David Cammock - Trinidad Projects Highlights
Positions:
Project Delivery Manager
Project Campaign Manager
Facilities:
Hibiscus & Poinsettia Platforms
Central Block & Beachfield On-Shore
Gas Facilities
• Hibiscus Platform
Relocation and thereafter removal of Temporary Accommodation module.
Addition of new Permanent Accommodation module and helideck and associated
utilities upgrades.
Installation of Compression module.
• Poinsettia Platform
Installation of 65 x man temporary accommodation module.
Removal of 85 x man Temporary Accommodation module and helideck.
Addition of new Permanent Accommodation module and helideck and associated
utilities upgrades.
Control Room relocation and upgrade.
• Beachfield
Flare system replacement
VRU Compressor overhaul
Condensate Tank Bund Replacement
Opens Drains Upgrade
• Central Block
Relief and Blowdown system upgrade
Hot Oil Package upgrade
Three Phase Separator Upgrade
• As Project Delivery Manager I was responsible for
all Brownfield modification to the Hibiscus and
Poinsettia platforms as well as the Central Block
and Beachfield Gas processing facilities. I was
responsible for Projects in the SELECT, DEFINE and
EXECUTE phases.
• As Project Campaign Manager I was responsible
for integration and delivery of three major projects
on the Hibiscus and Poinsettia Platforms. These
being the Brownfield programme, installation and
integration of the Accommodation modules and
installation of the Hibiscus compression module.
• In both of these roles I managed a project team
comprising the following functions: HSSE, Quality,
Project Controls, Project Engineering, Engineering,
Contracts & Procurement, Operations Assurance,
Logistics, Community Liaison, Completions,
Construction and Commissioning.
• In both of these roles I was accountable for
delivery from EPCM contractors such as Fluor and
McDermott and numerous smaller contractors and
fabricators based in Trinidad and overseas.
• I managed 10 major shutdowns in these roles.
Project: Beachfield Flare Replacement
1. Existing Flare prior to removal 2. New Flare Stack off-loading
3. New Flare Tip installation 4. New Flare installed 5. New Flare commissioned
Project: Hibiscus & Poinsettia Projects
1. Helideck Removal from Poinsettia 2. Temporary Accommodation Module removal from Poinsettia Platform
3. Temporary Accommodation Module
removal from Poinsettia Platform
4. DB50 Installing Compression Module on Hibiscus Platform
Project: Hibiscus Platform (Compression & Accommodation Modules Installed)
5. Hibiscus Platform after installation of Compression and Accommodation Modules
Project:
Starfish - Dolphin Platform
Position:
Project Delivery Manager
Topsides:
HIPPS Module Fabrication & Installation
Platform and Jacket strengthening
Riser & I-tube clamps
Piping, Structural and E&I Upgrades / Stair towers / Deck Extensions
Hydraulic Power Unit
Topsides Umbilical Termination Assembly
Sub-surface Control Centre
Subs-sea - Installation by Dive Support Vessel or Pipelay vessel:
Flowlines & Metrology Spools
Riser & I-Tube Clamps
Riser
I-tube
Umbilical
Manifold
SSIV
Hydraulic Flying Leads
Electrical Flying Leads
Flexible Jumpers
• Starfish project was a sub-sea tieback to
Dolphin platform.
• As Project Delivery Manager I was responsible
for all Brownfield modification to Dolphin
platform, as well as the greenfield Subsea
scope. I managed the Execute phase of the
project on a day to day basis. I reported
directly to the Senior Project Manager.
• In this role I managed the project team
comprising the following functions: HSSE,
Quality, Project Controls, Project Engineering,
Engineering, Contracts & Procurement,
Operations Assurance, Logistics, Community
Liaison, Completions, Construction and
Commissioning.
• In this role I was accountable for delivery from
EPCM contractors Fluor and Technip and
numerous smaller contractors and fabricators
based in Trinidad and overseas.
• I managed 3 shutdowns in this role.
Project: Starfish
1. G1200 Preparing to Lift HIPPS Module 2. HIPPS Module Installation 3. HIPPS Module Installed
4. East side of Dolphin Platform after HIPPS Module Installation 6. Riser installation by G1200
5. Winches for Riser, I-Tube and Umbilical Installation
Project: Starfish
1. Dive Support Vessel ‘Norman Commander’ at Dolphin Platform
3. Subsea Clamp Installation
2. Clamps being closed after
Riser Installation
Project: Starfish
1. Dolphin Platform after Starfish Project
Position:
Project Delivery Manager
Facilities:
Dolphin Accommodation Project
(Fabrication, Installation & Integration)
• It should be noted that in 2010 I was the
Engineering Manager for this project.
• As Project Delivery Manager I was responsible
for fabrication, on-shore completions and
commissioning, transport & installation, off-
shore hook-up and commissioning.
• In this role I was the client management
representative on site for the fabrication of
the accommodation module at Bay’s facility in
Corpus Christi, Texas, USA.
• I was also responsible for managing the
Brownfield Team for on-shore commissioning
as well as off-shore installation, hook-up and
commissioning.
2. Helideck Installation
1. Preparing for Helideck Installation
3. HVAC Ducting & VAV boxes 4. Wet Units Installation
& Framing of Sleeping Quarters
5. Switchgear Installation
Project: Dolphin Accommodations
1. Accommodation Module with Helideck Installed

