Project Manager
Project management is an analytical role. It is the responsibility of
the project manager to ensure that the project progresses fluently,
deliveries are on time, and deadlines and milestones met.
The project manager controls and organizes the patterns in moving
pieces — designers, developers, clients and everyone involved —
keeping each individual on track to perform as one integrated unit.
Planning and Defining Scope
Activity Planning and Sequencing
Developing Schedules
Time Estimating & Cost Estimating
Risk Analysis
Monitoring and Reporting Progress
Controlling Quality
Documentation & Developing a Budget
Tasks and Responsibilities:
Project Manager
www.cubix.co
www.cubix.co
Project Manager
The project manager is responsible for sequence Activities which is the process of
identifying and documenting relationships among the project activities. The key
benefit of this process is that it defines the logical sequence of work to obtain the
greatest efficiency given all project constraints.
Activity Planning and Sequencing
www.cubix.co
Project Manager
The project manager is responsible for project scope which is the part of
project planning that involves determining and documenting a list of specific
project goals, deliverables, features, functions, tasks, deadlines, and ultimately
costs. In other words, it is what needs to be achieved and the work that must be
done to deliver a project.
Planning and Defining Scope
www.cubix.co
Project Manager
The project manager is responsible for identifying and organizing project tasks into
a sequence of events that create the project management plan. A variety of inputs
and tools are used in the scheduling process, all of which are designed to help you
understand your resources, your constraints, and your risks.
Developing Schedules
www.cubix.co
Project Manager
The project manager is responsible for accurate time estimation as it is a crucial
skill in project management. Without it, you won't know how long your project will
take, and you won't be able to get commitment from the people who need to sign
it off. A problem with a cost overrun can be avoided with a credible, reliable, and
accurate cost estimate.
Time Estimating & Cost Estimating
www.cubix.co
Project Manager
Standardization and clear interfaces are critical to a heterogeneous environment,
enabling users to develop strategies for communicating throughout their
network. This enables application developers to reduce software development
costs and bring products to market quickly, and enables users to upgrade hardware
while retaining their software applications and minimizing conversion costs.
Interoperability and Portability Analysis
www.cubix.co
Project Manager
Risk Analysis
The project manager is responsible for Risk analysis - the review of
the risks associated with a particular event or action. It is applied to projects,
information technology, security issues and any action where risks may be
analyzed on a quantitative and qualitative basis.
www.cubix.co
Project Manager
Monitoring & Reporting Progress
The project manager is responsible for assessing progress and formulating reports
based on the outcomes to identify the gap and take measures to increase
productivity.
www.cubix.co
Project Manager
Controlling Quality
The project manager is responsible for quality assurance of the project making
sure that the project is free from any hinder and avoid any forthcoming hiccup.
www.cubix.co
Project Manager
Documentation & Developing a Budget
Project documentation is used to define the way we manage projects and the
governance surrounding them. Project budgets, similar to resource plans, are a
reflection of project work and the timing of that work. A comprehensive budget
provides management with an understanding of how funds will be utilized and
expended over time for projects or operations.
www.cubix.co
Product Manager
The product management is a strategic role. It is the responsibility of the product
manager to define exactly what the product is and who it is for. It is then up to the
project manager — and the rest of the team — to then follow this directive.
The product managers play a vital role in the success or failures of a
project since all other team members look toward them for
guidance and direction on the overall product vision. If this vision is
incomplete, then the project will most certainly suffer.
Strategy
Releases
Ideation
Features
Go-to-Market
Tasks and Responsibilities:
www.cubix.co
Product Manager
www.cubix.co
Product Manager
The product manager is responsible for setting a product vision and strategy. Their
job is to clearly articulate the business value to the product team so they
understand the intent behind the new product or product release. They own the
strategy behind the product along with its roadmap and must work with
engineering to build what matters.
Strategy
www.cubix.co
Product Manager
PMs must plan for what their teams will deliver and when they will deliver it. This
holds true no matter which dev methodologies product teams use. The product
manager owns the release aspect of product. Responsibilities include knowing
when (and when not) to create a master release; managing features and
dependencies in and across releases; and managing releases with phases and
milestones.
Releases
www.cubix.co
Product Manager
Product managers own ideation -- the creative process of generating, developing,
and curating new ideas. They collect, curate, and promote the most relevant ideas
into features. They know which ideas should be promoted to features -- the ones
that will achieve key objectives for the product line and business. They also ensure
that key feedback and requests are seamlessly integrated into their product
planning and development processes.
Ideation
www.cubix.co
Product Manager
The product manager defines the features and requirements necessary to deliver a
complete product to market and lead the product team to success. They are
responsible for articulating the ‘what’ and working with engineering to determine
the ‘when’.
Features
www.cubix.co
Product Manager
The product manager is typically seen as the CEO of a product. For the product
manager, this means they are responsible for making product decisions and often
is the lead resource for the rest of the organization when deep product expertise is
required. This includes supporting the organizations that help bring the product to
market and work directly with customers -- namely marketing, sales and support.
Go-To-Market
Project Manager Product Manager
Build a product
Add new features to a product
Create new versions or extensions of a
product
Manage a team of designers and
developers, and track their work.
Keep the project on time and in
budget with giving transparency to the
client. Who in often times is the Product
Manager type-role in application
development.
Use a variety of project management
tools to accomplish their task
Gather and prioritize product and
customer requirements
Define the product vision
Work with sales and marketing to
ensure revenue and customer
satisfaction goals are met
Vs.
www.cubix.co
Product and project management are similar concepts— but in order to
create a successful product, you need to understand how these concepts
differ.
Project management focuses internally to achieve specific objectives and
complete the project on time and under budget. Once the project is done,
that project is no longer ‘managed’. Product Management takes a broader
view, and focuses externally on the customer and the overall and
continued success of the project.
Although it’s possible to have one person fill both the product and
project manager roles, it’s ideal to separate these roles to avoid conflicts
of interest and underperformance.
www.cubix.co
Why Both Are Needed?
At Cubix, we not only associate a product manager along with a project
manager for every project, but our clientele work with product managers
from the very beginning. Thus, allowing every project to be conceptualized
with a strategist before the project kicks off, and then undergoing numerous
discovery workshops before jumping into development, to ensure the
product has everything it needs for an initial roll out.
For more information read our post Project Manager Vs. Product Manager
www.cubix.co
What We Practice at Cubix?

