SlideShare a Scribd company logo
1 of 3
Charles D. White
60 Cooper Run Drive Phone: 856-751-5680
Cherry Hill, New Jersey 08003 Email: cwhite1232@gmail.com
OBJECTIVE
Seeking an operational leadership opportunity that requires the transformation of broad operational
processes/systems and the skills and experience to deliver cost savings and continuous improvement
opportunities.
PROFILE
Global business operations executive with demonstrated leadership in manufacturing, supply chain operations
and information technology enablement. Recognized for leadership in managing multi-million dollar projects and
shepherding large organizations through significant change during material improvement, re-engineering and
information technology implementations. Plant manufacturing experience with superior results in cost reduction,
and process improvements by designing, building and motivating high performing teams.
Areas of expertise:
Marrying 11 years of plant manufacturing
experience with cost reduction and operational
process excellence expertise
Optimizing work process through redesign,
technology and outsourcing
Leading complex, global projects Implementing global ERP systems (3)
Integrating Change Management principles in
complex project efforts
Deploying robust plant floor information
systems
PROFESSIONAL EXPERIENCE
Independent Consulting
Consulting Analyst for Callisto Integration 2016
Participated in developing a Management Execution System (MES) and factory scheduling assessment for a
multi-facility coffee and tea company. Assessment focused on factory engineering requirements, but also
delivered a high-level change management and business fundamentals review to help the client gauge their
company’s readiness for success. Installation project approached a cost of one million dollars and is currently
pending final approval.
Campbell Soup Company, Camden, NJ
Senior Director Global Supply Chain Excellence 2010 - 2015
Led a team of systems/process professionals that support the evolution of process and tools to drive cost
reduction and continuous supply chain improvement. Leveraged integrated SAP supply chain applications and
non-SAP system solutions to enable the global supply chain. Developed project concepts and took business
teams through feasibility, discovery and project execution fundamentals to optimize project efforts and results.
Cornerstone Plant Floor Information Project – Project Lead 2013 - 2015
 Developed concepts and a business case for plantfloor quality data collection and analysis solutions to enable the
Pepperidge Farm and Campbell Soup manufacturing facilities
 Solutions supportthe minimization ofmanufacturing process and finished productvariation
 Built team and led blueprinting,design,build,testing and change managementphases ofthe project
 Developed proposal for Campbell Soup thermal plants
o $10+ million discoveryproposal for design,build and deploymentofintegrated MES solutions
 Led deploymentof manufacturing Pepperidge Farm facilityactivities:
o Project Investment$3.126 million;Hard Dollar Savings/IRR of15%
o 8 Plant deployment
o Project Team 20 core and 40 extended team members
Formula Information Translation Discovery - Project Lead 2010 - 2012
 Developed concepts and business case for optimizing process bringing formula information from R&D systems to the plant
floor minimizing data flow anomalies and resulting manufacturing mistakes
 Documented standards and roadmap to guide companyon its Formula Translation journey
 Built team and led blueprinting and integrated solution design development
 Led project build exercise:
o Proposed projectinvestment$25 million over 5 years
o Global deploymentplan
o Project Team 30 core and 50 extended team members
o Project was deferred due to funding constraints
SAP ERP Project Lead – Make to Ship (Supply Chain) 2005 – 2010
Led a team of SAP system and process professionals supporting the global SAP/ERP install across 25 Campbell
Soup facilities world-wide. Team was responsible for the deployment of quality, accounts payable, maintenance,
purchasing, planning, manufacturing, warehousing, logistics and master data management capabilities.
SAP Center of Excellence (COE) – Make To Ship 2009 - 2010
 Led team supporting global SAP supplychain install. Team also managed solution standards and evolution ofthe solution
capability.
 Oversaw team of 22 experienced SAP professionals and an extensive network of local power user teams
 Facilitated the coordination ofrequired business process changes and enabling technologies
SAP Solution Design and Deployment Lead – Make To Ship 2005 - 2009
 Led team deploying SAP/ERP supplychain solution
 Re-evaluated business processes and aligned with SAP functionality
 Oversaw core team of 30+ experienced professionals and an extensive network of local power user teams
 Modules install included Purchasing,Warehousing,Manufacturing,Planning,Maintenance,Accounts Payable, Quality and
Master Data
 Investment$50+million with an achieved 20% IRR.
Senior Director IT 1996 - 2004
 Led and managed information technology operations for the Campbell Food Service business
 Led Campbell Operations Systems; corporate supply chain systems (custom and shrink wrapped)
 Led Campbell corporate group that supported key global strategic systems focusing on purchasing and
planning processes
ERP Project Lead 1992 - 1995
 Led major ERP initiative deploying an integrated system for the Campbell North America supply chain. A $25
million dollar project; 30 person team and 20% return on investment.
 Led team in development of custom pilot ERP integrated system for Sacramento manufacturing facility.
Focused on Purchasing, Planning, A/P, Maintenance and Inventory applications
Senior Plant Manufacturing Roles 1980 - 1991
 Held senior operations positions in various manufacturing facilities across the country
 Incorporated Lean Manufacturing and Deming concepts to optimize operating efficiencies
 Managed with a holistic process/data driven mind-set
IT Systems Analyst Roles 1977 - 1979
 Developed systems and modeling techniques to support Campbell business processes
EDUCATION
Masters of Business Administration Bachelor of Science Business Administration
University of North Carolina University of Virginia
.

