SlideShare a Scribd company logo
1 of 2
J. Gregory Renfro, P.E.
28593 Malabar Road
Trabuco Canyon, CA 92679
949.459.8981 residence· 714.310.0829 mobile
greg.renfro@outlook.com
PROFESSIONAL SUMMARY
Results oriented business professional with demonstrated success as an operationally driven leader with
the ability to plan, anticipate and build for the future. Executive leadership experience in optimizing
performance during high-growth and market driven declines within a multi-site environment. Direct
experience in leading International locations while living in U.S. and abroad. Proven leadership and
management abilities, strong interpersonal skills, and a drive to contribute to a winning team.
 Executive leadership  Turn around environments
 Excellent technical skills  Change Management
 International business
experience
 Expert Testimony and Forensic
Analysis
 Creative problem solver
 Board of Directors experience
(Norway, India, Abu Dhabi)
PROFESSIONAL EXPERIENCE
NATIONAL OILWELL VARCO (Successor to VARCO INTERNATIONAL, INC.) 1979 – 2015
NATIONAL OILWELL VARCO 2005 – 2015
Vice President- (Retired May 2015)
Global Manufacturing Strategy
Manufacturing and global supply chain executive for the Rig Solutions division of a $32 billion large-cap
corporation. Responsible for operational performance optimization throughout Rig Solutions’ 42
manufacturing locations in the U.S. and around the world. Key architect for new business development
strategies in Europe, Canada, Mexico, Brazil and China
 Recognized leader in manufacturing innovation and supply chain management for the corporation.
 Recent implementations have allowed targeted plants to increase production by >100% year over year
and more than doubling operating contribution without significant capital outlay
 Key resource for global M&A activities. Called on for evaluation and recommendation for acquisition
and green field development in China, Russia, India, Europe, Mexico and Brazil.
 Executive Steering committee member at the University of Wisconsin-Madison Center for Quick
Response Manufacturing.
VARCO DRILLING EQUIPMENT GROUP, Orange, CA 2002 – 2005
Senior Vice President
Manufacturing executive for three manufacturing locations supporting a $500 MM engineering,
manufacturing and service business. Responsibilities include manufacturing operations in Orange,
California, Mexicali, Mexico and Etten-Leur, The Netherlands. After merging with Tuboscope in 2000,
Varco International, Inc. became a $4.0 billion premier mid-cap oil field products and services company.
 Recognized leader of the manufacturing revolution. Implemented QRM (Quick Response
Manufacturing) in Orange and Etten-Leur facilities. Dramatically reduced indirect overhead while
significantly improving on time delivery, quality and lead times.
 Facilities are “best in class” among all the Varco locations.
 Reduced labor content of products by >20% on average while reducing overall lead times by >50%.
 Taking full advantage of the velocity model set forth in QRM.
 Set in place an aggressive forecasting model to allow 3 to 4 week deliveries on products normally
requiring 6 to 9 months.
 Created cost conscious, quality driven organizations. Focused on optimizing financial performance
while exceeding customer’s needs. Improved on time deliveries from low 20% to > 90%.
J. Gregory Renfro PAGE 2
Senior Vice President of Drilling Support Services 2001-2002
In 2001, the company reorganized, eliminating its divisional structure and moved into a functional
organizational arrangement where I was tasked with establishing worldwide spare parts, service, and rental
and repair organization.
 Refurbished operations in Aberdeen, Scotland, Singapore, Lafayette, Louisiana, and Houston Texas.
 Established new operations in Stavanger, Norway, Dubai, U.A.E., and Macae, Brazil
 Standardized operations, training and reporting in all locations.
 Established B2B with several key customers.
 Established an eDrill monitoring center in Houston that provided on-line, real time monitoring and
diagnostic capabilities of complex robotic equipment in remote locations throughout the world.
 Generated >$209 MM in annual revenue with > 40% contribution margin.
 Hired and trained my replacement and transferred responsibility to Houston.
President
Varco BJ, Etten-Leur, The Netherlands 1999 – 2001
Responsible for $96 MM worldwide business providing oilfield handling tools used in oil & gas exploration
and drilling activities.
 Set business strategies, goals and objectives for Sales and Engineering organizations as well as Dutch
and Mexican production facilities
 Achieved operating income of 25.6%
 Achieved corporate inventory turn goals of 8 times for all locations
 Managed down expenses during industry downturn in 1999. Still able to maintain >20% Operating
Income on revenue of ~$60MM
 Implemented QRM cells in approximately 40% of production areas.
 Picked up North Sea operations for other Varco divisions while stationed in the Netherlands.
Senior Vice President of Manufacturing
Varco Systems, Orange, CA 1995 – 1998
 Key member of senior management team supporting significant growth period in production while
improving profitability. Revenue grew from $102 MM @ 15.5% operating income in 1995 to $269 MM
@ 24% operating income in 1998
 Ramped up production from 272181 standard hours in 1995 to 575013 standard hours in 1998. This
was a key enabler to the revenue growth.
 Implemented effective 7X24 production schedule to accommodate market needs.
 Upgraded middle and senior manufacturing management team
Senior Vice President Engineering and Information Technology 1994 – 1995
Varco Systems, Orange, CA
 Completed an MRP II implementation and developed and implemented an electronic drawing and
documentation package with seamless integration to MRP II.
 Developed and linked a field performance reporting system.
 Implemented an engineering resource management and scheduling tool
 Introduced 3-D solid modeling engineering design package.
Vice President of Manufacturing Varco Systems, Orange, CA 1992 – 1994
Vice President of Operations, Varco BJ/Best Flow Products, Houston, TX 1989 – 1992
Engineering Manager BJ Machinery, Round Rock and Houston, TX 1979 – 1988
EDUCATION
BSME, The University of New Mexico, Albuquerque, New Mexico 1978
Registered Professional Engineer, State of Texas #53664
Holder of 3 US Patents in design of Machinery
PROFESSIONAL AFFILIATIONS
Center for Quick Response Manufacturing
National Society of Professional Engineers
API, IADC, SPE

