IPTC-18322-MS
SHE&S Improvement of a Major Subcontractor
on the Barzan Onshore Project
Khurshid Khan (Descon)
Johnny Brand (JGC Corporation)
Robert E. DeHart (RasGas Company Ltd.)
AGENDA
1. Introduction
2. Mitigation plan
3. Achievements
4. Closing Remarks
Slide 2
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
1. Personal safety leadership plan
2. Alignment workshop
3. KPI analysis
4. Organisational reinforcement
5. Sustainable corrective actions
6. Monthly planning and coordination
7. SHE&S officers task programme
8. Training and Education
9. Finish strong campaign
10. Welfare and recreational activities
INTRODUCTION (What is Barzan?)
Slide 3
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
• Develop a sour gas processing facility, located
within Ras Laffan Industrial City, Qatar
• Provide natural gas for domestic market
• Vital to help fuel the growth for Qatar’s development
• A joint venture between Qatar
Petroleum and ExxonMobil Barzan
Limited, with RasGas Company
Limited entrusted with project
management and execution, and
JGC as the Engineering,
Procurement and Construction
(EPC) contractor for the work.
INTRODUCTION (SHE&S Management System)
Slide 4
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
INTRODUCTION (Challenge)
Slide 5
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
Descon had a difficult
start to the project (TRIR
of 0.245) with a spike in
work related injuries but
committed early to
continuous/sustainable
improvement to project
completion (final TRIR
of 0.129) with good
results.
The key success factors of Descon’s performance improvement are
covered in this presentation
MITIGATION PLAN
Slide 6
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
• An HSE undertaking form was developed and
each one of Descon’s employees signed for
commitment. The form states that each
employee is responsible for his or her own
safety.
• All new employees took this oath in the host
country prior to mobilisation.
• The undertaking is recorded in the personnel
file of employees and referred to in case of non
compliance or in case of an incident.
• This was also linked to the employees annual
performance appraisal.
MITIGATION PLAN
Slide 7
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
1. Discipline Manager’s Personal Leadership Plan
• Line managers analysed their safety leadership responsibilities
• Descon management regularly reviewed the status of these plans
• Highly effective driver for sustained improved safety performance
2. Alignment Workshop
• In Dec-2012, team building was facilitated through a 3rd party consultant
• Issues were tabulated in an action plan
• A fun calendar was
made for the year’s
(2013) key targets
MITIGATION PLAN
Slide 8
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
3. KPI Analysis and Improvement
• Leading and lagging indicators analysed
• Improvement actions developed from these:
- Task Instruction leader training
- Craft training
- Focused inspections etc.
4. Organisational Reinforcement
• Mobilised a new site manager, SHE&S manager, Dep. SHE&S manager
• Regular visits from JGC Corporate SHE&S team to monitor and review
SHE&S improvement plan implementation
MITIGATION PLAN
Slide 9
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
5. Sustainable Corrective Actions
• Early-morning breakfast sessions carried out
• Focus on Last Minute Risk Assessment process
- Safety as a core value
- Quality a must
- Good production
6. Planning and Coordination
• Monthly IIF calendar developed
• Tool-box talks by line supervision
• Method Statement / JSA review meetings
MITIGATION PLAN
Slide 10
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
7. SHE&S Officer Task Programme
• Task programme including daily, weekly and monthly targets and
activities
• Focus areas included Task Instruction (TSTI) reviews, Permit to Work
(PTW) assessment, Method Statement / Job Safety Analysis (MS / JSA)
reviews, unsafe act / condition reporting, etc.
• Programme was dynamic and adjusted based on site conditions and
proved to be highly effective in driving improvement
8. Training and Education
• Craft training
• Incident and Injury Free (IIF) training
• SHE&S specific training
MITIGATION PLAN
Slide 11
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
9. Finish Strong
• Focus on sustainable improvement until project completion
• Ensured that competent persons remain on site
10. Welfare and
Recreation
• Celebrations were
arranged
• Sporting and
recreational events
were arranged
• Welfare facilities
provided
ACHIEVEMENTS
Slide 12
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
• QP HSE excellence award
2013 (silver)
• JGC corporate SHE&S award
2015 (highest category)
• JGC world wide poster
competition winner (3rd)
• Barzan project Subcontractor
of the month (11 times)
• JGC life critical rules campaign
grand champion
• JGC safety day booth winner
2014
CLOSING REMARKS
Slide 13
IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
• Descon’s safety performance improved so significantly on the project
that their safety performance became the best performance of a
subcontractor in the project
• Changes started with key organisation changes followed by sustained
actions to drive improvement
• Descon achieved world class results, demonstrating truly sustainable
SHE&S improvement
Indicator*
Descon
Barzan OGP Global OGP Middle East
2012 PTD
FAR 0.005 0.004
LTIR 0.025 0.006 0.007 0.096 0.050
TRIR 0.232 0.123 0.167 0.348 0.204
Acknowledgements
Thank You
Questions
Slide 14

