1. Task RiskIdentified Riskrating(5 beinghigh) Solution Contacts
Photoshootatlocationone
(AR3)
Trip hazardsof chairs&
tables
3/5 To tide area before the
shootto ensure thatthere is
nothingtotrip over
Teacher– AJO& EMG,
Parentsare aware of the
task andthe locationwhere
we will be doingour
photoshoot.
Headachesfromstrong
lights
4/5 Make sure that actors have
enoughbreaksbetween
shootsto ensure headaches
do notoccur
Wet FloorHazards
2/5 Checkfloorbefore starting
shoot
PhotoshootatPossible
Locationtwo (SP4)
Trips& FallsonSlippery
ground
4/5 To warn cast and crewwhilst
walkingtolocation.Iwill
leadthe wayand bringa first
aidkit
Equipmentbreaking 3/5 Equipmentwill be handled
carefullyandstoredwith
care
Parentswill be aware of
task andlocation.If an
emergencyhappens999
will be phonedaswell as
all parentsColdweather 3/5 Advise thatall cast wear
suitable clothingaswell as
lookat the forecastfor the
photoshootday.