More Related Content

What's hot

Renfro Resume '15
Renfro Resume '15Renfro Resume '15
Renfro Resume '15Greg Renfro
 
Wayne Hamilton Resume 5.9.16
Wayne Hamilton Resume 5.9.16Wayne Hamilton Resume 5.9.16
Wayne Hamilton Resume 5.9.16Wayne Hamilton
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela H. Gallegos
 
Resume - Melissa Kaufman 7-26-16
Resume - Melissa Kaufman 7-26-16Resume - Melissa Kaufman 7-26-16
Resume - Melissa Kaufman 7-26-16Melissa Darrigan
 
J keith hubbard vice president of operations and supply chain
J  keith hubbard  vice president of operations and supply chainJ  keith hubbard  vice president of operations and supply chain
J keith hubbard vice president of operations and supply chainJ. Keith Hubbard
 
Megan_Bowman_Resume_2015
Megan_Bowman_Resume_2015Megan_Bowman_Resume_2015
Megan_Bowman_Resume_2015Megan Bowman
 
Stogsdill.tricia.resume.v3 [101093]
Stogsdill.tricia.resume.v3 [101093]Stogsdill.tricia.resume.v3 [101093]
Stogsdill.tricia.resume.v3 [101093]Tricia Stogsdill
 
Mahendra Shah, Green-Lean V-6 Sigma BI BPM Evangelsit. Empowering Enterpris...
 Mahendra  Shah, Green-Lean V-6 Sigma BI BPM Evangelsit. Empowering Enterpris... Mahendra  Shah, Green-Lean V-6 Sigma BI BPM Evangelsit. Empowering Enterpris...
Mahendra Shah, Green-Lean V-6 Sigma BI BPM Evangelsit. Empowering Enterpris...Mahendra Shah,
 
Roland Doiron Resume 2
Roland Doiron Resume 2Roland Doiron Resume 2
Roland Doiron Resume 2Roland Doiron
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens
 
William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016William Bryant, PMP
 
bufford, peter resume 160608
bufford, peter resume 160608bufford, peter resume 160608
bufford, peter resume 160608Peter Bufford
 
CV update Feb 2016
CV update Feb 2016CV update Feb 2016
CV update Feb 2016ewan forgie
 

What's hot (20)

Renfro Resume '15
Renfro Resume '15Renfro Resume '15
Renfro Resume '15
 
Wayne Hamilton Resume 5.9.16
Wayne Hamilton Resume 5.9.16Wayne Hamilton Resume 5.9.16
Wayne Hamilton Resume 5.9.16
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1
 
Resume - Melissa Kaufman 7-26-16
Resume - Melissa Kaufman 7-26-16Resume - Melissa Kaufman 7-26-16
Resume - Melissa Kaufman 7-26-16
 
J keith hubbard vice president of operations and supply chain
J  keith hubbard  vice president of operations and supply chainJ  keith hubbard  vice president of operations and supply chain
J keith hubbard vice president of operations and supply chain
 
Jake Stenner Resume
Jake Stenner ResumeJake Stenner Resume
Jake Stenner Resume
 
Megan_Bowman_Resume_2015
Megan_Bowman_Resume_2015Megan_Bowman_Resume_2015
Megan_Bowman_Resume_2015
 