More Related Content

What's hot

Baldwin Dias resume
Baldwin Dias resumeBaldwin Dias resume
Baldwin Dias resumeBaldwin Dias
 
Chris Marsh operations resume
Chris Marsh operations resumeChris Marsh operations resume
Chris Marsh operations resumeChris Marsh
 
Corneliu ioan gligor - cv - operations management
Corneliu ioan gligor - cv - operations managementCorneliu ioan gligor - cv - operations management
Corneliu ioan gligor - cv - operations managementCornell J. Gligor
 
zCharlieResume091416
zCharlieResume091416zCharlieResume091416
zCharlieResume091416Charlie White
 
JameyCranford_Manfac_Manager_Resume 2015
JameyCranford_Manfac_Manager_Resume 2015JameyCranford_Manfac_Manager_Resume 2015
JameyCranford_Manfac_Manager_Resume 2015Jamey Cranford
 
Reverse chronological cirriculum vitae/resume
Reverse chronological cirriculum vitae/resumeReverse chronological cirriculum vitae/resume
Reverse chronological cirriculum vitae/resumebohemians3
 
Christopher irving parks_4.8. 2020 new
Christopher irving parks_4.8. 2020 newChristopher irving parks_4.8. 2020 new
Christopher irving parks_4.8. 2020 newChris Parks
 
2015.08 John Kidd cv.2
2015.08 John Kidd cv.22015.08 John Kidd cv.2
2015.08 John Kidd cv.2John Kidd
 
Carissima Hudson Resume Jan 2017 updated
Carissima Hudson Resume Jan 2017 updatedCarissima Hudson Resume Jan 2017 updated
Carissima Hudson Resume Jan 2017 updatedCarissima Hudson
 
