Prepared by Schneider Engineering, Ltd. |
ADVANCED METERING INFRASTRUCTURE
PLANNING DISCUSSION
Presentation
Goal
Continue the conversation regarding advanced metering
for the City’s electric and water utilities.
Our presentation will address the following areas:
o Review of AMI implementation in Texas / ERCOT
o Discussions of the need / benefits of possible pilot
project(s)
o AMI features, benefits and costs – what
functionality will consumers and CS Utilities realize?
o Discussion and recommendations on how to
proceed
2
Quick Review of AMI
3
What is Advanced
Metering
Infrastructure?
Electronic meters with high-speed /
two-way communications
Various technologies / systems in the
“advanced metering” industry
Distinctions are related to the type of
communication network utilized
4
Review of AMI adoption and
implementation by utilities in Texas
5
Current AMI
Status - Texas
Investor-Owned
Utilities (IOU)
Drivers
•2005: HB-2129 – “…PUCT shall establish a
non-bypassable surcharge for IOUs to use
to recover reasonable and necessary costs
incurred in deploying advanced metering
and meter information networks…”
•2007: HB-3693 – “…it is the intent of the
legislature that …advanced meter
information networks be deployed as
rapidly as possible to allow IOU customers
to better manage energy use and control
costs and to facilitate demand response
initiatives.”
Legislation
• 2009: PUCT approves non-bypassable
surcharge fees to pay for IOU advanced
meter deployment.
• IOU customers will pay those monthly
fees from 2009 through 2020
Regulation
6
7
1. IOUs have installed over 6 million AMI meters in Texas
2. CenterPoint Energy received a Smart Grid stimulus grant from DOE
which covered approximately 50% of their AMI project
implementation costs
3. SE is working to confirm end of surcharge timeframe
Current AMI
Status – Texas
Investor-Owned
Utilities (IOUs)
Numbers
Number of AMI
Meters1
Deployment
Complete
Residential
Surcharge
Surcharge
Timeframe
CenterPoint 2.3 M 2012 $3.05 2011 – 20142
Oncor 3.0 M 2012 $2.19 2011 – 2020
AEP TCC 809 K 2013 $2.26 2011 – TBD3
AEP TNC 193 K 2013 $2.35 2011 – TBD3
TNMP 200 K 2016 $3.40 2011 – TBD3
Current AMI
Status - Texas
Public Power
Situation
Municipal Owned Utilities (MOUs) and Electric
Cooperatives
Local Control (no mandates)
Cooperative segment were early adopters
AMR/PLC (due to rural profile and associated meter reading costs)
Drivers for AMI adoption / implementation
• Linked to attainment of strategic goals
• Failing 1st Generation AMR system
• Operational and Customer Service benefits
8
9
City / Utility Total Meters Number of AMI
meters deployed
Deployment
Schedule
San Antonio
(CPS Energy) 740,000 electric
Pilot program
40,000 in 2011
Started mid-2014
Full deployment
by 2018 (RF Mesh)
Austin (Austin
Energy)
435,000 electric Full deployment 2004-2011
Bryan (BTU) 52,000 electric Full deployment 2012 (P2P)
Denton (DME) 48,500 electric 44,000 to date
Complete late-
2014
New Braunfels
(NBU)
31,000 electric
29,500 water 0 Initial study only
Georgetown
(GUS)
23,000 electric
23,000 water
Full deployment
Completed
recently (RF Mesh)
Current AMI in
Texas
Public Power
Deployment
Is there any need to pilot AMI?
10
To Pilot
or
Not to Pilot?
Leading AMI manufactures all
have operational systems that can
be observed (nearby)
The various types of AMI
(difference communication
technologies) are proven / mature
technologies
Pilots require significant
communication, software / IT costs
– whether it is 1,000 or 100,000
meters
At this point – AMI Pilot projects
are expensive and risky – and not
necessary
11
AMI in College Station
12
Key Business
Case Factors /
Considerations
13
•Electric Meters: 10-15 years life
•Meters have…more electronics…more
plastic
•Water Meters: Several variables /
assumptions
•Battery life impacted by number of reads
per day / per month
•Some manufacturers have 20 year
accuracy guarantee and 10 year battery
life guarantee—(prorated in years 10-20)
Expected life of
new “AMI
Electric and
Water Meter”
•Elimination of manual meter reading
•No more trips to connect /disconnect
accounts (electric only)
