirs on dam site can be determined by using a number of method
such as:
• From the contour map of the area
• Method of integration
USING CONTOUR MAP
 A topographic survey of the dam site is carried out.
 A contour map is drawn.
 Area enclosed within each contour is measured.
 Areas of intervening contours at smaller intervals are
interpolated.
For example the area of the reservoir at 200 m contour is A1
and at 205 m contour is A2 hectors. Then the area of 200.5m contour is
=[ A1 +
200.5−200
205−200
A2 − A1 ]2
=[ A1 +
0.5
5
A2 − A1 ]2
In this way the areas can be computed at sufficiently
low contour intervals (0.5m) which can be used to
determine the incremental volume (∆𝑆) stored between two
Successive contours, by using the simple average method
(multiplying the avg. of the 2 areas at two elevations, by the
elevation difference (∆h) ).
The summation of these incremental volumes below any
elevation, is the storage volume below that level.
∆𝑆 =
𝑎1+𝑎2
2
(∆h) ; sometimes the following formula can be used
∆𝑆 =
∆h
3
(𝑎1 + 𝑎2 + 𝑎1𝑎2) ; 𝑎1, 𝑎2……. Areas at 0.5m interval
Prismoidal formula can also be used preferably where three consecutive sections
at equal height are taken. According to this
∆𝑆 =
∆h
6
(𝐴1 + 4𝐴2 + 𝐴3);
Where 𝐴1, 𝐴2 𝑎𝑛𝑑 𝐴3 are the areas of succeeding contours, and ∆h is the vertical
distance between two alternate counters.
METHOD OF INTEGRATION
It’s evident that the areas at different elevations, as well as the storage at different elevation
,can be mathematically worked out, and both plotted on a graph paper, to obtain
AREA-ELEVATION CURVE & STORAGE ELEVATION CURVE as shown in fig.
• The area-elevation curve will yield capacity-elevation curve when integrated.
Using this concept; the method of integration is established
• The surveyed areas are plotted on a graph paper and area-elevation curve
is drawn.
• The equation of the curve is obtained by statistical methods.
• The equation is then integrated and the capacity-elevation curve is obtained
• The general from of the equation:
A=a+b. ℎ + gℎ2
+..........ηℎ𝑛−1
; where A is the area at any elevation h and
a,b, g are all constants.
From the actual survey, or from the points falling on the area-elevation curve
the area of any required number of contours (n) are known.
Let 𝐴0 , 𝐴1, 𝐴2 … … be the areas corresponding to the known level values 0, 𝑦1, 𝑦2
are the heights above datum
Substituting these values in the previous equation we get
𝐴0=a
𝐴1=a+b.𝑦1+ g.𝑦1
2
+..........η.𝑦1
𝑛−1
𝐴2=a+b.𝑦2+ g.𝑦2
2
+..........η.𝑦2
𝑛−1
𝐴3=a+b.𝑦3+ g.𝑦3
2
+..........η.𝑦3
𝑛−1
Solving these we can get a,b,g,η ;hence the equation of
area-elevation curve becomes defined. The equation can now be integrated between the limits
0 to y
‫׬‬𝑦=0
𝑦=𝑦
𝐴𝑦 𝑑𝑦=‫׬‬𝑦=0
𝑦=𝑦
(a+b.y+ g. 𝑦2
+..........η. 𝑦𝑛−1
) 𝑑𝑦
𝑆𝑦= [a.y+b.
𝑦2
2
+ g.
𝑦3
3
+....η
𝑦𝑛
𝑛
].K ; where K is the reservoir capacity of the dam.
CEE-325
Hydraulic & Hydraulic Structure
Q2.(V) BRIEFLY DESCRIBE AS HOW YOU WOULD FIX THE STORAGE CAPACITY
OF A RESERVOIR AND THE HEIGHT OF THE DAM REQUIRED FOR THIS
STORAGE. WHAT IS THE RELATION BETWEEN RESERVOIR CAPACITY AND
RESERVOIR YIELD?
1)Fixing the reservoir capacity for the Computed value of the Dependable Yield of the
Reservoir Catchment:
After deciding the dependable yield for the proposed reservoir (tank), the reservoir capacity is
decided as follows:
The water demand is computed by estimating the crop water requirement (including transit losses)
and any other water demand required to meet the water supply needs or the downstream commitments of
water release, if any. Reservoir losses at about 15% of the water demand is then added to obtain the live or
the net storage required to meet the given demand. Dead storage is now added to this live storage to obtain
the gross storage required to meet the demand. The reservoir capacity, however cannot exceed the
catchment yield (inflow into the reservoir) and hence the reservoir capacity is fixed at the value which is
lesser of the value of the assessed gross storage required to meet the demand and the assessed dependable
yield for the reservoir site. The full tank level (FTL) or the full reservoir level (FRL) is fully computed
from the elevation-capacity curve.
The dead storage level or dead storage required in the above computation is usually fixed at higher of
the following values:
(a) Dead Storage = Rate of silting × Life of the reservoir
(b) Dead Storage = 10% of gross storage or net water demand
(c) Dead Storage level being equal to the full supply level of the off taking canal at the tank site
2)Fixing the Reservoir Capacity from the Annual Inflow and Outflow Data:
The capacity of reservoir may be determined by determining the storage needed to accommodate the
given inflow minus given outflow as governed by the equation.
Inflow − Outflow = Increase in Reservoir Storage
However, this study involves numerous factors as discussed below:
Stream flow data at the reservoir site must be know. Monthly inflow rates are sufficient for large
reservoirs but daily data may be required for small reservoirs. When the inflow data at the dam site are not
known the data at a station elsewhere on the stream or on a nearby stream may be collected and adjusted
to the dam site.
Beside determining the stream flow data at the dam site an adjustment has to be made for the water
required to be passed from the reservoir to satisfy the prior water rights and to obey the agreements
between various sharing states through which the river is passing.
Moreover, the construction of a reservoir increases the exposed area of the water surface above that
of the natural stream and thus increase the evaporation losses.
All this factors make this study very very complex. So, an approximate easy solution for determining
the reservoir capacity may be obtained graphically with the help of Mass Curves.
3)Fixing the reservoirs capacity with the help of
Mass curve (Ripple diagram) method
After a flow hydrographs for the stream at the dam
site have been plotted for a large number of years(25 to
30) , the required storage capacity for a reservoir with a
given outflow pattern can be approximately calculated
with the help of mass curve . A hydrograph is a plot of
discharge vs. time while a mass curve is plot of
accumulated flow vs. time . After the inflow mass curve
has ben plotted, the mass curve of demand may also be
plotted by accumulating the required outflow . If a
constant rate of withdrawal is required from the
reservoir , the mass curve will be a straight line having
a slope equal to the demand rate, although in practice ,
they may be carved also.
By applying necessary steps we can determine the
reservoirs capacity for a given demand.
On the other hand the reservoirs fixing the demand for a
given reservoir capacity , may also done with the help of
mass curve of inflow.
Determining reservoir capacity for a
given demand
The mass curve of inflow and the demand line
can be used to determine the required storage
capacity in fig-1 , it is evident that the demand lines
draws tangential to the high points A1,A2,A3.. Of
the mass curve , represent the ratio of withdrawal
from the reservoir . Assuming the reservoir to be full
whenever the demand line interests the mass curve
(points F1,F2…) the maximum departure (B1C1,
B2C2,..) between the two curves represents the