Dion Metcalfe Resume - Revised 19 Jan 2016
Dion Metcalfe Resume - Revised 19 Jan 2016Dion Metcalfe Resume - Revised 19 Jan 2016
Dion Metcalfe Resume - Revised 19 Jan 2016Dion H. Metcalfe
 
John cabral resume 4 27-2018
John cabral resume 4 27-2018John cabral resume 4 27-2018
John cabral resume 4 27-2018John Cabral
 
CV-Fernando Sofio QA.QC
CV-Fernando Sofio QA.QCCV-Fernando Sofio QA.QC
CV-Fernando Sofio QA.QCFernando Sofio
 
Steve Larson Resume 1720
Steve Larson Resume 1720Steve Larson Resume 1720
Steve Larson Resume 1720Steve Larson
 

What's hot (20)

Baldwin Dias resume
Baldwin Dias resumeBaldwin Dias resume
Baldwin Dias resume
 
Chris Marsh operations resume
Chris Marsh operations resumeChris Marsh operations resume
Chris Marsh operations resume
 
Corneliu ioan gligor - cv - operations management
Corneliu ioan gligor - cv - operations managementCorneliu ioan gligor - cv - operations management
Corneliu ioan gligor - cv - operations management
 
zCharlieResume091416
zCharlieResume091416zCharlieResume091416
zCharlieResume091416
 
Hvrsume Hv Word Format
Hvrsume Hv Word FormatHvrsume Hv Word Format
Hvrsume Hv Word Format
 
Resume 1
Resume 1Resume 1
Resume 1
 
JameyCranford_Manfac_Manager_Resume 2015
JameyCranford_Manfac_Manager_Resume 2015JameyCranford_Manfac_Manager_Resume 2015
JameyCranford_Manfac_Manager_Resume 2015
 
Reverse chronological cirriculum vitae/resume
Reverse chronological cirriculum vitae/resumeReverse chronological cirriculum vitae/resume
Reverse chronological cirriculum vitae/resume
 
Christopher irving parks_4.8. 2020 new
Christopher irving parks_4.8. 2020 newChristopher irving parks_4.8. 2020 new
Christopher irving parks_4.8. 2020 new
 
2015.08 John Kidd cv.2
2015.08 John Kidd cv.22015.08 John Kidd cv.2
2015.08 John Kidd cv.2
 
NewQACV08-12-15
NewQACV08-12-15NewQACV08-12-15
NewQACV08-12-15
 
Van Heerden, PRODMAN
Van Heerden, PRODMANVan Heerden, PRODMAN
Van Heerden, PRODMAN
 
Carissima Hudson Resume Jan 2017 updated
Carissima Hudson Resume Jan 2017 updatedCarissima Hudson Resume Jan 2017 updated
Carissima Hudson Resume Jan 2017 updated
 
the full CV
the full CVthe full CV
the full CV
 
GARY OWENBY
GARY OWENBYGARY OWENBY
GARY OWENBY
 
Dion Metcalfe Resume - Revised 19 Jan 2016
Dion Metcalfe Resume - Revised 19 Jan 2016Dion Metcalfe Resume - Revised 19 Jan 2016
Dion Metcalfe Resume - Revised 19 Jan 2016
 
John cabral resume 4 27-2018
John cabral resume 4 27-2018John cabral resume 4 27-2018
John cabral resume 4 27-2018
 
CV-Fernando Sofio QA.QC
CV-Fernando Sofio QA.QCCV-Fernando Sofio QA.QC
CV-Fernando Sofio QA.QC
 
MS CV New v2
MS CV New v2MS CV New v2
MS CV New v2
 
Steve Larson Resume 1720
Steve Larson Resume 1720Steve Larson Resume 1720
Steve Larson Resume 1720
 

Viewers also liked

Viewers also liked (13)

Evolución de la multimedia1
Evolución de la multimedia1Evolución de la multimedia1
Evolución de la multimedia1
 