More Related Content

Viewers also liked

What Makes You DO Stuff? The Psychology of Motivation @ Dev Up 2016
What Makes You DO Stuff? The Psychology of Motivation @ Dev Up 2016What Makes You DO Stuff? The Psychology of Motivation @ Dev Up 2016
What Makes You DO Stuff? The Psychology of Motivation @ Dev Up 2016Arthur Doler
 
адреса консультационных групп для объявления
адреса консультационных групп для объявленияадреса консультационных групп для объявления
адреса консультационных групп для объявленияsupportfranco
 
Top 8 cash supervisor resume samples
Top 8 cash supervisor resume samplesTop 8 cash supervisor resume samples
Top 8 cash supervisor resume samplesowenwhites99
 
Intruksi Fundamental
Intruksi FundamentalIntruksi Fundamental
Intruksi FundamentalAkmal Fajar
 
Haynes CV Jun 15 for Linked In
Haynes CV Jun 15 for Linked InHaynes CV Jun 15 for Linked In
Haynes CV Jun 15 for Linked InRichard Haynes
 
Top 8 scheduling supervisor resume samples
Top 8 scheduling supervisor resume samplesTop 8 scheduling supervisor resume samples
Top 8 scheduling supervisor resume samplesowenwhites99
 
New Government in Brazil: impacts on the energy arena
New Government in Brazil: impacts on the energy arenaNew Government in Brazil: impacts on the energy arena
New Government in Brazil: impacts on the energy arenaRafael Herzberg
 

Viewers also liked (11)

SATISH GOPAL KANADE
SATISH GOPAL KANADESATISH GOPAL KANADE
SATISH GOPAL KANADE
 
Pankaj C V
Pankaj C VPankaj C V
Pankaj C V
 
What Makes You DO Stuff? The Psychology of Motivation @ Dev Up 2016
What Makes You DO Stuff? The Psychology of Motivation @ Dev Up 2016What Makes You DO Stuff? The Psychology of Motivation @ Dev Up 2016
What Makes You DO Stuff? The Psychology of Motivation @ Dev Up 2016
 
адреса консультационных групп для объявления
адреса консультационных групп для объявленияадреса консультационных групп для объявления
адреса консультационных групп для объявления
 
Top 8 cash supervisor resume samples
Top 8 cash supervisor resume samplesTop 8 cash supervisor resume samples
Top 8 cash supervisor resume samples
 
Job Description
Job DescriptionJob Description
Job Description
 
Intruksi Fundamental
Intruksi FundamentalIntruksi Fundamental
Intruksi Fundamental
 
Haynes CV Jun 15 for Linked In
Haynes CV Jun 15 for Linked InHaynes CV Jun 15 for Linked In
Haynes CV Jun 15 for Linked In
 
Top 8 scheduling supervisor resume samples
Top 8 scheduling supervisor resume samplesTop 8 scheduling supervisor resume samples
Top 8 scheduling supervisor resume samples
 
New Government in Brazil: impacts on the energy arena
New Government in Brazil: impacts on the energy arenaNew Government in Brazil: impacts on the energy arena
New Government in Brazil: impacts on the energy arena
 
Fall-11
Fall-11Fall-11
Fall-11
 

Similar to IPTC_18322_MS_presentation_final - 7Dec15

IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...Bob DeHart
 
Maintenance operational-plan
Maintenance operational-planMaintenance operational-plan
Maintenance operational-planAdrianniko
 
Murad al qasem-resume 2016
Murad al qasem-resume 2016Murad al qasem-resume 2016
Murad al qasem-resume 2016Murad Al Qasem
 
My Professional Graphical CV
My Professional Graphical CVMy Professional Graphical CV
My Professional Graphical CVRahmat Hidayat
 