reservoir capacity just required to satisfy the
demand.
Fig-1 has been drawn for the demand of 2000
hectare - meters /year . The biggest departure
ordinate (the maximum of (B1C1, B2C2,..) work
out to be 1950 hectare- meters/year, which represent
the required storage capacity for the reservoir. The
vertical distance between the successive tangents
A1B1 and A2B2 etc, represents the water wasted
over the spillway .
The spillway must have sufficient capacity to discharge this flood
volume.
For fig -1 the spillway capacity works out to be 600hectare- meters and the
reservoirs capacity as 1950 hectare-meters. It can also be observed that :
1) Assume the reservoir to be full a A1, it is depleted to 1950-1500=450 ha-
m at C1 and is again full at F1.
2) The Reservoir is full between F1 and A2 and the quantity of water spilled
over the spillway is equal to 600 ha-m.
3) From A2 the water starts reducing in the reservoir till it becomes fully
empty at C1
4) the water again starts collecting in the reservoir and it is again full at F2.
Fixing the demand for a reservoir of a given capacity
In the previous section . We have explained as to how the reservoir
capacity can be determined for a given demand. The reservoirs fixing the
demand for a given reservoir capacity , may also done with the help of mass
curve of inflow.
In this can tangent are drawn to the high point (A1,A2…)of the mass inflow
curve in such a way that maximum departure from the mass curve is equal to
the reservoir capacity. The slope of the line so draw represent the demand rate
which can be obtained with this capacity during different periods. The
minimum value of these slopes will represent the withdrawal rate, which can
certain be obtained from the given reservoir, and will, thus represent it’s firm
yield.
4)Fixing of reservoir capacity analysis using Sequent
Peak Algorithm.
The Sequent Peak Algorithm is a simple and straight
forward analytical procedure, for computing reservoir
capacity , and is used for as an excellent alternative to the
mass curve method of determining reservoir capacity.
The mass curve approach is easy to use when short periods
of data are to be analyzed.
SPA is a modification of the Mass Curve analysis for
lengthy time series and particularly suited to computer
coding.
Sequent peak algorithm is a plot between time on X
axis and cumulative inflow minus cumulative outflow on Y
axis. The quantity taken on Y axis , corresponding to each
month equals to ∑inflow- ∑outflow= ∑inflow-
∑outflow. This value is called cumulative net inflow. The
positive value of cumulative net inflow , represent
cumulative surplus , representing cumulative surpuls of
inflow will be potted above X axis , while its negative value
, representing cumulative deficit of inflow ill be plotted
bellow X axis.
The obtained plot will consist of peak and trough as shown
The first ridge point a1in this plotting is called the 1st peak ,
while subsequent ridge points 𝐴2, 𝐴3, 𝐴4 etc are called
sequent peaks.
Similarly, the first trough point 𝐵1 is called the while
subsequent trough points 𝐵2, 𝐵3etc may be called the
sequent troughs.
The difference between the first peak and first trough
(height 𝐴1𝐵1) will in this plot evidently, represent the
reservoir storage required under normal inflows and is
called the normal storage whereas, the maximum difference
between any sequent peak and the just following trough
will represent the maximum storage required for the
reservoir.
The normal and maximum storage trough sequent peak
algorithm is calculated as follows:
1) Convert the monthly inflows into the volume units for
the period of the available data.
2) estimation the monthly volumes of all outflows from the
reservoir. This should include losses from evaporation, seepage
and other losses
3) compute the cumulative values of inflows.
4) compute the cumulative values of outflows.
5) compute the values of cumulative inflow minus cumulative outflow.
6) plot a graph by taking months (time) on x-axis and σ(𝐼 − 𝑂) of step (5) on y-axis on an ordinary
graph paper.
7) the data will plot peaks and troughs. The second and subsequent peaks are called sequent peaks.
8) the maximum difference between any sequent peak and the just following trough is the maximum
storage required for the reservoir. The difference between the first peak and the trough flowing it, is the
storage required under normal inflows
Determination of dam height
The dam must be high enough to
1)Store water to the normal full pool elevation
2)Provide for the temporary storage needed to route the spillway design flood through
the dam
3)Provide sufficient freeboard to assure an acceptable degree of safety against possible
overtopping from waves and run up.
Physical characteristics of the dam and reservoir site or existing development within the
reservoir area may impose upper limits in selecting the normal full-pool level.
Freeboard is the distance between the maximum reservoir level and the top of the dam.
Usually 3ft or more of freeboard is provided to avoid overtopping by wind generated waves.
Additional freeboard may be provided for possible effects of surges induced by earthquakes,
landslides etc. .
The economic height of dam is that height of the dam corresponding to which
the cost of the dam per unit of storage is minimum. For this purpose the estimates
are prepared for construction costs for several heights of the dam somewhat above
and below the level at which the elevation-storage curve shows a fairly high rate of
increase of storage per unit rise of elevation keeping the length of the dam moderate.
The construction cost is found to increase with the dam height as shown in fig below
For each dam height the reservoir storage is known from the reservoir capacity
curve. The construction cost per unit of storage for all the possible dam heights can
be then be worked out and plotted as shown in fig
Reservoir capacity:
The most important physical characteristics of a reservoir is nothing but its storage capacity. The
capacity of reservoir on dam sites, is determined from contour map.
Fig. Typical contour map of a dam site.
Reservoir yield:
The amount of water that can be drawn from a reservoir, in any specified time
interval is called the reservoir yield. It depends upon the inflow into the reservoir
and the reservoir losses.
Relation between reservoir capacity and reservoir yield:
Reservoir yield depends on the active storage capacity of reservoir and again
storage in a reservoir depends on reservoir capacity.
Relationship between yield and storage:
Inflow – yield = change in storage
• If inflow is more than yield
➢ Storage will increase
• If inflow is less than yield
➢ Storage will be depleted
 Mass balance equation of reservoir
 St-1+Qt-Rt-lt= St
 St-1 is storage at end of previous time interval
 Qt is inflows at current time interval
 Rt is release at current time interval
 Lt is loss
 St <= k for each interval
 K is reservoir fixed storage capacity
Fig. Graphical Relation between reservoir capacity & reservoir
yield.
DETERMINATION OF YIELD FROM A RESERVOIR
OF GIVEN CAPACITY
 1. Prepare a mass curve in the same manner as in the previous case
 2. Draw tangents at high points in such a manner that their
maximum departure from the mass curve does nit exceed the given