More Related Content

What's hot

Intro to Project Management/Waterfall 2022
Intro to Project Management/Waterfall 2022Intro to Project Management/Waterfall 2022
Intro to Project Management/Waterfall 2022Julija Melnika
 
Project management roles in context - PRINCE2 introduction
Project management roles in context - PRINCE2 introductionProject management roles in context - PRINCE2 introduction
Project management roles in context - PRINCE2 introductionNorthumbria University
 
Role of a Project Manager.. in nutshell
Role of a Project Manager.. in nutshellRole of a Project Manager.. in nutshell
Role of a Project Manager.. in nutshellSamir Paralikar
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Managerkanti choudhary
 
Project Management 101
Project Management 101Project Management 101
Project Management 101MurftheSurf
 
Project Management Best Practices: Brock Boddie/General Assembly
Project Management Best Practices: Brock Boddie/General AssemblyProject Management Best Practices: Brock Boddie/General Assembly
Project Management Best Practices: Brock Boddie/General AssemblyGeneral Assembly
 
Ppt for Real Estate Project
Ppt for Real Estate ProjectPpt for Real Estate Project
Ppt for Real Estate ProjectIsha M
 
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...systred
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for allSurgyy Design
 
CRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsCRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsChris Gorga
 
Top10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful ProjectTop10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful Projectarjencornelisse
 
Role of Project Manager
Role of Project ManagerRole of Project Manager
Role of Project ManagerMuhammad khan
 
Software Project Management Lab Manual Lab 1
Software Project Management Lab  Manual  Lab 1Software Project Management Lab  Manual  Lab 1
Software Project Management Lab Manual Lab 1sundas Shabbir
 
2. characteristics of a projec
2. characteristics of a projec2. characteristics of a projec
2. characteristics of a projecDr. Johnson Mavole
 
It project management and best practices
It project management and best practicesIt project management and best practices
It project management and best practicesNaresh Pokhriyal
 

What's hot (20)

Project management best practices
Project management best practicesProject management best practices
Project management best practices
 
Intro to Project Management/Waterfall 2022
Intro to Project Management/Waterfall 2022Intro to Project Management/Waterfall 2022
Intro to Project Management/Waterfall 2022
 
