Site preparation for 100 kW site. BLM District Office, Salem, Oregon
Trees removed, road base installed, caisson drilling 184 caissons required
Site built in two sections to deal with change in grade Upper section caissons being formed
Upper section forms for caisson Sonotubes
Ready for rebar and concrete
Upper section forms with Sonotubes placed
Upper section concrete caisson pour
Lower section concrete pour
Caissons ready for racks.
Racks installed on caissons Zilla Racks manufactured by Next Generation Energy
PV modules being installed. Modules manufactured by SolarWorld -- Sunmodule 245 Mono
Upper modules ready for wiring and grounding 408 modules required for 100 kW system
“ The demonstration project for the Department of the Interior (BLM) involved the design/build delivery of more than 455 kW of solar photovoltaic arrays with a budget of approximately $2.3 million.”  Robert Phillips
Front view of completed modules
Upper modules ready for wiring and grounding 408 modules required for 100 kW system
Inverter slab and power conduits installed. 400 ft trench to main distribution tie-in point for net metering
Power trench backfill in progress (slight rain delay) 4” for power and 1” for data control wiring
Installed photovoltaic modules 100kW total site output
Ready for summer 100 kW inverter ready for DC input from modules
“ I have had the pleasure of working closely with Front Range Wireless (FRW) for the past year as the Senior Solutions Project Manager for Johnson Controls Inc. They have been one of the keys to our success on a major solar installation project for the Bureau of Land Management. Front Range has been responsible for the site surveys, providing the engineering design, and providing turnkey construction services of eight solar systems at six sites.  The demonstration project for the Department of the Interior (BLM) involved the design/build delivery of more than 455 kW of solar photovoltaic arrays with a budget of approximately $2.3 million. There are several contractors on this project and we refer to FRW as the "A Team". They are aggressive in their planning, project reporting, and problem solving. They have performed at the expected level and helped maintain the momentum on this project. Their construction crew is extremely professional and productive, traveling away from their families for up to four months at a time. They will be an asset to any project team. In summary, I have been extremely pleased with their performance to date. ”   Robert Phillips, Senior Solutions Project Manager, Johnson Controls Inc .

More Related Content

What's hot

Conergy Lakeland construction start - August 2016 FINAL
Conergy Lakeland construction start - August 2016 FINALConergy Lakeland construction start - August 2016 FINAL
Conergy Lakeland construction start - August 2016 FINALAlbe Alberto
 
Flinders Island Isolated Power System (IPS) Connect 2016 S KILMETE PUC
Flinders Island Isolated Power System (IPS) Connect 2016 S KILMETE PUCFlinders Island Isolated Power System (IPS) Connect 2016 S KILMETE PUC
Flinders Island Isolated Power System (IPS) Connect 2016 S KILMETE PUCjames hamilton
 
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)Sunrator Technologies LLP
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitRené Balle
 
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilYamen Nanne
 
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...ScottMadden, Inc.
 
Tom's Resume 9-1-16
Tom's Resume 9-1-16Tom's Resume 9-1-16
Tom's Resume 9-1-16Tom Coughlin
 
Powering sydneys future workshop
Powering sydneys future workshopPowering sydneys future workshop
Powering sydneys future workshopTransGrid AU
 
Distributed Gas Power Generation - Reliability, Value and Market Coordination
Distributed Gas Power Generation -  Reliability, Value and Market CoordinationDistributed Gas Power Generation -  Reliability, Value and Market Coordination
Distributed Gas Power Generation - Reliability, Value and Market CoordinationInvest Northern Ireland
 
Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP
Flinders Island Isolated Power System (IPS) Connect 2016  H MERKEL ACEPFlinders Island Isolated Power System (IPS) Connect 2016  H MERKEL ACEP
Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEPjames hamilton
 
Tehachapi Renewable Transmission Project
Tehachapi Renewable Transmission ProjectTehachapi Renewable Transmission Project
Tehachapi Renewable Transmission ProjectCordoba Corp
 
Julie Baldwin - October 6, 2011
Julie Baldwin - October 6, 2011Julie Baldwin - October 6, 2011
Julie Baldwin - October 6, 2011p21decision
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnercare Inc.
 