capacity of reservoir
DETERMINATION OF YIELD FROM A RESERVOIR
OF GIVEN CAPACITY
 3. Measure the slopes of these tangents
and which represents the yield which can
be obtained in each year from the
reservoir of given capacity
 Slope of the fattest tangent is the safe yield
DETERMINATION OF YIELD FROM A
RESERVOIR OF GIVEN CAPACITY
CEE-325
HYDRAULIC STRUCTURE
Q2.VI: WRITE SHORT NOTE ON FIRM YIELD, DESIGN
YIELD AND SECONDARY YIELD OF A RESERVOIR.
# Yield from a reservoir: Yield is the volume of water which
can be withdrawn from a reservoir in a specified period of
time. The yield is determined from the storage capacity of
the reservoir and the mass inflow curve.
# Safe yield (Firm yield): is the maximum quantity of water
which can be supplied from a reservoir in a specified period
of time during a critical dry year. Lowest recorded natural
flow of the river for a number of years is taken as the
critical dry period for determining the safe yield.
# Design yield: is the yield adopted in the design of a
reservoir. Fixed after considering the urgency of the water
needs and the amount of risk involved. The design yield
should be such that the demands of the consumers are
reasonably met with, and at the same time, the storage
required is not unduly large.
Generally dependability percentage value of 50% to 75%
may be used to compute the dependable yield or design yield.
# Secondary yield: is the quantity of water which is
available during the period of high flow in the rivers
when the yield is more than the safe yield. It is supplied
on as and when basis at the lower rates. The hydropower
developed from secondary yield is sold to industries at
cheaper rates.
Example:
A contour survey of a reservoir site gives the following data:
The capacity of the reservoir up to 200m elevation is found to be 14.1ha. m. Determine the
general equation for the area-elevation curve and capacity-elevation curve. Also determine the
reservoir capacity at RL 225m.
Contour value Area
At 200m contour 6.0 hectares
At 210m contour 18.1 hectares
At 220m contour 34.0 hectares
Solution:
From equation of area-elevation curve, wherein y is the height above RL 200m, as
𝐴𝑦 = 𝛼 + 𝛽. 𝑦 + 𝛾. 𝑦2
Now substituting the given values, we have
𝐴0 = 6.0 ℎ𝑒𝑐𝑡𝑎𝑟𝑒𝑠
∴ 6.0 = 𝛼 + 𝛽. 0 + 𝛾. 0
∴ 𝛼 = 6.0 ….. (𝑖)
𝐴𝑙𝑠𝑜 𝐴1 = 18.1 ℎ𝑒𝑐𝑡𝑎𝑟𝑒𝑠, 𝑎𝑡 𝑦1 = 10𝑚 (𝑔𝑖𝑣𝑒𝑛)
∴ 18.1 = 𝛼 + 𝛽. 10 + 𝛾. 102
⇒ 18.1 = 6.0 + 10𝛽 + 100𝛾
⇒ 12.1 = 10𝛽 + 100𝛾
∴ 𝛽 + 10𝛾 = 1.21 ….. (𝑖𝑖)
𝐴𝑙𝑠𝑜 𝐴2 = 34 ℎ𝑒𝑐𝑡𝑎𝑟𝑒𝑠, 𝑎𝑡 𝑦2 = 20𝑚 𝑔𝑖𝑣𝑒𝑛
∴ 34 = 𝛼 + 𝛽. 20 + 𝛾. 202
⇒ 34 = 6.0 + 20𝛽 + 400𝛾
⇒ 28 = 10𝛽 + 100𝛾
∴ 𝛽 + 20𝛾 = 1.4 ….. (𝑖𝑖𝑖)
Solving (𝑖𝑖) and(𝑖𝑖𝑖), we get,
𝛽 + 10𝛾 = 1.21
𝛽 + 20𝛾 = 1.4
⇒ 10𝛾 = 0.19
∴ 𝛾 = 0.019
∴ 𝛽 + 0.19 = 1.21
∴ 𝛽 = 1.02
Hence, the equation of area-elevation curve is given by
𝐴𝑦 = 6 + 1.02𝑦 + 0.019𝑦2 ans.
Integrating this equation, we get
𝑆𝑦 = 6𝑦 + 1.02
𝑦2
2
+ 0.019
𝑦3
3
+ 𝐾
The constant K is obviously the reservoir capacity up to RL 200m which is given to be 14.1 ℎ𝑎. 𝑚.
∴ 𝑆𝑦 = 6𝑦 + 0.51𝑦2 + 0.0063𝑦3 + 14.1
Hence the capacity-elevation curve is given by
𝑆𝑦 = 0.0063𝑦3 + 0.51𝑦2 + 6𝑦 + 14.1 ans.
To determine the capacity at rl 225m, we have to substitute
𝑦 = 225 − 200 = 25𝑚 in the above equation to obtain the requisite capacity in ℎ𝑎. 𝑚.,
𝑖. 𝑒. Required capacity at rl 225m
= 0.0063 25 3 + 0.51 25 2 + 6 25 + 14.1
= 98.96 + 318.75 + 150 + 14.1
= 581.81ha. m. Ans.
=****=
Example 18.3.
The daily flows in a river for the three consecutive years are given in the table by class interval
along with the number of days the flow belonged to this class. What are the 50% and 75%
dependable flows (annual and daily) for the river?
Year 1981 Year 1982 Year 1983
S. So.
Daily mean
Discharge
𝑚3
𝑠
(Range)
No. of days the flow
belonged to the given
range (class interval)
No. of days the flow
equaled the class
range of col (2)
No. of days the flow
equaled the range
given in col (2)
1 2 3 4 5
1 100-90.1 0 6 10
2 90-80.1 16 19 16
3 80-70.1 27 25 38
4 70-60.1 21 60 67
5 60-50.1 43 51 58
6 50-40.1 59 38 38
7 40-30.1 64 29 70
8 30-20.1 22 48 29
9 20-10.1 59 63 26
10 10-negligible 54 26 13
Solution:
With the given daily flows, we will calculate the annual yields for the given 3 years of records, as computed in Table
18.4. Since daily discharge figs, are given in range (interval), mid value of range (interval) can be assumed to be the flow
discharge, which when multiplied by no. of days, will give yield during those days. Summation of yield values over 365 days
will give annual yield, as shown in Table 18.4, which otherwise is self-explanatory.
Year 1981 Year 1982 Year 1983
S. So.
Daily mean
Discharge
𝑚3
𝑠
(Range)
Mean
value of
daily
discharge
range
No. of days
the flow
belonged to
the given
range (class
interval)
Yield
(𝑀𝑚3
)
= 𝑐𝑜𝑙 3
× 𝑐𝑜𝑙 (4)
× 0.0864
No. of
days the
flow
equaled
the class
range of
col (2)
Yield
(M𝑚3
)
= 0.0864
× 𝑐𝑜𝑙 (3)
× 𝑐𝑜𝑙 (6)
No. of
days the
flow
equaled
the range
given in
col (2)
Yield
(M𝑚3
)
= 0.0864
× 𝑐𝑜𝑙 (3)
× 𝑐𝑜𝑙 (8)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1 100-90.1 95.05 0 0 6 49.25 10 82.08
2 90-80.1 85.05 16 117.50 19 139.54 16 117.50
3 80-70.1 75.05 27 174.96 25 162.00 38 246.24
4 70-60.1 65.05 21 117.94 60 336.96 67 376.27
5 60-50.1 55.05 43 204.34 51 242.35 58 275.62
6 50-40.1 45.05 59 229.39 38 147.77 38 147.74
7 40-30.1 35.05 64 193.54 29 87.70 70 211.68
8 30-20.1 25.05 22 47.52 48 103.68 29 62.64
9 20-10.1 15.05 59 74.34 63 81.65 26 33.70
10 10-negligible 5.05 54 23.33 26 11.23 13 5.62
∑ 365 1182 86 365 1361.98 365 1559.09
The river yield for 3 year is thus calculated by summation of col (5), (7) & (9). Let these yields be arranged
in descending order.
Order no. (𝑚) For p% dependability,
=
𝑃
100
× 𝑁 …… (eq. 18.4)
(1) Order no for 75% dependability =
75
100
× 3 = 2.25
Since order no. Of 2.25 is not an integer, the mean value of yield corresponding to S.No. 2 and 3 will be
taken as yield for 75% dependability, given as,
=
1361.98 + 1182.86
2
= 1272.42 𝑀𝑚3
Hence, annual flow with 75% dependability = 1272.42 𝑀𝑚3
ans.
∴ Daily flow (discharge) with 75% dependability,
=
1272.42 × 106
365 × 86400
Τ
𝑚3 𝑠
= 𝟒𝟎. 𝟑𝟒 Τ
𝒎𝟑 𝒔 Ans.
Year Annual Yield (𝑴𝒎𝟑
) Order No. (𝒎)
1983 1559.09 1
1982 1361.98 2
1981 1182.86 3
𝑁 = 3
(𝑖𝑖) Order no. For 50% dependability =
𝑃
100
× 𝑁 =
50
100
× 3 = 1.5
Since order no. Of 1.5 is not an integer, the mean value of yield corresponding to order no. 1 & 2
shall be taken as the yield of 50%. Dependability, given as:
=
1559.09 + 1361.98
2
= 1460.54 𝑀𝑚3
Hence, annual flow with 50% dependability = 1460.54 𝑀𝑚3
ans.
∴ Daily flow (discharge) with 50% dependability,
=
1460.54 × 106
365 × 86400
Τ
𝑚3
𝑠
= 𝟒𝟔. 𝟑𝟏 Τ
𝒎𝟑 𝒔 Ans.
=****=
Example 18.4.
The design annual rainfall for the catchment of a proposed reservoir has been computed to be
99 cm. The catchment area has been estimated to have the mean annual temperature of 20°C. The
catchment area contributing to the proposed reservoir is 1000 sq.Km. Calculate the annual design
catchment yield for this reservoir. Make use of khosla’s formula.
Solution:
Using khosla’s formula connecting the design rainfall (p) with the design yield (q) as:
Q = p − 0.48 tm
Where,
P = 99 cm (given)
tm = 20°c (given)
∴ Q = 99 − 0.48 x 20 = 89.4 cm = 0.894 m
The total yield produced in m3 from the given catchment of 1000 sq.Km (i. e. 1000 × 106m2)
= 0.894 × 1000 × 106m3 = 894Mm3 ans.
=****=