•Increased efficiency related to customer
service and operations
•Reduction in water losses (leak
detection)
Savings Drivers
•Need additional IT, communications and
meter /system techniciansOffsets to Savings
What will AMI
in CS likely
consist of?
What will it do?
Likely to select a Radio-
Frequency based AMI
system
•Point-to-Point or Mesh
•Backhaul with fiber, cellular or
microwave
Meter Data Management
System
•Manage all the interval data
•Robust interactive consumer portal
with graphs, charts, alerts
Eliminate manual meter
reading
•Current annual cost is $372K
•No need to go on consumer’s
premise
Remote connect / disconnect
feature on electric meters
•Current annual cost for manual
service $73K
Potential for utility to integrate AMI information and
functionality
•Reduce outage times / improve outage notifications
•Support demand response / conservation voltage reduction
•Improve system operations and planning
•Provide data for Load/System Studies and Transformer Loading Studies
•Enable new rate design(s)
14
Initial Project Costs - Estimate
15
AMI Component / Item Quantity Unit Cost Total Cost Comments
Communication System
(materials and installation)
(Shared)
1 system $350K - $750K
Depends on type of RF system
selected
Software / IT / MDM (Shared) Initial Setup $750K- $900K Upfront costs
Electric Meters 40,000 $100 - $140 $4M - $5.6M
Depends on type of RF system
selected
Electric Meter Installation 40,000 $15 $600K
Water Meters 8,250 $60 $495K
25% of system has AMI compatible
meters installed – just need a new
registers
24,750 $140 $3.465M
Water Meter Installation
8,250 $30 $247.5K
24,750 $60 $1.485M
Total $11,392,500 – $13,542,500
Project Costs -
Initial and
Ongoing
Initial Costs
• $11.4 M - $13.6 M
Ongoing Costs
• Additional FTEs
• $100K - $200K in annual licensing / maintenance fees
Does this estimate square with IOU monthly
charges ($2-3 per month on electric meters) ?
• Yes. Counting both electric and water accounts – a $2.50 per
meter per month charge equals $2.19M / year for CS
• Recovery at this rate over 6 years equals $13.14M
16
Will Expected
Savings Offset
Costs?
17
•Savings related to the elimination of manual
meter reading and trip costs for electric
connects / disconnects equals approximately
$.50/meter/month
•These savings partially offset by additional
O&M costs for AMI system (meter and
communications technicians)
•Hard to quantify / monetize:
•Customer service benefits
•Operational benefits (loss reduction,
conservation voltage reduction and demand
response)
•Reliability benefits (reduction in outage
times)
•Water leakage reduction benefits
•A detailed Business Case / Planning Study can
get at some of this granular savings detail
Hard to
see how.
Maybe
over the
life of the
system..?
Where to go from here?
18
Current
Situation
No current statutory or regulatory mandate for
College Station to have AMI metering system
Current process / manual meter reading system is
functional
Other significant capital projects in the queue
(ERP upgrade is scheduled thru 2015)
Currently have a placeholder for an AMI system in
the FY19 budget
19
Recommended
Actions
For a project of this size, complexity and magnitude
A formal study is needed
• Link to core strategies for reliability, affordability,
safety and customer service
• Determine (nail down) options, costs and benefits
• Specify system type and functionality
• Determine overall schedule
• Plan for RFPs / AMI system selection and MDM system
• Develop installation Plan (and RFP)
• Plan for integration with IT, OMS, SCADA (other “Smart
Utility” systems)
• Start Study in FY17
20
Summary
The City of College Station Utilities is in a good
position related to eventual implementation of AMI
for both the electric and water utilities
1. There is no mandate -- (it’s on your terms)
2. Time to evaluate, plan and “get it right”
3. Study, plan and engineer system in advance
4. Learn from the experience of other utilities
5. Monitor status of other CIP projects to ensure
resources and funds available to take on AMI when
time comes
21
Questions / Discussion
22