What's hot (20)

Conergy Lakeland construction start - August 2016 FINAL
Conergy Lakeland construction start - August 2016 FINALConergy Lakeland construction start - August 2016 FINAL
Conergy Lakeland construction start - August 2016 FINAL
 
Flinders Island Isolated Power System (IPS) Connect 2016 S KILMETE PUC
Flinders Island Isolated Power System (IPS) Connect 2016 S KILMETE PUCFlinders Island Isolated Power System (IPS) Connect 2016 S KILMETE PUC
Flinders Island Isolated Power System (IPS) Connect 2016 S KILMETE PUC
 
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
Energy Storage 101
Energy Storage 101Energy Storage 101
Energy Storage 101
 
KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System Retrofit
 
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed Soil
 
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
 
Tom's Resume 9-1-16
Tom's Resume 9-1-16Tom's Resume 9-1-16
Tom's Resume 9-1-16
 
2 sun shot perspective-pathways to reducing pv lcoe
2   sun shot perspective-pathways to reducing pv lcoe2   sun shot perspective-pathways to reducing pv lcoe
2 sun shot perspective-pathways to reducing pv lcoe
 
Diosynth Electrical Upgrade
Diosynth Electrical UpgradeDiosynth Electrical Upgrade
Diosynth Electrical Upgrade
 
Powering sydneys future workshop
Powering sydneys future workshopPowering sydneys future workshop
Powering sydneys future workshop
 
Distributed Gas Power Generation - Reliability, Value and Market Coordination
Distributed Gas Power Generation -  Reliability, Value and Market CoordinationDistributed Gas Power Generation -  Reliability, Value and Market Coordination
Distributed Gas Power Generation - Reliability, Value and Market Coordination
 
Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP
Flinders Island Isolated Power System (IPS) Connect 2016  H MERKEL ACEPFlinders Island Isolated Power System (IPS) Connect 2016  H MERKEL ACEP
Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP
 
Steve Burns | GW EMSE-EEM
Steve Burns | GW EMSE-EEMSteve Burns | GW EMSE-EEM
Steve Burns | GW EMSE-EEM
 
14 swet presentation
14 swet presentation14 swet presentation
14 swet presentation
 
NZC - Ben Taube
NZC - Ben TaubeNZC - Ben Taube
NZC - Ben Taube
 
Tehachapi Renewable Transmission Project
Tehachapi Renewable Transmission ProjectTehachapi Renewable Transmission Project
Tehachapi Renewable Transmission Project
 
Julie Baldwin - October 6, 2011
Julie Baldwin - October 6, 2011Julie Baldwin - October 6, 2011
Julie Baldwin - October 6, 2011
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial Buildings
 

Viewers also liked

Trina Solar: Environmentally Responsible Approach to Performance
Trina Solar: Environmentally Responsible Approach to Performance Trina Solar: Environmentally Responsible Approach to Performance
Trina Solar: Environmentally Responsible Approach to Performance Trina Solar Ltd
 
Adani power
Adani power Adani power
Adani power neelster
 
2.24 MW Solar Project Proposal
2.24 MW Solar Project Proposal2.24 MW Solar Project Proposal
2.24 MW Solar Project ProposalBrandon McNulty
 
Solar energy proposal by MGE
Solar energy proposal by MGESolar energy proposal by MGE
Solar energy proposal by MGEViet Ngo Thanh
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1Murugappa Group
 
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...JLanka Technologies (Pvt) Limited
 
Investment proposal for solar pv system training modules
Investment proposal for solar pv system training modulesInvestment proposal for solar pv system training modules
Investment proposal for solar pv system training modulesAli Ar-Ridha
 
SOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOPSOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOPMurugappa Group
 
General technical specification for construction
General technical specification for constructionGeneral technical specification for construction
General technical specification for constructionmool1005
 
Grid connected Solar Rooftop
Grid connected Solar Rooftop Grid connected Solar Rooftop
Grid connected Solar Rooftop medors
 