More Related Content

Similar to reservoir detail description Lecture 13,14.pdf

Application-Of-Laplace-Transform-To-Pressure-Transient-Analysis-In-A-Reservoi...
Application-Of-Laplace-Transform-To-Pressure-Transient-Analysis-In-A-Reservoi...Application-Of-Laplace-Transform-To-Pressure-Transient-Analysis-In-A-Reservoi...
Application-Of-Laplace-Transform-To-Pressure-Transient-Analysis-In-A-Reservoi...Oluwaseun Olaleye
 
IRJET - Effect of Local Scour on Foundation of Hydraulic Structure
IRJET - Effect of Local Scour on Foundation of Hydraulic StructureIRJET - Effect of Local Scour on Foundation of Hydraulic Structure
IRJET - Effect of Local Scour on Foundation of Hydraulic StructureIRJET Journal
 
Water measurement
Water measurementWater measurement
Water measurementHina Bhatu
 
Using Hec Ras For Analysus of Flood Characteristic
Using Hec Ras For Analysus of Flood CharacteristicUsing Hec Ras For Analysus of Flood Characteristic
Using Hec Ras For Analysus of Flood CharacteristicLucia797414
 
Module 03 Distribution Works.pptx
Module 03 Distribution Works.pptxModule 03 Distribution Works.pptx
Module 03 Distribution Works.pptxSilasChaudhari
 
Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankC. P. Kumar
 
For Water Resources engineering notes.pptx
For Water Resources engineering notes.pptxFor Water Resources engineering notes.pptx
For Water Resources engineering notes.pptxMuss20
 
Hydrological Application of Remote – Sensing and GIS for Handling of Excess R...
Hydrological Application of Remote – Sensing and GIS for Handling of Excess R...Hydrological Application of Remote – Sensing and GIS for Handling of Excess R...
Hydrological Application of Remote – Sensing and GIS for Handling of Excess R...IDES Editor
 
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSAnkit Balyan MBA, B.Tech.
 
Chapter Seven: Applications of System Analysis
Chapter Seven: Applications of System AnalysisChapter Seven: Applications of System Analysis
Chapter Seven: Applications of System AnalysisGodisgoodtube
 
CH3 Energy&power.pptx
CH3 Energy&power.pptxCH3 Energy&power.pptx
CH3 Energy&power.pptxDawit Girma
 
Hydrologic modeling of detention pond
Hydrologic modeling of detention pondHydrologic modeling of detention pond
Hydrologic modeling of detention pondeSAT Journals
 

Similar to reservoir detail description Lecture 13,14.pdf (20)

Jgrass newage-waterbudget
Jgrass newage-waterbudgetJgrass newage-waterbudget
Jgrass newage-waterbudget
 
Application-Of-Laplace-Transform-To-Pressure-Transient-Analysis-In-A-Reservoi...
Application-Of-Laplace-Transform-To-Pressure-Transient-Analysis-In-A-Reservoi...Application-Of-Laplace-Transform-To-Pressure-Transient-Analysis-In-A-Reservoi...
Application-Of-Laplace-Transform-To-Pressure-Transient-Analysis-In-A-Reservoi...
 