More Related Content

What's hot

Stockley Week 22 Airport Lines Possession - Share with Pride
Stockley Week 22 Airport Lines Possession - Share with PrideStockley Week 22 Airport Lines Possession - Share with Pride
Stockley Week 22 Airport Lines Possession - Share with PrideThomas Ingrey
 
Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoJorge Cabaco
 
CV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerCV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerPeter Storey
 
Eurohull LTD presentation
Eurohull LTD presentationEurohull LTD presentation
Eurohull LTD presentationEUROHULL LTD
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie ResumeBert Savoie
 
Lugo Marine - Barge Presentation 2011
Lugo Marine - Barge Presentation 2011Lugo Marine - Barge Presentation 2011
Lugo Marine - Barge Presentation 2011lugomarine
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
Evaluating logistical challenges of offshore module transportation
Evaluating logistical challenges of offshore module transportationEvaluating logistical challenges of offshore module transportation
Evaluating logistical challenges of offshore module transportationMerrylyn Yeo
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon CapabilityDamien Allen
 
GRANT GREEN OFFSHORE CV
GRANT GREEN OFFSHORE CVGRANT GREEN OFFSHORE CV
GRANT GREEN OFFSHORE CVGrant Green
 
McKajj Services Presentation (Long)
McKajj Services Presentation (Long)McKajj Services Presentation (Long)
McKajj Services Presentation (Long)Michael Haugh
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Steve Groombridge
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017Richard Batts
 

What's hot (20)

Stockley Week 22 Airport Lines Possession - Share with Pride
Stockley Week 22 Airport Lines Possession - Share with PrideStockley Week 22 Airport Lines Possession - Share with Pride
Stockley Week 22 Airport Lines Possession - Share with Pride
 
Rogers cv feb 2016
Rogers cv feb 2016Rogers cv feb 2016
Rogers cv feb 2016
 
Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge Cabaco
 
CV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerCV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-Manager
 
Eurohull LTD presentation
Eurohull LTD presentationEurohull LTD presentation
Eurohull LTD presentation
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
Lugo Marine - Barge Presentation 2011
Lugo Marine - Barge Presentation 2011Lugo Marine - Barge Presentation 2011
Lugo Marine - Barge Presentation 2011
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Evaluating logistical challenges of offshore module transportation
Evaluating logistical challenges of offshore module transportationEvaluating logistical challenges of offshore module transportation
Evaluating logistical challenges of offshore module transportation
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon Capability
 
GRANT GREEN OFFSHORE CV
GRANT GREEN OFFSHORE CVGRANT GREEN OFFSHORE CV
GRANT GREEN OFFSHORE CV
 
McKajj Services Presentation (Long)
McKajj Services Presentation (Long)McKajj Services Presentation (Long)
McKajj Services Presentation (Long)
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Compositeworks technical revolution
Compositeworks  technical revolution Compositeworks  technical revolution
Compositeworks technical revolution
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
Appendices
AppendicesAppendices
Appendices
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017
 
Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
 

Viewers also liked

Technical Article for Check-6
Technical Article for Check-6Technical Article for Check-6
Technical Article for Check-6Randy Stuart
 
Bahasa inggris narrative
Bahasa inggris narrativeBahasa inggris narrative
Bahasa inggris narrativefirmanchan
 
Estrategia en la introducción y uso de las
Estrategia en la introducción y uso de lasEstrategia en la introducción y uso de las
Estrategia en la introducción y uso de lasOneiragonzalez
 
무료 오션파라다이스 ≫mum888.com≪ 야마토 릴게임 야마토주소ye7
무료 오션파라다이스 ≫mum888.com≪ 야마토 릴게임 야마토주소ye7 무료 오션파라다이스 ≫mum888.com≪ 야마토 릴게임 야마토주소ye7
무료 오션파라다이스 ≫mum888.com≪ 야마토 릴게임 야마토주소ye7 rlaehdrb212
 
Capital Markets Day 2015, Nina Kopola, President & CEO on Nov 11
Capital Markets Day 2015, Nina Kopola, President & CEO on Nov 11Capital Markets Day 2015, Nina Kopola, President & CEO on Nov 11
Capital Markets Day 2015, Nina Kopola, President & CEO on Nov 11Suominen Corporation
 
Suominen Corporation results presentation Q3 2016
Suominen Corporation results presentation Q3 2016Suominen Corporation results presentation Q3 2016
Suominen Corporation results presentation Q3 2016Suominen Corporation
 
Universidad de Guayaquil
Universidad de GuayaquilUniversidad de Guayaquil
Universidad de GuayaquilGise Estefania
 
175호내지(수정) 1
175호내지(수정) 1175호내지(수정) 1
175호내지(수정) 1Jay Kim
 
3esi-Enersight-Strategy-and-Portfolio-Solution-Brochure
3esi-Enersight-Strategy-and-Portfolio-Solution-Brochure3esi-Enersight-Strategy-and-Portfolio-Solution-Brochure
3esi-Enersight-Strategy-and-Portfolio-Solution-BrochureHeather Ogle
 
Hr association annual report 2012-eng
Hr association annual report 2012-engHr association annual report 2012-eng
Hr association annual report 2012-engHR Association
 
Бакалавриат менеджмент профиль маркетинг
Бакалавриат менеджмент профиль маркетингБакалавриат менеджмент профиль маркетинг
Бакалавриат менеджмент профиль маркетингMaxim Kosyakov
 
Suominen's investor presentation, Oslo, 1 September 2015
Suominen's investor presentation, Oslo, 1 September 2015Suominen's investor presentation, Oslo, 1 September 2015
Suominen's investor presentation, Oslo, 1 September 2015Suominen Corporation
 
Hr and admin progress report 19th bo d meeting_english
Hr and admin progress report 19th bo d meeting_englishHr and admin progress report 19th bo d meeting_english
Hr and admin progress report 19th bo d meeting_englishValerie S. TABIOU - AKPLOGAN
 

Viewers also liked (16)

Technical Article for Check-6
Technical Article for Check-6Technical Article for Check-6
Technical Article for Check-6
 
Bahasa inggris narrative
Bahasa inggris narrativeBahasa inggris narrative
Bahasa inggris narrative
 
Doc1
Doc1Doc1
Doc1
 
Estrategia en la introducción y uso de las
Estrategia en la introducción y uso de lasEstrategia en la introducción y uso de las
Estrategia en la introducción y uso de las
 
무료 오션파라다이스 ≫mum888.com≪ 야마토 릴게임 야마토주소ye7
무료 오션파라다이스 ≫mum888.com≪ 야마토 릴게임 야마토주소ye7 무료 오션파라다이스 ≫mum888.com≪ 야마토 릴게임 야마토주소ye7
무료 오션파라다이스 ≫mum888.com≪ 야마토 릴게임 야마토주소ye7
 
Capital Markets Day 2015, Nina Kopola, President & CEO on Nov 11
Capital Markets Day 2015, Nina Kopola, President & CEO on Nov 11Capital Markets Day 2015, Nina Kopola, President & CEO on Nov 11
Capital Markets Day 2015, Nina Kopola, President & CEO on Nov 11
 