Stogsdill.tricia.resume.v3 [101093]
Stogsdill.tricia.resume.v3 [101093]Stogsdill.tricia.resume.v3 [101093]
Stogsdill.tricia.resume.v3 [101093]
 
Resume 1
Resume 1Resume 1
Resume 1
 
Mahendra Shah, Green-Lean V-6 Sigma BI BPM Evangelsit. Empowering Enterpris...
 Mahendra  Shah, Green-Lean V-6 Sigma BI BPM Evangelsit. Empowering Enterpris... Mahendra  Shah, Green-Lean V-6 Sigma BI BPM Evangelsit. Empowering Enterpris...
Mahendra Shah, Green-Lean V-6 Sigma BI BPM Evangelsit. Empowering Enterpris...
 
TC-CV-2015
TC-CV-2015TC-CV-2015
TC-CV-2015
 
Roland Doiron Resume 2
Roland Doiron Resume 2Roland Doiron Resume 2
Roland Doiron Resume 2
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
 
Resume Giridhar
Resume GiridharResume Giridhar
Resume Giridhar
 
William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016
 
Resume2017
Resume2017Resume2017
Resume2017
 
KY Fung Resume_me
KY Fung Resume_meKY Fung Resume_me
KY Fung Resume_me
 
CL + CV AUG 2016
CL + CV AUG 2016CL + CV AUG 2016
CL + CV AUG 2016
 
bufford, peter resume 160608
bufford, peter resume 160608bufford, peter resume 160608
bufford, peter resume 160608
 
CV update Feb 2016
CV update Feb 2016CV update Feb 2016
CV update Feb 2016
 

Viewers also liked

Viewers also liked (13)

Pontuaçao ate 4 etapa.pdf
Pontuaçao ate 4 etapa.pdfPontuaçao ate 4 etapa.pdf
Pontuaçao ate 4 etapa.pdf
 
hany azer career
hany azer career hany azer career
hany azer career
 
CESA 7 Homeless Assessment
CESA 7 Homeless AssessmentCESA 7 Homeless Assessment
CESA 7 Homeless Assessment
 
kingdoom tower
kingdoom tower kingdoom tower
kingdoom tower
 
Resultados
ResultadosResultados
Resultados
 
CV
CVCV
CV
 
Lista de inscritos para divulgacao (1)
Lista de inscritos para divulgacao (1)Lista de inscritos para divulgacao (1)
Lista de inscritos para divulgacao (1)
 
Resultado geral
Resultado geralResultado geral
Resultado geral
 
Lista de inscritos para divulgacao
Lista de inscritos para divulgacaoLista de inscritos para divulgacao
Lista de inscritos para divulgacao
 
Lista de inscritos medianeira
Lista de inscritos medianeiraLista de inscritos medianeira
Lista de inscritos medianeira
 
Resultados sport
Resultados sportResultados sport
Resultados sport
 
Resume_rgibson_June_2015
Resume_rgibson_June_2015Resume_rgibson_June_2015
Resume_rgibson_June_2015
 
Geral
GeralGeral
Geral
 

Similar to zCharlieResume091416

Duane Kelling Resume
Duane Kelling ResumeDuane Kelling Resume
Duane Kelling ResumeDuane Kelling
 
NPI operations eng
NPI operations eng NPI operations eng
NPI operations eng Craig Oeser
 
Sanjay kumar
Sanjay kumarSanjay kumar
Sanjay kumarsk1900
 
Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]west5812
 
Martin Howley CV 20160906
Martin Howley CV 20160906Martin Howley CV 20160906
Martin Howley CV 20160906Martin Howley
 
Miller dwayne-resume08132013
Miller dwayne-resume08132013Miller dwayne-resume08132013
Miller dwayne-resume08132013Dwayne Miller
 
Supply Chain Business Systems Expert
Supply Chain Business Systems  ExpertSupply Chain Business Systems  Expert
Supply Chain Business Systems ExpertAmish Patel,MSME
 
Abdur Resume 2016
Abdur Resume 2016Abdur Resume 2016
Abdur Resume 2016Abdur Khan
 
William G Hull resume
William G Hull resumeWilliam G Hull resume
William G Hull resumeBill Hull
 