Mactan Cebu International Airport.rev3docx - Copy
Mactan Cebu International Airport.rev3docx - CopyMactan Cebu International Airport.rev3docx - Copy
Mactan Cebu International Airport.rev3docx - Copyshiladitya chanda
 
Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2Chetan Pandharinath Padme
 
Step_6_Determining_the_PPAs___CapDev_Agenda.pptx
Step_6_Determining_the_PPAs___CapDev_Agenda.pptxStep_6_Determining_the_PPAs___CapDev_Agenda.pptx
Step_6_Determining_the_PPAs___CapDev_Agenda.pptxJesselQuitorio4
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&tNishant Pandey
 
Sustainable development and project management
Sustainable development and project managementSustainable development and project management
Sustainable development and project managementOmar Latif
 
PPL Internship Report Abdullah Haider Ali
PPL Internship Report Abdullah Haider AliPPL Internship Report Abdullah Haider Ali
PPL Internship Report Abdullah Haider AliAbdullahHaiderAli
 
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112McDonald Stewart
 
Rdpl bank specific profile 22062016
Rdpl  bank specific profile 22062016Rdpl  bank specific profile 22062016
Rdpl bank specific profile 22062016subhash gupta
 

Similar to IPTC_18322_MS_presentation_final - 7Dec15 (20)

IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
 
Maintenance operational-plan
Maintenance operational-planMaintenance operational-plan
Maintenance operational-plan
 
Murad al qasem-resume 2016
Murad al qasem-resume 2016Murad al qasem-resume 2016
Murad al qasem-resume 2016
 
My Professional Graphical CV
My Professional Graphical CVMy Professional Graphical CV
My Professional Graphical CV
 
Mactan Cebu International Airport.rev3docx - Copy
Mactan Cebu International Airport.rev3docx - CopyMactan Cebu International Airport.rev3docx - Copy
Mactan Cebu International Airport.rev3docx - Copy
 
KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...
KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...
KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...
 
Biju_cv__nov_2015
Biju_cv__nov_2015Biju_cv__nov_2015
Biju_cv__nov_2015
 
Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2
 
L&T KUMATSU , BANGLORE
L&T KUMATSU , BANGLOREL&T KUMATSU , BANGLORE
L&T KUMATSU , BANGLORE
 
Resume_Md Shafiqul Islam_EHS_160330
Resume_Md Shafiqul Islam_EHS_160330Resume_Md Shafiqul Islam_EHS_160330
Resume_Md Shafiqul Islam_EHS_160330
 
CV Mahesh Mohan R BCP
CV Mahesh Mohan R BCPCV Mahesh Mohan R BCP
CV Mahesh Mohan R BCP
 
AKSHAY SHARMA, FRM
AKSHAY SHARMA, FRMAKSHAY SHARMA, FRM
AKSHAY SHARMA, FRM
 
Step_6_Determining_the_PPAs___CapDev_Agenda.pptx
Step_6_Determining_the_PPAs___CapDev_Agenda.pptxStep_6_Determining_the_PPAs___CapDev_Agenda.pptx
Step_6_Determining_the_PPAs___CapDev_Agenda.pptx
 
ESG Framework.pptx
ESG Framework.pptxESG Framework.pptx
ESG Framework.pptx
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
Sustainable development and project management
Sustainable development and project managementSustainable development and project management
Sustainable development and project management
 
3 project life cycle
3   project life cycle3   project life cycle
3 project life cycle
 
PPL Internship Report Abdullah Haider Ali
PPL Internship Report Abdullah Haider AliPPL Internship Report Abdullah Haider Ali
PPL Internship Report Abdullah Haider Ali
 
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
PSIS 4145-IS SP2013 Lecture 2 Project Initiation and Management 20130112
 
Rdpl bank specific profile 22062016
Rdpl  bank specific profile 22062016Rdpl  bank specific profile 22062016
Rdpl bank specific profile 22062016
 