Project management roles in context - PRINCE2 introduction
Project management roles in context - PRINCE2 introductionProject management roles in context - PRINCE2 introduction
Project management roles in context - PRINCE2 introduction
 
Role of a Project Manager.. in nutshell
Role of a Project Manager.. in nutshellRole of a Project Manager.. in nutshell
Role of a Project Manager.. in nutshell
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Manager
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Project Management 101
Project Management 101Project Management 101
Project Management 101
 
Project Management Best Practices: Brock Boddie/General Assembly
Project Management Best Practices: Brock Boddie/General AssemblyProject Management Best Practices: Brock Boddie/General Assembly
Project Management Best Practices: Brock Boddie/General Assembly
 
Ppt for Real Estate Project
Ppt for Real Estate ProjectPpt for Real Estate Project
Ppt for Real Estate Project
 
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for all
 
CRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsCRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management Benefits
 
Top10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful ProjectTop10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful Project
 
Project Management Basics
Project Management BasicsProject Management Basics
Project Management Basics
 
Role of Project Manager
Role of Project ManagerRole of Project Manager
Role of Project Manager
 
Software Project Management Lab Manual Lab 1
Software Project Management Lab  Manual  Lab 1Software Project Management Lab  Manual  Lab 1
Software Project Management Lab Manual Lab 1
 
2. characteristics of a projec
2. characteristics of a projec2. characteristics of a projec
2. characteristics of a projec
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
It project management and best practices
It project management and best practicesIt project management and best practices
It project management and best practices
 
Project
ProjectProject
Project
 

Similar to Difference Between Product Manager and Project Manager - Defining the Roles and Responsibility

Top Project Management Best Practices.pdf
Top Project Management Best Practices.pdfTop Project Management Best Practices.pdf
Top Project Management Best Practices.pdfOrangescrum
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdfJamieDornan2
 
Project management playbook innovate vancouver (2019)
Project management playbook   innovate vancouver (2019)Project management playbook   innovate vancouver (2019)
Project management playbook innovate vancouver (2019)Innovate Vancouver
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
 
Software Project Management (SPM)
Software Project Management (SPM)Software Project Management (SPM)
Software Project Management (SPM)RubySaud
 
Software project management- Software Engineering
Software project management- Software EngineeringSoftware project management- Software Engineering
Software project management- Software EngineeringMuhammad Yousuf Abdul Qadir
 
A Guide to Software Development Manager Responsibilities.pdf
A Guide to Software Development Manager Responsibilities.pdfA Guide to Software Development Manager Responsibilities.pdf
A Guide to Software Development Manager Responsibilities.pdfLaura Miller
 
Digital project management
Digital project managementDigital project management
Digital project managementHafizaEmanFatima
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment helpassignmenthelpp
 
FINALS-INFO-MGT.-LESSON-1.pptx
FINALS-INFO-MGT.-LESSON-1.pptxFINALS-INFO-MGT.-LESSON-1.pptx
FINALS-INFO-MGT.-LESSON-1.pptxshiedakayn1
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleKate Pynn
 
ProgrammsStrategy HQ.pdf
ProgrammsStrategy HQ.pdfProgrammsStrategy HQ.pdf
ProgrammsStrategy HQ.pdfVograce
 
Managing Projects for Digital Innovation Culture
Managing Projects for Digital Innovation CultureManaging Projects for Digital Innovation Culture
Managing Projects for Digital Innovation CultureHoward Jess Mijares II
 
Project_management_Amit_dubey
Project_management_Amit_dubeyProject_management_Amit_dubey
Project_management_Amit_dubeyAmit Dubey
 
SWE-401 - 3. Software Project Management
SWE-401 - 3. Software Project ManagementSWE-401 - 3. Software Project Management
SWE-401 - 3. Software Project Managementghayour abbas
 
Project management 02112009
Project management 02112009Project management 02112009
Project management 02112009Manish Chaurasia
 
Quality software project managementi need deep explanation for thi.pdf
Quality software project managementi need deep explanation for thi.pdfQuality software project managementi need deep explanation for thi.pdf
Quality software project managementi need deep explanation for thi.pdfalokkesh
 
Software project management
Software project managementSoftware project management
Software project managementPAWAN KUMAR
 

Similar to Difference Between Product Manager and Project Manager - Defining the Roles and Responsibility (20)