More Related Content

What's hot

How to successfully implement sap ami
How to successfully implement sap amiHow to successfully implement sap ami
How to successfully implement sap ami
robgirvan
 
Abb power and automation solid foundations for smart cities
Abb power and automation   solid foundations for smart citiesAbb power and automation   solid foundations for smart cities
Abb power and automation solid foundations for smart cities
Siegfried Quemado
 
eMeter EnergyIP Data Sheet
eMeter EnergyIP Data SheeteMeter EnergyIP Data Sheet
eMeter EnergyIP Data Sheet
Michaline Todd
 
Smart metering in Europe
Smart metering in EuropeSmart metering in Europe
Smart metering in Europe
Leonardo ENERGY
 

What's hot (19)

How to successfully implement sap ami
How to successfully implement sap amiHow to successfully implement sap ami
How to successfully implement sap ami
 
Advanced Metering Infrastructure
Advanced Metering InfrastructureAdvanced Metering Infrastructure
Advanced Metering Infrastructure
 
Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)
 
Engineering the Smart Grid
Engineering the Smart GridEngineering the Smart Grid
Engineering the Smart Grid
 
Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...
Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...
Vision and Strategy for India’s Electricity Metering Infrastructure of the fu...
 
Smart power technology @ tata power delhi distribution
Smart power technology @ tata power delhi distributionSmart power technology @ tata power delhi distribution
Smart power technology @ tata power delhi distribution
 
Abb power and automation solid foundations for smart cities
Abb power and automation   solid foundations for smart citiesAbb power and automation   solid foundations for smart cities
Abb power and automation solid foundations for smart cities
 
Meazon energy submetering_portfolio
Meazon energy submetering_portfolioMeazon energy submetering_portfolio
Meazon energy submetering_portfolio
 
Automated Utility Metering
Automated Utility MeteringAutomated Utility Metering
Automated Utility Metering
 
I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
Smart Grid Deployment Experience and Utility Case Studies
Smart Grid Deployment Experience and Utility Case StudiesSmart Grid Deployment Experience and Utility Case Studies
Smart Grid Deployment Experience and Utility Case Studies
 
Smart metering solution
Smart metering solutionSmart metering solution
Smart metering solution
 
eMeter EnergyIP Data Sheet
eMeter EnergyIP Data SheeteMeter EnergyIP Data Sheet
eMeter EnergyIP Data Sheet
 
Smart metering in Europe
Smart metering in EuropeSmart metering in Europe
Smart metering in Europe
 
EPC Solutions LLP- Presentation [ENERGY MANAGEMENT]
EPC Solutions LLP- Presentation [ENERGY MANAGEMENT]EPC Solutions LLP- Presentation [ENERGY MANAGEMENT]
EPC Solutions LLP- Presentation [ENERGY MANAGEMENT]
 
Solar Performance Monitoring
Solar Performance MonitoringSolar Performance Monitoring
Solar Performance Monitoring
 
The Energy Management Console
The Energy Management ConsoleThe Energy Management Console
The Energy Management Console
 
Managing Vendor Issues on AMI Design
Managing Vendor Issues on AMI DesignManaging Vendor Issues on AMI Design
Managing Vendor Issues on AMI Design
 

Viewers also liked (8)

Ami introduction demo_2
Ami introduction demo_2Ami introduction demo_2
Ami introduction demo_2
 
Smart grid govind bhagwatikar
Smart grid govind bhagwatikarSmart grid govind bhagwatikar
Smart grid govind bhagwatikar
 
Advanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocolAdvanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocol
 
SMART GRID
SMART GRIDSMART GRID
SMART GRID
 
energy theft detection
energy theft detectionenergy theft detection
energy theft detection
 
Electricity theft (1)
Electricity theft (1)Electricity theft (1)
Electricity theft (1)
 
Smart metering infrastructure Architecture and analytics
Smart metering infrastructure Architecture and analyticsSmart metering infrastructure Architecture and analytics
Smart metering infrastructure Architecture and analytics
 
Advance Metering Infrastructure:Smart Meter
Advance Metering Infrastructure:Smart MeterAdvance Metering Infrastructure:Smart Meter
Advance Metering Infrastructure:Smart Meter
 

Similar to College Station Automated Metering Infrastructure

Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Anil Kumar Bohra
 
it_in_power_distribution.ppt
it_in_power_distribution.pptit_in_power_distribution.ppt
it_in_power_distribution.ppt
YuvrajSaigal
 
Smart grid technologies after midsem slides
Smart grid technologies after midsem slidesSmart grid technologies after midsem slides
Smart grid technologies after midsem slides
IIIT Bhubaneswar
 

Similar to College Station Automated Metering Infrastructure (20)

Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
 
Panel 2: Utility Presentation
Panel 2: Utility PresentationPanel 2: Utility Presentation
Panel 2: Utility Presentation
 
Advanced Metering Infrastructure (AMI) projects of California-USA
Advanced Metering Infrastructure (AMI) projects of California-USAAdvanced Metering Infrastructure (AMI) projects of California-USA
Advanced Metering Infrastructure (AMI) projects of California-USA
 