IRJET - Effect of Local Scour on Foundation of Hydraulic Structure
IRJET - Effect of Local Scour on Foundation of Hydraulic StructureIRJET - Effect of Local Scour on Foundation of Hydraulic Structure
IRJET - Effect of Local Scour on Foundation of Hydraulic Structure
 
Water measurement
Water measurementWater measurement
Water measurement
 
Using Hec Ras For Analysus of Flood Characteristic
Using Hec Ras For Analysus of Flood CharacteristicUsing Hec Ras For Analysus of Flood Characteristic
Using Hec Ras For Analysus of Flood Characteristic
 
Module 03 Distribution Works.pptx
Module 03 Distribution Works.pptxModule 03 Distribution Works.pptx
Module 03 Distribution Works.pptx
 
Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation Tank
 
1.pdf
1.pdf1.pdf
1.pdf
 
For Water Resources engineering notes.pptx
For Water Resources engineering notes.pptxFor Water Resources engineering notes.pptx
For Water Resources engineering notes.pptx
 
designing simple drainage system.pptx
designing simple drainage system.pptxdesigning simple drainage system.pptx
designing simple drainage system.pptx
 
Hydrological Application of Remote – Sensing and GIS for Handling of Excess R...
Hydrological Application of Remote – Sensing and GIS for Handling of Excess R...Hydrological Application of Remote – Sensing and GIS for Handling of Excess R...
Hydrological Application of Remote – Sensing and GIS for Handling of Excess R...
 
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
 
CE573_Poster2
CE573_Poster2CE573_Poster2
CE573_Poster2
 
Reservoir
ReservoirReservoir
Reservoir
 
Chapter Seven: Applications of System Analysis
Chapter Seven: Applications of System AnalysisChapter Seven: Applications of System Analysis
Chapter Seven: Applications of System Analysis
 
CH3 Energy&power.pptx
CH3 Energy&power.pptxCH3 Energy&power.pptx
CH3 Energy&power.pptx
 
Chapter 5 Fetter Ground water flow to wells
Chapter 5 Fetter Ground water flow to wellsChapter 5 Fetter Ground water flow to wells
Chapter 5 Fetter Ground water flow to wells
 
JGrass-NewAge water budget
JGrass-NewAge water budget JGrass-NewAge water budget
JGrass-NewAge water budget
 
Hydrologic modeling of detention pond
Hydrologic modeling of detention pondHydrologic modeling of detention pond
Hydrologic modeling of detention pond
 
Ph d presentation npc final
Ph d presentation npc finalPh d presentation npc final
Ph d presentation npc final
 

Recently uploaded

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 

Recently uploaded (20)