Roshan Stouwie June 2016 Resume
Roshan Stouwie June 2016 ResumeRoshan Stouwie June 2016 Resume
Roshan Stouwie June 2016 ResumeRoshan Stouwie
 
Karla Vohra Resume_v16
Karla Vohra Resume_v16Karla Vohra Resume_v16
Karla Vohra Resume_v16Kruti Vohra
 
Kathleen M Mathis Resume
Kathleen M  Mathis ResumeKathleen M  Mathis Resume
Kathleen M Mathis ResumeKathy Mathis
 
Austin C Mattson_II_resume_May 2013
Austin C  Mattson_II_resume_May 2013Austin C  Mattson_II_resume_May 2013
Austin C Mattson_II_resume_May 2013Austin C. Mattson II
 
Michael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael Jones
 
X resume and cl nur quadir-hi2
X resume and cl   nur quadir-hi2X resume and cl   nur quadir-hi2
X resume and cl nur quadir-hi2Nur Quadir
 

Similar to zCharlieResume091416 (20)

Duane Kelling Resume
Duane Kelling ResumeDuane Kelling Resume
Duane Kelling Resume
 
RESBF_122016
RESBF_122016RESBF_122016
RESBF_122016
 
NPI operations eng
NPI operations eng NPI operations eng
NPI operations eng
 
Sanjay kumar
Sanjay kumarSanjay kumar
Sanjay kumar
 
Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]Howard Kornblum Resume R12a[1]
Howard Kornblum Resume R12a[1]
 
Martin Howley CV 20160906
Martin Howley CV 20160906Martin Howley CV 20160906
Martin Howley CV 20160906
 
Miller dwayne-resume08132013
Miller dwayne-resume08132013Miller dwayne-resume08132013
Miller dwayne-resume08132013
 
Supply Chain Business Systems Expert
Supply Chain Business Systems  ExpertSupply Chain Business Systems  Expert
Supply Chain Business Systems Expert
 
RJRothen_Resume_0816
RJRothen_Resume_0816RJRothen_Resume_0816
RJRothen_Resume_0816
 
Abdur Resume 2016
Abdur Resume 2016Abdur Resume 2016
Abdur Resume 2016
 
schofield_alan-CV
schofield_alan-CVschofield_alan-CV
schofield_alan-CV
 
William G Hull resume
William G Hull resumeWilliam G Hull resume
William G Hull resume
 
Roshan Stouwie June 2016 Resume
Roshan Stouwie June 2016 ResumeRoshan Stouwie June 2016 Resume
Roshan Stouwie June 2016 Resume
 
WR CV PK-v1
WR CV PK-v1WR CV PK-v1
WR CV PK-v1
 
Gallacher T Resume 090716
Gallacher T Resume 090716Gallacher T Resume 090716
Gallacher T Resume 090716
 
Karla Vohra Resume_v16
Karla Vohra Resume_v16Karla Vohra Resume_v16
Karla Vohra Resume_v16
 
Kathleen M Mathis Resume
Kathleen M  Mathis ResumeKathleen M  Mathis Resume
Kathleen M Mathis Resume
 
Austin C Mattson_II_resume_May 2013
Austin C  Mattson_II_resume_May 2013Austin C  Mattson_II_resume_May 2013
Austin C Mattson_II_resume_May 2013
 
Michael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15New
 
X resume and cl nur quadir-hi2
X resume and cl   nur quadir-hi2X resume and cl   nur quadir-hi2
X resume and cl nur quadir-hi2
 