EE Reports Submetering 102 Guide
EE Reports Submetering 102 GuideEE Reports Submetering 102 Guide
EE Reports Submetering 102 Guide
 
smart meter technical seminar report
smart meter technical seminar reportsmart meter technical seminar report
smart meter technical seminar report
 
Grid code
Grid codeGrid code
Grid code
 
Power Distribution Overview
Power Distribution OverviewPower Distribution Overview
Power Distribution Overview
 
Intelligent management of electrical systems in industries
Intelligent management of electrical systems in industriesIntelligent management of electrical systems in industries
Intelligent management of electrical systems in industries
 
distribution automation (1).pptx
distribution automation (1).pptxdistribution automation (1).pptx
distribution automation (1).pptx
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
The electricity distribution system and energy decarbonisation
The electricity distribution system and energy decarbonisationThe electricity distribution system and energy decarbonisation
The electricity distribution system and energy decarbonisation
 
How Fort Collins is taking steps to modernize their electric grid
How Fort Collins is taking steps to modernize their electric gridHow Fort Collins is taking steps to modernize their electric grid
How Fort Collins is taking steps to modernize their electric grid
 
Metering, Operations and Utilities: 2020 and Beyond (NC Meter School General ...
Metering, Operations and Utilities: 2020 and Beyond (NC Meter School General ...Metering, Operations and Utilities: 2020 and Beyond (NC Meter School General ...
Metering, Operations and Utilities: 2020 and Beyond (NC Meter School General ...
 
Distribution System Automation
 Distribution System Automation  Distribution System Automation
Distribution System Automation
 
Issues faced by developer for net metering
Issues faced by developer for net meteringIssues faced by developer for net metering
Issues faced by developer for net metering
 
Smart Grid Components Control Elements & Smart Grid Technology
Smart Grid Components Control Elements & Smart Grid TechnologySmart Grid Components Control Elements & Smart Grid Technology
Smart Grid Components Control Elements & Smart Grid Technology
 
Electric Power Industry In Transition
Electric Power Industry In TransitionElectric Power Industry In Transition
Electric Power Industry In Transition
 
A Vision for a Holistic and Smart Grid with High Benefits to Society
A Vision for a Holistic and Smart Grid with High Benefits to SocietyA Vision for a Holistic and Smart Grid with High Benefits to Society
A Vision for a Holistic and Smart Grid with High Benefits to Society
 
it_in_power_distribution.ppt
it_in_power_distribution.pptit_in_power_distribution.ppt
it_in_power_distribution.ppt
 
Smart grid technologies after midsem slides
Smart grid technologies after midsem slidesSmart grid technologies after midsem slides
Smart grid technologies after midsem slides
 

More from City of College Station

More from City of College Station (20)

Gus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant PresentationGus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant Presentation
 
2020 BVEDC Compliance Report
2020 BVEDC Compliance Report2020 BVEDC Compliance Report
2020 BVEDC Compliance Report
 
College Station Community Recreation Center Update
College Station Community Recreation Center UpdateCollege Station Community Recreation Center Update
College Station Community Recreation Center Update
 
Gus Roy Road Land Use
Gus Roy Road Land UseGus Roy Road Land Use
Gus Roy Road Land Use
 
Debt Parameters Ordinance
Debt Parameters OrdinanceDebt Parameters Ordinance
Debt Parameters Ordinance
 
Historical Marker No. 106
Historical Marker No. 106Historical Marker No. 106
Historical Marker No. 106
 
Historical Cemetery Project
Historical Cemetery ProjectHistorical Cemetery Project
Historical Cemetery Project
 
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use PathTxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
 
Creek Meadows PUE Abandonment
Creek Meadows PUE AbandonmentCreek Meadows PUE Abandonment
Creek Meadows PUE Abandonment
 
Semi Annual Report on Impact Fees
Semi Annual Report on Impact FeesSemi Annual Report on Impact Fees
Semi Annual Report on Impact Fees
 
Name Change for Part of Royder Road
Name Change for Part of Royder Road Name Change for Part of Royder Road
Name Change for Part of Royder Road
 
Options to Preserve Neighborhood Integrity
Options to Preserve Neighborhood IntegrityOptions to Preserve Neighborhood Integrity
Options to Preserve Neighborhood Integrity
 
Northgate Study and Operations Plan
Northgate Study and Operations PlanNorthgate Study and Operations Plan
Northgate Study and Operations Plan
 
Lick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown CrossingLick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown Crossing
 
Housing of Fowl Animal Ordinance
Housing of Fowl Animal OrdinanceHousing of Fowl Animal Ordinance
Housing of Fowl Animal Ordinance
 