Solar Roof top Project proposal delhi
Solar Roof top Project proposal delhiSolar Roof top Project proposal delhi
Solar Roof top Project proposal delhiTarun Rathore
 

Viewers also liked (17)

SOLAR ENERGY PROPOSAL
SOLAR ENERGY PROPOSALSOLAR ENERGY PROPOSAL
SOLAR ENERGY PROPOSAL
 
Trina Solar: Environmentally Responsible Approach to Performance
Trina Solar: Environmentally Responsible Approach to Performance Trina Solar: Environmentally Responsible Approach to Performance
Trina Solar: Environmentally Responsible Approach to Performance
 
Jakson Power Solutions
Jakson Power SolutionsJakson Power Solutions
Jakson Power Solutions
 
Jakson_report_Final
Jakson_report_FinalJakson_report_Final
Jakson_report_Final
 
Trinamount
TrinamountTrinamount
Trinamount
 
Adani power
Adani power Adani power
Adani power
 
2.24 MW Solar Project Proposal
2.24 MW Solar Project Proposal2.24 MW Solar Project Proposal
2.24 MW Solar Project Proposal
 
Adani power
Adani powerAdani power
Adani power
 
Solar energy proposal by MGE
Solar energy proposal by MGESolar energy proposal by MGE
Solar energy proposal by MGE
 
Proposal solar
Proposal solarProposal solar
Proposal solar
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1
 
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
 
Investment proposal for solar pv system training modules
Investment proposal for solar pv system training modulesInvestment proposal for solar pv system training modules
Investment proposal for solar pv system training modules
 
SOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOPSOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOP
 
General technical specification for construction
General technical specification for constructionGeneral technical specification for construction
General technical specification for construction
 
Grid connected Solar Rooftop
Grid connected Solar Rooftop Grid connected Solar Rooftop
Grid connected Solar Rooftop
 
Solar Roof top Project proposal delhi
Solar Roof top Project proposal delhiSolar Roof top Project proposal delhi
Solar Roof top Project proposal delhi
 

Similar to BLM 100 kW site, Salem, Oregon

Staten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plantsStaten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plantsRakesh Singh
 
Staten solarprofile epc for spv power plant applicants
Staten solarprofile epc for spv power plant applicantsStaten solarprofile epc for spv power plant applicants
Staten solarprofile epc for spv power plant applicantsRakesh Singh
 
PVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALPVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALRobert Potter
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Graeme Donaldson
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalRobert Potter
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Dennis Kehoe
 
Navigating Interconnecion and Transmission in the Major US Markets
Navigating Interconnecion and Transmission in the Major US MarketsNavigating Interconnecion and Transmission in the Major US Markets
Navigating Interconnecion and Transmission in the Major US Marketsbrokish
 
Navigating I T
Navigating I  TNavigating I  T
Navigating I Trpeters
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
PV System Design Project
PV System Design ProjectPV System Design Project
PV System Design ProjectMichael Clarke
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic ProjectHarry Indig
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic ProjectHarry Indig
 
Industry Development & Job Creation FLAGSHIPS
Industry Development & Job Creation FLAGSHIPSIndustry Development & Job Creation FLAGSHIPS
Industry Development & Job Creation FLAGSHIPSBrett Thomas (MCIPS)
 
Why Space Solar Power Needs the Satellite Industry
Why Space Solar Power Needs the Satellite IndustryWhy Space Solar Power Needs the Satellite Industry
Why Space Solar Power Needs the Satellite Industryrobertbell
 
Building an AZ solar supply chain and industrial cluster
Building an AZ solar supply chain and industrial clusterBuilding an AZ solar supply chain and industrial cluster
Building an AZ solar supply chain and industrial clusterArizona Solar Summit
 
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdfSatish Nair
 

Similar to BLM 100 kW site, Salem, Oregon (20)

Staten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plantsStaten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plants
 
Staten solarprofile epc for spv power plant applicants
Staten solarprofile epc for spv power plant applicantsStaten solarprofile epc for spv power plant applicants
Staten solarprofile epc for spv power plant applicants
 
PVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALPVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINAL
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 Final
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015
 
Navigating Interconnecion and Transmission in the Major US Markets
Navigating Interconnecion and Transmission in the Major US MarketsNavigating Interconnecion and Transmission in the Major US Markets
Navigating Interconnecion and Transmission in the Major US Markets
 
Navigating I T
Navigating I  TNavigating I  T
Navigating I T
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Poster Board_v8
Poster Board_v8Poster Board_v8
Poster Board_v8
 
G1 Here Comes the Sun
G1 Here Comes the SunG1 Here Comes the Sun
G1 Here Comes the Sun
 
PV System Design Project
PV System Design ProjectPV System Design Project
PV System Design Project
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic Project
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic Project
 
Michael%20Weir-3
Michael%20Weir-3Michael%20Weir-3
Michael%20Weir-3
 
Industry Development & Job Creation FLAGSHIPS
Industry Development & Job Creation FLAGSHIPSIndustry Development & Job Creation FLAGSHIPS
Industry Development & Job Creation FLAGSHIPS
 
Why Space Solar Power Needs the Satellite Industry
Why Space Solar Power Needs the Satellite IndustryWhy Space Solar Power Needs the Satellite Industry
Why Space Solar Power Needs the Satellite Industry
 
Building an AZ solar supply chain and industrial cluster
Building an AZ solar supply chain and industrial clusterBuilding an AZ solar supply chain and industrial cluster
Building an AZ solar supply chain and industrial cluster
 
resume2016kaaa
resume2016kaaaresume2016kaaa
resume2016kaaa
 
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
 

BLM 100 kW site, Salem, Oregon

  • 1. Site preparation for 100 kW site. BLM District Office, Salem, Oregon
  • 2. Trees removed, road base installed, caisson drilling 184 caissons required
  • 3. Site built in two sections to deal with change in grade Upper section caissons being formed
  • 4. Upper section forms for caisson Sonotubes
  • 5. Ready for rebar and concrete
  • 6. Upper section forms with Sonotubes placed
  • 7. Upper section concrete caisson pour
  • 10. Racks installed on caissons Zilla Racks manufactured by Next Generation Energy
  • 11. PV modules being installed. Modules manufactured by SolarWorld -- Sunmodule 245 Mono
  • 12. Upper modules ready for wiring and grounding 408 modules required for 100 kW system
  • 13. “ The demonstration project for the Department of the Interior (BLM) involved the design/build delivery of more than 455 kW of solar photovoltaic arrays with a budget of approximately $2.3 million.” Robert Phillips
  • 14. Front view of completed modules
  • 15. Upper modules ready for wiring and grounding 408 modules required for 100 kW system
  • 16. Inverter slab and power conduits installed. 400 ft trench to main distribution tie-in point for net metering
  • 17. Power trench backfill in progress (slight rain delay) 4” for power and 1” for data control wiring
  • 18. Installed photovoltaic modules 100kW total site output
  • 19. Ready for summer 100 kW inverter ready for DC input from modules
  • 20. “ I have had the pleasure of working closely with Front Range Wireless (FRW) for the past year as the Senior Solutions Project Manager for Johnson Controls Inc. They have been one of the keys to our success on a major solar installation project for the Bureau of Land Management. Front Range has been responsible for the site surveys, providing the engineering design, and providing turnkey construction services of eight solar systems at six sites. The demonstration project for the Department of the Interior (BLM) involved the design/build delivery of more than 455 kW of solar photovoltaic arrays with a budget of approximately $2.3 million. There are several contractors on this project and we refer to FRW as the "A Team". They are aggressive in their planning, project reporting, and problem solving. They have performed at the expected level and helped maintain the momentum on this project. Their construction crew is extremely professional and productive, traveling away from their families for up to four months at a time. They will be an asset to any project team. In summary, I have been extremely pleased with their performance to date. ” Robert Phillips, Senior Solutions Project Manager, Johnson Controls Inc .