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

reservoir detail description Lecture 13,14.pdf

  • 2. Whatever be the size or use of a reservoir , the main function of a reservoir is to store water and thus to stabilize the flow of water. Therefore, the most important Physical characteristic of a reservoir is nothing but its STORGE CAPACITY. The capacity of reservoirs on dam site can be determined by using a number of method such as: • From the contour map of the area • Method of integration
  • 3. USING CONTOUR MAP  A topographic survey of the dam site is carried out.  A contour map is drawn.  Area enclosed within each contour is measured.  Areas of intervening contours at smaller intervals are interpolated.
  • 4. For example the area of the reservoir at 200 m contour is A1 and at 205 m contour is A2 hectors. Then the area of 200.5m contour is =[ A1 + 200.5−200 205−200 A2 − A1 ]2 =[ A1 + 0.5 5 A2 − A1 ]2 In this way the areas can be computed at sufficiently low contour intervals (0.5m) which can be used to determine the incremental volume (∆𝑆) stored between two Successive contours, by using the simple average method (multiplying the avg. of the 2 areas at two elevations, by the elevation difference (∆h) ). The summation of these incremental volumes below any elevation, is the storage volume below that level. ∆𝑆 = 𝑎1+𝑎2 2 (∆h) ; sometimes the following formula can be used ∆𝑆 = ∆h 3 (𝑎1 + 𝑎2 + 𝑎1𝑎2) ; 𝑎1, 𝑎2……. Areas at 0.5m interval
  • 5. Prismoidal formula can also be used preferably where three consecutive sections at equal height are taken. According to this ∆𝑆 = ∆h 6 (𝐴1 + 4𝐴2 + 𝐴3); Where 𝐴1, 𝐴2 𝑎𝑛𝑑 𝐴3 are the areas of succeeding contours, and ∆h is the vertical distance between two alternate counters.
  • 6. METHOD OF INTEGRATION It’s evident that the areas at different elevations, as well as the storage at different elevation ,can be mathematically worked out, and both plotted on a graph paper, to obtain AREA-ELEVATION CURVE & STORAGE ELEVATION CURVE as shown in fig.
  • 7. • The area-elevation curve will yield capacity-elevation curve when integrated. Using this concept; the method of integration is established • The surveyed areas are plotted on a graph paper and area-elevation curve is drawn. • The equation of the curve is obtained by statistical methods. • The equation is then integrated and the capacity-elevation curve is obtained • The general from of the equation: A=a+b. ℎ + gℎ2 +..........ηℎ𝑛−1 ; where A is the area at any elevation h and a,b, g are all constants. From the actual survey, or from the points falling on the area-elevation curve the area of any required number of contours (n) are known. Let 𝐴0 , 𝐴1, 𝐴2 … … be the areas corresponding to the known level values 0, 𝑦1, 𝑦2 are the heights above datum
  • 8. Substituting these values in the previous equation we get 𝐴0=a 𝐴1=a+b.𝑦1+ g.𝑦1 2 +..........η.𝑦1 𝑛−1 𝐴2=a+b.𝑦2+ g.𝑦2 2 +..........η.𝑦2 𝑛−1 𝐴3=a+b.𝑦3+ g.𝑦3 2 +..........η.𝑦3 𝑛−1 Solving these we can get a,b,g,η ;hence the equation of area-elevation curve becomes defined. The equation can now be integrated between the limits 0 to y ‫׬‬𝑦=0 𝑦=𝑦 𝐴𝑦 𝑑𝑦=‫׬‬𝑦=0 𝑦=𝑦 (a+b.y+ g. 𝑦2 +..........η. 𝑦𝑛−1 ) 𝑑𝑦 𝑆𝑦= [a.y+b. 𝑦2 2 + g. 𝑦3 3 +....η 𝑦𝑛 𝑛 ].K ; where K is the reservoir capacity of the dam.
  • 9. CEE-325 Hydraulic & Hydraulic Structure Q2.(V) BRIEFLY DESCRIBE AS HOW YOU WOULD FIX THE STORAGE CAPACITY OF A RESERVOIR AND THE HEIGHT OF THE DAM REQUIRED FOR THIS STORAGE. WHAT IS THE RELATION BETWEEN RESERVOIR CAPACITY AND RESERVOIR YIELD?
  • 10. 1)Fixing the reservoir capacity for the Computed value of the Dependable Yield of the Reservoir Catchment: After deciding the dependable yield for the proposed reservoir (tank), the reservoir capacity is decided as follows: The water demand is computed by estimating the crop water requirement (including transit losses) and any other water demand required to meet the water supply needs or the downstream commitments of water release, if any. Reservoir losses at about 15% of the water demand is then added to obtain the live or the net storage required to meet the given demand. Dead storage is now added to this live storage to obtain the gross storage required to meet the demand. The reservoir capacity, however cannot exceed the catchment yield (inflow into the reservoir) and hence the reservoir capacity is fixed at the value which is lesser of the value of the assessed gross storage required to meet the demand and the assessed dependable yield for the reservoir site. The full tank level (FTL) or the full reservoir level (FRL) is fully computed from the elevation-capacity curve. The dead storage level or dead storage required in the above computation is usually fixed at higher of the following values: (a) Dead Storage = Rate of silting × Life of the reservoir (b) Dead Storage = 10% of gross storage or net water demand (c) Dead Storage level being equal to the full supply level of the off taking canal at the tank site
  • 11. 2)Fixing the Reservoir Capacity from the Annual Inflow and Outflow Data: The capacity of reservoir may be determined by determining the storage needed to accommodate the given inflow minus given outflow as governed by the equation. Inflow − Outflow = Increase in Reservoir Storage However, this study involves numerous factors as discussed below: Stream flow data at the reservoir site must be know. Monthly inflow rates are sufficient for large reservoirs but daily data may be required for small reservoirs. When the inflow data at the dam site are not known the data at a station elsewhere on the stream or on a nearby stream may be collected and adjusted to the dam site. Beside determining the stream flow data at the dam site an adjustment has to be made for the water required to be passed from the reservoir to satisfy the prior water rights and to obey the agreements between various sharing states through which the river is passing. Moreover, the construction of a reservoir increases the exposed area of the water surface above that of the natural stream and thus increase the evaporation losses. All this factors make this study very very complex. So, an approximate easy solution for determining the reservoir capacity may be obtained graphically with the help of Mass Curves.
  • 12. 3)Fixing the reservoirs capacity with the help of Mass curve (Ripple diagram) method After a flow hydrographs for the stream at the dam site have been plotted for a large number of years(25 to 30) , the required storage capacity for a reservoir with a given outflow pattern can be approximately calculated with the help of mass curve . A hydrograph is a plot of discharge vs. time while a mass curve is plot of accumulated flow vs. time . After the inflow mass curve has ben plotted, the mass curve of demand may also be plotted by accumulating the required outflow . If a constant rate of withdrawal is required from the reservoir , the mass curve will be a straight line having a slope equal to the demand rate, although in practice , they may be carved also. By applying necessary steps we can determine the reservoirs capacity for a given demand. On the other hand the reservoirs fixing the demand for a given reservoir capacity , may also done with the help of mass curve of inflow.