Top Project Management Best Practices.pdf
Top Project Management Best Practices.pdfTop Project Management Best Practices.pdf
Top Project Management Best Practices.pdf
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdf
 
Project management playbook innovate vancouver (2019)
Project management playbook   innovate vancouver (2019)Project management playbook   innovate vancouver (2019)
Project management playbook innovate vancouver (2019)
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
Software Project Management (SPM)
Software Project Management (SPM)Software Project Management (SPM)
Software Project Management (SPM)
 
Software project management- Software Engineering
Software project management- Software EngineeringSoftware project management- Software Engineering
Software project management- Software Engineering
 
A Guide to Software Development Manager Responsibilities.pdf
A Guide to Software Development Manager Responsibilities.pdfA Guide to Software Development Manager Responsibilities.pdf
A Guide to Software Development Manager Responsibilities.pdf
 
Digital project management
Digital project managementDigital project management
Digital project management
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
FINALS-INFO-MGT.-LESSON-1.pptx
FINALS-INFO-MGT.-LESSON-1.pptxFINALS-INFO-MGT.-LESSON-1.pptx
FINALS-INFO-MGT.-LESSON-1.pptx
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
ProgrammsStrategy HQ.pdf
ProgrammsStrategy HQ.pdfProgrammsStrategy HQ.pdf
ProgrammsStrategy HQ.pdf
 
Managing Projects for Digital Innovation Culture
Managing Projects for Digital Innovation CultureManaging Projects for Digital Innovation Culture
Managing Projects for Digital Innovation Culture
 
Project_management_Amit_dubey
Project_management_Amit_dubeyProject_management_Amit_dubey
Project_management_Amit_dubey
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
SWE-401 - 3. Software Project Management
SWE-401 - 3. Software Project ManagementSWE-401 - 3. Software Project Management
SWE-401 - 3. Software Project Management
 
Project management 02112009
Project management 02112009Project management 02112009
Project management 02112009
 
Quality software project managementi need deep explanation for thi.pdf
Quality software project managementi need deep explanation for thi.pdfQuality software project managementi need deep explanation for thi.pdf
Quality software project managementi need deep explanation for thi.pdf
 
Software project management
Software project managementSoftware project management
Software project management
 

Recently uploaded

Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 

Recently uploaded (20)

Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 

Difference Between Product Manager and Project Manager - Defining the Roles and Responsibility