Manga Kissxsis tomo 14
Manga Kissxsis tomo 14Manga Kissxsis tomo 14
Manga Kissxsis tomo 14
 
Skala za procenu nivoa usmerenosti na dete
Skala za procenu nivoa usmerenosti na deteSkala za procenu nivoa usmerenosti na dete
Skala za procenu nivoa usmerenosti na dete
 
maqueta de florencia
maqueta de florencia maqueta de florencia
maqueta de florencia
 
Gastronomia
GastronomiaGastronomia
Gastronomia
 
Comunicacion no verbal
Comunicacion no verbalComunicacion no verbal
Comunicacion no verbal
 
Network Marketing
Network MarketingNetwork Marketing
Network Marketing
 
Learning Nd development
Learning Nd developmentLearning Nd development
Learning Nd development
 
Scenarios for the Future: Reshaping the MOOC Landscape
Scenarios for the Future: Reshaping the MOOC LandscapeScenarios for the Future: Reshaping the MOOC Landscape
Scenarios for the Future: Reshaping the MOOC Landscape
 
CICAS Talk 2 Poster (Revised)(1)
CICAS Talk 2 Poster (Revised)(1)CICAS Talk 2 Poster (Revised)(1)
CICAS Talk 2 Poster (Revised)(1)
 
Thai horror cinema (lee sweetwan)
Thai horror cinema (lee sweetwan)Thai horror cinema (lee sweetwan)
Thai horror cinema (lee sweetwan)
 
Sindrome charcot
Sindrome charcotSindrome charcot
Sindrome charcot
 
Daftar nilai raport kelas ixa
Daftar nilai raport kelas ixaDaftar nilai raport kelas ixa
Daftar nilai raport kelas ixa
 

Similar to Renfro Resume '15

Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Edgardo Rivera-Sueiro
 
Michael Curtis Resume
Michael Curtis ResumeMichael Curtis Resume
Michael Curtis Resumecurtismw
 
Andrew Wilcox 2015 Resume
Andrew Wilcox 2015 ResumeAndrew Wilcox 2015 Resume
Andrew Wilcox 2015 ResumeAndrew Wilcox
 
PAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WDPAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WDPaul Otero
 
Austin C. Mattson II Resume Aug10
Austin C. Mattson II Resume Aug10Austin C. Mattson II Resume Aug10
Austin C. Mattson II Resume Aug10Austin Mattson II
 
VP Operations / General Manager
VP Operations / General ManagerVP Operations / General Manager
VP Operations / General Managerjiwri79
 
DougWilliams2016Resume-_with NOV_
DougWilliams2016Resume-_with NOV_DougWilliams2016Resume-_with NOV_
DougWilliams2016Resume-_with NOV_Doug Williams
 
David Hopkins resume
David Hopkins resumeDavid Hopkins resume
David Hopkins resumeDavid Hopkins
 
Fred Duchow Resume 2015
Fred Duchow Resume 2015Fred Duchow Resume 2015
Fred Duchow Resume 2015Fred Duchow
 
Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell
 
Cv michael awanayah2015 h-uk
Cv michael awanayah2015 h-ukCv michael awanayah2015 h-uk
Cv michael awanayah2015 h-ukMichael Awanayah
 
Paden_Robert_2015_2
Paden_Robert_2015_2Paden_Robert_2015_2
Paden_Robert_2015_2Robert Paden
 
Lohbauer resume 021717
Lohbauer resume 021717Lohbauer resume 021717
Lohbauer resume 021717Dave Lohbauer
 
Src Resume Full
Src Resume FullSrc Resume Full
Src Resume FullScott Cook
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Angel Rios
 
Raphael tasho tashev
Raphael tasho tashevRaphael tasho tashev
Raphael tasho tashevtashevraphael
 

Similar to Renfro Resume '15 (20)

Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1
 
Michael Curtis Resume
Michael Curtis ResumeMichael Curtis Resume
Michael Curtis Resume
 