  • 13. Determining reservoir capacity for a given demand The mass curve of inflow and the demand line can be used to determine the required storage capacity in fig-1 , it is evident that the demand lines draws tangential to the high points A1,A2,A3.. Of the mass curve , represent the ratio of withdrawal from the reservoir . Assuming the reservoir to be full whenever the demand line interests the mass curve (points F1,F2…) the maximum departure (B1C1, B2C2,..) between the two curves represents the reservoir capacity just required to satisfy the demand. Fig-1 has been drawn for the demand of 2000 hectare - meters /year . The biggest departure ordinate (the maximum of (B1C1, B2C2,..) work out to be 1950 hectare- meters/year, which represent the required storage capacity for the reservoir. The vertical distance between the successive tangents A1B1 and A2B2 etc, represents the water wasted over the spillway .
  • 14. The spillway must have sufficient capacity to discharge this flood volume. For fig -1 the spillway capacity works out to be 600hectare- meters and the reservoirs capacity as 1950 hectare-meters. It can also be observed that : 1) Assume the reservoir to be full a A1, it is depleted to 1950-1500=450 ha- m at C1 and is again full at F1. 2) The Reservoir is full between F1 and A2 and the quantity of water spilled over the spillway is equal to 600 ha-m. 3) From A2 the water starts reducing in the reservoir till it becomes fully empty at C1 4) the water again starts collecting in the reservoir and it is again full at F2. Fixing the demand for a reservoir of a given capacity In the previous section . We have explained as to how the reservoir capacity can be determined for a given demand. The reservoirs fixing the demand for a given reservoir capacity , may also done with the help of mass curve of inflow. In this can tangent are drawn to the high point (A1,A2…)of the mass inflow curve in such a way that maximum departure from the mass curve is equal to the reservoir capacity. The slope of the line so draw represent the demand rate which can be obtained with this capacity during different periods. The minimum value of these slopes will represent the withdrawal rate, which can certain be obtained from the given reservoir, and will, thus represent it’s firm yield.
  • 15. 4)Fixing of reservoir capacity analysis using Sequent Peak Algorithm. The Sequent Peak Algorithm is a simple and straight forward analytical procedure, for computing reservoir capacity , and is used for as an excellent alternative to the mass curve method of determining reservoir capacity. The mass curve approach is easy to use when short periods of data are to be analyzed. SPA is a modification of the Mass Curve analysis for lengthy time series and particularly suited to computer coding. Sequent peak algorithm is a plot between time on X axis and cumulative inflow minus cumulative outflow on Y axis. The quantity taken on Y axis , corresponding to each month equals to ∑inflow- ∑outflow= ∑inflow- ∑outflow. This value is called cumulative net inflow. The positive value of cumulative net inflow , represent cumulative surplus , representing cumulative surpuls of inflow will be potted above X axis , while its negative value , representing cumulative deficit of inflow ill be plotted bellow X axis. The obtained plot will consist of peak and trough as shown
  • 16. The first ridge point a1in this plotting is called the 1st peak , while subsequent ridge points 𝐴2, 𝐴3, 𝐴4 etc are called sequent peaks. Similarly, the first trough point 𝐵1 is called the while subsequent trough points 𝐵2, 𝐵3etc may be called the sequent troughs. The difference between the first peak and first trough (height 𝐴1𝐵1) will in this plot evidently, represent the reservoir storage required under normal inflows and is called the normal storage whereas, the maximum difference between any sequent peak and the just following trough will represent the maximum storage required for the reservoir. The normal and maximum storage trough sequent peak algorithm is calculated as follows: 1) Convert the monthly inflows into the volume units for the period of the available data. 2) estimation the monthly volumes of all outflows from the reservoir. This should include losses from evaporation, seepage and other losses
  • 17. 3) compute the cumulative values of inflows. 4) compute the cumulative values of outflows. 5) compute the values of cumulative inflow minus cumulative outflow. 6) plot a graph by taking months (time) on x-axis and σ(𝐼 − 𝑂) of step (5) on y-axis on an ordinary graph paper. 7) the data will plot peaks and troughs. The second and subsequent peaks are called sequent peaks. 8) the maximum difference between any sequent peak and the just following trough is the maximum storage required for the reservoir. The difference between the first peak and the trough flowing it, is the storage required under normal inflows
  • 18. Determination of dam height The dam must be high enough to 1)Store water to the normal full pool elevation 2)Provide for the temporary storage needed to route the spillway design flood through the dam 3)Provide sufficient freeboard to assure an acceptable degree of safety against possible overtopping from waves and run up. Physical characteristics of the dam and reservoir site or existing development within the reservoir area may impose upper limits in selecting the normal full-pool level. Freeboard is the distance between the maximum reservoir level and the top of the dam. Usually 3ft or more of freeboard is provided to avoid overtopping by wind generated waves. Additional freeboard may be provided for possible effects of surges induced by earthquakes, landslides etc. .
  • 19. The economic height of dam is that height of the dam corresponding to which the cost of the dam per unit of storage is minimum. For this purpose the estimates are prepared for construction costs for several heights of the dam somewhat above and below the level at which the elevation-storage curve shows a fairly high rate of increase of storage per unit rise of elevation keeping the length of the dam moderate. The construction cost is found to increase with the dam height as shown in fig below For each dam height the reservoir storage is known from the reservoir capacity curve. The construction cost per unit of storage for all the possible dam heights can be then be worked out and plotted as shown in fig
  • 20. Reservoir capacity: The most important physical characteristics of a reservoir is nothing but its storage capacity. The capacity of reservoir on dam sites, is determined from contour map. Fig. Typical contour map of a dam site.
  • 21. Reservoir yield: The amount of water that can be drawn from a reservoir, in any specified time interval is called the reservoir yield. It depends upon the inflow into the reservoir and the reservoir losses. Relation between reservoir capacity and reservoir yield: Reservoir yield depends on the active storage capacity of reservoir and again storage in a reservoir depends on reservoir capacity. Relationship between yield and storage: Inflow – yield = change in storage • If inflow is more than yield ➢ Storage will increase • If inflow is less than yield ➢ Storage will be depleted
  • 22.  Mass balance equation of reservoir  St-1+Qt-Rt-lt= St  St-1 is storage at end of previous time interval  Qt is inflows at current time interval  Rt is release at current time interval  Lt is loss  St <= k for each interval  K is reservoir fixed storage capacity
  • 23. Fig. Graphical Relation between reservoir capacity & reservoir yield.