FY 21 Debt Issuance
FY 21 Debt IssuanceFY 21 Debt Issuance
FY 21 Debt Issuance
 
FY 21 City Council Strategic Plan
FY 21 City Council Strategic PlanFY 21 City Council Strategic Plan
FY 21 City Council Strategic Plan
 
Pet Sales Ordinance
Pet Sales OrdinancePet Sales Ordinance
Pet Sales Ordinance
 
Unlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation AssistanceUnlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation Assistance
 
Rental Registration Fee Consideration
Rental Registration Fee ConsiderationRental Registration Fee Consideration
Rental Registration Fee Consideration
 

Recently uploaded

Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi EscortsRussian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Monica Sydney
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
MadhuKothuru
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 

Recently uploaded (20)

Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery ServicePrivate Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi EscortsRussian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
Russian Escorts in Abu Dhabi 0508644382 Abu Dhabi Escorts
 
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
Vivek @ Cheap Call Girls In Kamla Nagar | Book 8448380779 Extreme Call Girls ...
 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final Presentation
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 

College Station Automated Metering Infrastructure

  • 1. Prepared by Schneider Engineering, Ltd. | ADVANCED METERING INFRASTRUCTURE PLANNING DISCUSSION
  • 2. Presentation Goal Continue the conversation regarding advanced metering for the City’s electric and water utilities. Our presentation will address the following areas: o Review of AMI implementation in Texas / ERCOT o Discussions of the need / benefits of possible pilot project(s) o AMI features, benefits and costs – what functionality will consumers and CS Utilities realize? o Discussion and recommendations on how to proceed 2
  • 4. What is Advanced Metering Infrastructure? Electronic meters with high-speed / two-way communications Various technologies / systems in the “advanced metering” industry Distinctions are related to the type of communication network utilized 4
  • 5. Review of AMI adoption and implementation by utilities in Texas 5
  • 6. Current AMI Status - Texas Investor-Owned Utilities (IOU) Drivers •2005: HB-2129 – “…PUCT shall establish a non-bypassable surcharge for IOUs to use to recover reasonable and necessary costs incurred in deploying advanced metering and meter information networks…” •2007: HB-3693 – “…it is the intent of the legislature that …advanced meter information networks be deployed as rapidly as possible to allow IOU customers to better manage energy use and control costs and to facilitate demand response initiatives.” Legislation • 2009: PUCT approves non-bypassable surcharge fees to pay for IOU advanced meter deployment. • IOU customers will pay those monthly fees from 2009 through 2020 Regulation 6
  • 7. 7 1. IOUs have installed over 6 million AMI meters in Texas 2. CenterPoint Energy received a Smart Grid stimulus grant from DOE which covered approximately 50% of their AMI project implementation costs 3. SE is working to confirm end of surcharge timeframe Current AMI Status – Texas Investor-Owned Utilities (IOUs) Numbers Number of AMI Meters1 Deployment Complete Residential Surcharge Surcharge Timeframe CenterPoint 2.3 M 2012 $3.05 2011 – 20142 Oncor 3.0 M 2012 $2.19 2011 – 2020 AEP TCC 809 K 2013 $2.26 2011 – TBD3 AEP TNC 193 K 2013 $2.35 2011 – TBD3 TNMP 200 K 2016 $3.40 2011 – TBD3
  • 8. Current AMI Status - Texas Public Power Situation Municipal Owned Utilities (MOUs) and Electric Cooperatives Local Control (no mandates) Cooperative segment were early adopters AMR/PLC (due to rural profile and associated meter reading costs) Drivers for AMI adoption / implementation • Linked to attainment of strategic goals • Failing 1st Generation AMR system • Operational and Customer Service benefits 8
  • 9. 9 City / Utility Total Meters Number of AMI meters deployed Deployment Schedule San Antonio (CPS Energy) 740,000 electric Pilot program 40,000 in 2011 Started mid-2014 Full deployment by 2018 (RF Mesh) Austin (Austin Energy) 435,000 electric Full deployment 2004-2011 Bryan (BTU) 52,000 electric Full deployment 2012 (P2P) Denton (DME) 48,500 electric 44,000 to date Complete late- 2014 New Braunfels (NBU) 31,000 electric 29,500 water 0 Initial study only Georgetown (GUS) 23,000 electric 23,000 water Full deployment Completed recently (RF Mesh) Current AMI in Texas Public Power Deployment
  • 10. Is there any need to pilot AMI? 10