  • 2. www.cubix.co Project Manager Project management is an analytical role. It is the responsibility of the project manager to ensure that the project progresses fluently, deliveries are on time, and deadlines and milestones met.
  • 3. The project manager controls and organizes the patterns in moving pieces — designers, developers, clients and everyone involved — keeping each individual on track to perform as one integrated unit. Planning and Defining Scope Activity Planning and Sequencing Developing Schedules Time Estimating & Cost Estimating Risk Analysis Monitoring and Reporting Progress Controlling Quality Documentation & Developing a Budget Tasks and Responsibilities: Project Manager www.cubix.co
  • 4. www.cubix.co Project Manager The project manager is responsible for sequence Activities which is the process of identifying and documenting relationships among the project activities. The key benefit of this process is that it defines the logical sequence of work to obtain the greatest efficiency given all project constraints. Activity Planning and Sequencing
  • 5. www.cubix.co Project Manager The project manager is responsible for project scope which is the part of project planning that involves determining and documenting a list of specific project goals, deliverables, features, functions, tasks, deadlines, and ultimately costs. In other words, it is what needs to be achieved and the work that must be done to deliver a project. Planning and Defining Scope
  • 6. www.cubix.co Project Manager The project manager is responsible for identifying and organizing project tasks into a sequence of events that create the project management plan. A variety of inputs and tools are used in the scheduling process, all of which are designed to help you understand your resources, your constraints, and your risks. Developing Schedules
  • 7. www.cubix.co Project Manager The project manager is responsible for accurate time estimation as it is a crucial skill in project management. Without it, you won't know how long your project will take, and you won't be able to get commitment from the people who need to sign it off. A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate. Time Estimating & Cost Estimating
  • 8. www.cubix.co Project Manager Standardization and clear interfaces are critical to a heterogeneous environment, enabling users to develop strategies for communicating throughout their network. This enables application developers to reduce software development costs and bring products to market quickly, and enables users to upgrade hardware while retaining their software applications and minimizing conversion costs. Interoperability and Portability Analysis
  • 9. www.cubix.co Project Manager Risk Analysis The project manager is responsible for Risk analysis - the review of the risks associated with a particular event or action. It is applied to projects, information technology, security issues and any action where risks may be analyzed on a quantitative and qualitative basis.
  • 10. www.cubix.co Project Manager Monitoring & Reporting Progress The project manager is responsible for assessing progress and formulating reports based on the outcomes to identify the gap and take measures to increase productivity.
  • 11. www.cubix.co Project Manager Controlling Quality The project manager is responsible for quality assurance of the project making sure that the project is free from any hinder and avoid any forthcoming hiccup.
  • 12. www.cubix.co Project Manager Documentation & Developing a Budget Project documentation is used to define the way we manage projects and the governance surrounding them. Project budgets, similar to resource plans, are a reflection of project work and the timing of that work. A comprehensive budget provides management with an understanding of how funds will be utilized and expended over time for projects or operations.
  • 13. www.cubix.co Product Manager The product management is a strategic role. It is the responsibility of the product manager to define exactly what the product is and who it is for. It is then up to the project manager — and the rest of the team — to then follow this directive.
  • 14. The product managers play a vital role in the success or failures of a project since all other team members look toward them for guidance and direction on the overall product vision. If this vision is incomplete, then the project will most certainly suffer. Strategy Releases Ideation Features Go-to-Market Tasks and Responsibilities: www.cubix.co Product Manager
  • 15. www.cubix.co Product Manager The product manager is responsible for setting a product vision and strategy. Their job is to clearly articulate the business value to the product team so they understand the intent behind the new product or product release. They own the strategy behind the product along with its roadmap and must work with engineering to build what matters. Strategy
  • 16. www.cubix.co Product Manager PMs must plan for what their teams will deliver and when they will deliver it. This holds true no matter which dev methodologies product teams use. The product manager owns the release aspect of product. Responsibilities include knowing when (and when not) to create a master release; managing features and dependencies in and across releases; and managing releases with phases and milestones. Releases
  • 17. www.cubix.co Product Manager Product managers own ideation -- the creative process of generating, developing, and curating new ideas. They collect, curate, and promote the most relevant ideas into features. They know which ideas should be promoted to features -- the ones that will achieve key objectives for the product line and business. They also ensure that key feedback and requests are seamlessly integrated into their product planning and development processes. Ideation
  • 18. www.cubix.co Product Manager The product manager defines the features and requirements necessary to deliver a complete product to market and lead the product team to success. They are responsible for articulating the ‘what’ and working with engineering to determine the ‘when’. Features
  • 19. www.cubix.co Product Manager The product manager is typically seen as the CEO of a product. For the product manager, this means they are responsible for making product decisions and often is the lead resource for the rest of the organization when deep product expertise is required. This includes supporting the organizations that help bring the product to market and work directly with customers -- namely marketing, sales and support. Go-To-Market
  • 20. Project Manager Product Manager Build a product Add new features to a product Create new versions or extensions of a product Manage a team of designers and developers, and track their work. Keep the project on time and in budget with giving transparency to the client. Who in often times is the Product Manager type-role in application development. Use a variety of project management tools to accomplish their task Gather and prioritize product and customer requirements Define the product vision Work with sales and marketing to ensure revenue and customer satisfaction goals are met Vs. www.cubix.co
  • 21. Product and project management are similar concepts— but in order to create a successful product, you need to understand how these concepts differ. Project management focuses internally to achieve specific objectives and complete the project on time and under budget. Once the project is done, that project is no longer ‘managed’. Product Management takes a broader view, and focuses externally on the customer and the overall and continued success of the project. Although it’s possible to have one person fill both the product and project manager roles, it’s ideal to separate these roles to avoid conflicts of interest and underperformance. www.cubix.co Why Both Are Needed?
  • 22. At Cubix, we not only associate a product manager along with a project manager for every project, but our clientele work with product managers from the very beginning. Thus, allowing every project to be conceptualized with a strategist before the project kicks off, and then undergoing numerous discovery workshops before jumping into development, to ensure the product has everything it needs for an initial roll out. For more information read our post Project Manager Vs. Product Manager www.cubix.co What We Practice at Cubix?