zCharlieResume091416

  • 1. Charles D. White 60 Cooper Run Drive Phone: 856-751-5680 Cherry Hill, New Jersey 08003 Email: cwhite1232@gmail.com OBJECTIVE Seeking an operational leadership opportunity that requires the transformation of broad operational processes/systems and the skills and experience to deliver cost savings and continuous improvement opportunities. PROFILE Global business operations executive with demonstrated leadership in manufacturing, supply chain operations and information technology enablement. Recognized for leadership in managing multi-million dollar projects and shepherding large organizations through significant change during material improvement, re-engineering and information technology implementations. Plant manufacturing experience with superior results in cost reduction, and process improvements by designing, building and motivating high performing teams. Areas of expertise: Marrying 11 years of plant manufacturing experience with cost reduction and operational process excellence expertise Optimizing work process through redesign, technology and outsourcing Leading complex, global projects Implementing global ERP systems (3) Integrating Change Management principles in complex project efforts Deploying robust plant floor information systems PROFESSIONAL EXPERIENCE Independent Consulting Consulting Analyst for Callisto Integration 2016 Participated in developing a Management Execution System (MES) and factory scheduling assessment for a multi-facility coffee and tea company. Assessment focused on factory engineering requirements, but also delivered a high-level change management and business fundamentals review to help the client gauge their company’s readiness for success. Installation project approached a cost of one million dollars and is currently pending final approval. Campbell Soup Company, Camden, NJ Senior Director Global Supply Chain Excellence 2010 - 2015 Led a team of systems/process professionals that support the evolution of process and tools to drive cost reduction and continuous supply chain improvement. Leveraged integrated SAP supply chain applications and non-SAP system solutions to enable the global supply chain. Developed project concepts and took business teams through feasibility, discovery and project execution fundamentals to optimize project efforts and results. Cornerstone Plant Floor Information Project – Project Lead 2013 - 2015  Developed concepts and a business case for plantfloor quality data collection and analysis solutions to enable the Pepperidge Farm and Campbell Soup manufacturing facilities  Solutions supportthe minimization ofmanufacturing process and finished productvariation  Built team and led blueprinting,design,build,testing and change managementphases ofthe project
  • 2.  Developed proposal for Campbell Soup thermal plants o $10+ million discoveryproposal for design,build and deploymentofintegrated MES solutions  Led deploymentof manufacturing Pepperidge Farm facilityactivities: o Project Investment$3.126 million;Hard Dollar Savings/IRR of15% o 8 Plant deployment o Project Team 20 core and 40 extended team members Formula Information Translation Discovery - Project Lead 2010 - 2012  Developed concepts and business case for optimizing process bringing formula information from R&D systems to the plant floor minimizing data flow anomalies and resulting manufacturing mistakes  Documented standards and roadmap to guide companyon its Formula Translation journey  Built team and led blueprinting and integrated solution design development  Led project build exercise: o Proposed projectinvestment$25 million over 5 years o Global deploymentplan o Project Team 30 core and 50 extended team members o Project was deferred due to funding constraints SAP ERP Project Lead – Make to Ship (Supply Chain) 2005 – 2010 Led a team of SAP system and process professionals supporting the global SAP/ERP install across 25 Campbell Soup facilities world-wide. Team was responsible for the deployment of quality, accounts payable, maintenance, purchasing, planning, manufacturing, warehousing, logistics and master data management capabilities. SAP Center of Excellence (COE) – Make To Ship 2009 - 2010  Led team supporting global SAP supplychain install. Team also managed solution standards and evolution ofthe solution capability.  Oversaw team of 22 experienced SAP professionals and an extensive network of local power user teams  Facilitated the coordination ofrequired business process changes and enabling technologies SAP Solution Design and Deployment Lead – Make To Ship 2005 - 2009  Led team deploying SAP/ERP supplychain solution  Re-evaluated business processes and aligned with SAP functionality  Oversaw core team of 30+ experienced professionals and an extensive network of local power user teams  Modules install included Purchasing,Warehousing,Manufacturing,Planning,Maintenance,Accounts Payable, Quality and Master Data  Investment$50+million with an achieved 20% IRR. Senior Director IT 1996 - 2004  Led and managed information technology operations for the Campbell Food Service business  Led Campbell Operations Systems; corporate supply chain systems (custom and shrink wrapped)  Led Campbell corporate group that supported key global strategic systems focusing on purchasing and planning processes ERP Project Lead 1992 - 1995  Led major ERP initiative deploying an integrated system for the Campbell North America supply chain. A $25 million dollar project; 30 person team and 20% return on investment.  Led team in development of custom pilot ERP integrated system for Sacramento manufacturing facility. Focused on Purchasing, Planning, A/P, Maintenance and Inventory applications
  • 3. Senior Plant Manufacturing Roles 1980 - 1991  Held senior operations positions in various manufacturing facilities across the country  Incorporated Lean Manufacturing and Deming concepts to optimize operating efficiencies  Managed with a holistic process/data driven mind-set IT Systems Analyst Roles 1977 - 1979  Developed systems and modeling techniques to support Campbell business processes EDUCATION Masters of Business Administration Bachelor of Science Business Administration University of North Carolina University of Virginia .