  • 11. To Pilot or Not to Pilot? Leading AMI manufactures all have operational systems that can be observed (nearby) The various types of AMI (difference communication technologies) are proven / mature technologies Pilots require significant communication, software / IT costs – whether it is 1,000 or 100,000 meters At this point – AMI Pilot projects are expensive and risky – and not necessary 11
  • 12. AMI in College Station 12
  • 13. Key Business Case Factors / Considerations 13 •Electric Meters: 10-15 years life •Meters have…more electronics…more plastic •Water Meters: Several variables / assumptions •Battery life impacted by number of reads per day / per month •Some manufacturers have 20 year accuracy guarantee and 10 year battery life guarantee—(prorated in years 10-20) Expected life of new “AMI Electric and Water Meter” •Elimination of manual meter reading •No more trips to connect /disconnect accounts (electric only) •Increased efficiency related to customer service and operations •Reduction in water losses (leak detection) Savings Drivers •Need additional IT, communications and meter /system techniciansOffsets to Savings
  • 14. What will AMI in CS likely consist of? What will it do? Likely to select a Radio- Frequency based AMI system •Point-to-Point or Mesh •Backhaul with fiber, cellular or microwave Meter Data Management System •Manage all the interval data •Robust interactive consumer portal with graphs, charts, alerts Eliminate manual meter reading •Current annual cost is $372K •No need to go on consumer’s premise Remote connect / disconnect feature on electric meters •Current annual cost for manual service $73K Potential for utility to integrate AMI information and functionality •Reduce outage times / improve outage notifications •Support demand response / conservation voltage reduction •Improve system operations and planning •Provide data for Load/System Studies and Transformer Loading Studies •Enable new rate design(s) 14
  • 15. Initial Project Costs - Estimate 15 AMI Component / Item Quantity Unit Cost Total Cost Comments Communication System (materials and installation) (Shared) 1 system $350K - $750K Depends on type of RF system selected Software / IT / MDM (Shared) Initial Setup $750K- $900K Upfront costs Electric Meters 40,000 $100 - $140 $4M - $5.6M Depends on type of RF system selected Electric Meter Installation 40,000 $15 $600K Water Meters 8,250 $60 $495K 25% of system has AMI compatible meters installed – just need a new registers 24,750 $140 $3.465M Water Meter Installation 8,250 $30 $247.5K 24,750 $60 $1.485M Total $11,392,500 – $13,542,500
  • 16. Project Costs - Initial and Ongoing Initial Costs • $11.4 M - $13.6 M Ongoing Costs • Additional FTEs • $100K - $200K in annual licensing / maintenance fees Does this estimate square with IOU monthly charges ($2-3 per month on electric meters) ? • Yes. Counting both electric and water accounts – a $2.50 per meter per month charge equals $2.19M / year for CS • Recovery at this rate over 6 years equals $13.14M 16
  • 17. Will Expected Savings Offset Costs? 17 •Savings related to the elimination of manual meter reading and trip costs for electric connects / disconnects equals approximately $.50/meter/month •These savings partially offset by additional O&M costs for AMI system (meter and communications technicians) •Hard to quantify / monetize: •Customer service benefits •Operational benefits (loss reduction, conservation voltage reduction and demand response) •Reliability benefits (reduction in outage times) •Water leakage reduction benefits •A detailed Business Case / Planning Study can get at some of this granular savings detail Hard to see how. Maybe over the life of the system..?
  • 18. Where to go from here? 18
  • 19. Current Situation No current statutory or regulatory mandate for College Station to have AMI metering system Current process / manual meter reading system is functional Other significant capital projects in the queue (ERP upgrade is scheduled thru 2015) Currently have a placeholder for an AMI system in the FY19 budget 19
  • 20. Recommended Actions For a project of this size, complexity and magnitude A formal study is needed • Link to core strategies for reliability, affordability, safety and customer service • Determine (nail down) options, costs and benefits • Specify system type and functionality • Determine overall schedule • Plan for RFPs / AMI system selection and MDM system • Develop installation Plan (and RFP) • Plan for integration with IT, OMS, SCADA (other “Smart Utility” systems) • Start Study in FY17 20
  • 21. Summary The City of College Station Utilities is in a good position related to eventual implementation of AMI for both the electric and water utilities 1. There is no mandate -- (it’s on your terms) 2. Time to evaluate, plan and “get it right” 3. Study, plan and engineer system in advance 4. Learn from the experience of other utilities 5. Monitor status of other CIP projects to ensure resources and funds available to take on AMI when time comes 21