Suominen Corporation results presentation Q3 2016
Suominen Corporation results presentation Q3 2016Suominen Corporation results presentation Q3 2016
Suominen Corporation results presentation Q3 2016
 
Universidad de Guayaquil
Universidad de GuayaquilUniversidad de Guayaquil
Universidad de Guayaquil
 
175호내지(수정) 1
175호내지(수정) 1175호내지(수정) 1
175호내지(수정) 1
 
3esi-Enersight-Strategy-and-Portfolio-Solution-Brochure
3esi-Enersight-Strategy-and-Portfolio-Solution-Brochure3esi-Enersight-Strategy-and-Portfolio-Solution-Brochure
3esi-Enersight-Strategy-and-Portfolio-Solution-Brochure
 
Hr association annual report 2012-eng
Hr association annual report 2012-engHr association annual report 2012-eng
Hr association annual report 2012-eng
 
Бакалавриат менеджмент профиль маркетинг
Бакалавриат менеджмент профиль маркетингБакалавриат менеджмент профиль маркетинг
Бакалавриат менеджмент профиль маркетинг
 
CUCI
 CUCI CUCI
CUCI
 
Suominen's investor presentation, Oslo, 1 September 2015
Suominen's investor presentation, Oslo, 1 September 2015Suominen's investor presentation, Oslo, 1 September 2015
Suominen's investor presentation, Oslo, 1 September 2015
 
Hr and admin progress report 19th bo d meeting_english
Hr and admin progress report 19th bo d meeting_englishHr and admin progress report 19th bo d meeting_english
Hr and admin progress report 19th bo d meeting_english
 
Serie esofagogastroduodenal
Serie esofagogastroduodenalSerie esofagogastroduodenal
Serie esofagogastroduodenal
 

Similar to Project Overview - D.Cammock

David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin
 
930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdfRaviNobleseas
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaStephen McKnight
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cvGeoff Chandler
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie ResumeBert Savoie
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webPaul Heinrich
 
Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Jerry Brown
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyMike Bisland
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2john rhynold
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Malcolm Kiper
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docxcravennichole326
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018TECNALIA Marine Energy
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxcravennichole326
 
Summary chunnel tunnel project management
Summary chunnel tunnel project managementSummary chunnel tunnel project management
Summary chunnel tunnel project managementNilesh Dhotre
 

Similar to Project Overview - D.Cammock (20)

David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LP
 
930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
Simon Murphy CV
Simon Murphy CVSimon Murphy CV
Simon Murphy CV
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
Resume 1
Resume 1 Resume 1
Resume 1
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
Pgt resume 042416
Pgt resume 042416Pgt resume 042416
Pgt resume 042416
 
Mishref Pump Station
Mishref Pump StationMishref Pump Station
Mishref Pump Station
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docx
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docx
 
Summary chunnel tunnel project management
Summary chunnel tunnel project managementSummary chunnel tunnel project management
Summary chunnel tunnel project management
 