Andrew Wilcox 2015 Resume
Andrew Wilcox 2015 ResumeAndrew Wilcox 2015 Resume
Andrew Wilcox 2015 Resume
 
PAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WDPAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WD
 
Austin C. Mattson II Resume Aug10
Austin C. Mattson II Resume Aug10Austin C. Mattson II Resume Aug10
Austin C. Mattson II Resume Aug10
 
VK Updated 24 May 2016
VK Updated 24 May 2016VK Updated 24 May 2016
VK Updated 24 May 2016
 
VP Operations / General Manager
VP Operations / General ManagerVP Operations / General Manager
VP Operations / General Manager
 
DougWilliams2016Resume-_with NOV_
DougWilliams2016Resume-_with NOV_DougWilliams2016Resume-_with NOV_
DougWilliams2016Resume-_with NOV_
 
David Hopkins resume
David Hopkins resumeDavid Hopkins resume
David Hopkins resume
 
Michael Oczowinski Resume
Michael Oczowinski ResumeMichael Oczowinski Resume
Michael Oczowinski Resume
 
Lino Carrillo
Lino CarrilloLino Carrillo
Lino Carrillo
 
Fred Duchow Resume 2015
Fred Duchow Resume 2015Fred Duchow Resume 2015
Fred Duchow Resume 2015
 
Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017
 
Cv michael awanayah2015 h-uk
Cv michael awanayah2015 h-ukCv michael awanayah2015 h-uk
Cv michael awanayah2015 h-uk
 
Paden_Robert_2015_2
Paden_Robert_2015_2Paden_Robert_2015_2
Paden_Robert_2015_2
 
Lohbauer resume 021717
Lohbauer resume 021717Lohbauer resume 021717
Lohbauer resume 021717
 
Src Resume Full
Src Resume FullSrc Resume Full
Src Resume Full
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1
 
Raphael tasho tashev
Raphael tasho tashevRaphael tasho tashev
Raphael tasho tashev
 