  • 24. DETERMINATION OF YIELD FROM A RESERVOIR OF GIVEN CAPACITY  1. Prepare a mass curve in the same manner as in the previous case  2. Draw tangents at high points in such a manner that their maximum departure from the mass curve does nit exceed the given capacity of reservoir
  • 25. DETERMINATION OF YIELD FROM A RESERVOIR OF GIVEN CAPACITY  3. Measure the slopes of these tangents and which represents the yield which can be obtained in each year from the reservoir of given capacity  Slope of the fattest tangent is the safe yield
  • 26. DETERMINATION OF YIELD FROM A RESERVOIR OF GIVEN CAPACITY
  • 27. CEE-325 HYDRAULIC STRUCTURE Q2.VI: WRITE SHORT NOTE ON FIRM YIELD, DESIGN YIELD AND SECONDARY YIELD OF A RESERVOIR.
  • 28. # Yield from a reservoir: Yield is the volume of water which can be withdrawn from a reservoir in a specified period of time. The yield is determined from the storage capacity of the reservoir and the mass inflow curve. # Safe yield (Firm yield): is the maximum quantity of water which can be supplied from a reservoir in a specified period of time during a critical dry year. Lowest recorded natural flow of the river for a number of years is taken as the critical dry period for determining the safe yield.
  • 29. # Design yield: is the yield adopted in the design of a reservoir. Fixed after considering the urgency of the water needs and the amount of risk involved. The design yield should be such that the demands of the consumers are reasonably met with, and at the same time, the storage required is not unduly large. Generally dependability percentage value of 50% to 75% may be used to compute the dependable yield or design yield.
  • 30. # Secondary yield: is the quantity of water which is available during the period of high flow in the rivers when the yield is more than the safe yield. It is supplied on as and when basis at the lower rates. The hydropower developed from secondary yield is sold to industries at cheaper rates.
  • 31. Example: A contour survey of a reservoir site gives the following data: The capacity of the reservoir up to 200m elevation is found to be 14.1ha. m. Determine the general equation for the area-elevation curve and capacity-elevation curve. Also determine the reservoir capacity at RL 225m. Contour value Area At 200m contour 6.0 hectares At 210m contour 18.1 hectares At 220m contour 34.0 hectares
  • 32. Solution: From equation of area-elevation curve, wherein y is the height above RL 200m, as 𝐴𝑦 = 𝛼 + 𝛽. 𝑦 + 𝛾. 𝑦2 Now substituting the given values, we have 𝐴0 = 6.0 ℎ𝑒𝑐𝑡𝑎𝑟𝑒𝑠 ∴ 6.0 = 𝛼 + 𝛽. 0 + 𝛾. 0 ∴ 𝛼 = 6.0 ….. (𝑖) 𝐴𝑙𝑠𝑜 𝐴1 = 18.1 ℎ𝑒𝑐𝑡𝑎𝑟𝑒𝑠, 𝑎𝑡 𝑦1 = 10𝑚 (𝑔𝑖𝑣𝑒𝑛) ∴ 18.1 = 𝛼 + 𝛽. 10 + 𝛾. 102 ⇒ 18.1 = 6.0 + 10𝛽 + 100𝛾 ⇒ 12.1 = 10𝛽 + 100𝛾 ∴ 𝛽 + 10𝛾 = 1.21 ….. (𝑖𝑖) 𝐴𝑙𝑠𝑜 𝐴2 = 34 ℎ𝑒𝑐𝑡𝑎𝑟𝑒𝑠, 𝑎𝑡 𝑦2 = 20𝑚 𝑔𝑖𝑣𝑒𝑛 ∴ 34 = 𝛼 + 𝛽. 20 + 𝛾. 202 ⇒ 34 = 6.0 + 20𝛽 + 400𝛾 ⇒ 28 = 10𝛽 + 100𝛾 ∴ 𝛽 + 20𝛾 = 1.4 ….. (𝑖𝑖𝑖)
  • 33. Solving (𝑖𝑖) and(𝑖𝑖𝑖), we get, 𝛽 + 10𝛾 = 1.21 𝛽 + 20𝛾 = 1.4 ⇒ 10𝛾 = 0.19 ∴ 𝛾 = 0.019 ∴ 𝛽 + 0.19 = 1.21 ∴ 𝛽 = 1.02 Hence, the equation of area-elevation curve is given by 𝐴𝑦 = 6 + 1.02𝑦 + 0.019𝑦2 ans. Integrating this equation, we get 𝑆𝑦 = 6𝑦 + 1.02 𝑦2 2 + 0.019 𝑦3 3 + 𝐾 The constant K is obviously the reservoir capacity up to RL 200m which is given to be 14.1 ℎ𝑎. 𝑚. ∴ 𝑆𝑦 = 6𝑦 + 0.51𝑦2 + 0.0063𝑦3 + 14.1 Hence the capacity-elevation curve is given by 𝑆𝑦 = 0.0063𝑦3 + 0.51𝑦2 + 6𝑦 + 14.1 ans. To determine the capacity at rl 225m, we have to substitute 𝑦 = 225 − 200 = 25𝑚 in the above equation to obtain the requisite capacity in ℎ𝑎. 𝑚.,
  • 34. 𝑖. 𝑒. Required capacity at rl 225m = 0.0063 25 3 + 0.51 25 2 + 6 25 + 14.1 = 98.96 + 318.75 + 150 + 14.1 = 581.81ha. m. Ans. =****=
  • 35. Example 18.3. The daily flows in a river for the three consecutive years are given in the table by class interval along with the number of days the flow belonged to this class. What are the 50% and 75% dependable flows (annual and daily) for the river? Year 1981 Year 1982 Year 1983 S. So. Daily mean Discharge 𝑚3 𝑠 (Range) No. of days the flow belonged to the given range (class interval) No. of days the flow equaled the class range of col (2) No. of days the flow equaled the range given in col (2) 1 2 3 4 5 1 100-90.1 0 6 10 2 90-80.1 16 19 16 3 80-70.1 27 25 38 4 70-60.1 21 60 67 5 60-50.1 43 51 58 6 50-40.1 59 38 38 7 40-30.1 64 29 70 8 30-20.1 22 48 29 9 20-10.1 59 63 26 10 10-negligible 54 26 13
  • 36. Solution: With the given daily flows, we will calculate the annual yields for the given 3 years of records, as computed in Table 18.4. Since daily discharge figs, are given in range (interval), mid value of range (interval) can be assumed to be the flow discharge, which when multiplied by no. of days, will give yield during those days. Summation of yield values over 365 days will give annual yield, as shown in Table 18.4, which otherwise is self-explanatory. Year 1981 Year 1982 Year 1983 S. So. Daily mean Discharge 𝑚3 𝑠 (Range) Mean value of daily discharge range No. of days the flow belonged to the given range (class interval) Yield (𝑀𝑚3 ) = 𝑐𝑜𝑙 3 × 𝑐𝑜𝑙 (4) × 0.0864 No. of days the flow equaled the class range of col (2) Yield (M𝑚3 ) = 0.0864 × 𝑐𝑜𝑙 (3) × 𝑐𝑜𝑙 (6) No. of days the flow equaled the range given in col (2) Yield (M𝑚3 ) = 0.0864 × 𝑐𝑜𝑙 (3) × 𝑐𝑜𝑙 (8) (1) (2) (3) (4) (5) (6) (7) (8) (9) 1 100-90.1 95.05 0 0 6 49.25 10 82.08 2 90-80.1 85.05 16 117.50 19 139.54 16 117.50 3 80-70.1 75.05 27 174.96 25 162.00 38 246.24 4 70-60.1 65.05 21 117.94 60 336.96 67 376.27 5 60-50.1 55.05 43 204.34 51 242.35 58 275.62 6 50-40.1 45.05 59 229.39 38 147.77 38 147.74 7 40-30.1 35.05 64 193.54 29 87.70 70 211.68 8 30-20.1 25.05 22 47.52 48 103.68 29 62.64 9 20-10.1 15.05 59 74.34 63 81.65 26 33.70 10 10-negligible 5.05 54 23.33 26 11.23 13 5.62 ∑ 365 1182 86 365 1361.98 365 1559.09
  • 37. The river yield for 3 year is thus calculated by summation of col (5), (7) & (9). Let these yields be arranged in descending order. Order no. (𝑚) For p% dependability, = 𝑃 100 × 𝑁 …… (eq. 18.4) (1) Order no for 75% dependability = 75 100 × 3 = 2.25 Since order no. Of 2.25 is not an integer, the mean value of yield corresponding to S.No. 2 and 3 will be taken as yield for 75% dependability, given as, = 1361.98 + 1182.86 2 = 1272.42 𝑀𝑚3 Hence, annual flow with 75% dependability = 1272.42 𝑀𝑚3 ans. ∴ Daily flow (discharge) with 75% dependability, = 1272.42 × 106 365 × 86400 Τ 𝑚3 𝑠 = 𝟒𝟎. 𝟑𝟒 Τ 𝒎𝟑 𝒔 Ans. Year Annual Yield (𝑴𝒎𝟑 ) Order No. (𝒎) 1983 1559.09 1 1982 1361.98 2 1981 1182.86 3 𝑁 = 3
  • 38. (𝑖𝑖) Order no. For 50% dependability = 𝑃 100 × 𝑁 = 50 100 × 3 = 1.5 Since order no. Of 1.5 is not an integer, the mean value of yield corresponding to order no. 1 & 2 shall be taken as the yield of 50%. Dependability, given as: = 1559.09 + 1361.98 2 = 1460.54 𝑀𝑚3 Hence, annual flow with 50% dependability = 1460.54 𝑀𝑚3 ans. ∴ Daily flow (discharge) with 50% dependability, = 1460.54 × 106 365 × 86400 Τ 𝑚3 𝑠 = 𝟒𝟔. 𝟑𝟏 Τ 𝒎𝟑 𝒔 Ans. =****=
  • 39. Example 18.4. The design annual rainfall for the catchment of a proposed reservoir has been computed to be 99 cm. The catchment area has been estimated to have the mean annual temperature of 20°C. The catchment area contributing to the proposed reservoir is 1000 sq.Km. Calculate the annual design catchment yield for this reservoir. Make use of khosla’s formula. Solution: Using khosla’s formula connecting the design rainfall (p) with the design yield (q) as: Q = p − 0.48 tm Where, P = 99 cm (given) tm = 20°c (given) ∴ Q = 99 − 0.48 x 20 = 89.4 cm = 0.894 m The total yield produced in m3 from the given catchment of 1000 sq.Km (i. e. 1000 × 106m2) = 0.894 × 1000 × 106m3 = 894Mm3 ans. =****=