Project Overview - D.Cammock

  • 1. David Cammock - Trinidad Projects Highlights
  • 2. Positions: Project Delivery Manager Project Campaign Manager Facilities: Hibiscus & Poinsettia Platforms Central Block & Beachfield On-Shore Gas Facilities • Hibiscus Platform Relocation and thereafter removal of Temporary Accommodation module. Addition of new Permanent Accommodation module and helideck and associated utilities upgrades. Installation of Compression module. • Poinsettia Platform Installation of 65 x man temporary accommodation module. Removal of 85 x man Temporary Accommodation module and helideck. Addition of new Permanent Accommodation module and helideck and associated utilities upgrades. Control Room relocation and upgrade. • Beachfield Flare system replacement VRU Compressor overhaul Condensate Tank Bund Replacement Opens Drains Upgrade • Central Block Relief and Blowdown system upgrade Hot Oil Package upgrade Three Phase Separator Upgrade • As Project Delivery Manager I was responsible for all Brownfield modification to the Hibiscus and Poinsettia platforms as well as the Central Block and Beachfield Gas processing facilities. I was responsible for Projects in the SELECT, DEFINE and EXECUTE phases. • As Project Campaign Manager I was responsible for integration and delivery of three major projects on the Hibiscus and Poinsettia Platforms. These being the Brownfield programme, installation and integration of the Accommodation modules and installation of the Hibiscus compression module. • In both of these roles I managed a project team comprising the following functions: HSSE, Quality, Project Controls, Project Engineering, Engineering, Contracts & Procurement, Operations Assurance, Logistics, Community Liaison, Completions, Construction and Commissioning. • In both of these roles I was accountable for delivery from EPCM contractors such as Fluor and McDermott and numerous smaller contractors and fabricators based in Trinidad and overseas. • I managed 10 major shutdowns in these roles.
  • 3. Project: Beachfield Flare Replacement 1. Existing Flare prior to removal 2. New Flare Stack off-loading 3. New Flare Tip installation 4. New Flare installed 5. New Flare commissioned
  • 4. Project: Hibiscus & Poinsettia Projects 1. Helideck Removal from Poinsettia 2. Temporary Accommodation Module removal from Poinsettia Platform 3. Temporary Accommodation Module removal from Poinsettia Platform 4. DB50 Installing Compression Module on Hibiscus Platform
  • 5. Project: Hibiscus Platform (Compression & Accommodation Modules Installed) 5. Hibiscus Platform after installation of Compression and Accommodation Modules
  • 6. Project: Starfish - Dolphin Platform Position: Project Delivery Manager Topsides: HIPPS Module Fabrication & Installation Platform and Jacket strengthening Riser & I-tube clamps Piping, Structural and E&I Upgrades / Stair towers / Deck Extensions Hydraulic Power Unit Topsides Umbilical Termination Assembly Sub-surface Control Centre Subs-sea - Installation by Dive Support Vessel or Pipelay vessel: Flowlines & Metrology Spools Riser & I-Tube Clamps Riser I-tube Umbilical Manifold SSIV Hydraulic Flying Leads Electrical Flying Leads Flexible Jumpers • Starfish project was a sub-sea tieback to Dolphin platform. • As Project Delivery Manager I was responsible for all Brownfield modification to Dolphin platform, as well as the greenfield Subsea scope. I managed the Execute phase of the project on a day to day basis. I reported directly to the Senior Project Manager. • In this role I managed the project team comprising the following functions: HSSE, Quality, Project Controls, Project Engineering, Engineering, Contracts & Procurement, Operations Assurance, Logistics, Community Liaison, Completions, Construction and Commissioning. • In this role I was accountable for delivery from EPCM contractors Fluor and Technip and numerous smaller contractors and fabricators based in Trinidad and overseas. • I managed 3 shutdowns in this role.
  • 7. Project: Starfish 1. G1200 Preparing to Lift HIPPS Module 2. HIPPS Module Installation 3. HIPPS Module Installed 4. East side of Dolphin Platform after HIPPS Module Installation 6. Riser installation by G1200 5. Winches for Riser, I-Tube and Umbilical Installation
  • 8. Project: Starfish 1. Dive Support Vessel ‘Norman Commander’ at Dolphin Platform 3. Subsea Clamp Installation 2. Clamps being closed after Riser Installation
  • 9. Project: Starfish 1. Dolphin Platform after Starfish Project
  • 10. Position: Project Delivery Manager Facilities: Dolphin Accommodation Project (Fabrication, Installation & Integration) • It should be noted that in 2010 I was the Engineering Manager for this project. • As Project Delivery Manager I was responsible for fabrication, on-shore completions and commissioning, transport & installation, off- shore hook-up and commissioning. • In this role I was the client management representative on site for the fabrication of the accommodation module at Bay’s facility in Corpus Christi, Texas, USA. • I was also responsible for managing the Brownfield Team for on-shore commissioning as well as off-shore installation, hook-up and commissioning. 2. Helideck Installation 1. Preparing for Helideck Installation 3. HVAC Ducting & VAV boxes 4. Wet Units Installation & Framing of Sleeping Quarters 5. Switchgear Installation
  • 11. Project: Dolphin Accommodations 1. Accommodation Module with Helideck Installed