This document provides a summary of Roger Newton-Darby's qualifications and professional experience. It lists his contact information, qualifications which include HSE diving certifications, and over 10 years of experience in various roles such as air diver, deck crew, and rigger for companies performing offshore oil and gas, renewable energy, and civil engineering projects. His experience includes tasks such as equipment preparation and deployment, installation and recovery of structures, and underwater construction work to depths of over 20 meters.
Roger Newton-Darby's Resume: Experienced HSE Air Diver Rigger
1. ROGER NEWTON-DARBY
22 Parham road /Gosport / Hampshire / PO12 4UD
Mobile +44 (0)7789882530 / Home Tel +44 (0) 2392 602497
Rog_nd@outlook.com
Summery
Safety conscious,Energetic, Physically fit, 34 year old, HSE Air Diver Rigger with DSV & Renewable
Energy Civils experience.
___________________________________________________________________________________
Qualifications and Training
HSE Part 1 & Top Up
BOSIET-HUET & CA-EBS Approved-OPITAOffshore expires Jan 2016
Rigger stages 3 OPITA expire July 2016
First Aid At Work Sept 2016
O2 providers cert no O2-045-003 expires 05-05-18
MTCS Off-Shore Air Diver
H.S.E Closed Bell Diving Cert 07/2/01782/(CB)
Professional Experience
2015 Company: Harkand ISS
Aug Client: TTBP
Position Air Diver
Vessel: Harkand Da Vinci (Trinidad)
Deck Duties: preparation of equipment. Deployment of Oceaneering Survey
. Baskets & LP HP Hoses + Hydrotight o rings and opperation
2015 Company: Harkand ISS
Aug Client: Maersk
Position: Deck Crew
Vessel: Harkand Da Vinci
Deck Duties: preparation of equipment. Deployment of Cooling structure + four
Circular pile legs. Wet store flexi flow coil, Recover mattresses
Project installation of cooling structure at Balloch field
2015 Company: Harkand ISS
July Client: Taqa
Position: Diver
Vessel: Harkand Atlantisi
Dive Duties: Installation and dismantling of Rigging & Cutting / sawing .
Project Harding Caisson Intervention & recovery
2015 Company: Harkand ISS
June Client: Apache
Position: Deck Crew
Vessel: Harkand Go Electra
Deck Duties: preparation of equipment/soft pipe tagline & deployment.
Project winch operation & deployment & recovery of Crane Grab.
2. 2014-2015 Company: Harkand ISS
Dec-Jan Client: BGTT
Position: Deck Crew
Vessel: Harkand Go Electra
Deck Duties: preparation of equipment & deployment of all deck works,
Project Trinidad winch operation deployment & recovery.
2014 Nov Company: Harkand ISS
Client: BGTT
Position: Deck Crew
Vessel: Harkand Go Electra
Deck Duties: preparation of equipment & deployment of all deck works,
Project Trinidad package maintenance & tidiness
2014 Aug-Sept Company: Harkand ISS
Client: Taqa
Vessel: Harkand Di Vinci
Position: Deck Crew
Deck Duties: preparation of equipment & deployment of all works cages,with use
of forward & mid-ship winches + crane. Winch operating,
project Ensco-80 package maintenance & tidiness
2014 June-July Company: Harkand ISS
Client: Apache
Position: Deck Crew
Vessel: Harkand Atlantis
Deck Duties: preparation of equipment & deployment of all works cages,with use
of forward & mid-ship winches + crane. Hydrotight operating,
project package maintenance & tidiness
2014 May-June Company: Harkand ISS
Client: Teekay Petrojarl
Position: Air Diver
Vessel: Harkand Da Vinci
Depth: 15m
Duties: installing clamps on risers at Forties Bravo & Beryle Bravo
Deck Duties: preparation and deployment of Golden gate and Lars operation for
both dive cages
2013-2014 Company: DCN
Client: FCBC /Scottish Transport
Position: Air Diver
Vessel: Anna S Fourth Bridge
Depth: 13m
Duties: Trench prep inside caisson walls for Concrete poor, Airlifting, Lp
water jetting the river bed ready for final caisson
readiness & for inspection of bed rock on the Fourth Bridge project
2013 Company: DCN
Client: Zublin
Position: Air Diver
Vessel: shore side/Dive barge 1 & 2 Stockholm
3. Depth: 23m
Duties: Brocco cutting, core drilling, Fixing Diamond cutting wire
Pad eye fitting to Concrete wall Extraction
Install/removal of jacks/hydraulics & inspection for emersion of
tunnelelements at JV Soderstromstunnel
in Soder Malarstrand south,riddarholmen north
Stockholm Sweden
2013 Company: Red 7 Marine
Client: ACE / Environment Agency
Position: Air Diver
Vessel: Assassin / shore side, Dover
Depth: 6m
Duties: Fixing eel passes,river & sea wall defenses,pile UT readings
Dover, South quay, themes & Ely
2012 Company: Reds LTD
Client: Centrica
Position: Air Diver
Vessel: European Seaway / Cardenio
Depth: 4m
Duties: Rigging & de-rigging of diving equipment on wind turbines,
Diving internal, external maintenance & survey’s
2012 Company: Red 7 Marine
Client: Costain Limited
Position: Air Diver
Vessel: Uni float Dive container
Depth: 9.10m
Duties: Instillation of reinforced circular piles for a new bridge
Walton-on-Themes
2012 Company: Red 7 Marine
Client: MACE / Emirates
Position: Air Diver
Vessel: Haven Sea Reach/Assassin
Depth: 9.10m
Duties: Fixing clamps for grouting all river side defensive piles +
fitting pontoons North Greenwich Emirates cable car
2012 Company: Red 7 Marine
Client: Eon UK / Rampion
Position: Air Diver
Vessel: Grey Mammoth + Fourth Jouster
Depth: 21m
Duties: Scour protection mattes placement Off-shore off Brighton-Hove
2012 / 2011 Company: Red 7 Marine
Client: Costain Limited
Position: Air Diver / Burner
Vessel: GPS Boxer + Williams 501
Depth: 9.10m
Duties: Larson pile removal Bradwell Power station
2011 Company: Red 7 Marine
Client: MACE
4. Position: Air Diver
Vessel: Assassin
Depth: 1m
Duties: works fitting St George’s pontoon London Themes
Unexploded ordnance removal Vauxhall
2011 Company: Red 7 Marine
Client: Cross rail link
Position: Air Diver
Vessel: Key side Installation
Depth: 9.10m
Duties: Pre-Installing Plastic cusp pipes with sand bags
for completion of major backfill Canary Wharf.
2010 Company: Red 7 Marine
Client: Costain Limited
Position: Air Diver
Vessel: River side Installation
Depth: 4m
Duties: Burning sheet Larson pile wall ST GERMANS
2010 Company: Red 7 Marine
Client: Siemens
Position: Rigger
Vessel: Haven Sea Reach
Duties: Removal of 3 Backactors from Seasalter Flats
2010 Company: AMC subsea
Client: Montrose Port Authority
Position: Air Diver / Rigger
Vessel: Dredging barge
Duties: Core drilling concrete slab and assisting with deployment of charge.