Renewable Energy Feasibility StudyRenewable Energy Feasibility Study
Wind TurbineWind Turbine
Jin...
ESEI
Project Motivation and ObjectsProject Motivation and Objects
Project Motivation
Chambersburg is a unique smart-grid b...
Pennsylvania Annul Wind MapPennsylvania Annul Wind Map
From the Pennsylvania wind map we can see the location of Chambersb...
Recommended Turbine ModelRecommended Turbine Model
Reasons for Choosing NPS 60-24 Model for Chambersburg
•Low wind speed d...
Site Construction PlanSite Construction Plan
Financial Analysis andFinancial Analysis and
Feasibility Study ConclusionFeasibility Study Conclusion
Overall Total Estima...
Financial Analysis andFinancial Analysis and
Feasibility Study ConclusionFeasibility Study Conclusion
Overall Total Estima...
You’ve finished this document.
Download and read it offline.
Upcoming SlideShare
Makalah_6 Makalah laporan praktikum perlintan
Next
Upcoming SlideShare
Makalah_6 Makalah laporan praktikum perlintan
Next
Download to read offline and view in fullscreen.

Share

Project Summary

Download to read offline

Related Books

Free with a 30 day trial from Scribd

See all

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

Project Summary

  1. 1. ChambersburgChambersburg Renewable Energy Feasibility StudyRenewable Energy Feasibility Study Wind TurbineWind Turbine Jinliang LiJinliang Li
  2. 2. ESEI Project Motivation and ObjectsProject Motivation and Objects Project Motivation Chambersburg is a unique smart-grid based self-sufficient electric utility in Pennsylvania. It is a real-world example of how a small utility can be successful. Chambersburg is famous for its low electric price rates and it is time to add another title to Chambersburg, “Green Energy Generation”. In August 3, 2015, President Obama and EPA has announced a new Clean Power Plan, which is requiring a dramatic reducing the Carbon pollution from power plants. So it is a great opportunity to introduce wind power into Chambersburg energy portfolio, which could not only resolve the carbon emission regulation issues but also can expand Chambersburg’s electric generation profile. Project Objects a. A Detail Feasibility Study of Wind Turbine installation includes proper turbine models and optimal pole heights b. A Construction Strategy c. An Output Study of The Designed Wind Turbine d. A Financial Estimation of Possible Cost and Payback Period
  3. 3. Pennsylvania Annul Wind MapPennsylvania Annul Wind Map From the Pennsylvania wind map we can see the location of Chambersburg is besides the town of York and the annual average wind speed at 80m in Chambersburg is around 7 m/s. 7 m/s is a relative low wind speed for construction of wind turbine farm. Comparing with other places in Pennsylvania such as Sandy Ridge, Allegheny Ridge, and Mill Run, which have a higher wind speed around 10 m/s, Chambersburg may require special designed low wind speed wind turbine for an efficient energy output.
  4. 4. Recommended Turbine ModelRecommended Turbine Model Reasons for Choosing NPS 60-24 Model for Chambersburg •Low wind speed design The Turbine is designed for specific low wind speed (10 m/s), which is suit to Chambersburg low wind speed region. •Easy to construction The Turbine’s hub is designed in 23 meters, which is relatively convenient to install and suit to the construction landscape. •Plug and Play The Turbine is design to simplify grid interconnect, because the construction ground is located besides a transmission station, it is essential to consider that the simplicity of plug and cut-off the wind turbine system. •Quiet The gearless design, advanced blades, and low rpm and tip speed, all contribute to low noise levels. Considering the residential in Chambersburg, Quietness is a unique benefit to Borough of Chambersburg, which may bring positive public image. •Easier Permitting The lower hub height helps Chambersburg to permit on site wind power generation proposal.
  5. 5. Site Construction PlanSite Construction Plan
  6. 6. Financial Analysis andFinancial Analysis and Feasibility Study ConclusionFeasibility Study Conclusion Overall Total Estimation Construction Cost Estimation Summary of Recommendations Financially, the project cannot be justified due to the long payback period of time which is about 40 years. It will greatly exceed the wind turbine designed life which is 20 years. The wind turbine may provide other benefits to Chambersburg such as improved public image through green generation and being a new technology adaptor.
  7. 7. Financial Analysis andFinancial Analysis and Feasibility Study ConclusionFeasibility Study Conclusion Overall Total Estimation Construction Cost Estimation Summary of Recommendations Financially, the project cannot be justified due to the long payback period of time which is about 40 years. It will greatly exceed the wind turbine designed life which is 20 years. The wind turbine may provide other benefits to Chambersburg such as improved public image through green generation and being a new technology adaptor.

Views

Total views

202

On Slideshare

0

From embeds

0

Number of embeds

5

Actions

Downloads

5

Shares

0

Comments

0

Likes

0

×