Marks Resume
Marks ResumeMarks Resume
Marks Resume
 

Renfro Resume '15

  • 1. J. Gregory Renfro, P.E. 28593 Malabar Road Trabuco Canyon, CA 92679 949.459.8981 residence· 714.310.0829 mobile greg.renfro@outlook.com PROFESSIONAL SUMMARY Results oriented business professional with demonstrated success as an operationally driven leader with the ability to plan, anticipate and build for the future. Executive leadership experience in optimizing performance during high-growth and market driven declines within a multi-site environment. Direct experience in leading International locations while living in U.S. and abroad. Proven leadership and management abilities, strong interpersonal skills, and a drive to contribute to a winning team.  Executive leadership  Turn around environments  Excellent technical skills  Change Management  International business experience  Expert Testimony and Forensic Analysis  Creative problem solver  Board of Directors experience (Norway, India, Abu Dhabi) PROFESSIONAL EXPERIENCE NATIONAL OILWELL VARCO (Successor to VARCO INTERNATIONAL, INC.) 1979 – 2015 NATIONAL OILWELL VARCO 2005 – 2015 Vice President- (Retired May 2015) Global Manufacturing Strategy Manufacturing and global supply chain executive for the Rig Solutions division of a $32 billion large-cap corporation. Responsible for operational performance optimization throughout Rig Solutions’ 42 manufacturing locations in the U.S. and around the world. Key architect for new business development strategies in Europe, Canada, Mexico, Brazil and China  Recognized leader in manufacturing innovation and supply chain management for the corporation.  Recent implementations have allowed targeted plants to increase production by >100% year over year and more than doubling operating contribution without significant capital outlay  Key resource for global M&A activities. Called on for evaluation and recommendation for acquisition and green field development in China, Russia, India, Europe, Mexico and Brazil.  Executive Steering committee member at the University of Wisconsin-Madison Center for Quick Response Manufacturing. VARCO DRILLING EQUIPMENT GROUP, Orange, CA 2002 – 2005 Senior Vice President Manufacturing executive for three manufacturing locations supporting a $500 MM engineering, manufacturing and service business. Responsibilities include manufacturing operations in Orange, California, Mexicali, Mexico and Etten-Leur, The Netherlands. After merging with Tuboscope in 2000, Varco International, Inc. became a $4.0 billion premier mid-cap oil field products and services company.  Recognized leader of the manufacturing revolution. Implemented QRM (Quick Response Manufacturing) in Orange and Etten-Leur facilities. Dramatically reduced indirect overhead while significantly improving on time delivery, quality and lead times.  Facilities are “best in class” among all the Varco locations.  Reduced labor content of products by >20% on average while reducing overall lead times by >50%.  Taking full advantage of the velocity model set forth in QRM.  Set in place an aggressive forecasting model to allow 3 to 4 week deliveries on products normally requiring 6 to 9 months.  Created cost conscious, quality driven organizations. Focused on optimizing financial performance while exceeding customer’s needs. Improved on time deliveries from low 20% to > 90%.
  • 2. J. Gregory Renfro PAGE 2 Senior Vice President of Drilling Support Services 2001-2002 In 2001, the company reorganized, eliminating its divisional structure and moved into a functional organizational arrangement where I was tasked with establishing worldwide spare parts, service, and rental and repair organization.  Refurbished operations in Aberdeen, Scotland, Singapore, Lafayette, Louisiana, and Houston Texas.  Established new operations in Stavanger, Norway, Dubai, U.A.E., and Macae, Brazil  Standardized operations, training and reporting in all locations.  Established B2B with several key customers.  Established an eDrill monitoring center in Houston that provided on-line, real time monitoring and diagnostic capabilities of complex robotic equipment in remote locations throughout the world.  Generated >$209 MM in annual revenue with > 40% contribution margin.  Hired and trained my replacement and transferred responsibility to Houston. President Varco BJ, Etten-Leur, The Netherlands 1999 – 2001 Responsible for $96 MM worldwide business providing oilfield handling tools used in oil & gas exploration and drilling activities.  Set business strategies, goals and objectives for Sales and Engineering organizations as well as Dutch and Mexican production facilities  Achieved operating income of 25.6%  Achieved corporate inventory turn goals of 8 times for all locations  Managed down expenses during industry downturn in 1999. Still able to maintain >20% Operating Income on revenue of ~$60MM  Implemented QRM cells in approximately 40% of production areas.  Picked up North Sea operations for other Varco divisions while stationed in the Netherlands. Senior Vice President of Manufacturing Varco Systems, Orange, CA 1995 – 1998  Key member of senior management team supporting significant growth period in production while improving profitability. Revenue grew from $102 MM @ 15.5% operating income in 1995 to $269 MM @ 24% operating income in 1998  Ramped up production from 272181 standard hours in 1995 to 575013 standard hours in 1998. This was a key enabler to the revenue growth.  Implemented effective 7X24 production schedule to accommodate market needs.  Upgraded middle and senior manufacturing management team Senior Vice President Engineering and Information Technology 1994 – 1995 Varco Systems, Orange, CA  Completed an MRP II implementation and developed and implemented an electronic drawing and documentation package with seamless integration to MRP II.  Developed and linked a field performance reporting system.  Implemented an engineering resource management and scheduling tool  Introduced 3-D solid modeling engineering design package. Vice President of Manufacturing Varco Systems, Orange, CA 1992 – 1994 Vice President of Operations, Varco BJ/Best Flow Products, Houston, TX 1989 – 1992 Engineering Manager BJ Machinery, Round Rock and Houston, TX 1979 – 1988 EDUCATION BSME, The University of New Mexico, Albuquerque, New Mexico 1978 Registered Professional Engineer, State of Texas #53664 Holder of 3 US Patents in design of Machinery PROFESSIONAL AFFILIATIONS Center for Quick Response Manufacturing National Society of Professional Engineers API, IADC, SPE