IPTC_18322_MS_presentation_final - 7Dec15

  • 1. IPTC-18322-MS SHE&S Improvement of a Major Subcontractor on the Barzan Onshore Project Khurshid Khan (Descon) Johnny Brand (JGC Corporation) Robert E. DeHart (RasGas Company Ltd.)
  • 2. AGENDA 1. Introduction 2. Mitigation plan 3. Achievements 4. Closing Remarks Slide 2 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) 1. Personal safety leadership plan 2. Alignment workshop 3. KPI analysis 4. Organisational reinforcement 5. Sustainable corrective actions 6. Monthly planning and coordination 7. SHE&S officers task programme 8. Training and Education 9. Finish strong campaign 10. Welfare and recreational activities
  • 3. INTRODUCTION (What is Barzan?) Slide 3 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) • Develop a sour gas processing facility, located within Ras Laffan Industrial City, Qatar • Provide natural gas for domestic market • Vital to help fuel the growth for Qatar’s development • A joint venture between Qatar Petroleum and ExxonMobil Barzan Limited, with RasGas Company Limited entrusted with project management and execution, and JGC as the Engineering, Procurement and Construction (EPC) contractor for the work.
  • 4. INTRODUCTION (SHE&S Management System) Slide 4 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand)
  • 5. INTRODUCTION (Challenge) Slide 5 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) Descon had a difficult start to the project (TRIR of 0.245) with a spike in work related injuries but committed early to continuous/sustainable improvement to project completion (final TRIR of 0.129) with good results. The key success factors of Descon’s performance improvement are covered in this presentation
  • 6. MITIGATION PLAN Slide 6 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) • An HSE undertaking form was developed and each one of Descon’s employees signed for commitment. The form states that each employee is responsible for his or her own safety. • All new employees took this oath in the host country prior to mobilisation. • The undertaking is recorded in the personnel file of employees and referred to in case of non compliance or in case of an incident. • This was also linked to the employees annual performance appraisal.
  • 7. MITIGATION PLAN Slide 7 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) 1. Discipline Manager’s Personal Leadership Plan • Line managers analysed their safety leadership responsibilities • Descon management regularly reviewed the status of these plans • Highly effective driver for sustained improved safety performance 2. Alignment Workshop • In Dec-2012, team building was facilitated through a 3rd party consultant • Issues were tabulated in an action plan • A fun calendar was made for the year’s (2013) key targets
  • 8. MITIGATION PLAN Slide 8 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) 3. KPI Analysis and Improvement • Leading and lagging indicators analysed • Improvement actions developed from these: - Task Instruction leader training - Craft training - Focused inspections etc. 4. Organisational Reinforcement • Mobilised a new site manager, SHE&S manager, Dep. SHE&S manager • Regular visits from JGC Corporate SHE&S team to monitor and review SHE&S improvement plan implementation
  • 9. MITIGATION PLAN Slide 9 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) 5. Sustainable Corrective Actions • Early-morning breakfast sessions carried out • Focus on Last Minute Risk Assessment process - Safety as a core value - Quality a must - Good production 6. Planning and Coordination • Monthly IIF calendar developed • Tool-box talks by line supervision • Method Statement / JSA review meetings
  • 10. MITIGATION PLAN Slide 10 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) 7. SHE&S Officer Task Programme • Task programme including daily, weekly and monthly targets and activities • Focus areas included Task Instruction (TSTI) reviews, Permit to Work (PTW) assessment, Method Statement / Job Safety Analysis (MS / JSA) reviews, unsafe act / condition reporting, etc. • Programme was dynamic and adjusted based on site conditions and proved to be highly effective in driving improvement 8. Training and Education • Craft training • Incident and Injury Free (IIF) training • SHE&S specific training
  • 11. MITIGATION PLAN Slide 11 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) 9. Finish Strong • Focus on sustainable improvement until project completion • Ensured that competent persons remain on site 10. Welfare and Recreation • Celebrations were arranged • Sporting and recreational events were arranged • Welfare facilities provided
  • 12. ACHIEVEMENTS Slide 12 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) • QP HSE excellence award 2013 (silver) • JGC corporate SHE&S award 2015 (highest category) • JGC world wide poster competition winner (3rd) • Barzan project Subcontractor of the month (11 times) • JGC life critical rules campaign grand champion • JGC safety day booth winner 2014
  • 13. CLOSING REMARKS Slide 13 IPTC-18322-MS • SHE&S Improvement on a major Project • Khurshid Khan (R. DeHart / J. Brand) • Descon’s safety performance improved so significantly on the project that their safety performance became the best performance of a subcontractor in the project • Changes started with key organisation changes followed by sustained actions to drive improvement • Descon achieved world class results, demonstrating truly sustainable SHE&S improvement Indicator* Descon Barzan OGP Global OGP Middle East 2012 PTD FAR 0.005 0.004 LTIR 0.025 0.006 0.007 0.096 0.050 TRIR 0.232 0.123 0.167 0.348 0.204